This bill died with 2020-2021 Regular Session. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Identical bill: A5063 —

Bill Text

What changed in the latest version

167 added · 61 removed

Plain-language change summary

The amended version of Bill S3192 requires an electric public utility to install and operate smart meter infrastructure and technology at certain customers’ premises. This changes the previous text by removing the requirement for utilities to file a proposed or updated plan with the Board of Public Utilities regarding the procurement and installation of smart meter technology. The practical effect is that the utilities will be directly responsible for the installation without needing prior approval or modification from the Board within a set timeframe.

→
Previous
Latest
S3192 SEG Statement 1/14/21 SENATE ECONOMIC GROWTH COMMITTEE   STATEMENT TO   SENATE, No.
S3192 1R [First Reprint] SENATE, No.
  with committee amendments   STATE OF NEW JERSEY   DATED:
3192 STATE OF NEW JERSEY 219th LEGISLATURE   INTRODUCED NOVEMBER 16, 2020     Sponsored by:
 JANUARY 14, 2021         The Senate Economic Growth Committee reports favorably and with committee amendments Senate Bill No.
Senator  TROY SINGLETON District 7 (Burlington)         SYNOPSIS      Requires electric public utility to install and operate smart meter infrastructure and technology at certain customers’ premises;
3192.
provides employment protections for certain electric public utility employees.
      As amended and reported, this bill requires an electric public utility (utility) to file a proposed or, as applicable, an updated plan with the Board of Public Utilities (BPU) for the procurement and installation of “smart meter infrastructure” and “smart meter technology,” as defined in the bill, at customer premises.  The BPU is to approve or modify the smart meter plan within 180 days of plan submittal.  The plan is to describe the smart meter infrastructure and smart meter technology the utility proposes to furnish, and the requirement that the utility furnish the smart meter infrastructure and smart meter technology either:
  CURRENT VERSION OF TEXT      As reported by the Senate Economic Growth Committee on January 14, 2021, with amendments.
1) upon a request from a customer that agrees to pay the cost of the smart meter infrastructure and technology at the time of the request;
   An Act concerning certain electric public utility meter infrastructure and technology and employment protections and supplementing Title 48 of the Revised Statutes.
or 2) in new building construction.  The bill requires that the smart meter plan include a provision requiring a utility to make available, with customer consent, direct smart meter access and electronic access to customer smart meter data to third parties, including electric power suppliers and providers of an electric related service.
       Be It Enacted by the Senate and General Assembly of the State of New Jersey:
      The bill requires a utility to file one or more proposed time-of-use electric rates and real-time price plans for customers provided with smart meter infrastructure and smart meter technology after the implementation of a smart meter plan as a component of the utility’s next rate base proceeding.  The BPU is to approve or modify the time-of-use rates and real-time price plan within 180 days of plan submittal.  A utility is required to offer time-of-use rates and real-time price plans to all customers that have been provided with smart meter infrastructure and smart meter technology and each residential or commercial customer may elect to participate in such a price plan.
       1.    As used in P.L.    , c.    (C.        ) (pending before the Legislature as this bill):
      The bill allows a utility to recover reasonable and prudent costs of providing smart meter infrastructure and smart meter technology under a proposed smart meter plan approved by the BPU.  Eligible cost recovery is to include annual depreciation and capital costs over the life of the smart meter infrastructure and smart meter technology, in accordance with a depreciation schedule not to exceed 25 years, and the cost of any electric distribution system upgrades that the utility may require to enable the use of smart meters and smart meter technology which are incurred, less operating and capital cost savings realized by the utility from the installation and use of smart meter infrastructure and smart meter technology.  The bill prohibits a utility from recovering lost or decreased revenues from customers due to reduced electricity usage or shifting electricity demand, but a utility may recover costs through a petition or, as applicable, an updated petition filed and approved by the board.
     “Board” means the Board of Public Utilities or any successor agency.
      The bill requires a utility to offer any employee whose position has been eliminated due to the utility’s installation and operation of smart meter infrastructure and smart meter technology a one-time right of first refusal for any available position with the utility for which the employee may qualify.
     “Customer” means any person that is an end user and is connected to any part of the transmission and distribution system within an electric public utility's service territory within this State.
      The committee amended the bill to change timelines for plan submissions to the board, require plans to include independent analyses estimating the cost, increase the depreciation schedule timeframe for cost recovery, and to change the manner through which a utility may recover costs.
     “Electric power supplier” shall have the same meaning as provided in section 3 of P.L.1999, c.23 (C.48:3-51).
     “Electric public utility” or “utility” means a public utility, as that term is defined in R.S.48:2-13, that provides electric distribution service to customers in this State.
     “Electric related service” shall have the same meaning as provided in section 3 of P.L.1999, c.23 (C.48:3-51).
     “Smart meter” means an electric metering device that employs smart meter technology to measure and record electricity usage data to both an electric public utility and a customer for billing and other purposes.  “Smart meter” shall include a basic hourly interval meter, a meter with one-way communication, and a real-time meter with built-in two-way communication capable of recording and transmitting instantaneous electric usage data.
     “Smart meter infrastructure” means a system consisting of the following components including, but not limited to:
     a.     a smart meter at the customer’s premises;
     b.    a communications network between the smart meter and the electric public utility and electric power supplier serving the customer;
and      c.     a smart meter data management application at the premises of the electric public utility and electric power supplier.
     “Smart meter technology” means technology, including metering technology and network communications technology capable of bidirectional communication between a customer and an electric public utility and electric power supplier serving the customer, that records electricity usage on at least an hourly basis, including related electric distribution system upgrades to enable the technology.
 “Smart meter technology” shall include technology that provides utility customers with direct access to, and use of, electricity price and consumption information.  “Smart meter technology” shall also include technology that:
     a.     directly provides utility customers with information on their hourly electricity usage;
     b.    enables time-of-use electric rates and real-time price plans;
     c.     effectively supports the automatic control of the customer’s electricity consumption by one or more of the following, as selected by the customer:
     (1)   the customer;
     (2) the customer’s utility;
or      (3)   a third party engaged by the customer or the customer’s utility.
       2.    a.
 1[Within 90 days after the effective date of P.L.    , c.    (C.        ) (pending before the Legislature as this bill), an] An1 electric public utility shall 1[submit to] file with1 the Board of Public Utilities, in a form and manner determined by the board, a proposed plan 1or, as applicable, an updated plan as ordered by the board,1 for the procurement and installation of smart meter infrastructure and smart meter technology.
 1A utility shall include in its filing with the board an independent analysis that estimates the costs and benefits of the procurement and installation of smart meter infrastructure and smart meter technology.1  The board shall approve or modify a proposed smart meter plan within 180 days of plan submittal.  A proposed smart meter plan shall describe the smart meter infrastructure and smart meter technology the utility intends to furnish and shall require the utility to furnish smart meter infrastructure and smart meter technology, as follows:
     (1)   upon a request from a customer that agrees to pay the cost of the smart meter infrastructure and smart meter technology at the time of the request;
or      (2)   in new building construction.
     b.    A plan filed with the board, pursuant to subsection a.
of this section, shall include a provision that an electric public utility shall make available, with customer consent, direct smart meter access and electronic access to customer smart meter data to third parties, including electric power suppliers and providers of an electric-related service.
       3.    1[Within 24 months after the effective date of P.L.    , c.    (C.        ) (pending before the Legislature as this bill), an] After the implementation of its smart meter plan, an1 electric public utility shall submit to the board 1, as a component of the utility’s next rate base proceeding filed under R.S.48:2-21 or R.S.48:2-21.1,1 one or more proposed time-of-use electric rates and real-time price plans for customers provided with smart meter infrastructure and smart meter technology.  The board shall approve or modify the time-of-use rates and real-time price plan within 180 days of plan submittal.  A utility shall offer the time-of-use rates and real-time price plan to all customers that have been provided with smart meter infrastructure and smart meter technology pursuant to P.L.    , c.    (C.        ) (pending before the Legislature as this bill).  A residential or commercial customer may elect to participate in a time-of-use rates or real-time price plan.
       4.    a.
An electric public utility may recover reasonable and prudent costs of providing smart meter infrastructure and smart meter technology, pursuant to P.L.    , c.    (C.        ) (pending before the Legislature as this bill), under a 1proposed smart meter1 plan approved by the board.  Eligible cost recovery shall include annual depreciation and capital costs over the life of the smart meter infrastructure and smart meter technology, in accordance with a depreciation schedule not to exceed 1[15] 251 years, and the cost of any electric distribution system upgrades that the utility may require to enable the use of smart meter infrastructure and smart meter technology that are incurred after the effective date of P.L.    , c.    (C.        ) (pending before the Legislature as this bill), less operating and capital cost savings realized by the utility from the installation and use of smart meter infrastructure and smart meter technology.
     b.    An electric public utility may recover smart meter infrastructure and smart meter technology costs 1[as follows:
     (1)   through base rates, including a deferral for future base rate recovery of current basis with a carrying charge as determined by the board;
or      (2)   on a full and current basis through a reconcilable automatic adjustment clause as determined by the board] through a petition or, as appropriate, an updated petition, filed with and approved by the board, under any applicable rules and regulations promulgated by the board1.
     c.     In no event shall lost or decreased revenues by an electric public utility, due to reduced electricity consumption or shifting electricity demand, be considered any of the following:
Show all 44 changed rows (4 more)
Previous
Latest
     (1)   a cost of smart meter infrastructure and smart meter technology recoverable under any reconcilable automatic adjustment clause allowed by the board, except that decreased revenues and reduced electricity usage may be reflected in the revenue and sales data used to calculate rates in a utility rate base rate proceeding filed under R.S.48:2-21 or R.S.48:2-21.1;
or      (2)   a recoverable cost.
       5.    An electric public utility shall offer any employee whose position has been eliminated due to the utility’s installation and operation of smart meter infrastructure and smart meter technology pursuant to P.L.    , c.    (C.        ) (pending before the Legislature as this bill) a one-time right of first refusal for any available position with the utility for which the employee may qualify.
       6.    This act shall take effect immediately, but shall remain inoperative for 60 days following the date of enactment.
View plain text versions (3)

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 0 co-sponsors · 120 not signed on

Sponsors (0)

None.

Co-sponsors (0)

None.

Not signed on (120)

120 members have not signed on to this bill.

Show all 120 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing
Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What is the current status of S3192?
This bill died with 2020-2021 Regular Session. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S3192?
Track S3192 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S3192

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S3192

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →