Oregon 2026 Regular Session Status: In Committee Bipartisan · 14 D · 1 R cosponsors

SB 1582 — Relating to energy; prescribing an effective date.

Last action — In committee upon adjournment.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2026 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there are no live odds of enactment. It would have to be reintroduced in the current session to move again.

Summary

Requires each electric company to develop a distributed power plant program for the procurement of grid services to be provided by distributed energy resources. Specifies the grid services that may be eligible for compensation and the classes of distributed energy resources technologies that must be eligible to provide the grid services. Allows a customer to enroll directly or through a third party in an electric company's distributed power plant program. Requires an electric company to use a standard offer, open access tariff. Allows an electric company to recover in rates prudently incurred costs associated with the program. Directs the Public Utility Commission to develop and adopt annual procurement targets and performance incentives. Allows an electric company to earn performance incentives for meeting program targets. Requires each electric company to file an annual report with the commission on the status of the electric company's distributed power plant program, including the capacity enrolled in the program. Provides for initial requirements and an implementing timeline. Requires an initial distributed power plant program to provide compensation for system-wide peak load reduction that is provided by an energy storage device that is a battery. Takes effect on the 91st day following adjournment sine die.

Bill Text

Action History

  1. In committee upon adjournment.

  2. Public Hearing held.

  3. Referred to Energy and Environment.

  4. Introduction and first reading. Referred to President's desk.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

5 sponsors · 10 co-sponsors · 75 not signed on

Sponsors (5)

Co-sponsors (10)

Not signed on (75)

75 members have not signed on to this bill.

Show all 75 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 1582 do?
Requires each electric company to develop a distributed power plant program for the procurement of grid services to be provided by distributed energy resources. Specifies the grid services that may be eligible for compensation and the classes of distributed energy resources technologies that must be eligible to provide the grid services. Allows a customer to enroll directly or through a third party in an electric company's distributed power plant program. Requires an electric company to use a standard offer, open access tariff. Allows an electric company to recover in rates prudently incurred costs associated with the program. Directs the Public Utility Commission to develop and adopt annual procurement targets and performance incentives. Allows an electric company to earn performance incentives for meeting program targets. Requires each electric company to file an annual report with the commission on the status of the electric company's distributed power plant program, including the capacity enrolled in the program. Provides for initial requirements and an implementing timeline. Requires an initial distributed power plant program to provide compensation for system-wide peak load reduction that is provided by an energy storage device that is a battery. Takes effect on the 91st day following adjournment sine die.
Who sponsors SB 1582?
SB 1582 is sponsored by Jules Walters (Democrat), Nathan Sosa (Democrat), Ken Helm (Democrat), Farrah Chaichi (Democrat), Janeen Sollman (Democrat), Lisa Reynolds (Democrat), Khanh Pham (Democrat), Deb Patterson (Democrat), Jeff Golden (Democrat), Lew Frederick (Democrat), Sarah McDonald (Democrat), Tom Andersen (Democrat), Mark Gamba (Democrat), Courtney Neron Misslin (Democrat), and David Brock Smith (Republican).
What is the current status of SB 1582?
This bill died with 2026 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 1582?
Track SB 1582 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 1582

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 1582

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →