EPA-USED OIL FACILITIES
Do you support it?
Want to know if it passes?
We'll email you when SB 2285 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on SB 2285.
You're tracking SB 2285
We'll email you the moment it moves.
SB 2285 — EPA-USED OIL FACILITIES
Last action — Session Sine Die
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill died with 94th Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Amends the Environmental Protection Act. Provides that processing sites or facilities that receive only on-specification used oil originating from used oil collectors for processing to produce products for sale to off-site petroleum facilities are not pollution control facilities under the Environmental Protection Act if these sites or facilities are: (i) located within a home rule unit of local government with a population of at least 30,000 according to the 2000 census, that home rule unit of local government has been designated as an Urban Round II Empowerment Zone by the United States Department of Housing and Urban Development, and that home rule unit of local government has enacted an ordinance approving the location of the site or facility and provided funding for the site or facility; and (ii) in compliance with all applicable zoning requirements. Effective immediately.
Bill Text
What changed in the latest version
1384 added · 138 removedPlain-language change summary
The recent changes to Bill SB 2285 clarify the permit issuance process for certain environmental facilities and conditions that can be applied based on past compliance history. Specifically, it now allows the Agency to impose reasonable conditions on permits relating to an applicant's past violations, emphasizing their compliance record when evaluating future applications. This is significant because it strengthens environmental protections by ensuring that only those with a good track record are granted permits, helping to prevent further contamination. Overall, it aims to enhance accountability and reduce environmental risks.
*LRB09415461RSP50656b* SB2285 94THEngrossed GENERALLRB094 ASSEMBLY15461 StateRSP of50656 Illinoisb andAN 2006ACT SB2285concerning Introducedsafety. 1/12/2006, by Sen.
James F.
Clayborne, Jr.
SYNOPSIS AS INTRODUCED:
ILCS 5/3.330 was 415 ILCS 5/3.32 Amends the Environmental Protection Act.
Provides that processing sites or facilities that receive only on-specification used oil originating from used oil collectors for processing to produce products for sale to off-site petroleum facilities are not pollution control facilities under the Environmental Protection Act if these sites or facilities are:
(i) located within a home rule unit of local government with a population of at least 30,000 according to the 2000 census, that home rule unit of local government has been designated as an Urban Round II Empowerment Zone by the United States Department of Housing and Urban Development, and that home rule unit of local government has enacted an ordinance approving the location of the site or facility and provided funding for the site or facility;
and (ii) in compliance with all applicable zoning requirements.
Effective immediately.
LRB094 15461 RSP 50656 b A BILL FOR SB2285 LRB094 15461 RSP 50656 b AN ACT concerning safety.
The Environmental Protection Act is amended by changing SectionSections 3.33039 and 39.2 as follows:
(415 ILCS 5/3.330)5/39) (was(from 415Ch. ILCS 5/3.32) Sec.
3.330.111 1/2, par.
Pollution1039) control(Text facility.of Section before amendment by P.A.
(a)94-725) "PollutionSec. control facility" is any waste storage site, sanitary landfill, waste disposal site, waste transfer station, waste treatment facility, or waste incinerator.
This39. includes sewers, sewage treatment plants, and any other facilities owned or operated by sanitary districts organized under the Metropolitan Water Reclamation District Act.
TheIssuance followingof arepermits; not pollution control facilities:
(1)procedures. (Blank);
(2)(a) wasteWhen storagethe sitesBoard regulatedhas underby 40regulation CFR,required Parta 761.42;permit for the construction, installation, or operation of any type of facility, equipment, vehicle, vessel, or aircraft, the applicant shall apply to the Agency for such permit and it shall be the duty of the Agency to issue such a permit upon proof by the applicant that the facility, equipment, vehicle, vessel, or aircraft will not cause a violation of this Act or of regulations hereunder.
(3)The sitesAgency orshall facilitiesadopt used by any person conducting a waste storage, waste treatment, waste disposal, waste transfer or waste incineration operation, or a combination thereof, for wastes generated by such person’sprocedures ownas activities, when such wastes are stored,necessary treated,to disposedcarry of,out transferredits orduties incineratedunder withinthis theSection. site or facility owned, controlled or operated by such person, or when such wastes are transported within or between sites or facilities owned, controlled or operated by such person;
(4)In sitesmaking orits facilitiesdeterminations aton whichpermit applications under this Section the StateAgency ismay performingconsider removalprior oradjudications remedialof actionnoncompliance pursuantwith tothis SectionAct 22.2by orthe 55.3;applicant that involved a release of a contaminant into the environment.
(5)In abandonedgranting quarriespermits, used solely for the disposalAgency ofmay concrete,impose earthreasonable materials,conditions gravel,specifically orrelated aggregateto debristhe resultingapplicant’s frompast roadcompliance constructionhistory activitieswith conductedthis byAct aas SB2285necessary - 2 - LRB094 15461 RSP 50656 b unit of government or construction activities due to thecorrect, constructiondetect, and installation of underground pipes, lines, conduit or wiresprevent offnoncompliance. of the premises of a public utility company which are conducted by a public utility;
(6)The sitesAgency ormay facilitiesimpose usedsuch byother anyconditions personas may be necessary to specificallyaccomplish conductthe apurposes landscapeof compostingthis operation;Act, and as are not inconsistent with the regulations promulgated by the Board hereunder.
(7)Except regional facilities as definedotherwise provided in thethis CentralAct, Midwesta Interstatebond Low-Levelor Radioactiveother Wastesecurity Compact;shall not be required as a condition for the issuance of a permit.
(8)If the portionAgency ofdenies aany sitepermit orunder facilitythis whereSection, coalthe combustionAgency wastesshall aretransmit storedto orthe disposedapplicant within the time limitations of inthis accordanceSB2285 withEngrossed subdivision- (r)(2)2 or- (r)(3)LRB094 of15461 RSP 50656 b Section 21;specific, detailed statements as to the reasons the permit application was denied.
(9)Such thestatements portionshall ofinclude, abut sitenot orbe facilitylimited usedto for the collection,following: storage or processing of waste tires as defined in Title XIV;
(10)(i) the portionSections of athis siteAct orwhich facilitymay usedbe forviolated treatmentif of petroleum contaminated materials by application onto or incorporation into the soilpermit surfacewere andgranted; any portion of that site or facility used for storage of petroleum contaminated materials before treatment.
Only(ii) thosethe categoriesprovision of petroleumthe listedregulations, inpromulgated Sectionunder 57.9(a)(3)this areAct, exemptwhich undermay thisbe subdivisionviolated (10);if the permit were granted;
(11)(iii) the portionspecific type of ainformation, siteif orany, facilitywhich wherethe usedAgency oildeems is collected or stored prior to shipment to a recycling or energy recovery facility, provided that the usedapplicant oildid isnot generatedprovide by households or commercial establishments, and the siteAgency; or facility is a recycling center or a business where oil or gasoline is sold at retail;
(11.5)and processing(iv) sitesa orstatement facilitiesof thatspecific receivereasons onlywhy on-specificationthe usedAct oil,and asthe definedregulations inmight 35not Ill.be met if the permit were granted.
Admin.If there is no final action by the Agency within 90 days after the filing of the application for permit, the applicant may deem the permit issued;
Codeexcept 739,that originatingthis fromtime usedperiod oilshall collectorsbe extended to 180 days when (1) notice and opportunity for processingpublic hearing are required by State or federal law or regulation, (2) the application which was filed is for any permit to develop a landfill subject to issuance pursuant to this subsection, or (3) the application that was filed is managedfor a MSWLF unit required to issue public notice under 35subsection Ill.(p) of Section 39.
Admin.The 90-day and 180-day time periods for the Agency to take final action do not apply to NPDES permit applications under subsection (b) of this Section, to RCRA permit applications under subsection (d) of this Section, or to UIC permit applications under subsection (e) of this Section.
CodeThe 739Agency toshall producepublish productsnotice of all final permit determinations for saledevelopment topermits off-sitefor petroleumMSWLF facilities,units ifand thesefor processingsignificant sitespermit modifications for lateral expansions for existing MSWLF units one time in a newspaper of general circulation in the county in which the unit is or facilitiesis are:proposed to be located.
(i)After locatedJanuary within1, a1994 homeand ruleuntil unitJuly of1, local1998, governmentoperating withpermits aissued populationunder ofthis atSection leastby 30,000 according to the 2000Agency federalfor census,sources that home rule unit of local government has SB2285 Engrossed - 3 - LRB094 15461 RSP 50656 b beenair designatedpollution aspermitted anto Urbanemit Roundless IIthan Empowerment25 Zonetons byper theyear Unitedof Statesany Departmentcombination of Housingregulated andair Urbanpollutants, Development,as anddefined thatin homeSection rule39.5 unit of localthis governmentAct, hasshall enactedbe anrequired ordinanceto approvingbe therenewed locationonly ofupon written request by the siteAgency orconsistent facilitywith andapplicable providedprovisions fundingof forthis theAct siteand orregulations facility;promulgated hereunder.
andSuch (ii)operating inpermits complianceshall withexpire all180 applicabledays zoningafter requirements.the date of such a request.
(12)The theBoard portionshall ofrevise aits siteregulations or facility utilizing coal combustion waste for stabilizationthe andexisting treatmentState ofair onlypollution wasteoperating generatedpermit onprogram thatconsistent site or facility when used in connection with responsethis actionsprovision pursuant to the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980, the federal Resource Conservation and Recovery Act of 1976, or the Illinois Environmental Protection Act or as authorized by theJanuary Agency;1, 1994.
(13)After June 30, 1998, operating permits issued under this Section by the portionAgency for sources of aair sitepollution orthat facilityare acceptingnot exclusivelysubject generalto constructionSection or39.5 demolitionof debris,this locatedAct inand aare countynot withrequired to have a populationfederally overenforceable 700,000State asoperating ofpermit Januaryshall 1,be 2000,required andto operatedbe andrenewed locatedonly inupon accordancewritten request by the Agency consistent with Sectionapplicable 22.38provisions of this Act;Act and its rules.
(14)Such theoperating portionpermits ofshall aexpire site180 ordays facility, located within a unit of local government that has enacted local zoning requirements, used to accept, separate, and process uncontaminated broken concrete, with or without protruding metal bars, provided that the uncontaminated broken concrete and metal bars are not speculatively accumulated, are at the site or facility no longer than one year after their acceptance, and are returned to the economicdate mainstream in the form of rawsuch materialsa orrequest. products;
andBefore (15)July the1, portion1998, ofthe aBoard siteshall orrevise facilityits locatedrules infor athe countyexisting withState aair populationpollution overoperating 3,000,000permit thatprogram hasconsistent obtainedwith localthis sitingparagraph approvaland undershall Sectionadopt 39.2rules ofthat thisrequire Act for a municipalsource wasteto incineratordemonstrate on or before July 1, 2005 and that isit usedqualifies for a non-hazardouspermit wasteunder transferthis station.paragraph.
Show all 360 changed lines (320 more)
(b) AThe newAgency pollutionmay controlissue facilityNPDES is:permits exclusively under this subsection for the discharge of contaminants from point sources into navigable waters, all as defined in the Federal Water Pollution Control Act, as now or hereafter amended, within the jurisdiction of the State, or into any well.
(1)All aNPDES pollutionpermits controlshall facilitycontain initiallythose permittedterms SB2285and -conditions, 4including -but LRB094not 15461limited RSPto 50656schedules bof forcompliance, developmentwhich ormay constructionbe afterrequired Julyto 1,accomplish 1981;the purposes and provisions of this Act.
orThe (2)Agency themay areaissue ofgeneral expansionNPDES beyondpermits thefor boundarydischarges from categories of apoint currentlysources permittedwhich pollutionare controlsubject facility;to the same permit limitations and conditions.
orSuch (3)general apermits permittedmay pollutionbe controlissued facilitywithout requestingindividual approvalapplications toand store,shall disposeconform of,to transferregulations orpromulgated incinerate,under forSection 402 of the firstFederal time,Water anyPollution specialControl Act, as now or hazardoushereafter waste.amended.
SB2285 Engrossed - 4 - LRB094 15461 RSP 50656 b The Agency may include, among such conditions, effluent limitations and other requirements established under this Act, Board regulations, the Federal Water Pollution Control Act, as now or hereafter amended, and regulations pursuant thereto, and schedules for achieving compliance therewith at the earliest reasonable date.
The Agency shall adopt filing requirements and procedures which are necessary and appropriate for the issuance of NPDES permits, and which are consistent with the Act or regulations adopted by the Board, and with the Federal Water Pollution Control Act, as now or hereafter amended, and regulations pursuant thereto.
The Agency, subject to any conditions which may be prescribed by Board regulations, may issue NPDES permits to allow discharges beyond deadlines established by this Act or by regulations of the Board without the requirement of a variance, subject to the Federal Water Pollution Control Act, as now or hereafter amended, and regulations pursuant thereto.
(c) Except for those facilities owned or operated by sanitary districts organized under the Metropolitan Water Reclamation District Act, no permit for the development or construction of a new pollution control facility may be granted by the Agency unless the applicant submits proof to the Agency that the location of the facility has been approved by the County Board of the county if in an unincorporated area, or the governing body of the municipality when in an incorporated area, in which the facility is to be located in accordance with Section 39.2 of this Act.
For purposes of this subsection (c), and for purposes of Section 39.2 of this Act, the appropriate county board or governing body of the municipality shall be the county board of the county or the governing body of the municipality in which the facility is to be located as of the date when the application for siting approval is filed.
In the event that siting approval granted pursuant to Section 39.2 has been transferred to a subsequent owner or operator, that subsequent owner or operator may apply to the SB2285 Engrossed - 5 - LRB094 15461 RSP 50656 b Agency for, and the Agency may grant, a development or construction permit for the facility for which local siting approval was granted.
Upon application to the Agency for a development or construction permit by that subsequent owner or operator, the permit applicant shall cause written notice of the permit application to be served upon the appropriate county board or governing body of the municipality that granted siting approval for that facility and upon any party to the siting proceeding pursuant to which siting approval was granted.
In that event, the Agency shall conduct an evaluation of the subsequent owner or operator’s prior experience in waste management operations in the manner conducted under subsection (i) of Section 39 of this Act.
Beginning August 20, 1993, if the pollution control facility consists of a hazardous or solid waste disposal facility for which the proposed site is located in an unincorporated area of a county with a population of less than 100,000 and includes all or a portion of a parcel of land that was, on April 1, 1993, adjacent to a municipality having a population of less than 5,000, then the local siting review required under this subsection (c) in conjunction with any permit applied for after that date shall be performed by the governing body of that adjacent municipality rather than the county board of the county in which the proposed site is located;
and for the purposes of that local siting review, any references in this Act to the county board shall be deemed to mean the governing body of that adjacent municipality;
provided, however, that the provisions of this paragraph shall not apply to any proposed site which was, on April 1, 1993, owned in whole or in part by another municipality.
In the case of a pollution control facility for which a development permit was issued before November 12, 1981, if an operating permit has not been issued by the Agency prior to August 31, 1989 for any portion of the facility, then the Agency may not issue or renew any development permit nor issue an original operating permit for any portion of such facility SB2285 Engrossed - 6 - LRB094 15461 RSP 50656 b unless the applicant has submitted proof to the Agency that the location of the facility has been approved by the appropriate county board or municipal governing body pursuant to Section 39.2 of this Act.
After January 1, 1994, if a solid waste disposal facility, any portion for which an operating permit has been issued by the Agency, has not accepted waste disposal for 5 or more consecutive calendars years, before that facility may accept any new or additional waste for disposal, the owner and operator must obtain a new operating permit under this Act for that facility unless the owner and operator have applied to the Agency for a permit authorizing the temporary suspension of waste acceptance.
The Agency may not issue a new operation permit under this Act for the facility unless the applicant has submitted proof to the Agency that the location of the facility has been approved or re-approved by the appropriate county board or municipal governing body under Section 39.2 of this Act after the facility ceased accepting waste.
Except for those facilities owned or operated by sanitary districts organized under the Metropolitan Water Reclamation District Act, and except for new pollution control facilities governed by Section 39.2, and except for fossil fuel mining facilities, the granting of a permit under this Act shall not relieve the applicant from meeting and securing all necessary zoning approvals from the unit of government having zoning jurisdiction over the proposed facility.
Before beginning construction on any new sewage treatment plant or sludge drying site to be owned or operated by a sanitary district organized under the Metropolitan Water Reclamation District Act for which a new permit (rather than the renewal or amendment of an existing permit) is required, such sanitary district shall hold a public hearing within the municipality within which the proposed facility is to be located, or within the nearest community if the proposed facility is to be located within an unincorporated area, at which information concerning the proposed facility shall be SB2285 Engrossed - 7 - LRB094 15461 RSP 50656 b made available to the public, and members of the public shall be given the opportunity to express their views concerning the proposed facility.
The Agency may issue a permit for a municipal waste transfer station without requiring approval pursuant to Section 39.2 provided that the following demonstration is made:
(1) the municipal waste transfer station was in existence on or before January 1, 1979 and was in continuous operation from January 1, 1979 to January 1, 1993;
(2) the operator submitted a permit application to the Agency to develop and operate the municipal waste transfer station during April of 1994;
(3) the operator can demonstrate that the county board of the county, if the municipal waste transfer station is in an unincorporated area, or the governing body of the municipality, if the station is in an incorporated area, does not object to resumption of the operation of the station;
and (4) the site has local zoning approval.
(d) The Agency may issue RCRA permits exclusively under this subsection to persons owning or operating a facility for the treatment, storage, or disposal of hazardous waste as defined under this Act.
All RCRA permits shall contain those terms and conditions, including but not limited to schedules of compliance, which may be required to accomplish the purposes and provisions of this Act.
The Agency may include among such conditions standards and other requirements established under this Act, Board regulations, the Resource Conservation and Recovery Act of 1976 (P.L.
94-580), as amended, and regulations pursuant thereto, and may include schedules for achieving compliance therewith as soon as possible.
The Agency shall require that a performance bond or other security be provided as a condition for the issuance of a RCRA permit.
In the case of a permit to operate a hazardous waste or PCB SB2285 Engrossed - 8 - LRB094 15461 RSP 50656 b incinerator as defined in subsection (k) of Section 44, the Agency shall require, as a condition of the permit, that the operator of the facility perform such analyses of the waste to be incinerated as may be necessary and appropriate to ensure the safe operation of the incinerator.
The Agency shall adopt filing requirements and procedures which are necessary and appropriate for the issuance of RCRA permits, and which are consistent with the Act or regulations adopted by the Board, and with the Resource Conservation and Recovery Act of 1976 (P.L.
94-580), as amended, and regulations pursuant thereto.
The applicant shall make available to the public for inspection all documents submitted by the applicant to the Agency in furtherance of an application, with the exception of trade secrets, at the office of the county board or governing body of the municipality.
Such documents may be copied upon payment of the actual cost of reproduction during regular business hours of the local office.
The Agency shall issue a written statement concurrent with its grant or denial of the permit explaining the basis for its decision.
(e) The Agency may issue UIC permits exclusively under this subsection to persons owning or operating a facility for the underground injection of contaminants as defined under this Act.
All UIC permits shall contain those terms and conditions, including but not limited to schedules of compliance, which may be required to accomplish the purposes and provisions of this Act.
The Agency may include among such conditions standards and other requirements established under this Act, Board regulations, the Safe Drinking Water Act (P.L.
93-523), as amended, and regulations pursuant thereto, and may include schedules for achieving compliance therewith.
The Agency shall require that a performance bond or other security be provided as a condition for the issuance of a UIC permit.
The Agency shall adopt filing requirements and procedures which are necessary and appropriate for the issuance of UIC SB2285 Engrossed - 9 - LRB094 15461 RSP 50656 b permits, and which are consistent with the Act or regulations adopted by the Board, and with the Safe Drinking Water Act (P.L.
93-523), as amended, and regulations pursuant thereto.
The applicant shall make available to the public for inspection, all documents submitted by the applicant to the Agency in furtherance of an application, with the exception of trade secrets, at the office of the county board or governing body of the municipality.
Such documents may be copied upon payment of the actual cost of reproduction during regular business hours of the local office.
The Agency shall issue a written statement concurrent with its grant or denial of the permit explaining the basis for its decision.
(f) In making any determination pursuant to Section 9.1 of this Act:
(1) The Agency shall have authority to make the determination of any question required to be determined by the Clean Air Act, as now or hereafter amended, this Act, or the regulations of the Board, including the determination of the Lowest Achievable Emission Rate, Maximum Achievable Control Technology, or Best Available Control Technology, consistent with the Board’s regulations, if any.
(2) The Agency shall, after conferring with the applicant, give written notice to the applicant of its proposed decision on the application including the terms and conditions of the permit to be issued and the facts, conduct or other basis upon which the Agency will rely to support its proposed action.
(3) Following such notice, the Agency shall give the applicant an opportunity for a hearing in accordance with the provisions of Sections 10-25 through 10-60 of the Illinois Administrative Procedure Act.
(g) The Agency shall include as conditions upon all permits issued for hazardous waste disposal sites such restrictions upon the future use of such sites as are reasonably necessary to protect public health and the environment, including SB2285 Engrossed - 10 - LRB094 15461 RSP 50656 b permanent prohibition of the use of such sites for purposes which may create an unreasonable risk of injury to human health or to the environment.
After administrative and judicial challenges to such restrictions have been exhausted, the Agency shall file such restrictions of record in the Office of the Recorder of the county in which the hazardous waste disposal site is located.
(h) A hazardous waste stream may not be deposited in a permitted hazardous waste site unless specific authorization is obtained from the Agency by the generator and disposal site owner and operator for the deposit of that specific hazardous waste stream.
The Agency may grant specific authorization for disposal of hazardous waste streams only after the generator has reasonably demonstrated that, considering technological feasibility and economic reasonableness, the hazardous waste cannot be reasonably recycled for reuse, nor incinerated or chemically, physically or biologically treated so as to neutralize the hazardous waste and render it nonhazardous.
In granting authorization under this Section, the Agency may impose such conditions as may be necessary to accomplish the purposes of the Act and are consistent with this Act and regulations promulgated by the Board hereunder.
If the Agency refuses to grant authorization under this Section, the applicant may appeal as if the Agency refused to grant a permit, pursuant to the provisions of subsection (a) of Section 40 of this Act.
For purposes of this subsection (h), the term "generator" has the meaning given in Section 3.205 of this Act, unless:
(1) the hazardous waste is treated, incinerated, or partially recycled for reuse prior to disposal, in which case the last person who treats, incinerates, or partially recycles the hazardous waste prior to disposal is the generator;
or (2) the hazardous waste is from a response action, in which case the person performing the response action is the generator.
This subsection (h) does not apply to any hazardous waste that is restricted from land disposal under 35 Ill.
Adm.
Code 728.
(i) Before issuing any RCRA permit, any permit for a waste SB2285 Engrossed - 11 - LRB094 15461 RSP 50656 b storage site, sanitary landfill, waste disposal site, waste transfer station, waste treatment facility, waste incinerator, or any waste-transportation operation, or any permit for a clean construction or demolition debris fill operation, the Agency shall conduct an evaluation of the prospective owner’s or operator’s prior experience in waste management operations.
The Agency may deny such a permit if the prospective owner or operator or any employee or officer of the prospective owner or operator has a history of:
(1) repeated violations of federal, State, or local laws, regulations, standards, or ordinances in the operation of waste management facilities or sites;
or (2) conviction in this or another State of any crime which is a felony under the laws of this State, or conviction of a felony in a federal court;
or (3) proof of gross carelessness or incompetence in handling, storing, processing, transporting or disposing of waste.
(i-5) Before issuing any permit or approving any interim authorization for a clean construction or demolition debris fill operation in which any ownership interest is transferred between January 1, 2005, and the effective date of the prohibition set forth in Section 22.52 of this Act, the Agency shall conduct an evaluation of the operation if any previous activities at the site or facility may have caused or allowed contamination of the site.
It shall be the responsibility of the owner or operator seeking the permit or interim authorization to provide to the Agency all of the information necessary for the Agency to conduct its evaluation.
The Agency may deny a permit or interim authorization if previous activities at the site may have caused or allowed contamination at the site, unless such contamination is authorized under any permit issued by the Agency.
(j) The issuance under this Act of a permit to engage in the surface mining of any resources other than fossil fuels shall not relieve the permittee from its duty to comply with SB2285 Engrossed - 12 - LRB094 15461 RSP 50656 b any applicable local law regulating the commencement, location or operation of surface mining facilities.
(k) A development permit issued under subsection (a) of Section 39 for any facility or site which is required to have a permit under subsection (d) of Section 21 shall expire at the end of 2 calendar years from the date upon which it was issued, unless within that period the applicant has taken action to develop the facility or the site.
In the event that review of the conditions of the development permit is sought pursuant to Section 40 or 41, or permittee is prevented from commencing development of the facility or site by any other litigation beyond the permittee’s control, such two-year period shall be deemed to begin on the date upon which such review process or litigation is concluded.
(l) No permit shall be issued by the Agency under this Act for construction or operation of any facility or site located within the boundaries of any setback zone established pursuant to this Act, where such construction or operation is prohibited.
(m) The Agency may issue permits to persons owning or operating a facility for composting landscape waste.
In granting such permits, the Agency may impose such conditions as may be necessary to accomplish the purposes of this Act, and as are not inconsistent with applicable regulations promulgated by the Board.
Except as otherwise provided in this Act, a bond or other security shall not be required as a condition for the issuance of a permit.
If the Agency denies any permit pursuant to this subsection, the Agency shall transmit to the applicant within the time limitations of this subsection specific, detailed statements as to the reasons the permit application was denied.
Such statements shall include but not be limited to the following:
(1) the Sections of this Act that may be violated if the permit were granted;
(2) the specific regulations promulgated pursuant to this Act that may be violated if the permit were granted;
SB2285 Engrossed - 13 - LRB094 15461 RSP 50656 b (3) the specific information, if any, the Agency deems the applicant did not provide in its application to the Agency;
and (4) a statement of specific reasons why the Act and the regulations might be violated if the permit were granted.
If no final action is taken by the Agency within 90 days after the filing of the application for permit, the applicant may deem the permit issued.
Any applicant for a permit may waive the 90 day limitation by filing a written statement with the Agency.
The Agency shall issue permits for such facilities upon receipt of an application that includes a legal description of the site, a topographic map of the site drawn to the scale of 200 feet to the inch or larger, a description of the operation, including the area served, an estimate of the volume of materials to be processed, and documentation that:
(1) the facility includes a setback of at least 200 feet from the nearest potable water supply well;
(2) the facility is located outside the boundary of the 10-year floodplain or the site will be floodproofed;
(3) the facility is located so as to minimize incompatibility with the character of the surrounding area, including at least a 200 foot setback from any residence, and in the case of a facility that is developed or the permitted composting area of which is expanded after November 17, 1991, the composting area is located at least 1/8 mile from the nearest residence (other than a residence located on the same property as the facility);
(4) the design of the facility will prevent any compost material from being placed within 5 feet of the water table, will adequately control runoff from the site, and will collect and manage any leachate that is generated on the site;
(5) the operation of the facility will include appropriate dust and odor control measures, limitations on operating hours, appropriate noise control measures for SB2285 Engrossed - 14 - LRB094 15461 RSP 50656 b shredding, chipping and similar equipment, management procedures for composting, containment and disposal of non-compostable wastes, procedures to be used for terminating operations at the site, and recordkeeping sufficient to document the amount of materials received, composted and otherwise disposed of;
and (6) the operation will be conducted in accordance with any applicable rules adopted by the Board.
The Agency shall issue renewable permits of not longer than 10 years in duration for the composting of landscape wastes, as defined in Section 3.155 of this Act, based on the above requirements.
The operator of any facility permitted under this subsection (m) must submit a written annual statement to the Agency on or before April 1 of each year that includes an estimate of the amount of material, in tons, received for composting.
(n) The Agency shall issue permits jointly with the Department of Transportation for the dredging or deposit of material in Lake Michigan in accordance with Section 18 of the Rivers, Lakes, and Streams Act.
(o) (Blank.) (p) (1) Any person submitting an application for a permit for a new MSWLF unit or for a lateral expansion under subsection (t) of Section 21 of this Act for an existing MSWLF unit that has not received and is not subject to local siting approval under Section 39.2 of this Act shall publish notice of the application in a newspaper of general circulation in the county in which the MSWLF unit is or is proposed to be located.
The notice must be published at least 15 days before submission of the permit application to the Agency.
The notice shall state the name and address of the applicant, the location of the MSWLF unit or proposed MSWLF unit, the nature and size of the MSWLF unit or proposed MSWLF unit, the nature of the activity proposed, the probable life of the proposed activity, the date the permit application will be submitted, and a statement that SB2285 Engrossed - 15 - LRB094 15461 RSP 50656 b persons may file written comments with the Agency concerning the permit application within 30 days after the filing of the permit application unless the time period to submit comments is extended by the Agency.
When a permit applicant submits information to the Agency to supplement a permit application being reviewed by the Agency, the applicant shall not be required to reissue the notice under this subsection.
(2) The Agency shall accept written comments concerning the permit application that are postmarked no later than 30 days after the filing of the permit application, unless the time period to accept comments is extended by the Agency.
(3) Each applicant for a permit described in part (1) of this subsection shall file a copy of the permit application with the county board or governing body of the municipality in which the MSWLF unit is or is proposed to be located at the same time the application is submitted to the Agency.
The permit application filed with the county board or governing body of the municipality shall include all documents submitted to or to be submitted to the Agency, except trade secrets as determined under Section 7.1 of this Act.
The permit application and other documents on file with the county board or governing body of the municipality shall be made available for public inspection during regular business hours at the office of the county board or the governing body of the municipality and may be copied upon payment of the actual cost of reproduction.
93-998,93-575, eff.
8-23-04;1-1-04;
94-94,94-272, eff.
7-1-05;7-19-05.) (Text of Section after amendment by P.A.
94-249,94-725) eff.Sec.
39.
Issuance of permits;
procedures.
(a) When the Board has by regulation required a permit for the construction, installation, or operation of any type of facility, equipment, vehicle, vessel, or aircraft, the applicant shall apply to the Agency for such permit and it shall be the duty of the Agency to issue such a permit upon SB2285 Engrossed - 16 - LRB094 15461 RSP 50656 b proof by the applicant that the facility, equipment, vehicle, vessel, or aircraft will not cause a violation of this Act or of regulations hereunder.
The Agency shall adopt such procedures as are necessary to carry out its duties under this Section.
In making its determinations on permit applications under this Section the Agency may consider prior adjudications of noncompliance with this Act by the applicant that involved a release of a contaminant into the environment.
In granting permits, the Agency may impose reasonable conditions specifically related to the applicant’s past compliance history with this Act as necessary to correct, detect, or prevent noncompliance.
The Agency may impose such other conditions as may be necessary to accomplish the purposes of this Act, and as are not inconsistent with the regulations promulgated by the Board hereunder.
Except as otherwise provided in this Act, a bond or other security shall not be required as a condition for the issuance of a permit.
If the Agency denies any permit under this Section, the Agency shall transmit to the applicant within the time limitations of this Section specific, detailed statements as to the reasons the permit application was denied.
Such statements shall include, but not be limited to the following:
(i) the Sections of this Act which may be violated if the permit were granted;
(ii) the provision of the regulations, promulgated under this Act, which may be violated if the permit were granted;
(iii) the specific type of information, if any, which the Agency deems the applicant did not provide the Agency;
and (iv) a statement of specific reasons why the Act and the regulations might not be met if the permit were granted.
If there is no final action by the Agency within 90 days after the filing of the application for permit, the applicant may deem the permit issued;
except that this time period shall SB2285 Engrossed - 17 - LRB094 15461 RSP 50656 b be extended to 180 days when (1) notice and opportunity for public hearing are required by State or federal law or regulation, (2) the application which was filed is for any permit to develop a landfill subject to issuance pursuant to this subsection, or (3) the application that was filed is for a MSWLF unit required to issue public notice under subsection (p) of Section 39.
The 90-day and 180-day time periods for the Agency to take final action do not apply to NPDES permit applications under subsection (b) of this Section, to RCRA permit applications under subsection (d) of this Section, or to UIC permit applications under subsection (e) of this Section.
The Agency shall publish notice of all final permit determinations for development permits for MSWLF units and for significant permit modifications for lateral expansions for existing MSWLF units one time in a newspaper of general circulation in the county in which the unit is or is proposed to be located.
After January 1, 1994 and until July 1, 1998, operating permits issued under this Section by the Agency for sources of air pollution permitted to emit less than 25 tons per year of any combination of regulated air pollutants, as defined in Section 39.5 of this Act, shall be required to be renewed only upon written request by the Agency consistent with applicable provisions of this Act and regulations promulgated hereunder.
Such operating permits shall expire 180 days after the date of such a request.
The Board shall revise its regulations for the existing State air pollution operating permit program consistent with this provision by January 1, 1994.
After June 30, 1998, operating permits issued under this Section by the Agency for sources of air pollution that are not subject to Section 39.5 of this Act and are not required to have a federally enforceable State operating permit shall be required to be renewed only upon written request by the Agency consistent with applicable provisions of this Act and its rules.
Such operating permits shall expire 180 days after the date of such a request.
Before July 1, 1998, the Board shall SB2285 Engrossed - 18 - LRB094 15461 RSP 50656 b revise its rules for the existing State air pollution operating permit program consistent with this paragraph and shall adopt rules that require a source to demonstrate that it qualifies for a permit under this paragraph.
(b) The Agency may issue NPDES permits exclusively under this subsection for the discharge of contaminants from point sources into navigable waters, all as defined in the Federal Water Pollution Control Act, as now or hereafter amended, within the jurisdiction of the State, or into any well.
All NPDES permits shall contain those terms and conditions, including but not limited to schedules of compliance, which may be required to accomplish the purposes and provisions of this Act.
The Agency may issue general NPDES permits for discharges from categories of point sources which are subject to the same permit limitations and conditions.
Such general permits may be issued without individual applications and shall conform to regulations promulgated under Section 402 of the Federal Water Pollution Control Act, as now or hereafter amended.
The Agency may include, among such conditions, effluent limitations and other requirements established under this Act, Board regulations, the Federal Water Pollution Control Act, as now or hereafter amended, and regulations pursuant thereto, and schedules for achieving compliance therewith at the earliest reasonable date.
The Agency shall adopt filing requirements and procedures which are necessary and appropriate for the issuance of NPDES permits, and which are consistent with the Act or regulations adopted by the Board, and with the Federal Water Pollution Control Act, as now or hereafter amended, and regulations pursuant thereto.
The Agency, subject to any conditions which may be prescribed by Board regulations, may issue NPDES permits to allow discharges beyond deadlines established by this Act or by regulations of the Board without the requirement of a variance, subject to the Federal Water Pollution Control Act, as now or SB2285 Engrossed - 19 - LRB094 15461 RSP 50656 b hereafter amended, and regulations pursuant thereto.
(c) Except for those facilities owned or operated by sanitary districts organized under the Metropolitan Water Reclamation District Act, no permit for the development or construction of a new pollution control facility may be granted by the Agency unless the applicant submits proof to the Agency that the location of the facility has been approved by the County Board of the county if in an unincorporated area, or the governing body of the municipality when in an incorporated area, in which the facility is to be located in accordance with Section 39.2 of this Act.
For purposes of this subsection (c), and for purposes of Section 39.2 of this Act, the appropriate county board or governing body of the municipality shall be the county board of the county or the governing body of the municipality in which the facility is to be located as of the date when the application for siting approval is filed.
In the event that siting approval granted pursuant to Section 39.2 has been transferred to a subsequent owner or operator, that subsequent owner or operator may apply to the Agency for, and the Agency may grant, a development or construction permit for the facility for which local siting approval was granted.
Upon application to the Agency for a development or construction permit by that subsequent owner or operator, the permit applicant shall cause written notice of the permit application to be served upon the appropriate county board or governing body of the municipality that granted siting approval for that facility and upon any party to the siting proceeding pursuant to which siting approval was granted.
In that event, the Agency shall conduct an evaluation of the subsequent owner or operator’s prior experience in waste management operations in the manner conducted under subsection (i) of Section 39 of this Act.
Beginning August 20, 1993, if the pollution control facility consists of a hazardous or solid waste disposal facility for which the proposed site is located in an unincorporated area of a county with a population of less than SB2285 Engrossed - 20 - LRB094 15461 RSP 50656 b 100,000 and includes all or a portion of a parcel of land that was, on April 1, 1993, adjacent to a municipality having a population of less than 5,000, then the local siting review required under this subsection (c) in conjunction with any permit applied for after that date shall be performed by the governing body of that adjacent municipality rather than the county board of the county in which the proposed site is located;
and for the purposes of that local siting review, any references in this Act to the county board shall be deemed to mean the governing body of that adjacent municipality;
provided, however, that the provisions of this paragraph shall not apply to any proposed site which was, on April 1, 1993, owned in whole or in part by another municipality.
In the case of a pollution control facility for which a development permit was issued before November 12, 1981, if an operating permit has not been issued by the Agency prior to August 31, 1989 for any portion of the facility, then the Agency may not issue or renew any development permit nor issue an original operating permit for any portion of such facility unless the applicant has submitted proof to the Agency that the location of the facility has been approved by the appropriate county board or municipal governing body pursuant to Section 39.2 of this Act.
After January 1, 1994, if a solid waste disposal facility, any portion for which an operating permit has been issued by the Agency, has not accepted waste disposal for 5 or more consecutive calendars years, before that facility may accept any new or additional waste for disposal, the owner and operator must obtain a new operating permit under this Act for that facility unless the owner and operator have applied to the Agency for a permit authorizing the temporary suspension of waste acceptance.
The Agency may not issue a new operation permit under this Act for the facility unless the applicant has submitted proof to the Agency that the location of the facility has been approved or re-approved by the appropriate county board or municipal governing body under Section 39.2 of this SB2285 Engrossed - 21 - LRB094 15461 RSP 50656 b Act after the facility ceased accepting waste.
Except for those facilities owned or operated by sanitary districts organized under the Metropolitan Water Reclamation District Act, and except for new pollution control facilities governed by Section 39.2, and except for fossil fuel mining facilities, the granting of a permit under this Act shall not relieve the applicant from meeting and securing all necessary zoning approvals from the unit of government having zoning jurisdiction over the proposed facility.
Before beginning construction on any new sewage treatment plant or sludge drying site to be owned or operated by a sanitary district organized under the Metropolitan Water Reclamation District Act for which a new permit (rather than the renewal or amendment of an existing permit) is required, such sanitary district shall hold a public hearing within the municipality within which the proposed facility is to be located, or within the nearest community if the proposed facility is to be located within an unincorporated area, at which information concerning the proposed facility shall be made available to the public, and members of the public shall be given the opportunity to express their views concerning the proposed facility.
The Agency may issue a permit for a municipal waste transfer station without requiring approval pursuant to Section 39.2 provided that the following demonstration is made:
(1) the municipal waste transfer station was in existence on or before January 1, 1979 and was in continuous operation from January 1, 1979 to January 1, 1993;
(2) the operator submitted a permit application to the Agency to develop and operate the municipal waste transfer station during April of 1994;
(3) the operator can demonstrate that the county board of the county, if the municipal waste transfer station is in an unincorporated area, or the governing body of the municipality, if the station is in an incorporated area, SB2285 Engrossed - 22 - LRB094 15461 RSP 50656 b does not object to resumption of the operation of the station;
and (4) the site has local zoning approval.
(d) The Agency may issue RCRA permits exclusively under this subsection to persons owning or operating a facility for the treatment, storage, or disposal of hazardous waste as defined under this Act.
All RCRA permits shall contain those terms and conditions, including but not limited to schedules of compliance, which may be required to accomplish the purposes and provisions of this Act.
The Agency may include among such conditions standards and other requirements established under this Act, Board regulations, the Resource Conservation and Recovery Act of 1976 (P.L.
94-580), as amended, and regulations pursuant thereto, and may include schedules for achieving compliance therewith as soon as possible.
The Agency shall require that a performance bond or other security be provided as a condition for the issuance of a RCRA permit.
In the case of a permit to operate a hazardous waste or PCB incinerator as defined in subsection (k) of Section 44, the Agency shall require, as a condition of the permit, that the operator of the facility perform such analyses of the waste to be incinerated as may be necessary and appropriate to ensure the safe operation of the incinerator.
The Agency shall adopt filing requirements and procedures which are necessary and appropriate for the issuance of RCRA permits, and which are consistent with the Act or regulations adopted by the Board, and with the Resource Conservation and Recovery Act of 1976 (P.L.
94-580), as amended, and regulations pursuant thereto.
The applicant shall make available to the public for inspection all documents submitted by the applicant to the Agency in furtherance of an application, with the exception of trade secrets, at the office of the county board or governing body of the municipality.
Such documents may be copied upon payment of the actual cost of reproduction during regular SB2285 Engrossed - 23 - LRB094 15461 RSP 50656 b business hours of the local office.
The Agency shall issue a written statement concurrent with its grant or denial of the permit explaining the basis for its decision.
(e) The Agency may issue UIC permits exclusively under this subsection to persons owning or operating a facility for the underground injection of contaminants as defined under this Act.
All UIC permits shall contain those terms and conditions, including but not limited to schedules of compliance, which may be required to accomplish the purposes and provisions of this Act.
The Agency may include among such conditions standards and other requirements established under this Act, Board regulations, the Safe Drinking Water Act (P.L.
93-523), as amended, and regulations pursuant thereto, and may include schedules for achieving compliance therewith.
The Agency shall require that a performance bond or other security be provided as a condition for the issuance of a UIC permit.
The Agency shall adopt filing requirements and procedures which are necessary and appropriate for the issuance of UIC permits, and which are consistent with the Act or regulations adopted by the Board, and with the Safe Drinking Water Act (P.L.
93-523), as amended, and regulations pursuant thereto.
The applicant shall make available to the public for inspection, all documents submitted by the applicant to the Agency in furtherance of an application, with the exception of trade secrets, at the office of the county board or governing body of the municipality.
Such documents may be copied upon payment of the actual cost of reproduction during regular business hours of the local office.
The Agency shall issue a written statement concurrent with its grant or denial of the permit explaining the basis for its decision.
(f) In making any determination pursuant to Section 9.1 of this Act:
(1) The Agency shall have authority to make the determination of any question required to be determined by the Clean Air Act, as now or hereafter amended, this Act, SB2285 Engrossed - 24 - LRB094 15461 RSP 50656 b or the regulations of the Board, including the determination of the Lowest Achievable Emission Rate, Maximum Achievable Control Technology, or Best Available Control Technology, consistent with the Board’s regulations, if any.
(2) The Agency shall, after conferring with the applicant, give written notice to the applicant of its proposed decision on the application including the terms and conditions of the permit to be issued and the facts, conduct or other basis upon which the Agency will rely to support its proposed action.
(3) Following such notice, the Agency shall give the applicant an opportunity for a hearing in accordance with the provisions of Sections 10-25 through 10-60 of the Illinois Administrative Procedure Act.
(g) The Agency shall include as conditions upon all permits issued for hazardous waste disposal sites such restrictions upon the future use of such sites as are reasonably necessary to protect public health and the environment, including permanent prohibition of the use of such sites for purposes which may create an unreasonable risk of injury to human health or to the environment.
After administrative and judicial challenges to such restrictions have been exhausted, the Agency shall file such restrictions of record in the Office of the Recorder of the county in which the hazardous waste disposal site is located.
(h) A hazardous waste stream may not be deposited in a permitted hazardous waste site unless specific authorization is obtained from the Agency by the generator and disposal site owner and operator for the deposit of that specific hazardous waste stream.
The Agency may grant specific authorization for disposal of hazardous waste streams only after the generator has reasonably demonstrated that, considering technological feasibility and economic reasonableness, the hazardous waste cannot be reasonably recycled for reuse, nor incinerated or chemically, physically or biologically treated so as to SB2285 Engrossed - 25 - LRB094 15461 RSP 50656 b neutralize the hazardous waste and render it nonhazardous.
In granting authorization under this Section, the Agency may impose such conditions as may be necessary to accomplish the purposes of the Act and are consistent with this Act and regulations promulgated by the Board hereunder.
If the Agency refuses to grant authorization under this Section, the applicant may appeal as if the Agency refused to grant a permit, pursuant to the provisions of subsection (a) of Section 40 of this Act.
For purposes of this subsection (h), the term "generator" has the meaning given in Section 3.205 of this Act, unless:
(1) the hazardous waste is treated, incinerated, or partially recycled for reuse prior to disposal, in which case the last person who treats, incinerates, or partially recycles the hazardous waste prior to disposal is the generator;
or (2) the hazardous waste is from a response action, in which case the person performing the response action is the generator.
This subsection (h) does not apply to any hazardous waste that is restricted from land disposal under 35 Ill.
Adm.
Code 728.
(i) Before issuing any RCRA permit, any permit for a waste storage site, sanitary landfill, waste disposal site, waste transfer station, waste treatment facility, waste incinerator, or any waste-transportation operation, or any permit or interim authorization for a clean construction or demolition debris fill operation, the Agency shall conduct an evaluation of the prospective owner’s or operator’s prior experience in waste management operations and clean construction or demolition debris fill operations.
The Agency may deny such a permit, or deny or revoke interim authorization, if the prospective owner or operator or any employee or officer of the prospective owner or operator has a history of:
(1) repeated violations of federal, State, or local laws, regulations, standards, or ordinances in the operation of waste management facilities or sites or clean construction or demolition debris fill operation facilities or sites;
or (2) conviction in this or another State of any crime SB2285 Engrossed - 26 - LRB094 15461 RSP 50656 b which is a felony under the laws of this State, or conviction of a felony in a federal court;
or conviction in this or another state or federal court of any of the following crimes:
forgery, official misconduct, bribery, perjury, or knowingly submitting false information under any environmental law, regulation, or permit term or condition;
or (3) proof of gross carelessness or incompetence in handling, storing, processing, transporting or disposing of waste or clean construction or demolition debris, or proof of gross carelessness or incompetence in using clean construction or demolition debris as fill.
(i-5) Before issuing any permit or approving any interim authorization for a clean construction or demolition debris fill operation in which any ownership interest is transferred between January 1, 2005, and the effective date of the prohibition set forth in Section 22.52 of this Act, the Agency shall conduct an evaluation of the operation if any previous activities at the site or facility may have caused or allowed contamination of the site.
It shall be the responsibility of the owner or operator seeking the permit or interim authorization to provide to the Agency all of the information necessary for the Agency to conduct its evaluation.
The Agency may deny a permit or interim authorization if previous activities at the site may have caused or allowed contamination at the site, unless such contamination is authorized under any permit issued by the Agency.
(j) The issuance under this Act of a permit to engage in the surface mining of any resources other than fossil fuels shall not relieve the permittee from its duty to comply with any applicable local law regulating the commencement, location or operation of surface mining facilities.
(k) A development permit issued under subsection (a) of Section 39 for any facility or site which is required to have a permit under subsection (d) of Section 21 shall expire at the end of 2 calendar years from the date upon which it was issued, SB2285 Engrossed - 27 - LRB094 15461 RSP 50656 b unless within that period the applicant has taken action to develop the facility or the site.
In the event that review of the conditions of the development permit is sought pursuant to Section 40 or 41, or permittee is prevented from commencing development of the facility or site by any other litigation beyond the permittee’s control, such two-year period shall be deemed to begin on the date upon which such review process or litigation is concluded.
(l) No permit shall be issued by the Agency under this Act for construction or operation of any facility or site located within the boundaries of any setback zone established pursuant to this Act, where such construction or operation is prohibited.
(m) The Agency may issue permits to persons owning or operating a facility for composting landscape waste.
In granting such permits, the Agency may impose such conditions as may be necessary to accomplish the purposes of this Act, and as are not inconsistent with applicable regulations promulgated by the Board.
Except as otherwise provided in this Act, a bond or other security shall not be required as a condition for the issuance of a permit.
If the Agency denies any permit pursuant to this subsection, the Agency shall transmit to the applicant within the time limitations of this subsection specific, detailed statements as to the reasons the permit application was denied.
Such statements shall include but not be limited to the following:
(1) the Sections of this Act that may be violated if the permit were granted;
(2) the specific regulations promulgated pursuant to this Act that may be violated if the permit were granted;
(3) the specific information, if any, the Agency deems the applicant did not provide in its application to the Agency;
and (4) a statement of specific reasons why the Act and the regulations might be violated if the permit were granted.
If no final action is taken by the Agency within 90 days SB2285 Engrossed - 28 - LRB094 15461 RSP 50656 b after the filing of the application for permit, the applicant may deem the permit issued.
Any applicant for a permit may waive the 90 day limitation by filing a written statement with the Agency.
The Agency shall issue permits for such facilities upon receipt of an application that includes a legal description of the site, a topographic map of the site drawn to the scale of 200 feet to the inch or larger, a description of the operation, including the area served, an estimate of the volume of materials to be processed, and documentation that:
(1) the facility includes a setback of at least 200 feet from the nearest potable water supply well;
(2) the facility is located outside the boundary of the 10-year floodplain or the site will be floodproofed;
(3) the facility is located so as to minimize incompatibility with the character of the surrounding area, including at least a 200 foot setback from any residence, and in the case of a facility that is developed or the permitted composting area of which is expanded after November 17, 1991, the composting area is located at least 1/8 mile from the nearest residence (other than a residence located on the same property as the facility);
(4) the design of the facility will prevent any compost material from being placed within 5 feet of the water table, will adequately control runoff from the site, and will collect and manage any leachate that is generated on the site;
(5) the operation of the facility will include appropriate dust and odor control measures, limitations on operating hours, appropriate noise control measures for shredding, chipping and similar equipment, management procedures for composting, containment and disposal of non-compostable wastes, procedures to be used for terminating operations at the site, and recordkeeping sufficient to document the amount of materials received, composted and otherwise disposed of;
and SB2285 Engrossed - 29 - LRB094 15461 RSP 50656 b (6) the operation will be conducted in accordance with any applicable rules adopted by the Board.
The Agency shall issue renewable permits of not longer than 10 years in duration for the composting of landscape wastes, as defined in Section 3.155 of this Act, based on the above requirements.
The operator of any facility permitted under this subsection (m) must submit a written annual statement to the Agency on or before April 1 of each year that includes an estimate of the amount of material, in tons, received for composting.
(n) The Agency shall issue permits jointly with the Department of Transportation for the dredging or deposit of material in Lake Michigan in accordance with Section 18 of the Rivers, Lakes, and Streams Act.
(o) (Blank.) (p) (1) Any person submitting an application for a permit for a new MSWLF unit or for a lateral expansion under subsection (t) of Section 21 of this Act for an existing MSWLF unit that has not received and is not subject to local siting approval under Section 39.2 of this Act shall publish notice of the application in a newspaper of general circulation in the county in which the MSWLF unit is or is proposed to be located.
The notice must be published at least 15 days before submission of the permit application to the Agency.
The notice shall state the name and address of the applicant, the location of the MSWLF unit or proposed MSWLF unit, the nature and size of the MSWLF unit or proposed MSWLF unit, the nature of the activity proposed, the probable life of the proposed activity, the date the permit application will be submitted, and a statement that persons may file written comments with the Agency concerning the permit application within 30 days after the filing of the permit application unless the time period to submit comments is extended by the Agency.
When a permit applicant submits information to the Agency to supplement a permit application being reviewed by the SB2285 Engrossed - 30 - LRB094 15461 RSP 50656 b Agency, the applicant shall not be required to reissue the notice under this subsection.
(2) The Agency shall accept written comments concerning the permit application that are postmarked no later than 30 days after the filing of the permit application, unless the time period to accept comments is extended by the Agency.
(3) Each applicant for a permit described in part (1) of this subsection shall file a copy of the permit application with the county board or governing body of the municipality in which the MSWLF unit is or is proposed to be located at the same time the application is submitted to the Agency.
The permit application filed with the county board or governing body of the municipality shall include all documents submitted to or to be submitted to the Agency, except trade secrets as determined under Section 7.1 of this Act.
The permit application and other documents on file with the county board or governing body of the municipality shall be made available for public inspection during regular business hours at the office of the county board or the governing body of the municipality and may be copied upon payment of the actual cost of reproduction.
(Source:
P.A.
93-575, eff.
1-1-04;
94-272, eff.
revised94-725, 8-18-05.)eff. Section 99.
6-1-06.) (415 ILCS 5/39.2) (from Ch.
111 1/2, par.
1039.2) Sec.
39.2.
Local siting review.
(a) The county board of the county or the governing body of the municipality, as determined by paragraph (c) of Section 39 of this Act, shall approve or disapprove the request for local siting approval for each pollution control facility which is subject to such review.
An applicant for local siting approval shall submit sufficient details describing the proposed facility to demonstrate compliance, and local siting approval shall be granted only if the proposed facility meets the following criteria:
(i) the facility is necessary to accommodate the waste SB2285 Engrossed - 31 - LRB094 15461 RSP 50656 b needs of the area it is intended to serve;
(ii) the facility is so designed, located and proposed to be operated that the public health, safety and welfare will be protected;
(iii) the facility is located so as to minimize incompatibility with the character of the surrounding area and to minimize the effect on the value of the surrounding property;
(iv) (A) for a facility other than a sanitary landfill or waste disposal site, the facility is located outside the boundary of the 100 year flood plain or the site is flood-proofed;
(B) for a facility that is a sanitary landfill or waste disposal site, the facility is located outside the boundary of the 100-year floodplain, or if the facility is a facility described in subsection (b)(3) of Section 22.19a, the site is flood-proofed;
(v) the plan of operations for the facility is designed to minimize the danger to the surrounding area from fire, spills, or other operational accidents;
(vi) the traffic patterns to or from the facility are so designed as to minimize the impact on existing traffic flows;
(vii) if the facility will be treating, storing or disposing of hazardous waste, an emergency response plan exists for the facility which includes notification, containment and evacuation procedures to be used in case of an accidental release;
(viii) if the facility is to be located in a county where the county board has adopted a solid waste management plan consistent with the planning requirements of the Local Solid Waste Disposal Act or the Solid Waste Planning and Recycling Act, the facility is consistent with that plan;
for purposes of this criterion (viii), the "solid waste management plan" means the plan that is in effect as of the date the application for siting approval is filed;
and (ix) if the facility will be located within a regulated SB2285 Engrossed - 32 - LRB094 15461 RSP 50656 b recharge area, any applicable requirements specified by the Board for such areas have been met.
The county board or the governing body of the municipality may also consider as evidence the previous operating experience and past record of convictions or admissions of violations of the applicant (and any subsidiary or parent corporation) in the field of solid waste management when considering criteria (ii) and (v) under this Section.
If the facility is subject to the location restrictions in Section 22.14 of this Act, compliance with that Section shall be determined as of the date the application for siting approval is filed.
(b) No later than 14 days before the date on which the county board or governing body of the municipality receives a request for site approval, the applicant shall cause written notice of such request to be served either in person or by registered mail, return receipt requested, on the owners of all property within the subject area not solely owned by the applicant, and on the owners of all property within 250 feet in each direction of the lot line of the subject property, said owners being such persons or entities which appear from the authentic tax records of the County in which such facility is to be located;
provided, that the number of all feet occupied by all public roads, streets, alleys and other public ways shall be excluded in computing the 250 feet requirement;
provided further, that in no event shall this requirement exceed 400 feet, including public streets, alleys and other public ways.
Such written notice shall also be served upon members of the General Assembly from the legislative district in which the proposed facility is located and shall be published in a newspaper of general circulation published in the county in which the site is located.
Such notice shall state the name and address of the applicant, the location of the proposed site, the nature and size of the development, the nature of the activity proposed, SB2285 Engrossed - 33 - LRB094 15461 RSP 50656 b the probable life of the proposed activity, the date when the request for site approval will be submitted, and a description of the right of persons to comment on such request as hereafter provided.
(c) An applicant shall file a copy of its request with the county board of the county or the governing body of the municipality in which the proposed site is located.
The request shall include (i) the substance of the applicant’s proposal and (ii) all documents, if any, submitted as of that date to the Agency pertaining to the proposed facility, except trade secrets as determined under Section 7.1 of this Act.
All such documents or other materials on file with the county board or governing body of the municipality shall be made available for public inspection at the office of the county board or the governing body of the municipality and may be copied upon payment of the actual cost of reproduction.
Any person may file written comment with the county board or governing body of the municipality concerning the appropriateness of the proposed site for its intended purpose.
The county board or governing body of the municipality shall consider any comment received or postmarked not later than 30 days after the date of the last public hearing.
(d) At least one public hearing is to be held by the county board or governing body of the municipality no sooner than 90 days but no later than 120 days after the date on which it received the request for site approval.
No later than 14 days prior to such hearing, notice shall be published in a newspaper of general circulation published in the county of the proposed site, and delivered by certified mail to all members of the General Assembly from the district in which the proposed site is located, to the governing authority of every municipality contiguous to the proposed site or contiguous to the municipality in which the proposed site is to be located, to the county board of the county where the proposed site is to be located, if the proposed site is located within the boundaries of a municipality, and to the Agency.
Members or SB2285 Engrossed - 34 - LRB094 15461 RSP 50656 b representatives of the governing authority of a municipality contiguous to the proposed site or contiguous to the municipality in which the proposed site is to be located and, if the proposed site is located in a municipality, members or representatives of the county board of a county in which the proposed site is to be located may appear at and participate in public hearings held pursuant to this Section.
The public hearing shall develop a record sufficient to form the basis of appeal of the decision in accordance with Section 40.1 of this Act.
The fact that a member of the county board or governing body of the municipality has publicly expressed an opinion on an issue related to a site review proceeding shall not preclude the member from taking part in the proceeding and voting on the issue.
(e) Decisions of the county board or governing body of the municipality are to be in writing, specifying the reasons for the decision, such reasons to be in conformance with subsection (a) of this Section.
In granting approval for a site the county board or governing body of the municipality may impose such conditions as may be reasonable and necessary to accomplish the purposes of this Section and as are not inconsistent with regulations promulgated by the Board.
Such decision shall be available for public inspection at the office of the county board or governing body of the municipality and may be copied upon payment of the actual cost of reproduction.
If there is no final action by the county board or governing body of the municipality within 180 days after the date on which it received the request for site approval, the applicant may deem the request approved.
At any time prior to completion by the applicant of the presentation of the applicant’s factual evidence and an opportunity for cross-questioning by the county board or governing body of the municipality and any participants, the applicant may file not more than one amended application upon payment of additional fees pursuant to subsection (k);
in which case the time limitation for final action set forth in this SB2285 Engrossed - 35 - LRB094 15461 RSP 50656 b subsection (e) shall be extended for an additional period of 90 days.
If, prior to making a final local siting decision, a county board or governing body of a municipality has negotiated and entered into a host agreement with the local siting applicant, the terms and conditions of the host agreement, whether written or oral, shall be disclosed and made a part of the hearing record for that local siting proceeding.
In the case of an oral agreement, the disclosure shall be made in the form of a written summary jointly prepared and submitted by the county board or governing body of the municipality and the siting applicant and shall describe the terms and conditions of the oral agreement.
(e-5) Siting approval obtained pursuant to this Section is transferable and may be transferred to a subsequent owner or operator.
In the event that siting approval has been transferred to a subsequent owner or operator, that subsequent owner or operator assumes and takes subject to any and all conditions imposed upon the prior owner or operator by the county board of the county or governing body of the municipality pursuant to subsection (e).
However, any such conditions imposed pursuant to this Section may be modified by agreement between the subsequent owner or operator and the appropriate county board or governing body.
Further, in the event that siting approval obtained pursuant to this Section has been transferred to a subsequent owner or operator, that subsequent owner or operator assumes all rights and obligations and takes the facility subject to any and all terms and conditions of any existing host agreement between the prior owner or operator and the appropriate county board or governing body.
(f) A local siting approval granted under this Section shall expire at the end of 2 calendar years from the date upon which it was granted, unless the local siting approval granted under this Section is for a sanitary landfill operation, in which case the approval shall expire at the end of 3 calendar SB2285 Engrossed - 36 - LRB094 15461 RSP 50656 b years from the date upon which it was granted, and unless within that period the applicant has made application to the Agency for a permit to develop the site.
In the event that the local siting decision has been appealed, such expiration period shall be deemed to begin on the date upon which the appeal process is concluded.
Except as otherwise provided in this subsection, upon the expiration of a development permit under subsection (k) of Section 39, any associated local siting approval granted for the facility under this Section shall also expire.
If a first development permit for a municipal waste incineration facility expires under subsection (k) of Section 39 after September 30, 1989 due to circumstances beyond the control of the applicant, any associated local siting approval granted for the facility under this Section may be used to fulfill the local siting approval requirement upon application for a second development permit for the same site, provided that the proposal in the new application is materially the same, with respect to the criteria in subsection (a) of this Section, as the proposal that received the original siting approval, and application for the second development permit is made before January 1, 1990.
(g) The siting approval procedures, criteria and appeal procedures provided for in this Act for new pollution control facilities shall be the exclusive siting procedures and rules and appeal procedures for facilities subject to such procedures.
Local zoning or other local land use requirements shall not be applicable to such siting decisions.
(h) Nothing in this Section shall apply to any existing or new pollution control facility located within the corporate limits of a municipality with a population of over 1,000,000.
(i) (Blank.) The Board shall adopt regulations establishing the geologic and hydrologic siting criteria necessary to protect usable groundwater resources which are to be followed by the Agency in its review of permit applications for new pollution SB2285 Engrossed - 37 - LRB094 15461 RSP 50656 b control facilities.
Such regulations, insofar as they apply to new pollution control facilities authorized to store, treat or dispose of any hazardous waste, shall be at least as stringent as the requirements of the Resource Conservation and Recovery Act and any State or federal regulations adopted pursuant thereto.
(j) Any new pollution control facility which has never obtained local siting approval under the provisions of this Section shall be required to obtain such approval after a final decision on an appeal of a permit denial.
(k) A county board or governing body of a municipality may charge applicants for siting review under this Section a reasonable fee to cover the reasonable and necessary costs incurred by such county or municipality in the siting review process.
(l) The governing Authority as determined by subsection (c) of Section 39 of this Act may request the Department of Transportation to perform traffic impact studies of proposed or potential locations for required pollution control facilities.
(m) An applicant may not file a request for local siting approval which is substantially the same as a request which was disapproved pursuant to a finding against the applicant under any of criteria (i) through (ix) of subsection (a) of this Section within the preceding 2 years.
(n) In any review proceeding of a decision of the county board or governing body of a municipality made pursuant to the local siting review process, the petitioner in the review proceeding shall pay to the county or municipality the cost of preparing and certifying the record of proceedings.
Should the petitioner in the review proceeding fail to make payment, the provisions of Section 3-109 of the Code of Civil Procedure shall apply.
In the event the petitioner is a citizens’ group that participated in the siting proceeding and is so located as to be affected by the proposed facility, such petitioner shall be exempt from paying the costs of preparing and certifying the SB2285 Engrossed - 38 - LRB094 15461 RSP 50656 b record.
(o) Notwithstanding any other provision of this Section, a transfer station used exclusively for landscape waste, where landscape waste is held no longer than 24 hours from the time it was received, is not subject to the requirements of local siting approval under this Section, but is subject only to local zoning approval.
(Source:
P.A.
94-591, eff.
8-15-05.) (415 ILCS 115/Act rep.) Section 10.
The Illinois Pollution Prevention Act is repealed.
Section 95.
No acceleration or delay.
Where this Act makes changes in a statute that is represented in this Act by text that is not yet or no longer in effect (for example, a Section represented by multiple versions), the use of that text does not accelerate or delay the taking effect of (i) the changes made by this Act or (ii) provisions derived from any other Public Act.
Section 97.
Applicability.
The changes made by Section 5 of this amendatory Act of the 94th General Assembly apply only to siting applications filed on or after the effective date of this amendatory Act.
Section 99.
Show all 360 changed rows (320 more)
Action History
-
Session Sine Die
-
Added Alternate Chief Co-Sponsor Rep. Wyvetter H. Younge
-
Referred to Rules Committee
-
First Reading
-
Chief House Sponsor Rep. Thomas Holbrook
-
Placed on Calendar Order of First Reading
-
Arrived in House
-
Third Reading - Passed; 040-011-000
-
Placed on Calendar Order of 3rd Reading
-
Senate Floor Amendment No. 1 Adopted; Clayborne
-
Recalled to Second Reading
-
Senate Floor Amendment No. 1 Recommend Do Adopt Environment & Energy; 008-001-000
-
Senate Floor Amendment No. 1 Rules Refers to Environment & Energy
-
Senate Floor Amendment No. 1 Referred to Rules
-
Senate Floor Amendment No. 1 Filed with Secretary by Sen. James F. Clayborne, Jr.
-
Placed on Calendar Order of 3rd Reading February 7, 2006
-
Second Reading
-
Placed on Calendar Order of 2nd Reading February 2, 2006
-
Do Pass Environment & Energy; 008-002-000
-
Assigned to Environment & Energy
-
Referred to Rules
-
First Reading
-
Filed with Secretary by Sen. James F. Clayborne, Jr.
Sponsors
- Jr. James F. Clayborne · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →0 sponsors · 1 co-sponsors · 182 not signed on · 1 voted No
Sponsors (0)
None.
Co-sponsors (1)
- James F. Clayborne, Jr.
Not signed on (182)
182 members have not signed on to this bill.
Show all 182 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 36 | 10 | 0 | 7 |
| Democrat | 4 | 1 | 0 | 0 |
| Republican | 0 | 0 | 0 | 1 |
| Total | 40 | 11 | 0 | 8 |
| % of votes cast | 68% | 19% | 0% | 14% |
How each member voted (59)
| Member | Party | Vote |
|---|---|---|
| Sandoval | — | Yea |
| Lauzen | — | Nay |
| Luechtefeld | — | Not Voting |
| Althoff | — | Nay |
| Martinez | — | Yea |
| Axley | — | Nay |
| Bomke | — | Nay |
| Burzynski | — | Yea |
| Meeks | — | Not Voting |
| DeLeo | — | Yea |
| Geo-Karis | — | Yea |
| Halvorson | — | Yea |
| Link | — | Yea |
| Maloney | — | Yea |
| Millner | — | Yea |
| Munoz | — | Yea |
| Pankau | — | Yea |
| Peterson | — | Yea |
| Radogno | — | Nay |
| Sullivan | — | Yea |
| Schoenberg | — | Yea |
| Shadid | — | Yea |
| Jacobs | — | Yea |
| Sieben | — | Yea |
| Cullerton | — | Yea |
| Jones, W. | — | Yea |
| Demuzio | — | Yea |
| Silverstein | — | Yea |
| Trotter | — | Yea |
| Viverito | — | Yea |
| Petka | — | Nay |
| Jones, J. | — | Nay |
| Brady | — | Not Voting |
| Clayborne | — | Yea |
| Crotty | — | Yea |
| Dahl | — | Nay |
| Dillard | — | Yea |
| Forby | — | Yea |
| Garrett | — | Yea |
| Haine | — | Yea |
| Hendon | — | Yea |
| Wilhelmi | — | Yea |
| Watson | — | Not Voting |
| Winkel | — | Not Voting |
| Cronin | — | Not Voting |
| Raoul | — | Yea |
| Rauschenberger | — | Not Voting |
| Righter | — | Yea |
| Risinger | — | Yea |
| Ronen | — | Yea |
| Roskam | — | Nay |
| Rutherford | — | Nay |
| del Valle | — | Yea |
| Don Harmon | Democrat | Nay |
| Emil Jones, III | Democrat | Yea |
| Kimberly A. Lightford | Democrat | Yea |
| Lakesia Collins | Democrat | Yea |
| Mattie Hunter | Democrat | Yea |
| Dave Syverson | Republican | Not Voting |
Subjects
Frequently asked questions
- What does SB 2285 do?
- Amends the Environmental Protection Act. Provides that processing sites or facilities that receive only on-specification used oil originating from used oil collectors for processing to produce products for sale to off-site petroleum facilities are not pollution control facilities under the Environmental Protection Act if these sites or facilities are: (i) located within a home rule unit of local government with a population of at least 30,000 according to the 2000 census, that home rule unit of local government has been designated as an Urban Round II Empowerment Zone by the United States Department of Housing and Urban Development, and that home rule unit of local government has enacted an ordinance approving the location of the site or facility and provided funding for the site or facility; and (ii) in compliance with all applicable zoning requirements. Effective immediately.
- Who sponsors SB 2285?
- SB 2285 is sponsored by James F. Clayborne, Jr..
- What is the current status of SB 2285?
- This bill died with 94th Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track SB 2285?
- Track SB 2285 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 2285
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 2285
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →