Illinois 93rd Regular Session Status: Passed Senate

SB 1497 — DESIGN-BUILD PROCUREMENT-TECH

Last action — Session Sine Die

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 93rd Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Creates the Design-Build Procurement Act. Contains only a short title provision.

Bill Text

What changed in the latest version

374 added · 1 removed

Plain-language change summary

The updated version of Bill SB 1497 includes a new section emphasizing that state construction agencies can use a design-build delivery method for public projects when it's deemed beneficial. This change ensures that agencies must publicly announce their requirements and base their selection on demonstrated competence, promoting fairness and transparency. Additionally, agencies must provide a written justification for choosing this method, considering factors like time and cost savings, which helps ensure that decisions are made with the public's interest in mind. Overall, this amendment aims to streamline project delivery while maintaining accountability.

→
Previous
Latest
093_SB1497 LRB093 08420 BDD 08642 b AN ACT concerning procurement.
SB1497 Engrossed LRB093 08420 BDD 08642 b AN ACT concerning procurement.
Section 5.
Legislative policy.
It is the intent of the General Assembly that State construction agencies be allowed to use the design-build delivery method for public projects if it is shown to be in the State's best interest for that particular project.
It shall be the policy of State construction agencies in the procurement of design-build services to publicly announce all requirements for design-build services and to procure these services on the basis of demonstrated competence and qualifications and with due regard for the principles of competitive selection.
A State construction agency shall, prior to issuing requests for proposals, promulgate and publish procedures for the solicitation and award of contracts pursuant to this Act.
A State construction agency shall, for each public project or projects permitted under this Act, make a written determination, including a description as to the particular advantages of the design-build procurement method, that it is in the best interests of this State to enter into a design-build contract for the project or projects.
In making that determination, the following factors shall be considered:
(1) The probability that the design-build procurement method will be in the best interests of the State by providing a material savings of time or cost over the design-bid-build or other delivery system.
(2) The type and size of the project and its SB1497 Engrossed -2- LRB093 08420 BDD 08642 b suitability to the design-build procurement method.
(3) The ability of the State construction agency to define and provide comprehensive scope and performance criteria for the project.
The State construction agency shall within 15 days after the initial determination provide an advisory copy to the Procurement Policy Board and maintain the full record of determination for 5 years.
Section 10.
Definitions.
As used in this Act:
"State construction agency" means and includes those agencies as defined in Section 1-15.25 of the Illinois Procurement Code, as amended, but does not mean the Illinois Department of Transportation and the Illinois State Toll Highway Authority.
"Delivery system" means the design and construction approach used to develop and construct a project.
"Design-bid-build" means the traditional delivery system used on public projects in this State that incorporates the Architectural, Engineering, and Land Surveying Qualification Based Selection Act (30 ILCS 535/) and the principles of competitive selection in the Illinois Procurement Code (30 ILCS 500/).
"Design-build" means a delivery system that provides responsibility within a single contract for the furnishing of architecture, engineering, land surveying and related services as required, and the labor, materials, equipment, and other construction services for the project.
"Design-build contract" means a contract for a public project under this Act between a State construction agency and a design-build entity to furnish architecture, engineering, land surveying, and related services as required, and to furnish the labor, materials, equipment, and other construction services for the project.
The design-build SB1497 Engrossed -3- LRB093 08420 BDD 08642 b contract may be conditioned upon subsequent refinements in scope and price and may allow the State construction agency to make modifications in the project scope without invalidating the design-build contract.
"Design-build entity" means any individual, sole proprietorship, firm, partnership, joint venture, corporation, professional corporation, or other entity that proposes to design and construct any public project under this Act.
A design-build entity and associated design-build professionals shall conduct themselves in accordance with the laws of this State and the related provisions of the Illinois Administrative Code, as referenced by the licensed design professional Acts of this State, with respect to the solicitation and contracting of design-build services.
"Design professional" means any individual, sole proprietorship, firm, partnership, joint venture, corporation, professional corporation, or other entity that offers services under the Illinois Architecture Practice Act of 1989 (225 ILCS 305/), the Professional Engineering Practice Act of 1989 (225 ILCS 325/), the Structural Engineering Licensing Act of 1989 (225 ILCS 340/), or the Illinois Professional Land Surveyor Act of 1989 (225 ILCS 330/).
"Evaluation criteria" means the requirements for the separate phases of the selection process as defined in this Act and may include the specialized experience, technical qualifications and competence, capacity to perform, past performance, experience with similar projects, assignment of personnel to the project, and other appropriate factors.
Price may not be used as a factor in the evaluation of Phase I proposals.
"Proposal" means the offer to enter into a design-build contract as submitted by a design-build entity in accordance with this Act.
SB1497 Engrossed -4- LRB093 08420 BDD 08642 b "Request for proposal" means the document used by a State construction agency to solicit proposals for a design-build contract.
"Scope and performance criteria" means the requirements for the public project, including but not limited to, the intended usage, capacity, size, scope, quality and performance standards, life-cycle costs, and other programmatic criteria that are expressed in performance-oriented and quantifiable specifications and drawings that can be reasonably inferred and are suited to allow a design-build entity to develop a proposal.
Section 15.
Solicitation of proposals.
(a) A State construction agency that elects to use the design-build delivery method must issue a notice of intent to receive requests for proposals for the project at least 14 days before issuing the request for the proposal.
The State construction agency must publish the advance notice in the official procurement bulletin of the State or the professional services bulletin of the State construction agency, if any.
The agency is encouraged to use publication of the notice in related construction industry service publications.
A brief description of the proposed procurement must be included in the notice.
The State construction agency must provide a copy of the request for proposal to any party requesting a copy.
(b) The request for proposal shall be prepared for each project and must contain, without limitation, the following information:
(1) The State construction agency that will award the design-build contract.
(2) A preliminary schedule for the completion of the contract.
(3) The proposed budget for the project, the source SB1497 Engrossed -5- LRB093 08420 BDD 08642 b of funds, and the currently available funds.
Show all 147 changed rows (107 more)
Previous
Latest
(4) Prequalification criteria for design-build entities wishing to submit proposals.
The State construction agency shall include, at a minimum, its normal prequalification, licensing, registration, and other requirements, but nothing contained herein precludes the use of additional prequalification criteria by the State construction agency.
(5) Material requirements of the contract, including but not limited to, the proposed terms and conditions, required performance and payment bonds, insurance, affirmative action, and workforce requirements, if any.
(6) The performance criteria.
(7) The evaluation criteria for each phase of the solicitation.
(8) The number of entities that will be considered for the technical and cost evaluation phase.
(c) The State construction agency may include any other relevant information that it chooses to supply.
The design-build entity shall be entitled to rely upon the accuracy of this documentation in the development of its proposal.
(d) The date that proposals are due must be at least 21 calendar days after the date of the issuance of the request for proposal.
In the event the cost of the project is estimated to exceed $10 million, then the proposal due date must be at least 28 calendar days after the date of the issuance of the request for proposal.
The State construction agency shall include in the request for proposal a minimum of 30 days to develop the Phase II submissions after the selection of entities from the Phase I evaluation is completed.
(e) Each design-build entity whose proposal proceeds to SB1497 Engrossed -6- LRB093 08420 BDD 08642 b the technical and cost evaluation phase may be reimbursed by the State construction agency to defray costs associated with the proposal preparation.
If the State construction agency elects to provide reimbursement, it shall specify in the request for proposal the basis or overall reimbursement to be provided.
Section 20.
Development of scope and performance criteria.
(a) The State construction agency shall develop, at the direction of a licensed design professional, a request for proposal, which shall include scope and performance criteria.
The scope and performance criteria must be in sufficient detail and contain adequate information to reasonably apprise the qualified design-build entities of the State construction agency's overall programmatic needs and goals, including criteria and preliminary design plans, general budget parameters, schedule, and delivery requirements.
(b) Each request for proposal shall also include a description of the level of design to be provided in the proposals.
This description must include the scope and type of renderings, drawings, and specifications that, at a minimum, will be required by the State construction agency to be produced by the design-build entities.
(c) The scope and performance criteria shall be prepared by a design professional who is an employee of the State construction agency, or the State construction agency may contract with an independent design professional selected under the Architectural, Engineering and Land Surveying Qualification Based Selection Act (30 ILCS 535/) to provide these services.
(d) The design professional that prepares the scope and performance criteria is prohibited from participating in any design-build entity proposal for the project.
SB1497 Engrossed -7- LRB093 08420 BDD 08642 b Section 25.
Selection Committee.
(a) Each State construction agency that elects to use the design-build delivery method shall establish a committee to evaluate and select the design-build entity.
The committee, under the discretion of the State construction agency, shall consist of 3, 5, or 7 members and shall include at least one licensed design professional and one member of the public.
The public member may not be employed or associated with any firm holding a contract with the State construction agency and shall be nominated by design or construction industry associations.
The selection committee may be designated for a set term or for the particular project subject to the request for proposal.
(b) The members of the selection committee must certify for each request for proposal that no conflict of interest exists between the members and the design-build entities submitting proposals.
If a conflict exists, the member must be replaced before any review of proposals.
Section 30.
Procedures for Selection.
(a) The State construction agency must use a two-phase procedure for the selection of the successful design-build entity.
Phase I of the procedure will evaluate and shortlist the design-build entities based on qualifications, and Phase II will evaluate the technical and cost proposals.
(b) The State construction agency shall include in the request for proposal the evaluating factors to be used in Phase I.
These factors are in addition to any prequalification requirements of design-build entities that the agency has set forth.
Each request for proposal shall establish the relative importance assigned to each evaluation factor and subfactor, including any weighting of criteria to be employed by the State construction agency.
The State construction agency must maintain a record of the evaluation SB1497 Engrossed -8- LRB093 08420 BDD 08642 b scoring to be disclosed in event of a protest regarding the solicitation.
The State construction agency shall include the following criteria in every Phase I evaluation of design-build entities:
(1) experience of personnel;
(2) successful experience with similar project types;
(3) financial capability;
(4) timeliness of past performance;
(5) experience with similarly sized projects;
(6) successful reference checks of the firm;
and (7) commitment to assign personnel for the duration of the project and qualifications of the entity's consultants.
The State construction agency may include any additional relevant criteria in Phase I that it deems necessary for a proper qualification review.
The State construction agency may not consider any design-build entity for evaluation or award if the entity has any pecuniary interest in the project or has other relationships or circumstances, including but not limited to, long-term leasehold, mutual performance, or development contracts with the State construction agency, that may give the design-build entity a financial or tangible advantage over other design-build entities in the preparation, evaluation, or performance of the design-build contract or that create the appearance of impropriety.
Upon completion of the qualifications evaluation, the State construction agency shall create a shortlist of the most highly qualified design-build entities.
The State construction agency, in its discretion, is not required to shortlist the maximum number of entities as identified for Phase II evaluation, provided however, no less than 2 design-build entities nor more than 6 are selected to submit Phase II proposals.
The State construction agency shall notify the entities selected for the shortlist in writing.
This notification shall commence the period for the preparation of the Phase II SB1497 Engrossed -9- LRB093 08420 BDD 08642 b technical and cost evaluations.
The State construction agency must allow sufficient time for the shortlist entities to prepare their Phase II submittals considering the scope and detail requested by the State agency.
(c) The State construction agency shall include in the request for proposal the evaluating factors to be used in the technical and cost submission components of Phase II.
Each request for proposal shall establish, for both the technical and cost submission components of Phase II, the relative importance assigned to each evaluation factor and subfactor, including any weighting of criteria to be employed by the State construction agency.
The State construction agency must maintain a record of the evaluation scoring to be disclosed in event of a protest regarding the solicitation.
The State construction agency shall include the following criteria in every Phase II technical evaluation of design-build entities:
(1) compliance with objectives of the project;
(2) compliance of proposed services to the request for proposal requirements;
(3) quality of products or materials proposed;
(4) quality of design parameters;
(5) design concepts;
(6) innovation in meeting the scope and performance criteria;
and (7) constructability of the proposed project.
The State construction agency may include any additional relevant technical evaluation factors it deems necessary for proper selection.
The State construction agency shall include the following criteria in every Phase II cost evaluation:
the total project cost, the construction costs, and the time of completion.
The State construction agency may include any additional relevant technical evaluation factors it deems necessary for proper selection.
In no event shall the total project cost criteria in this subsection exceed a weighting factor greater than 25%.
The State construction agency shall directly employ or SB1497 Engrossed -10- LRB093 08420 BDD 08642 b retain a licensed design professional to evaluate the technical and cost submissions to determine if the technical submissions are in accordance with generally accepted industry standards.
Upon completion of the technical submissions and cost submissions evaluation, the State construction agency may award the design-build contract to the highest overall ranked entity.
Section 35.
Small projects.
In any case where the total overall cost of the project is estimated to be less than $5 million, the State construction agency may combine the two-phase procedure for selection described in Section 30 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 30.
Section 40.
Submission of proposals.
Proposals must be properly identified and sealed.
Proposals may not be reviewed until after the deadline for submission has passed as set forth in the request for proposals.
All design-build entities submitting proposals shall be disclosed after the deadline for submission, and all design-build entities who are selected for Phase II evaluation shall also be disclosed at the time of that determination.
Proposals shall include a bid bond in the form and security as designated in the request for proposals.
Proposals shall also contain a separate sealed envelope with the cost information within the overall proposal submission.
Proposals shall include a list of all design professionals and other entities to which any work may be subcontracted during the performance of the contract.
In the event the request for proposal so designates, these entities must meet prequalification standards of the State construction agency.
Proposals must meet all material requirements of the SB1497 Engrossed -11- LRB093 08420 BDD 08642 b request for proposal or they may be rejected as non-responsive.
The State construction agency shall have the right to reject any and all proposals.
The drawings and specifications of the proposal shall remain the property of the design-build entity.
The State construction agency shall review the proposals for compliance with the performance criteria and evaluation factors.
Proposals may be withdrawn prior to evaluation for any cause.
After evaluation begins by the State construction agency, clear and convincing evidence of error is required for withdrawal.
Section 45.
Award.
The State construction agency may award the contract to the highest overall ranked entity.
Notice of award shall be made in writing.
Unsuccessful entities shall also be notified in writing.
The State construction agency may not request a best and final offer after the receipt of proposals.
The State construction agency may negotiate with the selected design-build entity after award but prior to contract execution for the purpose of securing better terms than originally proposed, provided that the salient features of the request for proposal are not diminished.
Section 50.
Administrative Procedure Act.
The Illinois Administrative Procedure Act (5 ILCS 100/) applies to all administrative rules and procedures of the State construction agency under this Act.
Section 53.
Federal requirements.
In the procurement of design-build contracts, State construction agencies shall comply with federal law and regulations and take all necessary steps to adapt their rules, policies, and SB1497 Engrossed -12- LRB093 08420 BDD 08642 b procedures to remain eligible for federal aid.
Section 55.
Severability.
The provisions of this Act are severable under Section 1.31 of the Statute on Statutes.
Section 99.
Effective date.
This Act takes effect upon becoming law.
View plain text versions (2)

Action History

  1. Session Sine Die

  2. Committee/3rd Reading Deadline Extended-Rule 9(b); April 30, 2004

  3. Committee Deadline Extended-Rule 9(b) April 2, 2004

  4. Added Alternate Co-Sponsor Rep. Kurt M. Granberg

  5. Referred to Rules Committee

  6. First Reading

  7. Added Alternate Chief Co-Sponsor Rep. Richard T. Bradley

  8. Chief House Sponsor Rep. Michael P. McAuliffe

  9. Placed on Calendar Order of First Reading

  10. Arrived in House

  11. Third Reading - Passed; 057-000-000

  12. Placed on Calendar Order of 3rd Reading April 3, 2003

  13. Senate Floor Amendment No. 3 Adopted; Link

  14. Recalled to Second Reading

  15. Senate Floor Amendment No. 3 Be Adopted Executive; 013-000-000

  16. Senate Floor Amendment No. 3 Rules Refers to Executive

  17. Senate Floor Amendment No. 3 Referred to Rules

  18. Senate Floor Amendment No. 3 Filed with Secretary by Sen. Terry Link

  19. Placed on Calendar Order of 3rd Reading March 19, 2003

  20. Second Reading

  21. Placed on Calendar Order of 2nd Reading March 18, 2003

  22. Do Pass as Amended Executive; 012-000-000

  23. Senate Committee Amendment No. 2 Adopted

  24. Senate Committee Amendment No. 1 Adopted

  25. Added as Chief Co-Sponsor Sen. Richard J. Winkel, Jr.

  26. Senate Committee Amendment No. 2 Rules Refers to Executive

  27. Senate Committee Amendment No. 1 Rules Refers to Executive

  28. Senate Committee Amendment No. 2 Referred to Rules

  29. Senate Committee Amendment No. 2 Filed with Secretary by Sen. Terry Link

  30. Senate Committee Amendment No. 1 Referred to Rules

  31. Senate Committee Amendment No. 1 Filed with Secretary by Sen. Terry Link

  32. Assigned to Executive

  33. Referred to Rules

  34. First Reading

  35. Filed with Secretary by Sen. Terry Link

Sponsors

  • Terry Link · Cosponsor
  • Kurt M. Granberg · Cosponsor

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 2 co-sponsors · 181 not signed on

Sponsors (0)

None.

Co-sponsors (2)

  • Terry Link
  • Kurt M. Granberg

Not signed on (181)

181 members have not signed on to this bill.

Show all 181 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Third Reading

Passed 57 Yea · 0 Nay · 2 Other
Party YeaNayPresentNot Voting
Unaffiliated 49002
Democrat 7000
Republican 1000
Total 57002
% of votes cast 97%0%0%3%
How each member voted (59)
Member Party Vote
Sandoval — Yea
Shadid — Yea
Sieben — Not Voting
Lauzen — Yea
Luechtefeld — Yea
Althoff — Yea
Martinez — Yea
Bomke — Yea
Burzynski — Yea
Halvorson — Yea
Hendon — Yea
Obama — Yea
Munoz — Yea
Sullivan, D. — Yea
Silverstein — Yea
Brady — Yea
Sullivan, J. — Yea
Petka — Yea
Trotter — Yea
Viverito — Yea
Demuzio — Yea
Link — Yea
Maloney — Yea
Meeks — Yea
Philip — Not Voting
Schoenberg — Yea
Wojcik — Yea
Woolard — Yea
DeLeo — Yea
Dillard — Yea
Garrett — Yea
Geo-Karis — Yea
Jacobs — Yea
Jones, J. — Yea
Jones, W. — Yea
Winkel — Yea
Watson — Yea
Cullerton — Yea
Clayborne — Yea
Cronin — Yea
Crotty — Yea
Haine — Yea
Peterson — Yea
Radogno — Yea
Rauschenberger — Yea
Righter — Yea
Risinger — Yea
Ronen — Yea
Roskam — Yea
Rutherford — Yea
del Valle — Yea
Don Harmon Democrat Yea
Emanuel "Chris" Welch Democrat Yea
Emil Jones, III Democrat Yea
Kimberly A. Lightford Democrat Yea
Lakesia Collins Democrat Yea
Lawrence "Larry" Walsh, Jr. Democrat Yea
Mattie Hunter Democrat Yea
Dave Syverson Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 1497 do?
Creates the Design-Build Procurement Act. Contains only a short title provision.
Who sponsors SB 1497?
SB 1497 is sponsored by Terry Link and Kurt M. Granberg.
What is the current status of SB 1497?
This bill died with 93rd Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 1497?
Track SB 1497 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 1497

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 1497

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →