California 2011-2012, 1st Special Session Status: Enacted

SB 2 — Energy: renewable energy resources.

Last action — Chaptered by Secretary of State. Chapter 1, Statutes of 2011-12 First Extraordinary Session.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. ✓
    Passed Assembly
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced February 01, 2011. Enacted.

Prognosis

Likely to advance 80% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 6 sponsors

    1 primary, 5 co-sponsors signed on.

  • Cleared a recorded vote

    Passed 7 recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

(1) Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, as defined. Existing law requires the PUC to require the state's 3 largest electrical corporations, Pacific Gas and Electric Company, San Diego Gas and Electric, and Southern California Edison, to identify a separate electrical rate component to fund programs that enhance system reliability and provide in-state benefits. This rate component is a nonbypassable element of local distribution and collected on the basis of usage. Existing PUC resolutions refer to the nonbypassable rate component as a "public goods charge." The public goods charge moneys are collected to support cost-effective energy efficiency and conservation activities, public interest research and development not adequately provided by competitive and regulated markets, and renewable energy resources. The existing Warren-Alquist State Energy Resources Conservation and Development Act establishes the State Energy Resources Conservation and Development Commission (Energy Commission) . The act requires the commission to certify sufficient sites and related facilities that are required to provide a supply of electric power sufficient to accommodate projected demand for power statewide. The act requires the commission to transmit a copy of an application for certification of a site and related facility to, among other entities, each federal and state agency having jurisdiction or special interest in matters pertinent to the proposed site and related facilities and to the Attorney General. This bill would require an applicant to inform the United States Department of Defense of a proposed project and that an application will be filed with the commission if the site and related facility specified in the application are proposed to be located within 1,000 feet of a military installation, or lie within special use airspace or beneath a low-level flight path, as defined. Existing law establishes the Renewable Resource Trust Fund as a fund that is continuously appropriated, with certain exceptions for administrative expenses, in the State Treasury, and requires that certain moneys collected to support renewable energy resources through the public goods charge are deposited into the fund and authorizes the Energy Commission to expend the moneys pursuant to the Renewable Energy Resources Program. The program states the intent of the Legislature to increase the amount of electricity generated from eligible renewable energy resources per year so that amount equals at least 20% of total retail sales of electricity in California per year by December 31, 2010. This bill would revise the Renewable Energy Resources Program to state the intent of the Legislature to increase the amount of electricity generated from eligible renewable energy resources per year, so that amount equals at least 33% of total retail sales of electricity in California per year by December 31, 2020. The bill would revise certain terms used in the program, and revise certain eligibility criteria for a renewable electrical generation facility, as defined, pursuant to the program. (2) Existing law expresses the intent of the Legislature, in establishing the California Renewables Portfolio Standard Program (RPS program) , to increase the amount of electricity generated per year from eligible renewable energy resources, as defined, to an amount that equals at least 20% of the total electricity sold to retail customers in California per year by December 31, 2010. The RPS program requires that a retail seller of electricity, including electrical corporations, community choice aggregators, and electric service providers, purchase a specified minimum percentage of electricity generated by eligible renewable energy resources, as defined, in any given year as a specified percentage of total kilowatthours sold to retail end-use customers each calendar year. The RPS program requires the PUC to implement annual procurement targets for each retail seller to increase its total procurement of electricity generated by eligible renewable energy resources by at least an additional 1% of retail sales per year so that 20% of its retail sales of electricity are procured from eligible renewable energy resources no later than December 31, 2010. Existing law requires the PUC to make a determination of the existing market cost for electricity, which PUC decisions call the market price referent, and to limit an electrical corporation's obligation to procure electricity from eligible renewable energy resources, that exceeds the market price referent, by a specified amount. This bill would express the intent that the amount of electricity generated per year from eligible renewable energy resources be increased to an amount that equals at least 20% of the total electricity sold to retail customers in California per year by December 31, 2013, and 33% by December 31, 2020. The bill would require the PUC, by January 1, 2012, to establish the quantity of electricity products from eligible renewable energy resources to be procured by each retail seller for specified compliance periods, sufficient to ensure that the procurement of electricity products from eligible renewable energy resources achieves 25% of retail sales by December 31, 2016, and 33% of retail sales by December 31, 2020, and that retail sellers procure not less than 33% of retail sales in all subsequent years. The bill, consistent with the goals of procuring the least-cost and best-fit eligible renewable energy resources that meet project viability principles, would require that all retail sellers procure a balanced portfolio of electricity products from eligible renewable energy resources, as specified. The bill would require the PUC to waive enforcement of the renewables portfolio standard procurement requirement if the PUC finds that the retail seller has demonstrated certain conditions exist that are beyond the control of the retail seller and will prevent compliance, and has taken all reasonable actions under its control to achieve compliance. The bill would require the PUC to direct each electrical corporation to annually prepare a renewable energy procurement plan containing specified matters and require, to the extent feasible, that the plan be proposed, reviewed, and adopted by the PUC as part of, and pursuant to, a general procurement plan process. The bill would require the PUC to direct all retail sellers to prepare and submit an annual compliance report. The bill would delete the existing market price referent provisions, and instead require the PUC to establish a limitation for each electrical corporation on the procurement expenditures for all eligible renewable energy resources used to comply with the renewables portfolio standard. The bill would require that by January 1, 2016, the PUC report to the Legislature assessing whether each electrical corporation can achieve a 33% renewables portfolio standard by December 31, 2020, and maintain that level thereafter, within the cost limitations. The bill would provide that, if the cost limitation for an electrical corporation is insufficient to support the projected costs of meeting the renewables portfolio standard procurement requirements, the electrical corporation is authorized to refrain from entering into new contracts or constructing facilities beyond the quantity that can be procured within the limitation, unless eligible renewable energy resources can be procured without exceeding a de minimis increase in rates, consistent with the electrical corporation's general procurement plan. The bill would delete an existing requirement that the PUC adopt flexible rules for compliance for retail sellers. The bill would revise the definitions of certain terms for purposes of the RPS program, would recast certain provisions applicable only to an electrical corporation with 60,000 or fewer customer accounts in California that serves retail end-use customers outside of California, and would add provisions applicable to certain smaller electrical corporations. The bill would authorize an electrical corporation to apply to the PUC for approval to construct, own, and operate an eligible renewable energy resource, and would require the PUC to approve the application if certain conditions are met, until electrical corporation owned and operated resources provide 8.25% of the corporation's anticipated retail sales. Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because the provisions of this bill are within the act and require action by the PUC to implement its requirements, a violation of these provisions would impose a state-mandated local program by expanding the definition of a crime. (3) Under existing law, the governing board of a local publicly owned electric utility is responsible for implementing and enforcing a renewables portfolio standard for the utility that recognizes the intent of the Legislature to encourage renewable resources, while taking into consideration the effect of the standard on rates, reliability, and financial resources and the goal of environmental improvement. This bill would repeal this provision, and instead generally make the requirements of the RPS program applicable to local publicly owned electric utilities, except that the utility's governing board would be responsible for implementation of those requirements, instead of the PUC, and certain enforcement authority with respect to local publicly owned electric utilities would be given to the Energy Commission and State Air Resources Board, instead of the PUC. By placing additional requirements upon local publicly owned electric utilities, the bill would impose a state-mandated local program. (4) Existing law requires the Energy Commission to certify eligible renewable energy resources, to design and implement an accounting system to verify compliance with the RPS requirements by retail sellers, and to develop tracking, accounting, verification, and enforcement mechanisms for renewable energy credits, as defined. This bill would require the Energy Commission to design and implement an accounting system to verify compliance with the RPS requirements by retail sellers and local publicly owned electric utilities. The bill would require the Energy Commission, among other things, to adopt regulations by July 1, 2011, specifying procedures for enforcement of the RPS requirements that include a public process under which the Energy Commission is authorized to issue a notice of violation and correction with respect to a local publicly owned electric utility and for referral to the State Air Resources Board for penalties imposed pursuant to the California Global Warming Solutions Act of 2006 or other laws if that act is suspended or repealed. This bill would revise the definition of renewable energy credit. The bill would require the Energy Commission, by June 30, 2011, to study and provide a report to the Legislature that analyzes run-of-river hydroelectric generating facilities, as defined, in British Columbia, including whether these facilities are, or should be, included as renewable electrical generation facilities for purposes of the Renewable Energy Resources Program administered by the Energy Commission or eligible renewable energy resources for purposes of the RPS program. (5) Existing law requires the PUC, by February 1 of each year, to prepare and submit to the Governor and the Legislature a written report on the costs of programs and activities conducted by an electrical corporation or gas corporation that have more than a specified number of customers in California. This bill would require the PUC, by February 1 of each year, to prepare and submit to the policy and fiscal committees of the Legislature a report on (A) all electrical corporation revenue requirement increases associated with meeting the renewables portfolio standard, (B) all cost savings experienced, or costs avoided, by electrical corporations as a result of meeting the renewables portfolio standard, (C) all costs incurred by electrical corporations for incentives for distributed and renewable generation, (D) all cost savings experienced, or costs avoided, by electrical corporations as a result of incentives for distributed generation and renewable generation, (E) specified costs for which an electrical corporation is seeking recovery in rates that are pending determination or approval by the PUC, (F) the decision number of each PUC decision in the prior year authorizing an electrical corporation to recover costs incurred in rates, (G) any changes in the prior year in load serviced by an electrical corporation, and (H) the efforts each electrical corporation is taking to recruit and train employees to ensure an adequately trained and available workforce. (6) The bill would require the PUC, by July 1, 2011, to determine the effective load carrying capacity of wind and solar energy resources on the electrical grid. The bill would require the PUC to use those values in establishing the contribution of those resources toward meeting specified resource adequacy requirements. (7) The Public Utilities Act prohibits any electrical corporation from beginning the construction of, among other things, a line, plant, or system, or of any extension thereof, without having first obtained from the PUC a certificate that the present or future public convenience and necessity require or will require that construction, termed a certificate of public convenience and necessity. This bill would require the PUC to issue a decision on an application for a certificate of public convenience and necessity within 18 months of the filing of a completed application under specified circumstances. (8) Existing law establishes the Department of Fish and Game in the Natural Resources Agency, and generally charges the department with the administration and enforcement of the Fish and Game Code. This bill would require the department to establish an internal division with the primary purpose of performing comprehensive planning and environmental compliance services with priority given to projects involving the building of eligible renewable energy resources. (9) The existing restructuring of the electrical industry within the Public Utilities Act provides for the establishment of an Independent System Operator (ISO) . Existing law requires the ISO to ensure efficient use and reliable operation of the transmission grid consistent with achieving planning and operating reserve criteria no less stringent than those established by the Western Electricity Coordinating Council of the North American Electric Reliability Corporation. Pursuant to existing law, the ISO's tariffs are required to be approved by the Federal Energy Regulatory Commission. This bill would require the ISO and other California balancing authorities to work cooperatively to integrate and interconnect eligible renewable energy resources to the transmission grid by the most efficient means possible with the goal of minimizing the impact and cost of new transmission facilities needed to meet both reliability needs and the renewables portfolio standard procurement requirements, and to accomplish this in a manner that respects the ownership, business, and dispatch models for transmission facilities owned by electrical corporations, local publicly owned electric utilities, joint power agencies, and independent transmission companies. (10) This bill would appropriate $322,000 from the Public Utilities Commission Utilities Reimbursement Account to the PUC for additional staffing to identify, review, and approve transmission lines reasonably necessary or appropriate to facilitate achievement of the renewables portfolio standard. (11) The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for specified reasons.

Bill Text

Action History

  1. Chaptered by Secretary of State. Chapter 1, Statutes of 2011-12 First Extraordinary Session.

  2. Approved by the Governor.

  3. Enrolled and presented to the Governor at 1 p.m.

  4. In Senate. Ordered to engrossing and enrolling.

  5. Read third time. Passed. (Ayes 55. Noes 19. Page 134.) Ordered to the Senate.

  6. Read second time. Ordered to third reading.

  7. From committee: Do pass. (Ayes 12. Noes 3.) (March 14).

  8. From committee: Do pass and re-refer to Com. on APPR. (Ayes 6. Noes 3.) (March 7). Re-referred to Com. on APPR.

  9. From committee: Do pass and re-refer to Com. on NAT. RES. (Ayes 10. Noes 3.) (March 3). Re-referred to Com. on NAT. RES.

  10. Referred to Coms. on U. & C. and NAT. RES.

  11. In Assembly. Read first time. Held at Desk.

  12. Read third time. Passed. (Ayes 26. Noes 11. Page 44.) Ordered to the Assembly.

  13. Read second time. Ordered to third reading.

  14. From committee: Do pass. (Ayes 5. Noes 1. Page 42.) (February 23).

  15. Set for hearing February 23.

  16. From committee: Do pass and re-refer to Com. on APPR. (Ayes 8. Noes 2. Page 35.) (February 15). Re-referred to Com. on APPR.

  17. Set for hearing February 15.

  18. Re-referred to Com. on E. U. & C.

  19. (Corrected March 29.)

  20. Introduced. Read first time. Referred to Com. on RLS.

Sponsors

  • Steinberg · Cosponsor
  • Skinner · Cosponsor
  • Simitian · Primary
  • Kehoe · Cosponsor
  • Chesbro · Cosponsor
  • Bradford · Cosponsor

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 5 co-sponsors · 116 not signed on · 3 voted No

Sponsors (1)

  • Simitian

Co-sponsors (5)

  • Steinberg
  • Skinner
  • Kehoe
  • Chesbro
  • Bradford

Not signed on (116)

116 members have not signed on to this bill.

Show all 116 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 55 Yea · 19 Nay · 5 Other
Party YeaNayPresentNot Voting
Unaffiliated 521705
Republican 0200
Democratic 3000
Total 551905
% of votes cast 70%24%0%6%
How each member voted (79)
Member Party Vote
Cedillo — Yea
Eng — Yea
Furutani — Yea
Hall — Yea
Feuer — Yea
Butler — Yea
Carter — Yea
Williams — Yea
Yamada — Yea
Fuentes — Yea
Galgiani — Yea
Campos — Yea
Portantino — Yea
John A. Pérez — Yea
Mitchell — Yea
Garrick — Nay
Fletcher — Yea
Gatto — Yea
Gordon — Yea
Chesbro — Yea
Gorell — Not Voting
Bonilla — Yea
Atkins — Yea
Hagman — Nay
Halderman — Nay
Harkey — Nay
Hayashi — Yea
Hueso — Yea
Block — Yea
Conway — Nay
Cook — Not Voting
Davis — Yea
Dickinson — Yea
Donnelly — Nay
Huffman — Yea
Jeffries — Not Voting
Knight — Nay
Logue — Nay
Mendoza — Yea
Monning — Yea
Morrell — Nay
Nestande — Nay
Norby — Nay
Olsen — Nay
Pan — Yea
Silva — Nay
Smyth — Yea
Solorio — Yea
Torres — Yea
Valadao — Nay
Wieckowski — Yea
Achadjian — Yea
Alejo — Yea
Ammiano — Yea
Beall — Yea
Blumenfield — Yea
Bradford — Yea
Brownley — Yea
Buchanan — Yea
Hill — Yea
Huber — Yea
Lara — Yea
Ma — Yea
Mansoor — Nay
Miller — Yea
Nielsen — Nay
Perea — Yea
Skinner — Not Voting
Swanson — Yea
Wagner — Nay
Bill Berryhill — Not Voting
Bonnie Lowenthal — Yea
Roger Hernández — Yea
V. Manuel Pérez — Yea
Allen, Benjamin Democratic Yea
Calderon, Lisa Democratic Yea
Fong, Mike Democratic Yea
Grove, Shannon Republican Nay
Jones, Brian W. Republican Nay

Official roll call →

Do pass.

Passed 12 Yea · 3 Nay · 2 Other
Party YeaNayPresentNot Voting
Unaffiliated 11302
Democratic 1000
Total 12302
% of votes cast 71%18%0%12%
How each member voted (17)
Member Party Vote
Davis — Yea
Gatto — Yea
Fuentes — Yea
Mitchell — Yea
Hall — Yea
Harkey — Nay
Campos — Yea
Lara — Yea
Donnelly — Nay
Nielsen — Nay
Blumenfield — Yea
Bradford — Yea
Hill — Yea
Norby — Not Voting
Solorio — Yea
Wagner — Not Voting
Calderon, Lisa Democratic Yea

Official roll call →

Passed 10 Yea · 3 Nay · 2 Other
Party YeaNayPresentNot Voting
Unaffiliated 9302
Democratic 1000
Total 10302
% of votes cast 67%20%0%13%
How each member voted (15)
Member Party Vote
Fuentes — Yea
Furutani — Yea
Gorell — Nay
Fletcher — Not Voting
Knight — Nay
Nestande — Not Voting
Valadao — Nay
Bradford — Yea
Buchanan — Yea
Huffman — Yea
Ma — Yea
Skinner — Yea
Swanson — Yea
Roger Hernández — Yea
Fong, Mike Democratic Yea

Official roll call →

3rd Reading

Passed 26 Yea · 11 Nay · 3 Other
Party YeaNayPresentNot Voting
Unaffiliated 221103
Republican 1000
Democratic 3000
Total 261103
% of votes cast 65%28%0%8%
How each member voted (40)
Member Party Vote
Cannella — Nay
Corbett — Yea
Emmerson — Nay
Correa — Nay
DeSaulnier — Yea
Fuller — Not Voting
Yee — Yea
Wyland — Nay
Evans — Yea
Hancock — Yea
Runner — Yea
De León — Yea
Harman — Not Voting
Negrete McLeod — Yea
Rubio — Yea
Hernandez — Yea
Kehoe — Yea
Gaines — Nay
Berryhill — Not Voting
Lieu — Yea
Alquist — Yea
Blakeslee — Yea
Dutton — Nay
Liu — Yea
Pavley — Yea
Price — Yea
Walters — Nay
Wolk — Yea
Anderson — Nay
Huff — Nay
Leno — Yea
Simitian — Yea
Steinberg — Yea
Vargas — Yea
Wright — Nay
La Malfa — Nay
Calderon, Lisa Democratic Yea
Lowenthal, Josh Democratic Yea
Padilla, Stephen C. Democratic Yea
Strickland, Tony Republican Yea

Official roll call →

Do pass.

Passed 5 Yea · 1 Nay · 3 Other
Party YeaNayPresentNot Voting
Unaffiliated 5103
Total 5103
% of votes cast 56%11%0%33%
How each member voted (9)
Member Party Vote
Emmerson — Not Voting
Wyland — Not Voting
De León — Not Voting
Kehoe — Yea
Pavley — Yea
Price — Yea
Walters — Nay
Alquist — Yea
Steinberg — Yea

Official roll call →

Passed 8 Yea · 2 Nay · 1 Other
Party YeaNayPresentNot Voting
Unaffiliated 6201
Republican 1000
Democratic 1000
Total 8201
% of votes cast 73%18%0%9%
How each member voted (11)
Member Party Vote
Corbett — Yea
DeSaulnier — Yea
Fuller — Not Voting
Rubio — Yea
De León — Yea
Berryhill — Nay
Pavley — Yea
Simitian — Yea
Wright — Nay
Padilla, Stephen C. Democratic Yea
Strickland, Tony Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 2 do?
(1) Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, as defined. Existing law requires the PUC to require the state's 3 largest electrical corporations, Pacific Gas and Electric Company, San Diego Gas and Electric, and Southern California Edison, to identify a separate electrical rate component to fund programs that enhance system reliability and provide in-state benefits. This rate component is a nonbypassable element of local distribution and collected on the basis of usage. Existing PUC resolutions refer to the nonbypassable rate component as a "public goods charge." The public goods charge moneys are collected to support cost-effective energy efficiency and conservation activities, public interest research and development not adequately provided by competitive and regulated markets, and renewable energy resources. The existing Warren-Alquist State Energy Resources Conservation and Development Act establishes the State Energy Resources Conservation and Development Commission (Energy Commission) . The act requires the commission to certify sufficient sites and related facilities that are required to provide a supply of electric power sufficient to accommodate projected demand for power statewide. The act requires the commission to transmit a copy of an application for certification of a site and related facility to, among other entities, each federal and state agency having jurisdiction or special interest in matters pertinent to the proposed site and related facilities and to the Attorney General. This bill would require an applicant to inform the United States Department of Defense of a proposed project and that an application will be filed with the commission if the site and related facility specified in the application are proposed to be located within 1,000 feet of a military installation, or lie within special use airspace or beneath a low-level flight path, as defined. Existing law establishes the Renewable Resource Trust Fund as a fund that is continuously appropriated, with certain exceptions for administrative expenses, in the State Treasury, and requires that certain moneys collected to support renewable energy resources through the public goods charge are deposited into the fund and authorizes the Energy Commission to expend the moneys pursuant to the Renewable Energy Resources Program. The program states the intent of the Legislature to increase the amount of electricity generated from eligible renewable energy resources per year so that amount equals at least 20% of total retail sales of electricity in California per year by December 31, 2010. This bill would revise the Renewable Energy Resources Program to state the intent of the Legislature to increase the amount of electricity generated from eligible renewable energy resources per year, so that amount equals at least 33% of total retail sales of electricity in California per year by December 31, 2020. The bill would revise certain terms used in the program, and revise certain eligibility criteria for a renewable electrical generation facility, as defined, pursuant to the program. (2) Existing law expresses the intent of the Legislature, in establishing the California Renewables Portfolio Standard Program (RPS program) , to increase the amount of electricity generated per year from eligible renewable energy resources, as defined, to an amount that equals at least 20% of the total electricity sold to retail customers in California per year by December 31, 2010. The RPS program requires that a retail seller of electricity, including electrical corporations, community choice aggregators, and electric service providers, purchase a specified minimum percentage of electricity generated by eligible renewable energy resources, as defined, in any given year as a specified percentage of total kilowatthours sold to retail end-use customers each calendar year. The RPS program requires the PUC to implement annual procurement targets for each retail seller to increase its total procurement of electricity generated by eligible renewable energy resources by at least an additional 1% of retail sales per year so that 20% of its retail sales of electricity are procured from eligible renewable energy resources no later than December 31, 2010. Existing law requires the PUC to make a determination of the existing market cost for electricity, which PUC decisions call the market price referent, and to limit an electrical corporation's obligation to procure electricity from eligible renewable energy resources, that exceeds the market price referent, by a specified amount. This bill would express the intent that the amount of electricity generated per year from eligible renewable energy resources be increased to an amount that equals at least 20% of the total electricity sold to retail customers in California per year by December 31, 2013, and 33% by December 31, 2020. The bill would require the PUC, by January 1, 2012, to establish the quantity of electricity products from eligible renewable energy resources to be procured by each retail seller for specified compliance periods, sufficient to ensure that the procurement of electricity products from eligible renewable energy resources achieves 25% of retail sales by December 31, 2016, and 33% of retail sales by December 31, 2020, and that retail sellers procure not less than 33% of retail sales in all subsequent years. The bill, consistent with the goals of procuring the least-cost and best-fit eligible renewable energy resources that meet project viability principles, would require that all retail sellers procure a balanced portfolio of electricity products from eligible renewable energy resources, as specified. The bill would require the PUC to waive enforcement of the renewables portfolio standard procurement requirement if the PUC finds that the retail seller has demonstrated certain conditions exist that are beyond the control of the retail seller and will prevent compliance, and has taken all reasonable actions under its control to achieve compliance. The bill would require the PUC to direct each electrical corporation to annually prepare a renewable energy procurement plan containing specified matters and require, to the extent feasible, that the plan be proposed, reviewed, and adopted by the PUC as part of, and pursuant to, a general procurement plan process. The bill would require the PUC to direct all retail sellers to prepare and submit an annual compliance report. The bill would delete the existing market price referent provisions, and instead require the PUC to establish a limitation for each electrical corporation on the procurement expenditures for all eligible renewable energy resources used to comply with the renewables portfolio standard. The bill would require that by January 1, 2016, the PUC report to the Legislature assessing whether each electrical corporation can achieve a 33% renewables portfolio standard by December 31, 2020, and maintain that level thereafter, within the cost limitations. The bill would provide that, if the cost limitation for an electrical corporation is insufficient to support the projected costs of meeting the renewables portfolio standard procurement requirements, the electrical corporation is authorized to refrain from entering into new contracts or constructing facilities beyond the quantity that can be procured within the limitation, unless eligible renewable energy resources can be procured without exceeding a de minimis increase in rates, consistent with the electrical corporation's general procurement plan. The bill would delete an existing requirement that the PUC adopt flexible rules for compliance for retail sellers. The bill would revise the definitions of certain terms for purposes of the RPS program, would recast certain provisions applicable only to an electrical corporation with 60,000 or fewer customer accounts in California that serves retail end-use customers outside of California, and would add provisions applicable to certain smaller electrical corporations. The bill would authorize an electrical corporation to apply to the PUC for approval to construct, own, and operate an eligible renewable energy resource, and would require the PUC to approve the application if certain conditions are met, until electrical corporation owned and operated resources provide 8.25% of the corporation's anticipated retail sales. Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because the provisions of this bill are within the act and require action by the PUC to implement its requirements, a violation of these provisions would impose a state-mandated local program by expanding the definition of a crime. (3) Under existing law, the governing board of a local publicly owned electric utility is responsible for implementing and enforcing a renewables portfolio standard for the utility that recognizes the intent of the Legislature to encourage renewable resources, while taking into consideration the effect of the standard on rates, reliability, and financial resources and the goal of environmental improvement. This bill would repeal this provision, and instead generally make the requirements of the RPS program applicable to local publicly owned electric utilities, except that the utility's governing board would be responsible for implementation of those requirements, instead of the PUC, and certain enforcement authority with respect to local publicly owned electric utilities would be given to the Energy Commission and State Air Resources Board, instead of the PUC. By placing additional requirements upon local publicly owned electric utilities, the bill would impose a state-mandated local program. (4) Existing law requires the Energy Commission to certify eligible renewable energy resources, to design and implement an accounting system to verify compliance with the RPS requirements by retail sellers, and to develop tracking, accounting, verification, and enforcement mechanisms for renewable energy credits, as defined. This bill would require the Energy Commission to design and implement an accounting system to verify compliance with the RPS requirements by retail sellers and local publicly owned electric utilities. The bill would require the Energy Commission, among other things, to adopt regulations by July 1, 2011, specifying procedures for enforcement of the RPS requirements that include a public process under which the Energy Commission is authorized to issue a notice of violation and correction with respect to a local publicly owned electric utility and for referral to the State Air Resources Board for penalties imposed pursuant to the California Global Warming Solutions Act of 2006 or other laws if that act is suspended or repealed. This bill would revise the definition of renewable energy credit. The bill would require the Energy Commission, by June 30, 2011, to study and provide a report to the Legislature that analyzes run-of-river hydroelectric generating facilities, as defined, in British Columbia, including whether these facilities are, or should be, included as renewable electrical generation facilities for purposes of the Renewable Energy Resources Program administered by the Energy Commission or eligible renewable energy resources for purposes of the RPS program. (5) Existing law requires the PUC, by February 1 of each year, to prepare and submit to the Governor and the Legislature a written report on the costs of programs and activities conducted by an electrical corporation or gas corporation that have more than a specified number of customers in California. This bill would require the PUC, by February 1 of each year, to prepare and submit to the policy and fiscal committees of the Legislature a report on (A) all electrical corporation revenue requirement increases associated with meeting the renewables portfolio standard, (B) all cost savings experienced, or costs avoided, by electrical corporations as a result of meeting the renewables portfolio standard, (C) all costs incurred by electrical corporations for incentives for distributed and renewable generation, (D) all cost savings experienced, or costs avoided, by electrical corporations as a result of incentives for distributed generation and renewable generation, (E) specified costs for which an electrical corporation is seeking recovery in rates that are pending determination or approval by the PUC, (F) the decision number of each PUC decision in the prior year authorizing an electrical corporation to recover costs incurred in rates, (G) any changes in the prior year in load serviced by an electrical corporation, and (H) the efforts each electrical corporation is taking to recruit and train employees to ensure an adequately trained and available workforce. (6) The bill would require the PUC, by July 1, 2011, to determine the effective load carrying capacity of wind and solar energy resources on the electrical grid. The bill would require the PUC to use those values in establishing the contribution of those resources toward meeting specified resource adequacy requirements. (7) The Public Utilities Act prohibits any electrical corporation from beginning the construction of, among other things, a line, plant, or system, or of any extension thereof, without having first obtained from the PUC a certificate that the present or future public convenience and necessity require or will require that construction, termed a certificate of public convenience and necessity. This bill would require the PUC to issue a decision on an application for a certificate of public convenience and necessity within 18 months of the filing of a completed application under specified circumstances. (8) Existing law establishes the Department of Fish and Game in the Natural Resources Agency, and generally charges the department with the administration and enforcement of the Fish and Game Code. This bill would require the department to establish an internal division with the primary purpose of performing comprehensive planning and environmental compliance services with priority given to projects involving the building of eligible renewable energy resources. (9) The existing restructuring of the electrical industry within the Public Utilities Act provides for the establishment of an Independent System Operator (ISO) . Existing law requires the ISO to ensure efficient use and reliable operation of the transmission grid consistent with achieving planning and operating reserve criteria no less stringent than those established by the Western Electricity Coordinating Council of the North American Electric Reliability Corporation. Pursuant to existing law, the ISO's tariffs are required to be approved by the Federal Energy Regulatory Commission. This bill would require the ISO and other California balancing authorities to work cooperatively to integrate and interconnect eligible renewable energy resources to the transmission grid by the most efficient means possible with the goal of minimizing the impact and cost of new transmission facilities needed to meet both reliability needs and the renewables portfolio standard procurement requirements, and to accomplish this in a manner that respects the ownership, business, and dispatch models for transmission facilities owned by electrical corporations, local publicly owned electric utilities, joint power agencies, and independent transmission companies. (10) This bill would appropriate $322,000 from the Public Utilities Commission Utilities Reimbursement Account to the PUC for additional staffing to identify, review, and approve transmission lines reasonably necessary or appropriate to facilitate achievement of the renewables portfolio standard. (11) The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for specified reasons.
Who sponsors SB 2?
SB 2 is sponsored by Steinberg, Skinner, Simitian, Kehoe, Chesbro, and Bradford.
What is the current status of SB 2?
This bill has been enacted into law. Introduced February 01, 2011. Enacted.
Where can I track SB 2?
Track SB 2 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 2

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 2

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →