SB 429 — AN ACT CONCERNING AUTHORIZATION OF STATE GRANT COMMITMENTS FOR SCHOOL BUILDING PROJECTS AND REVISIONS TO THE SCHOOL BUILDING PROJECTS STATUTES.

Last action — FILE NO. 616

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2022 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Bill Text

What changed in the latest version

323 added · 37 removed

323 line(s) added, 37 removed.

→
Previous
Latest
General Assembly Substitute Bill No.
Senate General Assembly File No.
429 February Session, 2022 AN ACT CONCERNING AUTHORIZATION OF STATE GRANT COMMITMENTS FOR SCHOOL BUILDING PROJECTS AND REVISIONS TO THE SCHOOL BUILDING PROJECTS STATUTES.
616 February Session, 2022 Substitute Senate Bill No.
429 Senate, April 25, 2022 The Committee on Finance, Revenue and Bonding reported through SEN.
FONFARA of the 1st Dist., Chairperson of the Committee on the part of the Senate, that the substitute bill ought to pass.
AN ACT CONCERNING AUTHORIZATION OF STATE GRANT COMMITMENTS FOR SCHOOL BUILDING PROJECTS AND REVISIONS TO THE SCHOOL BUILDING PROJECTS STATUTES.
Section1.(Effectivefrompassage)TheCommissionerofAdministrative Services, having reviewed applications for state grants for public school building projects in accordance with section 10-283 of the general statutes on the basis of priorities for such projects and standards for school construction established by the State Board of Education, and having prepared a listing of all such eligible projects ranked in order of priority, as determined by said commissioner, together withthe amount of the estimated grant with respect to each eligible project, and having submitted such listing of eligible projects, prior to December 15, 2021, to a committee of the General Assembly established under section 10-283a of the general statutes for the purpose of reviewing such listing, is herebyauthorizedtoenterintograntcommitmentsonbehalfofthestate in accordance with said section with respect to the priority listing of such projects and in such estimated amounts as approved by such committee prior to February 1, 2022, as follows:
Section1.(Effectivefrompassage)TheCommissionerofAdministrative Services, having reviewed applications for state grants for public school building projects in accordance with section 10-283 of the general statutes on the basis of priorities for such projects and standards for school construction established by the State Board of Education, and having prepared a listing of all such eligible projects ranked in order of priority, as determined by said commissioner, together withthe amount of the estimated grant with respect to each eligible project, and having submitted such listing of eligible projects, prior to December 15, 2021, to a committee of the General Assembly established under section 10-283a of the general statutes for the purpose of reviewing such listing, is herebyauthorizedto enterintograntcommitmentsonbehalfofthestate in accordance with said section with respect to the priority listing of sSB429 / File No.
616 1 sSB429 File No.
616 such projects and in such estimated amounts as approved by such committee prior to February 1, 2022, as follows:
T1 School District Estimated Estimated LCO \\PRDFS1\SCOUSERS\FORZANOF\WS\2022SB-00429-R01 of 11 SB.docx Substitute Bill No.
T1 School District Estimated Estimated T2 School Project Costs Grant T3 Project Number T4 T5 FARMINGTON T6 Farmington High School T7 22DASY052076N0622 $131,666,047 $24,924,383 T8 T9 STAMFORD T10 Westhill High School T11 22DASY135280N0622 $257,938,824 $51,587,765 T12 T13 STAMFORD T14 Stamford Early Childhood Center T15 22DASY135281N0622 $51,740,423 $10,348,085 T16 T17 GRANBY T18 Granby Memorial High School T19 22DASY056052A0622 $3,486,378 $1,319,943 T20 T21 HAMDEN T22 Hamden Middle School T23 22DASY062104DV0622 $17,100,000 $13,680,000 T24 T25 MANCHESTER T26 Keeney Elementary School T27 22DASY077241RNV0622 $23,800,000 $15,810,340 T28 T29 MILFORD T30 Pumpkin Delight Elementary School T31 22DASY084213EA0622 $15,060,750 $5,593,563 T32 T33 SIMSBURY T34 Latimer Lane School T35 22DASY128111RNV0622 $36,792,406 $12,351,211 T36 T37 REGIONAL DISTRICT 7 sSB429 / File No.
429 T2 School Project Costs Grant T3 Project Number T4 T5 FARMINGTON T6 Farmington High School T7 22DASY052076N0622 $131,666,047 $24,924,383 T8 T9 STAMFORD T10 Westhill High School T11 22DASY135280N0622 $257,938,824 $51,587,765 T12 T13 STAMFORD T14 Stamford Early Childhood Center T15 22DASY135281N0622 $51,740,423 $10,348,085 T16 T17 GRANBY T18 Granby Memorial High School T19 22DASY056052A0622 $3,486,378 $1,319,943 T20 T21 HAMDEN T22 Hamden Middle School T23 22DASY062104DV0622 $17,100,000 $13,680,000 T24 T25 MANCHESTER T26 Keeney Elementary School T27 22DASY077241RNV0622 $23,800,000 $15,810,340 T28 T29 MILFORD T30 Pumpkin Delight Elementary School T31 22DASY084213EA0622 $15,060,750 $5,593,563 T32 T33 SIMSBURY T34 Latimer Lane School T35 22DASY128111RNV0622 $36,792,406 $12,351,211 T36 T37 REGIONAL DISTRICT 7 T38 Regional School District No.
616 2 sSB429 File No.
7 T39 Agricultural Education Center T40 22DASY207031VE0622 $100,000 $80,000 (2) Previously Authorized Projects For the Technical Education and LCO {\\PRDFS1\SCOUSERS\FORZANOF\WS\2022SB-00422 of 11 R02-SB.docx } Substitute Bill No.
616 T38 Regional School District No.
429 CareerSystemThat Have ChangedSubstantially inScopeor Cost which are Seeking Reauthorization.
7 T39 Agricultural Education Center T40 22DASY207031VE0622 $100,000 $80,000 (2) Previously Authorized Projects For the Technical Education and CareerSystemThat Have ChangedSubstantially inScopeor Cost which are Seeking Reauthorization.
Such school safety infrastructure criteria shall conform to industry standards for school building safety infrastructure and shall address areas including, but not be limited to, (1) entryways to school buildings and classrooms, such as, reinforcement of entryways, ballistic glass, solid core doors, double door access, computer-controlled electronic locks, remote locks on all entrance and exits and buzzer systems, (2) the use of cameras throughout the school building and at all entrances and exits, including the use of closed-circuit television monitoring, (3) penetration resistant vestibules, [and] (4) other security infrastructure improvements and devices as they become industry standards, and (5) on and after July 1, 2022, a requirement that at least one window in each classroom is able to be opened and used as a means of escape during an emergency.
Such school safety infrastructure criteria shall conform to industry standards for school building safety infrastructure and shall address areas including, but not be limited to, (1) entryways to school buildings and classrooms, such as, reinforcement of entryways, ballistic glass, solid core doors, double door access, computer-controlled electronic locks, remote locks on all entrance and exits and buzzer systems, (2) the use of cameras throughout the school building and at all entrances and exits, including the use of closed-circuit television monitoring, (3) penetration resistant vestibules, [and] (4) other security infrastructure improvements and devices as they become industry standards, and (5) sSB429 / File No.
The council shall meet at least annually to review and update, if necessary, the school safety infrastructure criteria and make LCO {\\PRDFS1\SCOUSERS\FORZANOF\WS\2022SB-00423 of 11 R02-SB.docx } Substitute Bill No.
616 3 sSB429 File No.
429 such criteria available to local and regional boards of education.
616 on and after July 1, 2022, a requirement that at least one window in each classroom is able to be opened and used as a means of escape during an emergency.
The council shall meet at least annually to review and update, if necessary, the school safety infrastructure criteria and make such criteria available to local and regional boards of education.
(4) In the case of a new construction, extension, renovation or replacement, the plans do not provide that the building maintenance staff responsible for such facility are trained in or are receiving training LCO {\\PRDFS1\SCOUSERS\FORZANOF\WS\2022SB-0044 of 11 R02-SB.docx } Substitute Bill No.
sSB429 / File No.
429 in, or that the applicant plans to provide training in, the appropriate areas of plant operations including, but not limited to, heating, ventilation and air conditioning systems pursuant to section 10-231e, with specific training relative to indoor air quality;
616 4 sSB429 File No.
616 (4) In the case of a new construction, extension, renovation or replacement, the plans do not provide that the building maintenance staff responsible for such facility are trained in or are receiving training in, or that the applicant plans to provide training in, the appropriate areas of plant operations including, but not limited to, heating, ventilation and air conditioning systems pursuant to section 10-231e, with specific training relative to indoor air quality;
(a) For the fiscal year ending June 30, 2012, and each fiscal year thereafter, a local or regional board of education, a regional educational service center, a cooperative arrangement pursuant to section 10-158a, or any of the following entities that operate an interdistrict magnet LCO {\\PRDFS1\SCOUSERS\FORZANOF\WS\2022SB-0045 of 11 R02-SB.docx } Substitute Bill No.
(a) For the fiscal year ending June 30, 2012, and each fiscal year thereafter, a local or regional board of education, a regional educational sSB429 / File No.
429 school that assists the state in meeting its obligations pursuant to the decisionin Sheffv.
616 5 sSB429 File No.
616 service center, a cooperative arrangement pursuant to section 10-158a, or any of the following entities that operate an interdistrict magnet school that assists the state in meeting its obligations pursuant to the decisionin Sheffv.
Applications for reimbursement under this section for the construction of new interdistrict magnet schools shall not be accepted until the Commissioner of Education develops a comprehensive state-wide interdistrict magnet school plan, in accordance with the provisions of subdivision (1) of subsection (b) of section 10-264l, unless the Commissioner of Education determines that LCO {\\PRDFS1\SCOUSERS\FORZANOF\WS\2022SB-0046 of 11 R02-SB.docx } Substitute Bill No.
Applications for reimbursement under this section for the construction of new interdistrict magnet schools shall not be accepted until the Commissioner of Education develops a comprehensive state-wide interdistrict magnet school plan, in sSB429 / File No.
429 suchconstructionwillassistthestateinmeetingitsobligationspursuant to the decision in Sheff v.
616 6 sSB429 File No.
616 accordance with the provisions of subdivision (1) of subsection (b) of section 10-264l, unless the Commissioner of Education determines that suchconstructionwillassistthestateinmeetingitsobligationspursuant to the decision in Sheff v.
(c) (1) If the school building ceases to be used as an interdistrict magnet school facility and the grant was provided for the purchase or construction of the facility, the Commissioner of Administrative Services, in consultation with the Commissioner of Education, shall LCO {\\PRDFS1\SCOUSERS\FORZANOF\WS\2022SB-0047 of 11 R02-SB.docx } Substitute Bill No.
(c) (1) If the school building ceases to be used as an interdistrict magnet school facility and the grant was provided for the purchase or construction of the facility, the Commissioner of Administrative sSB429 / File No.
429 determine whether (A) title to the building and any legal interest in appurtenant land shall revert to the state, or (B) the school district shall reimburse the state an amount equal to the difference between the amount received pursuant to this section and the amount the district would have been eligible to receive based on the percentage determined pursuant to section 10-285a, as amended by this act, multiplied by the estimated eligible project costs.
616 7 sSB429 File No.
616 Services, in consultation with the Commissioner of Education, shall determine whether (A) title to the building and any legal interest in appurtenant land shall revert to the state, or (B) the school district shall reimburse the state an amount equal to the difference between the amount received pursuant to this section and the amount the district would have been eligible to receive based on the percentage determined pursuant to section 10-285a, as amended by this act, multiplied by the estimated eligible project costs.
(NEW) (Effective July 1, 2022) (a) Not later than January 1, 2023, and every five years thereafter, the Capitol Region Education Council shall adopt a long-range plan of capital improvement and school building project priorities and goals for interdistrict magnet school LCO {\\PRDFS1\SCOUSERS\FORZANOF\WS\2022SB-0048 of 11 R02-SB.docx } Substitute Bill No.
(NEW) (Effective July 1, 2022) (a) Not later than January 1, 2023, and every five years thereafter, the Capitol Region Education Council shall adopt a long-range plan of capital improvement and school sSB429 / File No.
429 facilities that will assist the state in meeting its obligations pursuant to the decision in Sheff v.
616 8 sSB429 File No.
616 building project priorities and goals for interdistrict magnet school facilities that will assist the state in meeting its obligations pursuant to the decision in Sheff v.
(NEW) (k) For all projects authorized on or after July 1, 2024, the percentage determined for any school building project for a local or regional board of education pursuant to this section shall be increased by five percentage points if the contractor who has been awarded the contract for such school building project reserves a portion equivalent LCO {\\PRDFS1\SCOUSERS\FORZANOF\WS\2022SB-00429 of 11 R02-SB.docx } Substitute Bill No.
(NEW) (k) For all projects authorized on or after July 1, 2024, the percentage determined for any school building project for a local or regional board of education pursuant to this section shall be increased by five percentage points if the contractor who has been awarded the sSB429 / File No.
429 to not less than twelve and one-half per cent of the total value of the contract or the portion set aside pursuant to subparagraph (A) of subdivision (3) of subsection (b) of section 4a-60g, for awards to subcontractors who are minority business enterprises, as defined in section 4a-60g.
616 9 sSB429 File No.
616 contract for such school building project reserves a portion equivalent to not less than twelve and one-half per cent of the total value of the contract or the portion set aside pursuant to subparagraph (A) of subdivision (3) of subsection (b) of section 4a-60g, for awards to subcontractors who are minority business enterprises, as defined in section 4a-60g.
Section 1 from passage New section LCO {\\PRDFS1\SCOUSERS\FORZANOF\WS\2022SB-004210 of 11 R02-SB.docx } Substitute Bill No.
Section 1 from passage New section sSB429 / File No.
429 Sec.
616 10 sSB429 File No.
616 Sec.
7 July 1, 2022 10-287i Statement of Legislative Commissioners:
7 July 1, 2022 10-287i ED Joint Favorable Subst.
In Section 6, "not less than" was added for clarity.
C/R FIN FIN Joint Favorable sSB429 / File No.
ED Joint Favorable Subst.
616 11 sSB429 File No.
Show all 132 changed rows (92 more)
Previous
Latest
C/R FIN FIN Joint Favorable LCO {\\PRDFS1\SCOUSERS\FORZANOF\WS\2022SB-00429- 11 of 11 R02-SB.docx }
616 The following Fiscal Impact Statement and Bill Analysis are prepared for the benefit of the members of the General Assembly, solely for purposes of information, summarization and explanation and do not represent the intent of the General Assembly or either chamber thereof for any purpose.
In general, fiscal impacts are based upon a variety of informational sources, including the analyst’s professional knowledge.
Whenever applicable, agency data is consulted as part of the analysis, however final products do not necessarily reflect an assessment from any specific department.
OFA Fiscal Note State Impact:
Agency Affected Fund-Effect FY 23 $ Out Years $ Treasurer, Debt Serv.
GF - Future Cost See Below 259 million Note:
GF=General Fund Municipal Impact:
Municipalities Effect FY 23 $ Out Years $ Various Municipalities Future See Below 184 million Revenue Gain Explanation The bill approves a net increase of $184 million in state grant commitments for school construction projects, which represents potential revenue gain for the specified municipalities.
The grants-in- aid will be financed through the issuance of General Obligation (GO) bonds in future fiscal years.
The bill does not authorize new GO bonds.
The projected debt service cost to the General Fund to issue $184 million of GO bonds at market rates is $259 million.
The bill changes statute regarding eligibility for school construction projects for interdistrict magnet schools.
To the extent additional projects are approved, there may be increased future costs through the school construction GO bonds.
The impact of additional projects on the school construction priority list will be reflected when such projects are considered by the legislature in the future.
The bill has the potential to increase reimbursement rates by 5 sSB429 / File No.
616 12 sSB429 File No.
616 percentage points or withhold 5 percent of reimbursement for school construction projects exceeding or missing certain contractor standards.
To the extent this changes future reimbursement rates, there would be a commensurate change in revenue gain to relevant municipalities and change in debt service for the State.
The Out Years The ongoing fiscal impact identified above will continue into the future subject to project completion, successful application for reimbursement, and the costs of borrowing.
sSB429 / File No.
616 13 sSB429 File No.
616 OLR Bill Analysis sSB 429 AN ACT CONCERNING AUTHORIZATION OF STATE GRANT COMMITMENTS FOR SCHOOL BUILDING PROJECTS AND REVISIONS TO THE SCHOOL BUILDING PROJECTS STATUTES.
TABLE OF CONTENTS:
§ 1 — SCHOOL CONSTRUCTION GRANT COMMITMENTS Authorizesnineschoolconstructionstate grant commitmentstotaling $135.69 million toward total project costs of $537.68 million;
reauthorizesonetechnical high school project with an additional state grant commitment of $48.67 million, which matches the additional estimated project cost §§ 2 & 3 — CLASSROOM WINDOW REQUIREMENT Requires certain school building projects on any list DAS submits to the General Assembly beginning July 1, 2023, include at least one window in each classroom that can be opened and used as a means of escape during an emergency;
specifies that the state’s school safety infrastructure criteria must address a similar requirement § 4 — MAGNET SCHOOLS AND SCHOOL CONSTRUCTION GRANTS Eliminates a provision limiting DAS’s approval of magnet school construction projects to ones found to reduce racial, ethnic, and economic isolation § 5 — CAPITOL REGION EDUCATION COUNCIL (CREC) LONG- RANGE CAPITAL IMPROVEMENT PLAN Requires CREC to adopt, every five years, a long-range plan of capital improvement and school building project priorities for magnet schools and a rolling three-year capital plan;
requires the plans be submitted to DAS, which in turn submits them to the legislature §§ 6 & 7 — PENALTY AND INCENTIVE FOR SCHOOL CONSTRUCTION PROJECTS USING MINORITY ENTERPRISE (MBE) SET-ASIDE GOALS Creates both a financial incentive and a penalty for school construction projects, depending upon whether they meet or fail to meet MBE set-aside goals sSB429 / File No.
616 14 sSB429 File No.
616 BACKGROUND § 1 — SCHOOL CONSTRUCTION GRANT COMMITMENTS Authorizes nine school construction state grant commitments totaling $135.69 million toward total project costs of $537.68 million;
reauthorizes one technical high school project with an additional state grant commitment of $48.67 million, which matches the additional estimated project cost Thisbillauthorizes nineschoolconstruction state grant commitments totaling $135.69 million toward total estimated project costs of $537.68 million.
It also reauthorizes one technical high school renovation project that has changed substantially in scope and cost with an additional state grant commitment of $48.67 million, which matches the additional estimated project cost.
Under the state school construction grant program, the state reimburses towns and local districts for a percentage of eligible school construction costs through state GO bonds (with less wealthy municipalities receiving a higher reimbursement).
The municipalities pay the remaining costs.
For the state-operated Connecticut Technical Education and Career System, also known as the technical high schools, the state pays 100% of the project costs.
For each project authorized by the bill, the table below shows the district, school, project type, estimates for total cost and state grant commitment, and state reimbursement rate.
School Construction Grant Commitments District School Project Estimated Estimated Reimbursement Type Project Costs Grant Rate Farmington Farmington New $131,666,047 $24,924,383 18.93% High School Stamford Westhill High New 257,938,824 51,587,765 20% School Stamford Early Stamford Childhood New 51,740,423 10,348,085 20% Center sSB429 / File No.
616 15 sSB429 File No.
616 Granby Granby Memorial High Alteration 3,486,378 1,319,943 37.86% School Extension/ Hamden Hamden Middle alteration;
17,100,000 13,680,000 80% School diversity school Keeney Manchester Elementary Renovation 23,800,000 15,810,340 66.43% School Pumpkin Milford Delight Extension/ 15,060,750 5,593,563 37.14% Elementary alteration School Simsbury Latimer Lane Renovation 36,792,406 12,351,211 33.57% School Regional School District Regional No.
7, Vo-ag 100,000 80,000 80% District 7 Agricultural equipment Education Center Totals $537,684,828 $135,695,290 Reauthorized Project The bill also reauthorizes, with a change in cost and scope, the proposal for Bullard-Havens Technical High School located in Bridgeport.
The reauthorization changes it from an extension and alteration project with an estimated total project cost of $139,447,195 to a new construction project with an estimated cost of $188,122,766.
This is a $48.67 million increase that the state pays in full.
The Bullard-Havens proposal was originally authorized by PA 05-6, June Special Session (JSS), as an extension and alteration project with an estimated total project cost of $27,331,000.
Then, PA 15-3, JSS, reauthorized the project with a new estimated cost of $60,383,000.
Last year Bullard-Havens was reauthorized again by PA 21-111, § 113, with a new estimated cost of $139,447,195.
EFFECTIVE DATE:
Upon passage sSB429 / File No.
616 16 sSB429 File No.
616 §§ 2 & 3 — CLASSROOM WINDOW REQUIREMENT Requires certain school building projects on any list DAS submits to the General Assembly beginning July 1, 2023, include at least one window in each classroom that can be opened and used as a means of escape during an emergency;
specifies that the state’s school safety infrastructure criteria must address a similar requirement The bill adds a requirement that windows with opening capability be included in all school building projects for new construction, extension, major alteration, renovation, or replacement on any Department of Administrative Services (DAS) project list submitted to the General Assembly beginning July 1, 2023.
It does so by prohibiting DAS from approving any school building project plan that does not provide for at least one window in each classroom that can be opened and used as a means of escape during an emergency, in accordance with the school safety infrastructure criteria required under law.
By law, all school building projects seeking state assistance must first have their plans and sites approved by DAS, among others.
Under existing law, the School Safety Infrastructure Council (SSIC) must develop school safety infrastructure criteria for the state’s school building projects program and school security infrastructure competitive grant program.
The criteria must conform to industry standards for school building safety infrastructure and address certain specified areas such as closed-circuit television monitoring use and penetration-resistant vestibules.
The bill specifies that the criteria must also address, by July 1, 2022, a requirement that all classrooms have at least one window that can be opened and used as a means of escape during anemergency.
(It isnot clear howthe SSIC criteriacanberevised by July 1, 2022 when that is the effective date of this new requirement.) EFFECTIVE DATE:
July 1, 2022 § 4 — MAGNET SCHOOLS AND SCHOOL CONSTRUCTION GRANTS Eliminates a provision limiting DAS’s approval of magnet school construction projects to ones found to reduce racial, ethnic, and economic isolation The bill eliminates a provision requiring the DAS commissioner to only approve school construction grant applications for interdistrict magnet school projects if the State Department of Education (SDE) sSB429 / File No.
616 17 sSB429 File No.
616 commissioner finds the school will reduce racial, ethnic, and economic isolation.
Under existing law, unchanged by the bill, SDE only approves magnet school funding if the school will reduce racial, ethnic, and economic isolation (CGS § 10-264l).
The bill also makes conforming and technical changes, including deleting an obsolete moratorium provision on grant applications for the construction of new magnet schools.
EFFECTIVE DATE:
July 1, 2022 § 5 — CAPITOL REGION EDUCATION COUNCIL (CREC) LONG- RANGE CAPITAL IMPROVEMENT PLAN Requires CREC to adopt, every five years, a long-range plan of capital improvement and school building project priorities for magnet schools and a rolling three-year capital plan;
requires the plans be submitted to DAS, which in turn submits them to the legislature Long-Range Plan The bill requires CREC to adopt, by January 1, 2023, and every five years after, a long-range plan of capital improvement and school building project priorities and goals for magnet school facilities that will help the state address its obligations under the Sheff court decision and related stipulations and orders.
The plan must include a summary of activities related to school building projects, capital improvements, and capital equipment included in a rolling three-year school building plan that is required by the bill.
Upon adoption of the long-range plan, CREC must submit it to DAS, and the department must file it directly with the Appropriations, Education, and Finance, Revenue and Bonding committees.
Rolling Three-Year Plan The bill requires CREC to maintain a rolling three-year school building project, capital improvement, and equipment plan that identifies the (1) expected school building projects, capital improvements, and capital equipment for each CREC magnet school facility and their anticipated cost and (2) specific equipment each magnet school is expected to need and the estimated cost, based on the sSB429 / File No.
616 18 sSB429 File No.
616 useful life of existing equipment and changing technology projections.
It also requires CREC to annually submit the plan to DAS, and the department must file it directly with the Appropriations, Education, and Finance, Revenue, and Bonding committees.
EFFECTIVE DATE:
July 1, 2022 §§ 6 & 7 — PENALTY AND INCENTIVE FOR SCHOOL CONSTRUCTION PROJECTS USING MINORITY ENTERPRISE (MBE) SET-ASIDE GOALS Creates both a financial incentive and a penalty for school construction projects, depending upon whether they meet or fail to meet MBE set-aside goals Penalty (§ 7) Under the state set-aside program, state agencies (municipal projects are addressed through the contractors, see below) must set aside at least 25% of the total value of all contracts they let for construction, goods, and services each fiscal year for exclusive bidding by certified small contractors.
The agencies must further reserve at least 25% of the set- aside value (i.e., at least 6.25% of the total) for exclusive bidding by certified MBEs.
Contractors awarded municipal public works contracts must comply with these requirements if the (1) contract includes state financial assistance and (2) total contract value exceeds $50,000.
By law, a “small contractor” is a business that (1) maintains its principal place of business in Connecticut, (2) had gross revenues of $20 million or less during its most recent fiscal year, and (3) is independent.
MBEs are small contractors owned by women, minorities, or people with disabilities.
The owner must have managerial and technical competence and experience directly related to his or her principal business activities.
In addition to set-aside requirements, the existing law requires nondiscrimination and affirmative action provisions be included in municipal public works contracts (as well as state contracts) (CGS §4a-60g).
The bill requires, starting with projects authorized on or after July 1, 2024, DAS to withhold 5%ofa schoolconstruction reimbursement grant sSB429 / File No.
616 19 sSB429 File No.
616 if the DAS commissioner determines that the applicant has failed to comply with the provisions of state set-aside law for MBEs.
(The bill places the burden to meet the MBE requirement on the town applying for school construction funds, but existing law places the MBE requirement on the project contractor, not the town.) Incentive (§ 6) The bill creates an increased school construction reimbursement grant of five additional percentage points for projects where the project contractor hasreserved(1)at least12.5%ofthetotalvalueofthecontract or (2) the portion set aside required by state MBE set-aside law (i.e, 6.25% of the state’s assistance for the project) for awards to MBE subcontractors.
This incentive begins for board of education-sponsored school building projects authorized on or after July 1, 2024.
Under state law governing school construction reimbursement grants, a town is assigned a state reimbursement percentage based on town property wealth (CGS § 10-285a).
For example, if a town has a 50% reimbursement rate and qualified under this incentive, it’s reimbursement rate would increase from 50% to 55%.
EFFECTIVE DATE:
July 1, 2022 BACKGROUND Related Bills sSB 428, favorably reported by the Education Committee, eliminates the SSIC and generally reassigns its duties to the School Building Projects Advisory Council (see §§ 6 & 7).
SB 485, favorably reported by the Finance, Revenue and Bonding Committee, similarly requires CREC to develop capital plans.
COMMITTEE ACTION Education Committee Joint Favorable Substitute Change of Reference - FIN Yea 39 Nay 0 (03/25/2022) sSB429 / File No.
616 20 sSB429 File No.
616 Finance, Revenue and Bonding Committee Joint Favorable Yea 51 Nay 0 (04/06/2022) sSB429 / File No.
616 21
View plain text versions (4)

Action History

  1. FILE NO. 616

  2. SENATE CALENDAR NUMBER 444

  3. FAV. RPT., TAB. FOR CAL., SEN.

  4. RPTD. OUT OF LCO

  5. REFERRED TO Office of Legislative Research AND Office of Fiscal Analysis 04/25/22

  6. FILED WITH LCO

  7. Joint Favorable

  8. FAV. CHG. OF REF. HOUSE TO COMM. ON Finance, Revenue and Bonding

  9. FAV. CHG. OF REF., SEN. TO COMM. ON Finance, Revenue and Bonding

  10. RPTD. OUT OF LCO

  11. FILED WITH LCO

  12. Joint Favorable Substitute Change of Reference FIN

  13. PUBLIC HEARING 0321

  14. REF. TO JOINT COMM. ON Education

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

2 sponsors · 0 co-sponsors · 185 not signed on

Sponsors (2)

Co-sponsors (0)

None.

Not signed on (185)

185 members have not signed on to this bill.

Show all 185 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 429?
SB 429 is sponsored by Sanchez, J. and Derek Slap (Democratic).
What is the current status of SB 429?
This bill died with 2022 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 429?
Track SB 429 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 429

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 429

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →