Indiana 2023 Regular Session Status: Enacted 6 R cosponsors

HB 1007 — Electric utility service.

Last action — Signed by the Governor

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed House
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced January 12, 2023. Enacted.

Odds of enactment

High chance

Based on the sponsor, cosponsors, and committee posture, this bill has a high chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Likely to advance 82% · moderate confidence
  • Enacted

    Current position in the legislative process.

  • 9 sponsors

    4 primary, 5 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (6 R).

  • Cleared a recorded vote

    Passed 1 recorded vote so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Summary

Provides that it is the continuing policy of the state that decisions concerning Indiana's electric generation resource mix, energy infrastructure, and electric service ratemaking constructs must take into account the following attributes of electric utility service: (1) Reliability. (2) Affordability. (3) Resiliency. (4) Stability. (5) Environmental sustainability. Requires the Indiana utility regulatory commission (IURC) to take each of these attributes into account when: (1) reviewing, and preparing a final director's report for, an integrated resource plan submitted by an electric utility; (2) acting upon a petition for the construction, purchase, or lease of an electric generation facility; and (3) reviewing whether the public convenience and necessity continues to require the completion of an electric generation facility under construction. Requires the IURC to commence before September 1, 2023, a comprehensive study to consider the appropriate: (1) design and framework for; and (2) requirements with respect to; performance based ratemaking for investor-owned electricity suppliers. Sets forth certain topics that the IURC shall consider and evaluate in conducting the required study. Requires the IURC to include in its annual report that is due before October 1, 2025, a report containing the IURC's analysis and recommendations on the specified topics. Provides that the report must contain recommendations, supported by sufficient data and analysis from the IURC's study, with respect to the appropriate: (1) design and framework for; and (2) requirements with respect to; performance based ratemaking for electricity suppliers, so as to enable the general assembly to fully evaluate the impact of performance based ratemaking on all classes of ratepayers, while considering the five attributes of electric utility service set forth as state policy in the bill. Amends the statute governing reliability adequacy metrics for certain electric utilities ("public utilities" under the statute) as follows: (1) Defines the terms: (A) "fall unforced capacity", or "fall UCAP"; and (B) "spring unforced capacity", or "spring UCAP"; for purposes of the prescribed reliability adequacy metrics. (2) Reduces to 15% the 30% limit (under current law) for a public utility's summer or winter unforced capacity (UCAP) that the public utility is authorized to acquire from capacity markets, for purposes of the reliability adequacy metrics included in a resource planning report (report) submitted to the IURC after June 30, 2023. (3) Provides that the reliability metrics included in a report submitted to the IURC after June 30, 2026, must include specified information concerning a public utility's ability to meet its spring UCAP and fall UCAP. (4) Provides that if, after reviewing a public utility's report, the IURC is not satisfied that the public utility can: (A) provide reliable electric service to its Indiana customers; or (B) either: (i) satisfy both its planning reserve margin requirement or other federal reliability requirements and the reliability adequacy metrics set forth in the bill; or (ii) provide sufficient reason as to why it is unable to satisfy both its planning reserve margin requirement or other federal reliability requirements and the reliability adequacy metrics set forth in the bill; the IURC may conduct an investigation into the matter. (Current law does not require the IURC to consider whether the public utility can provide sufficient reason as to its inability to satisfy both its planning reserve margin requirement or other federal reliability requirements and the reliability adequacy metrics set forth in the bill.) (5) Requires the IURC to include in its 2025 annual report its analysis regarding the appropriate percentage or portion of: (A) total spring UCAP; and (B) total fall UCAP; that public utilities should be authorized to acquire from capacity markets.

Bill Text

We don't have the full text on file for this bill yet.

Read HB 1007 on the official Indiana source →

Action History

  1. Signed by the Governor

  2. Public Law 55

  3. Signed by the President of the Senate

  4. Signed by the President Pro Tempore

  5. Signed by the Speaker

  6. House concurred in Senate amendments; Roll Call 318: yeas 93, nays 2

  7. Motion to concur filed

  8. Returned to the House with amendments

  9. Third reading: passed; Roll Call 227: yeas 48, nays 0

  10. Second reading: ordered engrossed

  11. Senators Leising and Byrne added as cosponsors

  12. Senator Donato added as third sponsor

  13. Senator Zay added as second sponsor

  14. Committee report: amend do pass, adopted

  15. First reading: referred to Committee on Utilities

  16. Referred to the Senate

  17. Representative Frye added as coauthor

  18. Senate sponsor: Senator Koch

  19. Third reading: passed; Roll Call 37: yeas 96, nays 1

  20. Second reading: ordered engrossed

  21. Amendment #2 (Pierce) failed; Roll Call 34: yeas 30, nays 61

  22. Amendment #1 (Errington) failed; Roll Call 33: yeas 27, nays 64

  23. Amendment #3 (Pryor) failed; Roll Call 32: yeas 28, nays 63

  24. Committee report: amend do pass, adopted

  25. First reading: referred to Committee on Utilities, Energy and Telecommunications

  26. Authored by Representative Soliday

  27. Coauthored by Representatives Jeter and Negele

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

4 sponsors · 5 co-sponsors · 141 not signed on

Sponsors (4)

Co-sponsors (5)

Not signed on (141)

141 members have not signed on to this bill.

Show all 141 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 48 Yea · 0 Nay · 2 Other
Party YeaNayPresentNot Voting
Republican 32001
Democrat 8000
Unaffiliated 8001
Total 48002
% of votes cast 96%0%0%4%
How each member voted (50)
Member Party Vote
Crane — Yea
Johnson — Yea
Sandlin — Yea
Messmer — Yea
Breaux — Yea
Perfect — Yea
Zay — Yea
Melton — Not Voting
Ford Jon — Yea
Andrea Hunley Democrat Yea
David Niezgodski Democrat Yea
Fady Qaddoura Democrat Yea
Greg Taylor Democrat Yea
J.D. Ford Democrat Yea
Lonnie Randolph Democrat Yea
Rodney Pol Democrat Yea
Shelli Yoder Democrat Yea
Aaron Freeman Republican Yea
Blake Doriot Republican Yea
Brian Buchanan Republican Yea
Chris Garten Republican Not Voting
Dan Dernulc Republican Yea
Ed Charbonneau Republican Yea
Eric Bassler Republican Yea
Eric Koch Republican Yea
Gary Byrne Republican Yea
Greg Walker Republican Yea
James Buck Republican Yea
James Tomes Republican Yea
Jean Leising Republican Yea
Jeff Raatz Republican Yea
Justin Busch Republican Yea
Kyle Walker Republican Yea
Linda Rogers Republican Yea
Liz Brown Republican Yea
Michael Crider Republican Yea
Michael Young Republican Yea
Mike Bohacek Republican Yea
Mike Gaskill Republican Yea
Rick Niemeyer Republican Yea
Rodric Bray Republican Yea
Ron Alting Republican Yea
Ryan Mishler Republican Yea
Scott Alexander Republican Yea
Scott Baldwin Republican Yea
Spencer Deery Republican Yea
Stacey Donato Republican Yea
Susan Glick Republican Yea
Travis Holdman Republican Yea
Vaneta Becker Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB 1007 do?
Provides that it is the continuing policy of the state that decisions concerning Indiana's electric generation resource mix, energy infrastructure, and electric service ratemaking constructs must take into account the following attributes of electric utility service: (1) Reliability. (2) Affordability. (3) Resiliency. (4) Stability. (5) Environmental sustainability. Requires the Indiana utility regulatory commission (IURC) to take each of these attributes into account when: (1) reviewing, and preparing a final director's report for, an integrated resource plan submitted by an electric utility; (2) acting upon a petition for the construction, purchase, or lease of an electric generation facility; and (3) reviewing whether the public convenience and necessity continues to require the completion of an electric generation facility under construction. Requires the IURC to commence before September 1, 2023, a comprehensive study to consider the appropriate: (1) design and framework for; and (2) requirements with respect to; performance based ratemaking for investor-owned electricity suppliers. Sets forth certain topics that the IURC shall consider and evaluate in conducting the required study. Requires the IURC to include in its annual report that is due before October 1, 2025, a report containing the IURC's analysis and recommendations on the specified topics. Provides that the report must contain recommendations, supported by sufficient data and analysis from the IURC's study, with respect to the appropriate: (1) design and framework for; and (2) requirements with respect to; performance based ratemaking for electricity suppliers, so as to enable the general assembly to fully evaluate the impact of performance based ratemaking on all classes of ratepayers, while considering the five attributes of electric utility service set forth as state policy in the bill. Amends the statute governing reliability adequacy metrics for certain electric utilities ("public utilities" under the statute) as follows: (1) Defines the terms: (A) "fall unforced capacity", or "fall UCAP"; and (B) "spring unforced capacity", or "spring UCAP"; for purposes of the prescribed reliability adequacy metrics. (2) Reduces to 15% the 30% limit (under current law) for a public utility's summer or winter unforced capacity (UCAP) that the public utility is authorized to acquire from capacity markets, for purposes of the reliability adequacy metrics included in a resource planning report (report) submitted to the IURC after June 30, 2023. (3) Provides that the reliability metrics included in a report submitted to the IURC after June 30, 2026, must include specified information concerning a public utility's ability to meet its spring UCAP and fall UCAP. (4) Provides that if, after reviewing a public utility's report, the IURC is not satisfied that the public utility can: (A) provide reliable electric service to its Indiana customers; or (B) either: (i) satisfy both its planning reserve margin requirement or other federal reliability requirements and the reliability adequacy metrics set forth in the bill; or (ii) provide sufficient reason as to why it is unable to satisfy both its planning reserve margin requirement or other federal reliability requirements and the reliability adequacy metrics set forth in the bill; the IURC may conduct an investigation into the matter. (Current law does not require the IURC to consider whether the public utility can provide sufficient reason as to its inability to satisfy both its planning reserve margin requirement or other federal reliability requirements and the reliability adequacy metrics set forth in the bill.) (5) Requires the IURC to include in its 2025 annual report its analysis regarding the appropriate percentage or portion of: (A) total spring UCAP; and (B) total fall UCAP; that public utilities should be authorized to acquire from capacity markets.
Who sponsors HB 1007?
HB 1007 is sponsored by Gary Byrne (Republican), Jean Leising (Republican), Stacey Donato (Republican), Andy Zay, Eric Koch (Republican), Randall Frye, Sharon Negele, Chris Jeter (Republican), and Edmond Soliday (Republican).
What is the current status of HB 1007?
This bill has been enacted into law. Introduced January 12, 2023. Enacted.
Where can I track HB 1007?
Track HB 1007 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 1007

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 1007

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →