SB 103 — Public Works/>$500,000/Prevailing Wage
Last action — Stricken
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced April 14, 2025. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Odds of enactment
Low chanceBased on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
Summary
This Act requires that for every public works contract or aggregate of public works contracts relating to a project in excess of $500,000 for new construction (including painting and decorating) or $45,000 for alteration, repair, renovation, rehabilitation, demolition or reconstruction (including painting and decorating of buildings or works) and which is paid for, in whole or in part, with public funds, which requires or involves the employment of mechanics and/or laborers shall contain a provision requiring the payment of the prevailing wage.
Bill Text
We don't have the full text on file for this bill yet.
Read SB 103 on the official Delaware source →Action History
-
Stricken
Sponsors
- John "Jack" Walsh · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 61 not signed on
Sponsors (1)
- John "Jack" Walsh Democratic
Co-sponsors (0)
None.
Not signed on (61)
61 members have not signed on to this bill.
Show all 61 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does SB 103 do?
- This Act requires that for every public works contract or aggregate of public works contracts relating to a project in excess of $500,000 for new construction (including painting and decorating) or $45,000 for alteration, repair, renovation, rehabilitation, demolition or reconstruction (including painting and decorating of buildings or works) and which is paid for, in whole or in part, with public funds, which requires or involves the employment of mechanics and/or laborers shall contain a provision requiring the payment of the prevailing wage.
- Who sponsors SB 103?
- SB 103 is sponsored by John "Jack" Walsh (Democratic).
- What is the current status of SB 103?
- This bill has been introduced in the Senate. Introduced April 14, 2025. It must pass committee before a floor vote.
- Where can I track SB 103?
- Track SB 103 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 103
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 103
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →