AN ACT TO AMEND TITLE 26 AND TITLE 29 OF THE DELAWARE CODE RELATING TO LARGE ENERGY USE FACILITIES.
The Act requires large energy facilities to generate all their energy in-state from renewable sources over a period of ten years. It also allows the Public Service Commission to regulate electric suppliers to protect the electric grid's reliability.
Do you support it?
Want to know if it passes?
We'll email you when HB 445 -SA 1, SA 2 w/ HA 1 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on HB 445 -SA 1, SA 2 w/ HA 1.
You're tracking HB 445 -SA 1, SA 2 w/ HA 1
We'll email you the moment it moves.
HB 445 -SA 1, SA 2 w/ HA 1 — AN ACT TO AMEND TITLE 26 AND TITLE 29 OF THE DELAWARE CODE RELATING TO LARGE ENERGY USE FACILITIES.
Last action — Environment, Energy & Transportation
No card. One bill, free forever — alerts when it moves.
-
1Introduced
-
2In Committee
-
3Passed House
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill has been introduced in the House. Introduced June 16, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Prognosis
Where this bill stands today.
Odds of enactment
LowHow often bills like it became law.
Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
In plain language
This bill mandates large energy facilities to use renewable energy from within Delaware.
The Act requires large energy facilities to generate all their energy in-state from renewable sources over a period of ten years. It also allows the Public Service Commission to regulate electric suppliers to protect the electric grid's reliability.
What this means for you
- Environment: This means a stronger push towards renewable energy use in large facilities, potentially benefiting environmental sustainability.
Summary
This Act requires large energy use facilities to produce renewable energy within the state to power their operations to prevent a drain on the electric grid. It provides for a “ramp-up” period requiring that a large energy use facility provide a plan to the Public Service Commission to ramp up their energy production within the state each year so that by the 10th year of operations, the facility is producing 100% of its energy usage through in-state production. This Act also allows the Public Service Commission to regulate electric suppliers insofar as necessary to ensure that large energy use facilities do not negatively affect the reliability of the electric grid.
Bill Text
We don't have the full text on file for this bill yet.
Read HB 445 -SA 1, SA 2 w/ HA 1 on the official Delaware source →Action History
-
Environment, Energy & Transportation
Sponsors
- Debra Heffernan · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 61 not signed on
Sponsors (1)
- Debra Heffernan Democratic
Co-sponsors (0)
None.
Not signed on (61)
61 members have not signed on to this bill.
Show all 61 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does HB 445 -SA 1, SA 2 w/ HA 1 do?
- This Act requires large energy use facilities to produce renewable energy within the state to power their operations to prevent a drain on the electric grid. It provides for a “ramp-up” period requiring that a large energy use facility provide a plan to the Public Service Commission to ramp up their energy production within the state each year so that by the 10th year of operations, the facility is producing 100% of its energy usage through in-state production. This Act also allows the Public Service Commission to regulate electric suppliers insofar as necessary to ensure that large energy use facilities do not negatively affect the reliability of the electric grid.
- Who sponsors HB 445 -SA 1, SA 2 w/ HA 1?
- HB 445 -SA 1, SA 2 w/ HA 1 is sponsored by Debra Heffernan (Democratic).
- What is the current status of HB 445 -SA 1, SA 2 w/ HA 1?
- This bill has been introduced in the House. Introduced June 16, 2026. It must pass committee before a floor vote.
- Where can I track HB 445 -SA 1, SA 2 w/ HA 1?
- Track HB 445 -SA 1, SA 2 w/ HA 1 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB 445 -SA 1, SA 2 w/ HA 1
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB 445 -SA 1, SA 2 w/ HA 1
Last checked for changes 4 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →