Florida 2019 Regular Session Status: In Committee

SB 902 — Building Permits

Last action — Laid on Table, companion bill(s) passed, see CS/CS/HB 447 (Ch. 2019-75)

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2019 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Bill Text

What changed in the latest version

460 added · 264 removed

460 line(s) added, 264 removed.

→
Previous
Latest
Florida Senate - 2019 SB 902 By Senator Perry 8-00857-19 2019902__ A bill to be entitled An act relating to open and expired building permits;
Florida Senate - 2019 CS for SB 902 By the Committee on Rules;
creating s.
and Senators Perry, Hutson, and Bracy 595-04575-19 2019902c1 A bill to be entitled An act relating to building permits;
553.7905, F.S.;
amending s.
specifying conditions under which a building permit is considered an open permit, expired permit, or closed permit;
125.56, F.S.;
authorizing an open or expired permit to be closed on by or on behalf of the current property owner if certain requirements are met;
authorizing counties to provide notice to certain persons under certain circumstances;
prohibiting a local enforcement agency from taking certain actions against a subsequent arms-length purchaser of property because a building permit was not properly closed within certain time periods;
authorizing counties that issue building permits to charge a person a single search fee for a certain amount under certain circumstances;
providing that a local enforcement agency maintains all rights and remedies identified on the permit;
amending s.
providing that certain permits may be closed under certain circumstances;
166.222, F.S.;
providing exceptions;
authorizing the governing bodies of municipalities to charge a person a single search fee for a certain amount under certain circumstances;
authorizing the owner of a home for sale to assume the role of an owner-builder in order to resolve an open permit under certain circumstances;
to charge a person one search fee for a certain amount under certain circumstances;
providing that such owner is not required to reside in the home for a specified period;
amending ss.
authorizing a contractor to hold an unlimited number of permits;
489.103 and 489.503, F.S.;
providing that certain provisions of the Florida Building Code are not applicable to certain permits;
providing exemptions to certain contracting requirements;
providing an exception;
revising forms for disclosure statements;
requiring a local enforcement agency to provide written notice to a property owner when issuing a building permit;
amending s.
authorizing a governmental entity to charge a fee for searching for and identifying certain open or unexpired building permits;
553.79, F.S.;
requiring a local enforcement agency to send a written notice to a property owner within a specified period if a permit has not been properly closed;
authorizing a local government to provide notice to certain persons under certain circumstances within a specified timeframe;
providing requirements for the notice;
authorizing a property owner to close a permit under certain circumstances;
providing that failure to receive written notice does not relieve certain persons from taking action to close a permit;
providing that a contractor is not liable for work performed in certain circumstances;
providing construction;
defining the term “close”;
authorizing a local enforcement agency to close a permit under certain circumstances;
prohibiting a local enforcement agency from taking certain actions relating to building permits that were applied for but not closed by a previous owner;
providing that local enforcement agencies retain all rights and remedies against the property owner and contractor listed on such a permit;
amending s.
553.80, F.S.;
authorizing the governing body of a local government to charge a person a single search fee one search fee for a certain amount under certain circumstances;
amending s.
440.103, F.S.;
conforming a cross-reference;
38 Be It Enacted by the Legislature of the State of Florida:
36 Be It Enacted by the Legislature of the State of Florida:
40 Section 1. Section 553.7905, Florida Statutes, is created to read:
38 Section 1. Paragraphs (c) and (d) are added to subsection (4) of section 125.56, Florida Statutes, to read:
553.7905 Open and expired permits;
125.56 Enforcement and amendment of the Florida Building Code and the Florida Fire Prevention Code;
procedures for closing;
inspection fees;
notices to owners applying for permits.— (1) A building permit shall be considered an open permit if it is issued for any portion of construction of any commercial, residential, or mixed-use project that has not received final inspection approval within one of the following periods:
inspectors;
(a) One year after the expiration of the notice of commencement or the last amendment thereto.
etc.— (4) (c) A county that issues building permits may send a written notice of expiration, by e-mail or United States Postal Service, to the owner of the property and the contractor listed on the permit, no less than 30 days before a building permit is set to expire.
(b) In the absence of a notice of commencement:
The written notice must identify the permit that is set to expire and the date the permit will expire.
1. One year after the last inspection conducted under the permit;
(d) A county that issues building permits may charge a person only one search fee, in an amount commensurate with the research and time costs incurred by the county, for identifying building permits for each unit or subunit assigned by the county to a particular tax parcel identification number.
or 2. If an inspection has not been performed on the project, 2 years after the date of issuance of the permit.
Section 2. Section 166.222, Florida Statutes, is amended to read:
(2) If an open permit expires without receiving final inspection approval and without complying with other requirements of the permit at issue, the open permit shall be considered an expired permit as provided in s.
166.222 Building code inspection fees.— (1) The governing body of a municipality may provide a schedule of reasonable inspection fees in order to defer the costs of inspection and enforcement of the provisions of its building code.
105.4 of the Florida Building Code.
(2) The governing body of a municipality that issues building permits may charge a person only one search fee, in an amount commensurate with the research and time costs incurred by the governing body, for identifying building permits for each unit or subunit assigned by the governing body to a particular tax parcel identification number.
Show all 165 changed rows (125 more)
Previous
Latest
(3) A closed permit is a building permit in which any of the following apply:
Section 3. Paragraphs (a) and (c) of subsection (7) of section 489.103, Florida Statutes, are amended to read:
(a) A final inspection approval has been obtained upon satisfaction of permit requirements.
489.103 Exemptions.—This part does not apply to:
(b) No work is started under the original permit within 6 months after issuance of the permit.
(7)(a) Owners of property when acting as their own contractor and providing direct, onsite supervision themselves of all work not performed by licensed contractors:
(c) The requirements of subsection (4) are satisfied.
1. When building or improving farm outbuildings or one family or two-family residences on such property for the occupancy or use of such owners and not offered for sale or lease, or building or improving commercial buildings, at a cost not to exceed $75,000, on such property for the occupancy or use of such owners and not offered for sale or lease.
(4) An open or expired permit may be closed by or on behalf of the current property owner, regardless of whether the property owner is the same owner who originally applied for the permit or is a subsequent owner, by complying with the requirements for closing permits pursuant to a mutual agreement between the current property owner and the local enforcement agency that issued the permit or, absent such an agreement, by complying with the following requirements:
In an action brought under this part, proof of the sale or lease, or offering for sale or lease, of any such structure by the owner-builder within 1 year after completion of same creates a presumption that the construction was undertaken for purposes of sale or lease.
(a) The property owner may retain the original contractor who obtained the permit or may hire a different contractor licensed in this state who possesses any license required for the performance of any work necessary to satisfy the conditions of the permit at issue, in order to close the open or expired permit;
2. When repairing or replacing wood shakes or asphalt or fiberglass shingles on one-family, two-family, or three-family residences for the occupancy or use of such owner or tenant of the owner and not offered for sale within 1 year after completion of the work and when the property has been damaged by natural causes from an event recognized as an emergency situation designated by executive order issued by the Governor declaring the existence of a state of emergency as a result and consequence of a serious threat posed to the public health, safety, and property in this state.
reactivate the permit if it is expired;
3. When installing, uninstalling, or replacing solar panels on one-family, two-family, or three-family residences, and the local permitting agency’s county or municipal government is participating in a “United States Department of Energy SunShot Initiative:
or satisfy any requirement of the permit at issue not yet satisfied, including correcting of any code violation in accordance with the building code that was in effect when the application for the permit was filed, and obtaining any necessary inspection.
Rooftop Solar Challenge” grant.
1. The state license of the contractor who performs these functions must be current and active.
However, an owner must utilize a licensed electrical contractor to effectuate the wiring of the solar panels, including any interconnection to the customer’s residential electrical wiring.
2. After providing the local enforcement agency a written notice of change to a new licensed contractor and reactivation of the permit, if applicable, the contractor is not liable for any existing defect or existing work that fails to comply with any applicable code, rule, regulation, ordinance, permit requirement, or law other than the work actually performed by the contractor.
The limitations of this exemption shall be expressly stated in the building permit approved and issued by the permitting agency for such project.
3. The property owner and the permitholder under the original open or expired permit remain liable, within the period of any applicable statute of limitations or repose and as provided by applicable law, for any defect in the work or for failure to comply with any applicable code, rule, regulation, ordinance, permit requirement, or law.
4. When completing the requirements of a building permit, where the contractor listed on the permit substantially completed the project as determined by the local permitting agency, for a one-family or two-family residence, townhome, or an accessory structure of a one-family or two-family residence or townhome or an individual residential condominium unit or cooperative unit.
4. To the extent required by chapter 489, the owner or the contractor may hire licensed subcontractors in the scope of the permitted work who may perform the functions of the contractor as outlined in this subsection to the extent the work is covered by the subcontractor’s license.
Prior to qualifying for the exemption, the owner must receive approval from the local permitting agency, and the local permitting agency must determine that the contractor listed on the permit substantially completed the project.
5. All work required to properly close an open or expired permit under this section must be performed in accordance with the building code in effect on the date the application for the open or expired permit was filed, unless, pursuant to the building code in effect when the work is performed, the contractor has sought and received approval from the local enforcement agency for an alternative material, design, or method of construction.
An owner who qualifies for the exemption under this subparagraph is not required to occupy the dwelling or unit for at least 1 year after the completion of the project.
(b)1. As an alternative to the procedures required in paragraph (a), a property owner may hire an engineer or architect who possesses a current and active license in this state;
(c) To qualify for exemption under this subsection, an owner must personally appear and sign the building permit application and must satisfy local permitting agency requirements, if any, proving that the owner has a complete understanding of the owner’s obligations under the law as specified in the disclosure statement in this section.
is experienced in designing, supervising, or inspecting work of the nature covered by the open or expired permit at issue;
However, for purposes of implementing a “United States Department of Energy SunShot Initiative:
and has at least 3 years of experience in performing field inspections regarding such work to inspect the construction work subject to the open or expired building permit, direct any repair necessary to comply with all the requirements of the permit, and confirm compliance by submitting an affidavit bearing the seal of the engineer or architect to the issuing local enforcement agency.
Rooftop Solar Challenge” grant and the participation of county and municipal governments, including local permitting agencies under the jurisdiction of such county and municipal governments, an owner’s notarized signature or personal appearance to sign the permit application is not required for a solar project, as described in subparagraph (a)3., if the building permit application is submitted electronically to the permitting agency and the owner certifies the application and disclosure statement using the permitting agency’s electronic confirmation system.
The affidavit must be substantially in the following form:
If any person violates the requirements of this subsection, the local permitting agency shall withhold final approval, revoke the permit, or pursue any action or remedy for unlicensed activity against the owner and any person performing work that requires licensure under the permit issued.
127 I, ...(specify name)..., possess a current and active ...(specify engineering or architectural)...
The local permitting agency shall provide the person with a disclosure statement in substantially the following form:
license in the State of Florida.
143 DISCLOSURE STATEMENT 145 1. I understand that state law requires construction to be done by a licensed contractor and have applied for an owner-builder permit under an exemption from the law.
I am experienced in designing, supervising, or inspecting work of the nature covered by the open or expired permit at the real property located at ...(specify address)....
The exemption specifies that I, as the owner of the property listed, may act as my own contractor with certain restrictions even though I do not have a license.
I have at least 3 years of experience in performing field inspections as to such work.
153 2. I understand that building permits are not required to be signed by a property owner unless he or she is responsible for the construction and is not hiring a licensed contractor to assume responsibility.
I have inspected the construction work subject to the open or expired building permit number ...(specify number)..., and I confirm that the construction work complies with all known requirements of the permit at issue.
158 3. I understand that, as an owner-builder, I am the responsible party of record on a permit.
140 Signed:
I understand that I may protect myself from potential financial risk by hiring a licensed contractor and having the permit filed in his or her name instead of my own name.
142 ...(affix licensing seal)...
I also understand that a contractor is required by law to be licensed in Florida and to list his or her license numbers on permits and contracts.
144 2. If any of the permitted work includes construction outside the engineer’s or architect’s area of expertise, the property owner, engineer, or architect may hire an engineer or architect licensed in the scope of the permitted work who may direct any necessary repairs to comply with all requirements of the permit at issue.
167 4. I understand that I may build or improve a one family or two-family residence or a farm outbuilding.
The engineer or architect hired by the property owner, engineer, or architect must confirm compliance by submitting to the local enforcement agency issuing the permit a signed and sealed affidavit attesting to compliance with all requirements of the permit at issue.
I may also build or improve a commercial building if the costs do not exceed $75,000.
3. The local enforcement agency issuing the permit shall accept the affidavit or affidavits referenced in this paragraph as satisfaction of all requirements of the permit at issue and shall thereafter close the building permit, unless the agency conducts its own final inspection within 7 business days after receipt of the affidavit or affidavits and discovers code or permit violations within the scope of work covered by the permit.
The building or residence must be for my own use or occupancy.
Such violations must be corrected to the local enforcement agency’s satisfaction as a condition to closing the permit.
It may not be built or substantially improved for sale or lease, unless I am completing the requirements of a building permit where the contractor listed on the permit substantially completed the project.
All work required to properly close an open or expired permit under this paragraph must be performed in accordance with the building code in effect on the date the application for the open or expired permit was filed, unless, pursuant to the building code in effect when the work is performed, the engineer or architect has sought and received approval from the local enforcement agency for an alternative material, design, or method of construction.
If a building or residence that I have built or substantially improved myself is sold or leased within 1 year after the construction is complete, the law will presume that I built or substantially improved it for sale or lease, which violates the exemption.
(5) The requirements of subsection (4) apply regardless of whether the building permit is open or has expired.
182 5. I understand that, as the owner-builder, I must provide direct, onsite supervision of the construction.
(6)(a) A local enforcement agency may not deny issuance of a building permit or issue a notice of violation to, or fine, penalize, sanction, or assess fees against, a subsequent arms length purchaser of the subject property for value solely because a building permit was not properly closed within one of the following periods:
186 6. I understand that I may not hire an unlicensed person to act as my contractor or to supervise persons working on my building or residence.
1. Five years after expiration of the date of recordation of the notice of commencement or of the last amendment thereto.
It is my responsibility to ensure that the persons whom I employ have the licenses required by law and by county or municipal ordinance.
2. If a notice of commencement was not recorded, within 7 years after the building permit was issued.
193 7. I understand that it is a frequent practice of unlicensed persons to have the property owner obtain an owner-builder permit that erroneously implies that the property owner is providing his or her own labor and materials.
(b) A local enforcement agency shall maintain all rights and remedies against the property owner and contractor identified on the permit.
I, as an owner-builder, may be held liable and subjected to serious financial risk for any injuries sustained by an unlicensed person or his or her employees while working on my property.
(7) An individual trade permit, or any other permit type determined by a local enforcement agency, may be closed 6 years after issuance of the permit if no apparent safety hazards exist and no code violations have been previously documented.
My homeowner’s insurance may not provide coverage for those injuries.
This subsection does not apply to a building permit for a building project still under construction with a legally granted permit extension.
I am willfully acting as an owner builder and am aware of the limits of my insurance coverage for injuries to workers on my property.
(8) As an alternative to the requirements in subsection (4), with the approval of the local enforcement agency, the owner of a home for sale may assume the role of an owner-builder in order to resolve an open permit for a substantially completed project when the project is abandoned or otherwise not completed by the licensed contractor who obtained the permit.
206 8. I understand that I may not delegate the responsibility for supervising work to a licensed contractor who is not licensed to perform the work being done.
The owner is not required to continue to reside in the home for 1 year.
Any person working on my building who is not licensed must work under my direct supervision and must be employed by me, which means that I must comply with laws requiring the withholding of federal income tax and social security contributions under the Federal Insurance Contributions Act (FICA) and must provide workers’ compensation for the employee.
This alternative applies only to real property consisting of single or multiple family dwellings up to and including four units.
I understand that my failure to follow these laws may subject me to serious financial risk.
(9) A contractor may hold an unlimited number of active permits.
219 9. I agree that, as the party legally and financially responsible for this proposed construction activity, I will abide by all applicable laws and requirements that govern owner-builders as well as employers.
(10) Provisions in the Florida Building Code which authorize permits to be administratively closed by a local enforcement agency are not applicable to a permit subject to regulation by an agency not specifically enforcing the Florida Building Code, except where the local enforcement agency has regulatory authority over other areas related to the permit, such as zoning or other land development code provisions.
I also understand that the construction must comply with all applicable laws, ordinances, building codes, and zoning regulations.
Regulations not subject to such provisions in the Florida Building Code include, but are not limited to, local zoning and land use rules, local stormwater management rules, local platting and subdivision requirements, rules implemented by the Department of Health and the Department of Business and Professional Regulation, local utility standards, and provisions of the National Flood Insurance Program Community Rating System.
227 10. I understand that I may obtain more information regarding my obligations as an employer from the Internal Revenue Service, the United States Small Business Administration, the Florida Department of Financial Services, and the Florida Department of Revenue.
(11) When issuing a building permit, a local enforcement agency shall provide to the property owner a written notice, which may be electronically provided if the permit package is electronically provided, in substantially the following form:
I also understand that I may contact the Florida Construction Industry Licensing Board at ...(telephone number)...
223 IMPORTANT NOTICE REGARDING COMPLIANCE WITH THE INSPECTION AND APPROVAL PROCESS FOR ALL BUILDING PERMITS 227 You are receiving a building permit authorizing the construction referenced in the application that was submitted to this local enforcement agency by you or on your behalf.
or ...(Internet website address)...
The permit is issued with conditions, including required building inspections and assurances that the construction complies with the design submitted with the permit application and any other conditions referenced in the permit.
for more information about licensed contractors.
It is critical that you ensure that all necessary building inspections are passed before the expiration of any notice of commencement or amendment thereto, as these inspections are important to ensure that construction has been performed in a safe and proper manner.
238 11. I am aware of, and consent to, an owner-builder building permit applied for in my name and understand that I am the party legally and financially responsible for the proposed construction activity at the following address:
If you have any questions regarding these procedures, please call the local enforcement agency.
...(address of property)....
Your failure to comply may also result in unsafe conditions arising from your construction.
244 12. I agree to notify ...(issuer of disclosure statements)...
245 (12) The applicable governmental entity may charge only one search fee for searching for and identifying open or unexpired building permits for a tax parcel, regardless of how many units or subunits may be assigned by a municipality or county to a particular tax parcel identification number, in an amount commensurate with research and time costs incurred by the governmental entity.
immediately of any additions, deletions, or changes to any of the information that I have provided on this disclosure.
(13) For all building permits issued after October 1, 2019, a local enforcement agency shall send a written notice to the property owner if a building permit has not been properly closed within 1 to 3 years after issuance of any such permit.
249 Licensed contractors are regulated by laws designed to protect the public.
The notice must advise the property owner of the need to properly close the permit upon completion of the work covered by the permit.
If you contract with a person who does not have a license, the Construction Industry Licensing Board and Department of Business and Professional Regulation may be unable to assist you with any financial loss that you sustain as a result of a complaint.
Failure to receive written notice does not relieve the contractor or the property owner from taking the necessary actions to legally close the permit.
Your only remedy against an unlicensed contractor may be in civil court.
(14) This act does not prevent a local governmental entity from enforcing any provision of a local land development code or other local ordinance not inconsistent with this section.
It is also important for you to understand that, if an unlicensed contractor or employee of an individual or firm is injured while working on your property, you may be held liable for damages.
Section 2. This act shall take effect October 1, 2019.
If you obtain an owner builder permit and wish to hire a licensed contractor, you will be responsible for verifying whether the contractor is properly licensed and the status of the contractor’s workers’ compensation coverage.
266 Before a building permit can be issued, this disclosure statement must be completed and signed by the property owner and returned to the local permitting agency responsible for issuing the permit.
A copy of the property owner’s driver license, the notarized signature of the property owner, or other type of verification acceptable to the local permitting agency is required when the permit is issued.
276 Signature:
...(signature of property owner)....
Date:
...(date)....
Section 4. Subsection (6) of section 489.503, Florida Statutes, is amended to read:
489.503 Exemptions.—This part does not apply to:
(6)(a) An owner of property making application for permit, supervising, and doing the work in connection with the construction, maintenance, repair, and alteration of and addition to a single-family or duplex residence for his or her own use and occupancy and not intended for sale or an owner of property when acting as his or her own electrical contractor and providing all material supervision himself or herself, when building or improving a farm outbuilding or a single-family or duplex residence on such property for the occupancy or use of such owner and not offered for sale or lease, or building or improving a commercial building with aggregate construction costs of under $75,000 on such property for the occupancy or use of such owner and not offered for sale or lease.
In an action brought under this subsection, proof of the sale or lease, or offering for sale or lease, of more than one such structure by the owner-builder within 1 year after completion of same is prima facie evidence that the construction was undertaken for purposes of sale or lease.
(b) An owner of property completing the requirements of a building permit, where the contractor listed on the permit substantially completed the project as determined by the local permitting agency, for a one-family or two family residence, townhome, accessory structure of a one-family or two-family residence or townhome or individual residential condominium unit or cooperative unit.
Prior to the owner qualifying for the exemption, the owner must receive approval from the local permitting agency, and the local permitting agency must determine that the contractor substantially completed the project.
An owner who qualifies for the exemption under this paragraph is not required to occupy the dwelling or unit for at least 1 year after the completion of the project.
(c) This subsection does not exempt any person who is employed by such owner and who acts in the capacity of a contractor.
For the purpose of this subsection, the term “owner of property” includes the owner of a mobile home situated on a leased lot.
To qualify for exemption under this subsection, an owner shall personally appear and sign the building permit application and must satisfy local permitting agency requirements, if any, proving that the owner has a complete understanding of the owner’s obligations under the law as specified in the disclosure statement in this section.
If any person violates the requirements of this subsection, the local permitting agency shall withhold final approval, revoke the permit, or pursue any action or remedy for unlicensed activity against the owner and any person performing work that requires licensure under the permit issued.
The local permitting agency shall provide the owner with a disclosure statement in substantially the following form:
330 Disclosure Statement 332 State law requires electrical contracting to be done by licensed electrical contractors.
You have applied for a permit under an exemption to that law.
The exemption allows you, as the owner of your property, to act as your own electrical contractor even though you do not have a license.
You may install electrical wiring for a farm outbuilding or a single-family or duplex residence.
You may install electrical wiring in a commercial building the aggregate construction costs of which are under $75,000.
The home or building must be for your own use and occupancy.
It may not be built for sale or lease, unless you are completing the requirements of a building permit where the contractor listed on the permit substantially completed the project.
If you sell or lease more than one building you have wired yourself within 1 year after the construction is complete, the law will presume that you built it for sale or lease, which is a violation of this exemption.
You may not hire an unlicensed person as your electrical contractor.
Your construction shall be done according to building codes and zoning regulations.
It is your responsibility to make sure that people employed by you have licenses required by state law and by county or municipal licensing ordinances.
Section 5. Present subsections (15) through (20) of section 553.79, Florida Statutes, are redesignated as subsections (17) through (22), respectively, new subsections (15) and (16) are added to that section, and paragraph (c) is added to subsection (1) of that section, to read:
553.79 Permits;
applications;
issuance;
inspections.— (1) (c) A local government that issues building permits may send a written notice of expiration, by e-mail or United States Postal Service, to the owner of the property and the contractor listed on the permit, no less than 30 days before a building permit is set to expire.
The written notice must identify the permit that is set to expire and the date the permit will expire.
(15)(a) A property owner, regardless of whether the property owner is the one listed on the application for the building permit, may close a building permit by complying with the following requirements:
1. The property owner may retain the original contractor listed on the permit or hire a different contractor appropriately licensed in this state to perform the work necessary to satisfy the conditions of the permit and to obtain any necessary inspections in order to close the permit.
If a contractor other than the original contractor listed on the permit is hired by the property owner to close the permit, such contractor is not liable for any defects in the work performed by the original contractor and is only liable for the work that he or she performs.
2. The property owner may assume the role of an owner builder, in accordance with ss.
489.103(7) and 489.503(6).
3. For purposes of this section, the term “close” means that the requirements of the permit have been satisfied.
(b) If a building permit is expired and its requirements have been substantially completed, as determined by the local enforcement agency, the permit may be closed without having to obtain a new building permit, and the work required to close the permit may be done pursuant to the building code in effect at the time the local enforcement agency received the application for the permit, unless the contractor has sought and received approval from the local enforcement agency for an alternative material, design, or method of construction.
(c) A local enforcement agency may close a building permit 6 years after the issuance of the permit, even in the absence of a final inspection, if the local enforcement agency determines that no apparent safety hazards exist.
(16)(a) A local enforcement agency may not deny issuance of a building permit to, issue a notice of violation to, or fine, penalize, sanction, or assess fees against an arms-length purchaser of a property for value solely because a building permit was applied for by a previous owner of the property was not closed.
The local enforcement agency shall maintain all rights and remedies against the property owner and contractor listed on the permit.
(b) The local enforcement agency may not deny issuance of a building permit to a contractor solely because the contractor is listed on other building permits that were not closed.
Section 6. Paragraph (e) is added to subsection (7) of section 553.80, Florida Statutes, to read:
553.80 Enforcement.— (7) The governing bodies of local governments may provide a schedule of reasonable fees, as authorized by s.
125.56(2) or s.
166.222 and this section, for enforcing this part.
These fees, and any fines or investment earnings related to the fees, shall be used solely for carrying out the local government’s responsibilities in enforcing the Florida Building Code.
When providing a schedule of reasonable fees, the total estimated annual revenue derived from fees, and the fines and investment earnings related to the fees, may not exceed the total estimated annual costs of allowable activities.
Any unexpended balances shall be carried forward to future years for allowable activities or shall be refunded at the discretion of the local government.
The basis for a fee structure for allowable activities shall relate to the level of service provided by the local government and shall include consideration for refunding fees due to reduced services based on services provided as prescribed by s.
553.791, but not provided by the local government.
Fees charged shall be consistently applied.
(e) The governing body of a local government that issues building permits may charge a person only one search fee, in an amount commensurate with the research and time costs incurred by the governing body, for identifying building permits for each unit or subunit assigned by the governing body to a particular tax parcel identification number.
Section 7. Section 440.103, Florida Statutes, is amended to read:
440.103 Building permits;
identification of minimum premium policy.—Every employer shall, as a condition to applying for and receiving a building permit, show proof and certify to the permit issuer that it has secured compensation for its employees under this chapter as provided in ss.
440.10 and 440.38.
Such proof of compensation must be evidenced by a certificate of coverage issued by the carrier, a valid exemption certificate approved by the department, or a copy of the employer’s authority to self-insure and shall be presented, electronically or physically, each time the employer applies for a building permit.
As provided in s.
553.79(20) s.
553.79(19), for the purpose of inspection and record retention, site plans or building permits may be maintained at the worksite in the original form or in the form of an electronic copy.
These plans and permits must be open to inspection by the building official or a duly authorized representative, as required by the Florida Building Code.
As provided in s.
627.413(5), each certificate of coverage must show, on its face, whether or not coverage is secured under the minimum premium provisions of rules adopted by rating organizations licensed pursuant to s.
627.221.
The words “minimum premium policy” or equivalent language shall be typed, printed, stamped, or legibly handwritten.
Section 8. This act shall take effect October 1, 2019.
View plain text versions (2)

Action History

  1. Laid on Table, companion bill(s) passed, see CS/CS/HB 447 (Ch. 2019-75)

  2. Substituted CS/CS/HB 447

  3. Read 2nd time

  4. Placed on Special Order Calendar, 05/02/19

  5. Placed on Calendar, on 2nd reading

  6. CS by Rules read 1st time

  7. Pending reference review -under Rule 4.7(2) - (Committee Substitute)

  8. CS by- Rules; YEAS 15 NAYS 0

  9. On Committee agenda-- Rules, 04/17/19, 2:00 pm, 110 Senate Building

  10. Now in Rules

  11. Favorable by Innovation, Industry, and Technology; YEAS 10 NAYS 0

  12. On Committee agenda-- Innovation, Industry, and Technology, 03/26/19, 1:30 pm, 110 Senate Building

  13. Now in Innovation, Industry, and Technology

  14. Favorable by Community Affairs; YEAS 5 NAYS 0

  15. On Committee agenda-- Community Affairs, 03/12/19, 4:00 pm, 301 Senate Building

  16. Introduced

  17. Referred to Community Affairs; Innovation, Industry, and Technology; Rules

  18. Filed

Sponsors

  • Perry · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 163 not signed on

Sponsors (1)

  • Perry

Co-sponsors (0)

None.

Not signed on (163)

163 members have not signed on to this bill.

Show all 163 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 15 Yea · 0 Nay · 2 Other
Party YeaNayPresentNot Voting
Unaffiliated 13001
Republican 2001
Total 15002
% of votes cast 88%0%0%12%
How each member voted (17)
Member Party Vote
Book — Yea
Farmer — Yea
Hutson — Yea
Thurston — Yea
Brandes — Yea
Braynon — Yea
Flores — Yea
Montford — Yea
Simmons — Yea
Simpson — Yea
Stargel — Yea
Gibson — Yea
Benacquisto — Yea
Lee — Not Voting
Bradley, Jennifer Republican Not Voting
Passidomo, Kathleen Republican Yea
Rodriguez, Ana Maria Republican Yea

Official roll call →

Favorable

Passed 10 Yea · 0 Nay
Party YeaNayPresentNot Voting
Unaffiliated 8000
Republican 2000
Total 10000
% of votes cast 100%0%0%0%
How each member voted (10)
Member Party Vote
Bracy — Yea
Farmer — Yea
Hutson — Yea
Brandes — Yea
Braynon — Yea
Gibson — Yea
Benacquisto — Yea
Simpson — Yea
Bradley, Jennifer Republican Yea
Passidomo, Kathleen Republican Yea

Official roll call →

Favorable

Passed 5 Yea · 0 Nay
Party YeaNayPresentNot Voting
Unaffiliated 4000
No Party Affiliation 1000
Total 5000
% of votes cast 100%0%0%0%
How each member voted (5)
Member Party Vote
Broxson — Yea
Farmer — Yea
Simmons — Yea
Flores — Yea
Pizzo, Jason W. B. No Party Affiliation Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 902?
SB 902 is sponsored by Perry.
What is the current status of SB 902?
This bill died with 2019 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 902?
Track SB 902 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 902

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 902

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →