Entertainment Industry
Do you support it?
Want to know if it passes?
We'll email you when SB 526 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on SB 526.
You're tracking SB 526
We'll email you the moment it moves.
SB 526 — Entertainment Industry
Last action — Died in Innovation, Industry, and Technology
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill died with 2019 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Bill Text
What changed in the latest version
489 added · 465 removed489 line(s) added, 465 removed.
Florida Senate - 2019 CS for SB 526 By Senatorthe GrutersCommittee 23-00493-19on 2019526__Commerce Aand billTourism; to be entitled An act relating to the entertainment industry;
and Senator Gruters 577-02468-19 2019526c1 A bill to be entitled An act relating to the entertainment industry;
requiring an applicant that receives funding to make a good faith effort to use existing providers of infrastructure or equipment in this state;state and Florida-resident cast and crew;
establishingrequiring the commissioner to set application windows for the grant;
requiring the commissioner to take specified action within a specifiedreasonable timeframe;period of time;
specifying that an applicant is onlymay authorized to submit only one application per fiscalapplication yearwindow; unless the applicant is producing certain television programs;
requiring the commissioner to select an alternate board member when certain conflicts of interest are present;
requiring the board to determine a score for each applicant’squalified project using specified criteria;
requiring the board to make a recommendation for certification or rejection of applicationsa qualified project within a specified timeframe;
requiring the commissioner to determine the priority order and scoring system of the specified criteria with assistance from the board;board and certain other persons;
requiring the commissioner to take certain actions relating to the certification or denialrejection of applicationsqualified withinprojects in a specifiedtimely timeframe;manner;
requiring the department to earmark and set aside funding necessary to fund the total maximum that may be awarded to the qualifiedcertified projects;projects, if funds are available;
requiring the commissioner to develop a verification process to verify the actual qualifiedcertified expenditures of a qualifiedcertified project after the project’s work in this state is complete;
requiring that the grant be issued within a specifiedreasonable timeframeperiod of time upon approval of the final grant amount by the department;
requiring qualifiedcertified projects to allow certain persons to visit the production site upon request of the commissioner and after providing the commissioner with certainreasonable notice;
6669 Be It Enacted by the Legislature of the State of Florida:
6871 Section 1. Film, Television, and Digital Media Targeted Grant Program.— (1) CREATION AND PURPOSES OF PROGRAM.—The Film, Television, and Digital Media Targeted Grant Program is created within the Department of Economic Opportunity under the supervision of the Commissioner of Film and Entertainment.
(b) “Commissioner”(b) “Certified project” means a qualified project that has been evaluated by the Commissionerboard, determined by the commissioner to meet or exceed the desired economic impact and other criteria of Filmthe program, and Entertainmenthas asgrant describedfunds inallocated s.to it based on the project’s estimated qualified expenditures.
(c) “Commissioner” means the Commissioner of Film and Entertainment as described in s.
(c) “Department”(d) “Department” means the Department of Economic Opportunity.
(d) “Digital(e) “Digital media project” means a commercial video gamegame, thatincluding an educational video game, which includes at least 30 minutes of game play time.
(e) “Family(f) “Family friendly” means having cross-generational appeal;
(f) “Film(g) “Film project” means a theatrical, direct-to-video, television, cable, Internet, streaming service, or animated narrative motion picture at least 75 minutes in length.
(g) “Florida(h) “Florida resident” means a person who has a valid Florida driver license or Florida identification card issued under s.
(h) “Office”(i) “Office” means the Office of Film and Entertainment within the department.
(i) “Principal(j) “Principal photography” means, for a film project or television project, the filming of major or significant components of the project which involve lead actors, or, for a digital media project, the period of time during which the work of the majority of the crew is dedicated solely to the project.
(j) “Production expenditures” means the costs of tangible and intangible property used and services performed primarily and customarily during the preproduction, production, and postproduction of a project.
1. The term includes, but is not limited to:
a. Wages, salaries, or other compensation, including amounts paid through payroll service companies, for technical and production crews, directors, producers, and performers.
b. Rental expenditures for sound stages, backlots, production, editing, digital effects, sound recording, sets, and set construction.
c. Rental expenditures for equipment, including, but not limited to, cameras and grip or lighting equipment.
d. Expenditures for production meals, craft services, rental cars, and hotels or other rental accommodations.
2. The term does not include any costs associated with airfare, development, marketing, or distribution.
(l)1. “Qualified expenditures” means production expenditures made solely for preproduction, production, or postproduction of a qualified project which are incurred in this state for any of the following:
which has a physical address,address in this state, not including a post office box;
b. Payments to Florida residents in the form of salary or wages up to a maximum of $200,000 per resident.resident, including amounts paid through payroll service companies, and benefits such as pension, health, and welfare payments for technical and production crews, directors, producers, and performers.
For purposes of this sub-subparagraph, payments do not include wages for executives, legal staff, workers, or other paidcorporate employeesstaff who are not employed byto thework projectsolely oron itsthe parentproject. or affiliate corporation.
or 2., expenditures made before qualification for the program, or expenditures relatedmade tovia Internet transactions.transactions, or any costs associated with development, marketing, or distribution.
161158 For the purposes of a televisiondigital projectmedia or a film project, the term includes only those qualified expenditures made within 29 fiscalmonths years after the project’s first qualified expenditure.
For(m) “Qualified theproject” purposesmeans of a film project, television project, or digital media project,project thefor termwhich includesa onlycomplete thoseapplication qualifiedfor expendituresthe madeprogram withinhas 9been monthssubmitted afterto the project’scommissioner firstand qualifiedaccepted expenditure.for consideration by the board.
Show all 130 changed lines (90 more)
(m) “Qualified project” means a film project, television project, or digital media project for which a complete application for the program has been submitted to and certified by the commissioner.
(n) “Television project” means a television pilot program or a television series that:
and 3. Has3. If the television project is a television series, has a minimum of seven episodes.
185180 The term does not include a project deemed by the office to have content that is obscene, as defined in s.
(o) “Underutilized area” means any county in this state other than Broward County, DadeMiami-Dade County, Orange County, or Seminole County.
2. Is projected to employ a crew, including cast and stand ins, but not including extras, also known as background performers, of which at least 60 percent will be Florida residents;residents and at least one member will be a military veteran;
3. Is projected to spend at least 6070 percent of its total budgetproduction days in this state;
and 4. Will not usereceive thea statecertificate salesof taxexemption exemption.pursuant to s.
(b) A288.1258. project may receive a grant in the amount of up to 12 percent of its verified qualified expenditures.
(b) A project may receive a grant in the amount of up to 20 percent of its verified qualified expenditures.
A certified project may not receive more than one bonus, and the total that may be awarded under any grant may not exceed 1523 percent of its verified qualified expenditures or $2 million, whichever is less.
(c) Each(c) A applicantcertified thatproject receives funding must make a good faith effort to use existing providers of infrastructure or equipment in this state, when available, including providers of camera gear, grip and lighting equipment, vehicles, and postproduction services.services, and to employ cast and crew who are Florida residents.
(4) APPLICATION WINDOWS.—Applications must be accepted in each fiscal year in which funding is available for the program during two application windows.windows each fiscal year.
The firstcommissioner applicationshall windowset isa thestart firstdate 5for businessboth days of each July, and the second application windowwindows. is the first 5 business days of each January.
However, the first application window must end no later than 5 business days after July 1 and the second must end no later than 5 business days after January 1.
Grant funds not earmarked and set aside for theapplicants firstapplying during one application window roll over for use in the secondnext application window.
(b) If all grant funds are earmarked and set aside for qualifiedcertified projects, additional applications may not be accepted until more funds become available to the program.
A project must have a production start date that is within 6 months after theJuly first1 dayif ofapplying in the applicationfirst window inor whichJanuary the1 companyif submitsapplying in the application.second window.
1. Project-related1. Proof employmentof information,funding; including employment numbers for Florida residents;
2. A2. Project-related detailedemployment budgetinformation, ofincluding plannedemployment qualifiednumbers expenditures;for Florida residents;
3. A detailedfull distributionline-item planbudget toand assista withdetailed determiningqualified theexpenditures potentialbudget; economic impact of the project in this state;
4. The4. A applicant’sdetailed expecteddistribution totalplan qualifiedto expendituresassist forwith wagesdetermining paidthe topotential Floridaeconomic residents;impact of the project in this state;
5. The applicant’s expected total qualified expenditures infor thiswages statepaid otherto thanFlorida wages;residents;
6. For6. The aapplicant’s filmexpected projecttotal orqualified televisionexpenditures project, a final script, a production schedule, a Day out of Days report, and anon-qualified listexpenditures ofin thethis expectedstate; shooting locations;
7. For a film project or television project,pilot, scriptsa forfinal twoscript, episodes;a production schedule, a Day out of Days report, and a list of the expected shooting locations;
8. For a digitaltelevision mediaseries, project,scripts for two episodes, a detailedDay gameout designof document;Days report, and a list of the expected shooting locations;
and9. For 9. Ana affirmationdigital signedmedia byproject, thea applicantdetailed thatgame thedesign informationdocument; on the application is correct.
(c) Within10. An 15affirmation businesssigned daysby after the lastapplicant businessthat daythe ofinformation eachon application window, the commissionerapplication shall:is correct;
and 11. The applicant’s Florida tax identification number.
(c) Within a reasonable period of time after the last business day of each application window, the commissioner shall:
3. Determine the maximum grant amount that each eligible applicant may be eligibleawarded; for;
4. Determine whether thean eligible applicant’s project is deemed family friendly;
5. Determine whetherthe eachpercentage applicantof or the parentapplicant’s companyproduction, ofif theany, applicantwhich is aproposed corporationto registeredoccur in thisan state;underutilized county;
6. Contact6. Determine whether each eligible applicant withis anya questions,corporation asregistered necessary;in this state;
7. Gather7. Contact anyeach additionalapplicant informationwith neededany toquestions, addressas thenecessary; criteria specified under subsection (7);
and8. Gather 8. Assembleany aadditional packageinformation containingneeded theto detailsaddress ofthe eachcriteria applicant’sspecified projectunder andsubsection deliver(7); it to each board member.
(d) An9. Assemble applicanta maypackage submitcontaining onlythe onedetails applicationof pereach fiscaleligible year.applicant’s project and deliver it to each board member;
However,and an10. Give applicantnotice producingto athe televisionboard seriesof maythe applydate and time for subsequentwhen seasonsthe ofboard thatmust televisionconvene seriesto withinassess theeach samequalified fiscalproject, year.as provided for in paragraph (6)(d).
(d) An applicant may submit only one application per application window.
(c) The4. If a board shallmember meethas withina 15conflict businessof daysinterest afterwith thea commissionerproject providesunder applicationconsideration, materialthe tocommissioner allmust ofselect thean membersalternate ofmember from the boardFlorida asFilm providedand inEntertainment subparagraphAdvisory (5)(c)8.Council.
Subsequent5. The meetingscommissioner mayshall beattend heldand withinoversee 10all businessmeetings. days after the initial meeting for that application window.
(c) The board shall meet at the call of the commissioner pursuant to subparagraph (5)(c)10.
The board may hold subsequent meetings after the initial meeting for that application window.
(d)1. The board shall determine a score for each applicant’squalified project using the criteria specified under subsection (7), with the highest scores going to projects determined to provide the best economic impact and return on investment to the state.
2. The board shall make a recommendation for certification or rejection of each applicationqualified project to the commissioner within 10 days after the board’s first meeting for that application window.
(7) CRITERIA FOR DETERMINING PROJECT SCORES.— (a) The priority order and scoring system of the criteria specified in paragraph (b) must be determined by the commissioner, with assistance from the board and other persons, as determined by the commissioner, in advance of the first application window.
(b) The board shall use at least the following criteria in determining a qualified project’s score:
8. Whether the applicantproject is afamily corporationfriendly. registered in this state.
9. Whether the project ishas familya friendly.Florida-resident writer, producer, or star.
10. Whether thea projectFlorida hasfilm, atelevision, Florida-residentor writer,digital producer,media orschool star.will assist with the production of the project.
11. Whether athe Floridaproject film,leadership television,team orhas digitala mediasuccessful schooltrack willrecord. assist with the production of the project.
12. Whether12. The thenumber projectof leadershipFlorida-resident teamveterans hashired aby successfulthe trackproject. record.
13. The number of Florida-residentFlorida veteransfilm hiredschool bygraduates the project.project will hire as cast or crew.
14. The(8) NOTIFICATION numberOF ofDECISION.— Florida(a) After filmthe schoolboard graduatesmakes its recommendations to the projectcommissioner, hasthe hiredcommissioner asshall, castin ora crew.timely manner:
(8) NOTIFICATION1. Make OFa DECISION.—final (a) Withindetermination 5on businesscertifying daysor afterrejecting theeach boardqualified makesproject, itsgiving recommendationsconsideration to the commissioner,board’s therecommendations commissionerand shall:scoring.
1. Provide2. Provide a list of qualifiedcertified projects to the department which includes the associated maximum grant amounts that the respective applicants may receive.
2. Notify3. Notify each applicantcertified project of the specified percentage of qualified expenditures for which theit applicant is eligible and the maximum grant amount that theit applicant may receive.
3. Provide4. Provide a notice of rejection to each rejected applicant;
however, the failure to notify an applicant of its rejection does not deem the applicant’s project a qualifiedcertified project.
(b) The(b) Based commissioneron shallthe makefinal determination of the finalcommissioner, determination,the givingdepartment considerationshall earmark and set aside the amount necessary to fund the board’stotal recommendations,maximum asthat tomay whetherbe anawarded applicantfor isthe certified forprojects, aif grant.funds are available.
(c) Based(9)(a) VERIFICATION onPROCESS.—The thecommissioner finalshall determinationdevelop ofa theprocess commissioner,to verify the departmentactual shallqualified earmarkexpenditures andof seta asidecertified theproject amountafter necessary to fund the totalproject’s maximumwork thatin maythis bestate awardedis forcomplete. the qualified projects.
(9)(a) VERIFICATION PROCESS.—The commissioner shall develop a process to verify the actual qualified expenditures of a qualified project after the project’s work in this state is complete.
1. Submission to the commissioner,commissioner electronicallyof orat asleast aall hardof copy,the byfollowing eachinformation, qualifiedelectronically projector withinin 90hard dayscopy, afteror makingboth, itsby finaleach qualifiedcertified expenditure,project: but not later than 1 year after its production start date of:
a. Data substantiating each qualified expenditure, which has been audited by an independent certified public accountant licensed in this state, as required by subparagraph 3.;4.;
and e. The most recent credit list showing where the credits required under subsection (10) will appear.appear;
2. Signing,f. A andcast submissionlist toand thea commissioner,final bycrew thelist qualifiedwith projectcontact ofinformation; an affidavit or written declaration signed under the penalty of perjury as specified in s.
and g. For the veteran employed by the project, a copy of his or her DD Form 214, as issued by the United States Department of Defense, or another acceptable form of identification as specified by the Department of Veteran’s Affairs.
2. Signing, and submission to the commissioner, by the certified project of an affidavit or written declaration signed under the penalty of perjury as specified in s.
3. The conductinformation ofand aaffidavit compliancerequired audit, at the qualified project’s expense, by ansubparagraphs independent1. certified public accountant to substantiate each qualified expenditure and submission of a report of the findings of the audit, including substantiating data, to the commissioner within 45 days after the initial receipt of records from the qualified project.
(b) The commissioner shall review the report and data2. submitted by the certified public accountant within 45 days after receipt of the report and data and report to the department the final verified amount of actual qualified expenditures made by the qualified project and the amount of the grant due to the qualified project.
(c) Uponmust approvalbe received by the departmentcommissioner ofwithin the120 finaldays grantafter amount,the whichcertified mayproject nothas exceedmade theits maximumlast specifiedqualified inexpenditure, thebut noticeno providedlater underthan subparagraph1 (8)(a)2.,year theafter grantits mustproduction bestart issueddate. within 30 days.
(d) ThePursuant departmentto shall deduct one-half of 1 percent of the totalrules grantadopted amountby before issuing the grantdepartment, to the qualifiedcommissioner project,may, andupon sucha amountshowing mustof begood creditedcause, togrant thea departmentone-time toextension offset the cost of thethis compliancedeadline. review.
(10) MARKETING4. The ANDconduct TOURISMof REQUIREMENT.—a (a) Thecompliance commissioneraudit, shallat ensure,the ascertified aproject’s conditionexpense, ofby receivingan independent certified public accountant who is a grantresident underof this section,state thatto substantiate the qualified expenditures, and submission of a qualifyingreport projectof includethe marketingfindings promotingof thisthe stateaudit, asincluding substantiating data, to the commissioner within a touristreasonable destinationperiod orof filmtime andafter entertainmentthe productioninitial destination.receipt of records from the certified project.
(b) The commissioner shall review the report and data submitted by the certified public accountant within a reasonable period of time after receipt of the report and data and report to the department the final verified amount of actual qualified expenditures made by the certified project and the amount of the grant due to the such project.
(c) Upon approval by the department of the final grant amount, which may not exceed the maximum specified in the notice provided under subparagraph (8)(a)3., the grant must be issued within a reasonable period of time.
(d) The department shall deduct one-half of 1 percent of the total grant amount before issuing the grant to the certified project, and such amount must be credited to the department to offset the cost of the compliance review.
(e) At the end of the fiscal year, grant funds that are not allocated to a certified project, and grant funds allocated but not awarded to a certified project, roll over to the next fiscal year.
(10) MARKETING AND TOURISM REQUIREMENT.— (a) The commissioner shall ensure, as a condition of receiving a grant under this section, that a certified project include marketing promoting this state as a tourist destination or film and entertainment production destination.
The commissioner shall provide the logos for the purposes specified in this paragraph, not including the logo for a local digital media office, which must be provided by the applicable office.
(b) A qualifiedcertified project must allow the commissioner, or an affiliate, and upa tominimum fiveof two guests to visit the production site upon the request of the commissioner.
Upon such request, the qualifiedcertified project must give the commissioner atreasonable least 10 business days’ notice of a visit date and time that is acceptable to the production.
(c) A qualifiedcertified project must provide at least five preapproved photos of the production to the commissioner and grant the commissioner free use of such photos in promoting this state as a film, television, or digital media production location or tourist destination.
(11) DISQUALIFICATION.—The department shall disqualify a certified project if the project:
(a) Does not begin principal photography in this state within 6the weeksperiod ofbeginning 30 days before and ending 90 days after the project’s listed production start date;date.
(b) DoesPursuant notto abidedepartment byrule, the policies,commissioner procedures,may, deadlines,upon ora requirementsshowing of thegood verificationcause, process;grant a one-time extension of this deadline;
(c) Does(b) Does not startabide productionby withinthe 6policies, weeksprocedures, beforedeadlines, or afterrequirements of the productionapplication startverification date;process;
(d) Does(c) Does not notify the commissioner of any change in the production start date before commencing production;
or (e) Submits(d) Submits fraudulent information.
(15) EXPIRATION.—The Film, Television, and Digital Media Targeted Grant Program expires June 30, 2020,2022, at which point all remaining appropriated funds not earmarked and set aside for qualifiedcertified projects must revert to the General Revenue Fund.
All remaining appropriated funds must revert to the General Revenue Fund no later than October 31, 2022.2023.
Show all 130 changed rows (90 more)
View plain text versions (2)
- S 526 c1 View text Current html
- Introduced S 526 Filed html
Action History
-
Died in Innovation, Industry, and Technology
-
Indefinitely postponed and withdrawn from consideration
-
CS by Commerce and Tourism read 1st time
-
Introduced
-
Now in Innovation, Industry, and Technology
-
Pending reference review under Rule 4.7(2) - (Committee Substitute)
-
CS by Commerce and Tourism; YEAS 4 NAYS 0
-
On Committee agenda-- Commerce and Tourism, 02/19/19, 10:00 am, 110 Senate Building
-
Referred to Commerce and Tourism; Innovation, Industry, and Technology; Appropriations
-
Filed
Sponsors
- Joe Gruters · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 163 not signed on
Sponsors (1)
- Gruters, Joe Republican
Co-sponsors (0)
None.
Not signed on (163)
163 members have not signed on to this bill.
Show all 163 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Republican | 2 | 0 | 0 | 0 |
| Unaffiliated | 2 | 0 | 0 | 1 |
| Total | 4 | 0 | 0 | 1 |
| % of votes cast | 80% | 0% | 0% | 20% |
How each member voted (5)
| Member | Party | Vote |
|---|---|---|
| Hutson | — | Yea |
| Stewart | — | Yea |
| Torres | — | Not Voting |
| Gruters, Joe | Republican | Yea |
| Wright, Tom A. | Republican | Yea |
Subjects
Frequently asked questions
- Who sponsors SB 526?
- SB 526 is sponsored by Gruters, Joe (Republican).
- What is the current status of SB 526?
- This bill died with 2019 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track SB 526?
- Track SB 526 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 526
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 526
Last checked for changes 2 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →