SB 9 — AN ACT CONCERNING CONNECTICUT'S ENERGY FUTURE.
Last action — SIGNED BY GOVERNOR
-
✓Introduced
-
✓In Committee
-
✓Passed Senate
-
✓Passed House
-
✓To Executive
-
6Enacted
This bill has been enacted into law. Introduced February 08, 2018. Enacted.
Prognosis
Where this bill stands today.
Odds of enactment
HighHow often bills like it became law.
-
Enacted
Current position in the legislative process.
-
15 sponsors
15 primary, 0 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (2 D).
-
Cleared a recorded vote
Passed 2 recorded votes so far.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
Bill Text
What changed in the latest version
48 added · 54 removedPlain-language change summary
The bill SB 9 updates the renewable energy requirements for electric suppliers and distribution companies, increasing the percentage of their total output or services that must come from Class I renewable energy sources from twenty percent to twenty-one percent. Additionally, the bill introduces new procedures for the retirement of renewable energy certificates and allows for potential reductions in required renewable energy output based on the authority's forecasts. These changes are significant as they aim to enhance the integration of renewable energy into the electric grid and streamline related processes for electric utilities.
General Assembly Governor'sSubstitute Bill No.
9 February Session, 2018 LCO*_____SB00009ET____032918____* No.AN ACT CONCERNING CONNECTICUT'S ENERGY FUTURE.
340 *00340__________* Referred to Committee on ENERGY AND TECHNOLOGY Introduced by:
SEN.
LOONEY, 11th Dist.
SEN.
DUFF, 25th Dist.
REP.
ARESIMOWICZ, 30th Dist.
REP.
RITTER M., 1st Dist.
AN ACT CONCERNING CONNECTICUT'S ENERGY FUTURE.
(a) An[An] Subject to any modifications required by the Public Utilities Regulatory Authority for retiring renewable energy certificates on behalf of all electric ratepayers pursuant to subsection (h) of this section and sections 16a-3f, 16a-3g, 16a-3h, 16a-3i, 16a-3j and 16a-3m, an electric supplier and an electric distribution company providing standard service or supplier of last resort service, pursuant to section 16-244c, as amended by this act, shall demonstrate:
(15) On and after January 1, 2020, not less than [twenty] twenty-one per cent of the total output or services of any such supplier or distribution company shall be generated from Class I renewable energy sources and an additional four per cent of the total output or services shall be from Class I or Class II renewable energy sources, [.] except that for any electric supplier that has entered into or renewed a retail electric supply contract on or before the effective date of this section, on and after January 1, 2020, not less than twenty per cent of the total output or services of any such electric supplier shall be generated from Class I renewable energy sources;
[.] (16) On and after January 1, 2021, not less than twenty-two and one-half per cent of the total output or services of any such supplier or distribution company shall be generated from Class I renewable energy sources and an additional four per cent of the total output or services shall be from Class I or Class II renewable energy sources;
Section 16-245a of the 2018 supplement to the general statutes is amended by adding subsection (h) as follows (Effective from passage):
(NEW) (h) The authority shall establish procedures for the retirement of renewable energy certificates purchased pursuant to section 7 of this act, which may include reductions to the percentage of the total output or services of an electric supplier or an electric distribution company generated from Class I renewable energy sources required pursuant to subsection (a) of this section, as amended by this act.
Any such reduction shall be based on the energy production that the authority forecasts will be procured pursuant to subsections (a) and (b) of section 7 of this act.
The authority shall determine any such reduction of an annual renewable portfolio standard not later than one year prior to the effective date of such annual renewable portfolio standard.
An electric distribution company shall not be responsible for any administrative or other costs or expenses associated with any difference between the number of renewable energy certificates planned to be retired pursuant to the authority's reduction and the actual number of renewable energy certificates retired.
Sec.
3.
The electric distribution company shall promptly transfer any payment received from the wholesale supplier for the failure to meet the renewable portfolio standards to the Clean Energy Fund for the development of Class I renewable energy sources, provided, on and after June 5, 2013, any such payment shall be refunded to ratepayers by using such payment to offset the costs to all customers of electric distribution companies of the costs of contracts and tariffs entered into pursuant to sections 16-244r, as amended by this act, [and] 16-244t and section 57 of this act.
3.4.
The authority shall allocate such payment to the Clean Energy Fund for the development of Class I renewable energy sources, provided, on and after June 5, 2013, any such payment shall be refunded to ratepayers by using such payment to offset the costs to all customers of electric distribution companies of the costs of contracts and tariffs entered into pursuant to sections 16-244r, as amended by this act, [and] 16-244t and section 57 of this act.
4.5.
5.6.
(NEW)Subparagraph (Effective from passage) (a) (1) Not later than one hundred eighty days after January 1, 2019, and annually thereafter, each electric distribution company shall solicit and file with the Public Utilities Regulatory Authority for its approval one or more twenty-year tariffs with (A) customers that own or develop new generation projects that are less than two megawatts in size, serve the distribution system of thesubdivision electric(3) distribution company and use a Class I renewable energy source that either (i) uses anaerobic digestion, or (ii) has emissions of nosubsection more(c) than 0.07 pounds per megawatt-hour of nitrogensection oxides,16-244r 0.10 pounds per megawatt-hour of carbonthe monoxide,2018 0.02supplement poundsto perthe megawatt-hourgeneral ofstatutes volatileis organicrepealed compounds and onethe grainfollowing peris onesubstituted hundred standard cubic feet, and (B) customers that own or develop new generation projects that are less than two megawatts in size,lieu servethereof the(Effective distributionfrom systempassage): of the electric distribution company and use a Class I renewable energy source that emits no pollutants.
(2)(A) OnThe oraggregate beforeprocurement Septemberof 1,renewable 2018,energy thecredits authorityby shallelectric initiatedistribution acompanies proceedingpursuant to establishthis asubdivision procurementshall plan(i) forincrease suchby electrican distributionadditional companieseight pursuantmillion dollars per year in years five, six and seven, (ii) be fifty-six million dollars in years eight to thisfifteen, subsectioninclusive, and may(iii) givedecline aby preferenceeight million dollars per year in years sixteen to technologiestwenty-two, manufactured,inclusive, researchedprovided orany developedmoney not allocated in any given year may roll into the state.next year's available funds.
TheOn authoritythe maydate requireof suchapproval electricof distributionthe companiesprocurement toplan conductby separate solicitations for the resourcesauthority inpursuant subparagraphsto (A)subsection and(a) (B) of subdivisionsection (1)7 of this subsectionact, basedany uponmoney thenot sizeyet ofallocated suchpursuant resources to allowthis forsection ashall diversityexpire. of selected projects.
Sec.
7.
(NEW) (Effective from passage) (a) (1) On or before September 1, 2018, the authority shall initiate a proceeding to establish a procurement plan and tariffs for each electric distribution company pursuant to this subsection and may give a preference to technologies manufactured, researched or developed in the state.
Each electric distribution company shall develop such procurement plan in consultation with the Department of Energy and Environmental Protection and shall submit such procurement plan to the authority not later than sixty days after the authority initiates the proceeding pursuant to this subdivision.
The authority may require such electric distribution companies to conduct separate solicitations for the resources in subparagraphs (A) and (B) of subdivision (2) of this subsection based upon the size of such resources to allow for a diversity of selected projects.
(2) Not later than July 1, 2019, and annually thereafter, each electric distribution company shall solicit and file with the Public Utilities Regulatory Authority for its approval one or more twenty-year tariffs that are consistent with the procurement plan established pursuant to this subsection and that are applicable to (A) customers that own or develop new generation projects that are less than two megawatts in size, serve the distribution system of the electric distribution company, are constructed after the solicitation conducted pursuant to subdivision (3) of this subsection to which the customer is responding, and use a Class I renewable energy source that either (i) uses anaerobic digestion, or (ii) has emissions of no more than 0.07 pounds per megawatt-hour of nitrogen oxides, 0.10 pounds per megawatt-hour of carbon monoxide, 0.02 pounds per megawatt-hour of volatile organic compounds and one grain per one hundred standard cubic feet, and (B) customers that own or develop new generation projects that are less than two megawatts in size, serve the distribution system of the electric distribution company, are constructed after the solicitation conducted pursuant to subdivision (3) of this subsection to which the customer is responding, and use a Class I renewable energy source that emits no pollutants.
Any system that is eligible pursuant to subparagraph (B) of this subdivision shall not be eligible pursuant to subparagraph (A) of this subdivision.
Such generation projects shall be sized so as not to exceed the load at the customer's individual electric meter or a set of electric meters, when such meters are combined for billing purposes, from the electric distribution company providing service to such customer, as determined by such electric distribution company, unless such customer is a state, municipal or agricultural customer, then such generation project shall be sized so as not to exceed the load at such customer's individual electric meter or a set of electric meters,meters at the same customer premises, when such meters are combined for billing purposes, and the load of up to five state, municipal or agricultural beneficial accounts identified by such state, municipal or agricultural customer, and such state, municipal or agricultural customer may include the load of up to five additional nonstate or municipal beneficial accounts when sizing such generation project, provided such accounts are critical facilities, as defined in subdivision (2) of subsection (a) of section 16-243y of the general statutes and are connected to a microgrid.
A shared clean energy facility, as defined in section 16-244x of the general statutes, may participate in any solicitation pursuant to this subsection consistent with the program requirements established by the Department of Energy and Environmental Protection.Protection and included in the procurement plan established pursuant to this subsection.
(4) The maximum selected purchase price of energy and renewable energy certificates on a cents-per-kilowatt-hour basis in any given solicitation shall not exceed such maximum selected purchase price for the same resources in the prior year's solicitation, unless the authority makes a determination that there are changed circumstances in any given year.
Show all 128 changed lines (88 more)
(b) At the expiration of the residential solar investment program pursuant to subsection (b) of section 16-245ff of the general statutes, each electric distribution company shall offer athe tarifffollowing options to residential customers for the purchase of energyproducts and renewable energy certificates generated from a Class I renewable energy source that has a nameplate capacity rating of twenty-five kilowatts or less for a term not to exceed twenty years.years:
Such(1) generationA projectstariff shallfor be sized so as not to exceed the loadpurchase at the customer's individual electric meter or a set of electricall meters,energy whenand suchrenewable metersenergy arecertificates combinedon fora billingcents-per-kilowatt-hour purposes,basis; from the electric distribution company providing service to such customer, as determined by such electric distribution company.
Theand authority(2) shalla initiatepricing astructure proceedingthat notconsists laterof than(A) Septemberthe 1,crediting 2018,of all kilowatt-hour charges applicable to establishsuch aresidential ratecustomer onof aany cents-per-kilowatt-hourenergy basisthat foris suchproduced tariff,by whichsuch mayClass beI basedrenewable uponenergy thesource resultsagainst ofany oneenergy orthat moreis competitivesimultaneously solicitationsconsumed issuedon pursuanta toreal-time subsectionbasis (a)by ofsuch thisresidential sectioncustomer, and shall(B) bea guidedtariff byfor the Comprehensivepurchase Energyof Strategyany preparedenergy not simultaneously consumed and credited pursuant to sectionsubparagraph 16a-3d(A) of thethis generalsubdivision statutes.and renewable energy certificates on a cents-per-kilowatt-hour basis.
TheA authorityresidential maycustomer modifyshall suchselect rateeither foroption newauthorized customers under this subsection based on changed circumstances and may establish an interim rate prior to the expiration of the residential solar investment program pursuant to subsectionsubdivision (b)(1) ofor section(2) 16-245ff of thethis generalsubsection, statutesconsistent aswith anthe alternativerequirements toof suchthis program.section.
(c)Such Thegeneration aggregateprojects procurement and tariff purchases of energy and renewable energy certificates by electric distribution companies pursuant to subsections (a) and (b) of this section shall be upsized toso thirty-fiveas millionnot dollars in year one and increase by up to anexceed additional thirty-five million dollars per year in each of the yearsload twoat through twelve of such a tariff, provided the annualcustomer's purchasesindividual underelectric subparagraphmeter (A)from of subdivision (1) of subsection (a) of this section, subparagraph (B) of subdivision (1) of subsection (a) of this section or subsection (b) of this section, each in the aggregate,electric shalldistribution notcompany exceedproviding fortyservice perto centsuch ofcustomer, theas totaldetermined annualby dollarsuch amountelectric establisheddistribution pursuantcompany. to this subsection.
The authority shall initiate a proceeding not later than September 1, 2018, to establish a rate for such tariffs, which may be based upon the results of one or more competitive solicitations issued pursuant to subsection (a) of this section and shall be guided by the Comprehensive Energy Strategy prepared pursuant to section 16a-3d of the general statutes.
The authority may modify such rate for new customers under this subsection based on changed circumstances and may establish an interim tariff rate prior to the expiration of the residential solar investment program pursuant to subsection (b) of section 16-245ff of the general statutes as an alternative to such program, provided any residential customer utilizing a tariff pursuant to this subsection at such customer's electric meter shall not be eligible for any incentives offered pursuant to section 16-245ff of the general statutes at the same such electric meter and any residential customer utilizing any incentives offered pursuant to section 16-245ff of the general statutes at such customer's electric meter shall not be eligible for a tariff pursuant to this subsection at the same such electric meter.
For purposes of this section, "residential customer" means a customer of a single-family dwelling or a multifamily dwelling consisting of two to four units.
(c) The aggregate procurement and tariff purchases of energy and renewable energy certificates by electric distribution companies pursuant to subsections (a) and (b) of this section shall be budgeted up to thirty-five million dollars in year one and increase by up to an additional thirty-five million dollars per year in each of the years two through six of such a tariff, provided the annual purchases under subparagraph (A) of subdivision (2) of subsection (a) of this section, subparagraph (B) of subdivision (2) of subsection (a) of this section or subsection (b) of this section, each in the aggregate, shall not exceed forty per cent of the total annual dollar amount established pursuant to this subsection except that actual expenditures may vary based on reasonable variations between budgeted and actual energy production, as outlined in the procurement plan established pursuant to subsection (a) of this section and determined by the authority.
For the purposes of budgeting, the amount of energy purchased pursuant to subdivision (2) of subsection (b) of this section shall be based on a reasonable forecast, as determined by the authority, when a residential customer enters into the tariff.
The authority mayshall give preference to projects that provide electric distribution system benefits, include energy storage systems, utilize time of use rates or other dynamic pricing or provide other energy policy benefits identified in the Comprehensive Energy Strategy prepared pursuant to section 16a-3d of the general statutes.
(d)The Eachauthority electricshall distributionestablish companytariffs shallfor retire the renewablepurchase of energy certificates it purchases pursuant to this subsection on behalfa ofcents-per-kilowatt-hour allbasis ratepayersat to satisfy the obligationsexpiration of allany electrictariff suppliersterms andauthorized electric distribution companies providing standard service or supplier of last resort service pursuant to section 16-245a of the general statutes, as amended by this act.section.
At the end of the tariff term pursuant to subdivision (2) of subsection (b) of this section, residential customers that elected the option pursuant to said subdivision shall be credited all cents-per-kilowatt-hour charges pursuant to the tariff rate for such customer for energy produced by the Class I renewable energy source against any energy that is simultaneously consumed on a real-time basis by such residential customer.
(d) In accordance with subsection (h) of section 16-245a of the general statutes, as amended by this act, each electric distribution company shall retire the renewable energy certificates it purchases pursuant to subsections (a) and (b) of this section on behalf of all ratepayers to satisfy the obligations of all electric suppliers and electric distribution companies providing standard service or supplier of last resort service pursuant to section 16-245a of the general statutes, as amended by this act.
(e) The net costs of any tariff offered by an electric distribution company pursuant to this section shall be recovered on a timely basis through a nonbypassable fully reconciling component of electric rates for all customers of the electric distribution company.
6.8.
(NEW) (Effective from passage) The state shallmay reduce energy consumption by not less than 1.6 million MMBtu, as defined in subdivision (4) of section 22a-197 of the general statutes, annually each year for calendar years commencing on and after January 1, 2020, up to and including calendar year 2025.
7.9.
Services provided under the plan shall be available to all customers of electric distribution companies and gas companies.companies, [.
[EachEach such company shall apply to the Energy Conservation Management Board for reimbursement for expenditures pursuant to the plan.]plan] Theprovided Energya Conservationcustomer Managementof Boardan shallelectric advisedistribution andcompany assistmay thenot electricbe distributiondenied companiessuch andservices gasbased companieson in the developmentfuel ofsuch customer uses to heat such plan.customer's home.
The Energy Conservation Management Board shall advise and assist the electric distribution companies and gas companies in the development of such plan.
The plan shall be executed through procurements put in place pursuant to section 8 of this act and any applicable conservation adjustment mechanisms applied in accordance with this section.
Electric distribution companies shall collect a conservation adjustment mechanism that ensures the plan is fully funded by collecting an amount that is not more than the sum of six mills per kilowatt hour of electricity sold to each end use customer of an electric distribution company during the three years of any Conservation and Load Management Plan,Plan. less the annual revenue requirement to fund any contracts entered into by the electric distribution companies pursuant to section 8 of this section.
8.10.
(NEW) (Effective from passage) (a) The Commissioner of Energy and Environmental Protection, in consultation with the procurement manager identified in subsection (l) of section 16-2 of the general statutes, the Office of Consumer Counsel, the Attorney General and a representative of the Energy Conservation Management Board, may issue one or more solicitations for long-term contracts from providers of passive demand response measures including, but not limited to, energy efficiency and conservation and load management programs, that are capable, either singly or through aggregation, of reducing electric demand by one megawatt or more.
Proposals pursuant to this subsection shall not have a contract term exceeding twenty years.
(b) The commissioner, in consultation with the procurement manager identified in subsection (l) of section 16-2 of the general statutes, the Office of Consumer Counsel, the Attorney General and a representative of the Energy Conservation Management Board, shall evaluate project proposals received under any solicitation issued pursuant to this section based on factors including, but not limited to, (1) whether the benefits of the proposal outweigh the costs to ratepayers, (2) whether the proposal is in the best interest of ratepayers, (3) whether the proposal is aligned with the policy goals outlined in the Integrated Resources Plan, approved pursuant to section 16a-3a of the general statutes, and the Comprehensive Energy Strategy, prepared pursuant to section 16a-3d of the general statutes, and (4) the degree to which the electric demand reduction can be verified using automated measurement.
(c) If the commissioner finds proposals received pursuant to this section to be in the best interest of electric ratepayers, in accordance with the provisions of subsection (b) of this section, the commissioner may select any such proposal or proposals, provided the total capacity of the resources selected under all solicitations issued pursuant to this section in any given year in the aggregate do not exceed twenty-five megawatts of electric demand reduction.
The commissioner may, on behalf of all customers of electric distribution companies, direct the electric distribution companies to enter into long-term contracts for such selected proposal or proposals.
(d) Any agreement entered into pursuant to this section shall be subject to review and approval by the Public Utilities Regulatory Authority.
The electric distribution company shall file an application for the approval of any such agreement with the authority.
The authority shall approve such agreement if it is prudent and cost effective.
The authority shall issue a decision not later than ninety days after such filing.
If the authority does not issue a decision within ninety days after such filing, the agreement shall be deemed approved.
The net costs of any such agreement, including costs incurred by the electric distribution company under the agreement and reasonable costs incurred by the electric distribution company in connection with the agreement, shall be recovered on a timely basis through a fully reconciling component of electric rates for all customers of the electric distribution company.
Any net revenues from the sale of products purchased in accordance with long-term contracts entered into pursuant to this section shall be credited to customers through the same fully reconciling rate component for all customers of the contracting electric distribution company.
(e) The commissioner may hire consultants to assist in implementing this section including, but not limited to, the evaluation of proposals submitted pursuant to this section.
All reasonable costs associated with the commissioner's solicitation and review of proposals pursuant to this section shall be recoverable through a fully reconciling component of electric rates for all customers of the electric distribution company.
Such costs shall be recoverable even if the commissioner does not select any proposals pursuant to solicitations issued pursuant to this section.
Sec.
9.
10.11.
11.12.
Seventy-five per cent of such assessed charges shall be [deposited in]in the Energy] used in furtherance of the [Energy] Conservation and Load Management [Fund] Plan established in section 16-245m, as amended by this act, and twenty-five per cent shall be deposited in the Clean Energy Fund established in section 16-245n, as amended by this act, except that such seventy-five per cent of assessed charges with respect to an electric supplier shall be [divided] allocated among the [Energy] Conservation and Load Management [Funds] Plan of electric distribution companies in proportion to the amount of electricity such electric supplier provides to end use customers in the state using the facilities of each electric distribution company.
A minimum of twenty-five per cent of the credits shall be allocated to the person that conserved the electricity or installed the project for customer-side distributed resources to which the energy credit is attributable and the remainder of the credits shall be [allocated to]to the Energy] used in furtherance of the [Energy] Conservation and Load Management [Fund] Plan, based on a schedule created by the authority no later than January 1, 2007, and reviewed annually thereafter.
The portion [allocated to]to the Energy] used in furtherance of the [Energy] Conservation and Load Management [Fund] Plan shall be used for measures that respond to energy demand and for peak reduction programs.
12.13.
13.14.
14.15.
15.16.
16.17.
17.18.
18.19.
19.20.
20.21.
21.22.
22.23.
23.24.
24.
Subdivision (1) of subsection (a) of section 16-245m of the general statutes is repealed.
(Effective July 1, 2020) Sec.
SubsectionSubdivision (1) of subsection (a) and subsection (b) of section 16-245m of the general statutes isare repealed.
2 from passage 16-244c(h)(1)16-245a Sec.
3 from passage 16-245(k)16-244c(h)(1) Sec.
4 from passage 16-243h16-245(k) Sec.
5 from passage New16-243h section Sec.
6 from passage New16-244r(c)(3)(A) section Sec.
7 from passage 16-245m(d)(1)New section Sec.
9 from passage 16-245n(b)16-245m(d)(1) Sec.
10 Julyfrom 1,passage 202016-245n(b) 12-264(c)(2) Sec.
11 July 1, 2020 16-243q(b)12-264(c)(2) to (d) Sec.
12 July 1, 2020 16-243t16-243q(b) to (d) Sec.
13 July 1, 2020 16-243v(d)16-243t and (e) Sec.
14 July 1, 2020 16-245c(e)16-243v(d) and (e) Sec.
15 July 1, 2020 16-245e(a)(1)16-245c(e) and (2) Sec.
16 July 1, 2020 16-245e(a)(13)16-245e(a)(1) and (2) Sec.
17 July 1, 2020 16-245f(a)16-245e(a)(13) Sec.
18 July 1, 2020 16-245i(a)16-245f(a) and (b) Sec.
19 July 1, 2020 16-245j(c)(4)(A)16-245i(a) and (b) Sec.
20 July 1, 2020 16-245m(d)(3)16-245j(c)(4)(A) Sec.
21 July 1, 2020 16-245n(f)(1)16-245m(d)(3) Sec.
22 July 1, 2020 16-245w(b)16-245n(f)(1) Sec.
23 July 1, 2020 16-258d(d)16-245w(b) Sec.
24 July 1, 2020 Repealer16-258d(d) section Sec.
25 July 1, 2020 Repealer section Statement of Purpose:Legislative Commissioners:
ToIn implementSection the1(a), Governor's"16a-6h" budgetwas recommendations.changed to "16a-3h" for accuracy, in Section 6, "any money not allocated before such date of approval" was changed to "any money not yet allocated", for clarity and in Section 7(c), "subparagraph (A) of subdivision (1) of subsection (a) of this section, subparagraph (B) of subdivision (1) of subsection (a) of this section" was changed to "subparagraph (A) of subdivision (2) of subsection (a) of this section, subparagraph (B) of subdivision (2) of subsection (a) of this section" for accuracy.
[ProposedET deletionsJoint areFavorable enclosedSubst. in brackets.
Proposed additions are indicated by underline, except that when the entire text of a bill or resolution or a section of a bill or resolution is new, it is not underlined.]
Show all 128 changed rows (88 more)
View plain text versions (2)
- R01 html
- R00 Current html
Action History
-
SIGNED BY GOVERNOR
-
TRANSMITTED BY SECRETARY OF THE STATE TO GOVERNOR
-
TRANSMITTED TO SECRETARY OF THE STATE
-
PUBLIC ACT 18-50
-
IN CONCURRENCE
-
HOUSE PASSED, SEN. AMEND. SCH. B
-
AMENDMENT WITHDRAWN HOUSE AMEND. SCH. A
-
MOTION TO RECONSIDER
-
HOUSE ADOPTED HOUSE AMEND. SCH. A
-
HOUSE ADOPTED SEN. AMEND. SCH. B
-
HOUSE CALENDAR NUMBER 557
-
FAV. RPT., TABLED FOR HOUSE CALENDER
-
TRANSMITTED PURSUANT TO JOINT RULE 17
-
SEN. PASSED, SEN. AMEND. SCH. B
-
SEN. ADOPTED SEN. AMEND. SCH. B
-
AMENDMENT WITHDRAWN, SENATE AMENDMENT SCH. A
-
FILE NO. 460
-
SENATE CALENDAR NUMBER 283
-
FAV. RPT., TAB. FOR CAL., SEN.
-
RPTD. OUT OF LCO
-
REFERRED TO Office of Legislative Research AND Office of Fiscal Analysis 04/11/18
-
FILED WITH LCO
-
Joint Favorable Substitute
-
PUBLIC HEARING 0301
-
REF. TO JOINT COMM. ON Energy and Technology
Sponsors
- Sam Belsito · Primary
- Dave W. Yaccarino · Primary
- Terrie E. Wood · Primary
- Matthew Ritter · Primary
- Joe Aresimowicz · Primary
- Laura M. Devlin · Primary
- Hilda E. Santiago · Primary
- L. Scott Frantz · Primary
- Pam Staneski · Primary
- Livvy R. Floren · Primary
- Geraldo C. Reyes · Primary
- Bobby G. Gibson · Primary
- Marilyn Moore · Primary
- Martin M. Looney · Primary
- Bob Duff · Primary
Sponsorship breakdown
Export CSV (upgrade) →15 sponsors · 0 co-sponsors · 172 not signed on · 20 voted No
Sponsors (15)
- Belsito, Sam
- Yaccarino, Dave W.
- Wood, Terrie E.
- Ritter, Matthew
- Aresimowicz, Joe
- Devlin, Laura M.
- Santiago, Hilda E.
- Frantz, L. Scott
- Staneski, Pam
- Floren, Livvy R.
- Reyes, Geraldo C.
- Gibson, Bobby G.
- Marilyn Moore
- Martin M. Looney Democratic
- Bob Duff Democratic
Co-sponsors (0)
None.
Not signed on (172)
172 members have not signed on to this bill.
Show all 172 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 60 | 26 | 0 | 2 |
| Republican | 14 | 10 | 0 | 2 |
| Democratic | 26 | 9 | 0 | 1 |
| Total | 100 | 45 | 0 | 5 |
| % of votes cast | 67% | 30% | 0% | 3% |
How each member voted (150)
| Member | Party | Vote |
|---|---|---|
| ABERCROMBIE | — | Yea |
| PORTER | — | Yea |
| ADAMS | — | Yea |
| REED | — | Yea |
| ALBIS | — | Yea |
| REBIMBAS | — | Yea |
| ALTOBELLO | — | Yea |
| RILEY | — | Nay |
| ARCONTI | — | Yea |
| CHEESEMAN | — | Yea |
| CUMMINGS | — | Nay |
| SIEGRIST | — | Yea |
| BORER | — | Nay |
| D'AMELIO | — | Yea |
| SIMANSKI | — | Nay |
| ROSE | — | Nay |
| SKULCZYCK | — | Yea |
| ROVERO | — | Nay |
| DAVIS | — | Yea |
| CONLEY | — | Yea |
| SANCHEZ | — | Yea |
| SREDZINSKI | — | Yea |
| CURREY | — | Yea |
| DEVLIN | — | Yea |
| SRINIVASAN | — | Nay |
| D'AGOSTINO | — | Nay |
| STANESKI | — | Yea |
| DE LA CRUZ | — | Yea |
| SCANLON | — | Yea |
| STOKES | — | Nay |
| SERRA | — | Yea |
| DUNSBY | — | Yea |
| STORMS | — | Nay |
| SIMMONS | — | Yea |
| FERGUSON | — | Yea |
| TWEEDIE | — | Nay |
| DIMASSA | — | Yea |
| FERRARO | — | Yea |
| SOTO | — | Yea |
| WILMS | — | Yea |
| FLEISCHMANN | — | Nay |
| FLOREN | — | Yea |
| FOX | — | Yea |
| STALLWORTH | — | Yea |
| FRANCE | — | Nay |
| FREY | — | Yea |
| TERCYAK | — | Nay |
| FUSCO | — | Nay |
| TONG | — | Yea |
| GREEN | — | Nay |
| ZIOBRON | — | Nay |
| URBAN | — | Yea |
| GUERRERA | — | Nay |
| VARGAS | — | Nay |
| VERRENGIA | — | Yea |
| KLARIDES | — | Yea |
| HAMPTON | — | Nay |
| WINKLER | — | Nay |
| KOKORUDA | — | Yea |
| ARESIMOWICZ | — | Yea |
| HENNESSY | — | Nay |
| YOUNG | — | Nay |
| KUPCHICK | — | Yea |
| JOHNSON | — | Yea |
| ZIOGAS | — | Nay |
| LABRIOLA | — | Yea |
| JULESON-SCOPINO | — | Yea |
| LAVIELLE | — | Yea |
| LEGEYT | — | Not Voting |
| MACLACHLAN | — | Yea |
| MCCARTY, K. | — | Yea |
| BERGER | — | Not Voting |
| BELSITO | — | Nay |
| BETTS | — | Yea |
| COOK | — | Yea |
| BOCCHINO | — | Yea |
| OHLER | — | Yea |
| GENTILE | — | Yea |
| O'NEILL | — | Yea |
| MORIN | — | Yea |
| MORRIS | — | Yea |
| BYRON | — | Yea |
| ORANGE | — | Nay |
| PERONE | — | Yea |
| CAMILLO | — | Yea |
| PETIT | — | Yea |
| RYAN | — | Yea |
| Mccarthy Vahey | — | Yea |
| Alphonse Paolillo | Democratic | Yea |
| Andre F. Baker | Democratic | Nay |
| Bob Duff | Democratic | Yea |
| Bob Godfrey | Democratic | Yea |
| Bobby G. Gibson | Democratic | Yea |
| Christopher Rosario | Democratic | Nay |
| Derek Slap | Democratic | Yea |
| Derell Wilson | Democratic | Nay |
| Frank Smith | Democratic | Yea |
| Geraldo C. Reyes | Democratic | Nay |
| Gregory Haddad | Democratic | Yea |
| Henry J. Genga | Democratic | Yea |
| Hilda E. Santiago | Democratic | Yea |
| Hilda E. Santiago | Democratic | Yea |
| Jason Rojas | Democratic | Yea |
| Jonathan Steinberg | Democratic | Yea |
| Joseph P. Gresko | Democratic | Yea |
| Josh Elliott | Democratic | Yea |
| Joshua M. Hall | Democratic | Nay |
| Juan R. Candelaria | Democratic | Yea |
| Kerry S. Wood | Democratic | Yea |
| Larry B. Butler | Democratic | Yea |
| Liz Linehan | Democratic | Yea |
| Mary M. Mushinsky | Democratic | Yea |
| Matthew L. Lesser | Democratic | Yea |
| Matthew Ritter | Democratic | Yea |
| Mike Demicco | Democratic | Yea |
| Minnie Gonzalez | Democratic | Not Voting |
| Patricia A. Dillon | Democratic | Nay |
| Patricia Billie Miller | Democratic | Nay |
| Patrick S. Boyd | Democratic | Nay |
| Rick Lopes | Democratic | Nay |
| Roland J. Lemar | Democratic | Yea |
| Steven J. Stafstrom | Democratic | Yea |
| Toni E. Walker | Democratic | Yea |
| Trenee McGee | Democratic | Yea |
| Anne Dauphinais | Republican | Nay |
| Ben McGorty | Republican | Yea |
| Bill Buckbee | Republican | Yea |
| Cara Christine Pavalock-D'Amato | Republican | Not Voting |
| Carol Hall | Republican | Nay |
| Christie M. Carpino | Republican | Yea |
| Craig C. Fishbein | Republican | Nay |
| Dave W. Yaccarino | Republican | Yea |
| David Rutigliano | Republican | Nay |
| Devin R. Carney | Republican | Yea |
| Doug Dubitsky | Republican | Nay |
| Jason Perillo | Republican | Nay |
| Jay M. Case | Republican | Yea |
| Joe Polletta | Republican | Nay |
| John E. Piscopo | Republican | Nay |
| Kurt Vail | Republican | Yea |
| Lezlye Zupkus | Republican | Not Voting |
| Mitch Bolinsky | Republican | Yea |
| Nicole Klarides-Ditria | Republican | Yea |
| Rob Sampson | Republican | Nay |
| Stephen G. Harding | Republican | Yea |
| Tami Zawistowski | Republican | Nay |
| Tim Ackert | Republican | Yea |
| Tom Delnicki | Republican | Yea |
| Tom O'Dea | Republican | Yea |
| Vincent J. Candelora | Republican | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democratic | 7 | 0 | 0 | 1 |
| Unaffiliated | 18 | 2 | 0 | 2 |
| Republican | 4 | 1 | 0 | 1 |
| Total | 29 | 3 | 0 | 4 |
| % of votes cast | 81% | 8% | 0% | 11% |
How each member voted (36)
| Member | Party | Vote |
|---|---|---|
| PAUL M. FORMICA | — | Yea |
| TIM LARSON | — | Yea |
| KEVIN KELLY | — | Yea |
| STEVE CASSANO | — | Yea |
| MARILYN MOORE | — | Yea |
| BETH BYE | — | Yea |
| EDWIN A. GOMES | — | Yea |
| TERRY B. GERRATANA | — | Yea |
| MICHAEL A. MCLACHLAN | — | Yea |
| KEVIN D. WITKOS | — | Not Voting |
| TONI BOUCHER | — | Yea |
| PAUL DOYLE | — | Yea |
| CARLO LEONE | — | Yea |
| CRAIG MINER | — | Yea |
| LEN SUZIO | — | Nay |
| GAYLE SLOSSBERG | — | Yea |
| ART LINARES | — | Yea |
| JOE MARKLEY | — | Nay |
| LEONARD FASANO | — | Yea |
| GEORGE LOGAN | — | Not Voting |
| ANTHONY GUGLIELMO | — | Yea |
| L. SCOTT FRANTZ | — | Yea |
| Bob Duff | Democratic | Yea |
| Catherine A. Osten | Democratic | Yea |
| Douglas McCrory | Democratic | Yea |
| Gary A. Winfield | Democratic | Yea |
| Joan V. Hartley | Democratic | Yea |
| John W. Fonfara | Democratic | Not Voting |
| Mae Flexer | Democratic | Yea |
| Martin M. Looney | Democratic | Yea |
| Eric C. Berthel | Republican | Nay |
| Heather S. Somers | Republican | Yea |
| Henri Martin | Republican | Yea |
| John A. Kissel | Republican | Not Voting |
| Kathy Kennedy | Republican | Yea |
| Tony Hwang | Republican | Yea |
Subjects
Frequently asked questions
- Who sponsors SB 9?
- SB 9 is sponsored by Belsito, Sam, Yaccarino, Dave W., Wood, Terrie E., Ritter, Matthew, Aresimowicz, Joe, Devlin, Laura M., Santiago, Hilda E., Frantz, L. Scott, Staneski, Pam, Floren, Livvy R., Reyes, Geraldo C., Gibson, Bobby G., Marilyn Moore, Martin M. Looney (Democratic), and Bob Duff (Democratic).
- What is the current status of SB 9?
- This bill has been enacted into law. Introduced February 08, 2018. Enacted.
- Where can I track SB 9?
- Track SB 9 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 9
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 9
Last checked for changes 2 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →