New Mexico 2026 Regular Session Status: Passed House 1 D cosponsors

HB 254 — AVOIDED GASSES IN PRC COST TEST

Last action — action postponed indefinitely

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has passed the House. Introduced January 30, 2026. It now moves to the second chamber.

Next likely step: consideration and a floor vote in the Senate.

Prognosis

Stalled 28% · moderate confidence

Where this bill stands today.

Odds of enactment

Moderate

How often bills like it became law.

  • Passed House

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (1 D).

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

1 added · 330 removed

Plain-language change summary

The updated version of House Bill 254 removes the introductory lines and focuses directly on the text of the bill. This change streamlines the document, making it clearer and easier to follow. By permitting the incorporation of avoided greenhouse gas emissions into utility cost assessments, it aims to encourage more environmentally friendly practices in public utilities, which can lead to better decision-making for energy efficiency and sustainability in New Mexico.

→
Previous
Latest
HOUSE BILL 254 57TH LEGISLATURE- STATE OF NEW MEXICO - SECOND SESSION, 2026 INTRODUCED BY Kristina Ortez 6 8 10 AN ACT RELATING TO PUBLIC UTILITIES;
57TH LEGISLATURE -STATEOFNEWMEXICO- SECOND SESSION, 2026
PERMITTING THE INCORPORATION OF THE VALUE OF AVOIDED GREENHOUSE GAS EMISSIONS IN THE PUBLIC REGULATION COMMISSION'S UTILITY COST TEST.
15 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF NEW MEXICO:
SECTION 1.
Section 62-17-4 NMSA 1978 (being Laws 2005, e t 17 Chapter 341, Section 4, as amended) is amended to read:
w l n d 18 "62-17-4.
DEFINITIONS.--As used in the Efficient Use of = = 19 a l Energy Act:
i a e r 20 A.
"achievable" means those energy efficiency or a t m m 21 load management resources available to the utility using its d r e 22 best efforts;
c e s k 23 B.
"advanced conductor" means a conductor that has e a n b 24 a direct current electrical resistance at least ten percent u [ lower than existing conductors of a similar diameter while .233401.1 simultaneously increasing the energy carrying capacity by at least seventy-five percent;
C.
"advanced grid technology" means hardware or software technology that increases the efficiency, capacity or reliability of existing or new electric transmission and distribution systems, facilities and equipment and includes advanced conductors, thermal ratings, [grid enhancing] grid- enhancing technology and technology determined by the commission or the federal energy regulation commission to increase the efficiency, capacity or reliability of an existing or new transmission facility;
D.
"advanced power flow controllers" means hardware or software technology used to push or pull electric power in a manner that balances overloaded lines and underused corridors within a distribution or transmission system;
E.
"commission" means the public regulation e t 17 commission;
w l n d 18 F.
"cost-effective" means that the energy = = 19 a l efficiency or load management program meets the utility cost i a e r 20 test;
a t m m 21 G.
"customer" means a utility customer at a single, d r e 22 contiguous field, location or facility, regardless of the c e s k 23 number of meters at that field, location or facility;
e a n b 24 H.
"distribution cooperative utility" means a u [ utility with distribution facilities organized as a rural .233401.1 - 2 - electric cooperative pursuant to Laws 1937, Chapter 100 or the Rural Electric Cooperative Act or similarly organized in other states;
I.
"dynamic line ratings" means hardware or software technology used to appropriately update the calculated thermal limits of existing distribution or transmission lines based on real-time and forecasted weather conditions;
J.
"energy efficiency" means measures, including energy conservation measures, or programs that target consumer behavior, equipment or devices to result in a decrease in consumption of electricity and natural gas without reducing the amount or quality of energy services;
K.
"[grid enhancing] grid-enhancing technology" means hardware or software technology that reduces congestion or enhances the flexibility of electric transmission and distribution systems by increasing the capacity of a line or e t 17 rerouting electricity from overloaded to uncongested lines w l n d 18 while maintaining industry safety standards and includes = = 19 a l dynamic line ratings, advanced power flow controllers and i a e r 20 topology optimization;
a t m m 21 L.
"large customer" means a customer with d r e 22 electricity consumption greater than seven thousand megawatt- c e s k 23 hours per year or natural gas use greater than three hundred e a n b 24 sixty thousand decatherms per year;
u [ M.
"load management" means measures or programs .233401.1 - 3 - that target equipment or devices to result in decreased peak electricity demand or shift demand from peak to off-peak periods;
N.
"program costs" means the prudent and reasonable costs of developing and implementing energy efficiency and load management programs;
[but] "program costs" does not include charges for incentives or the removal of regulatory disincentives;
O.
"public utility" means a public utility that is not also a distribution cooperative utility;
P.
"topology optimization" means hardware or software technology that identifies reconfigurations of the distribution or transmission grid and can enable the routing of power flows around congested or overloaded distribution or transmission elements;
Show all 78 changed rows (38 more)
Previous
Latest
and Q.
"utility cost test" means a standard that is met e t 17 if the monetary costs that are borne by the public utility and w l n d 18 that are incurred to develop, acquire and operate energy = = 19 a l efficiency or load management resources on a life-cycle basis i a e r 20 are less than the avoided monetary costs associated with a t m m 21 developing, acquiring and operating the associated supply-side d r e 22 resources, which for investor-owned electric utilities may c e s k 23 incorporate the value of avoided greenhouse gas emissions." e a n b 24 SECTION 2.
Section 62-17-5 NMSA 1978 (being Laws 2005, u [ Chapter 341, Section 5, as amended) is amended to read:
.233401.1 - 4 - "62-17-5.
COMMISSION APPROVAL--ENERGY EFFICIENCY AND LOAD MANAGEMENT PROGRAMS--DISINCENTIVES.-- A.
Pursuant to the findings and purpose of the Efficient Use of Energy Act, the commission shall consider public utility acquisition of cost-effective energy efficiency and load management resources to be in the public interest.
B.
The commission shall direct public utilities to evaluate and implement cost-effective programs that reduce energy demand and consumption.
C.
Before the commission approves an energy efficiency and load management program for a public utility, it shall find that the portfolio of programs is cost-effective and designed to provide every affected customer class with the opportunity to participate and benefit economically.
The commission shall determine the cost-effectiveness of energy efficiency and load management measures using the utility cost e t 17 test, which for investor-owned electric utilities may w l n d 18 incorporate the value of avoided greenhouse gas emissions.
In = = 19 a l determining life-cycle costs and benefits of energy efficiency i a e r 20 programs, the commission shall not adjust for taxes when a t m m 21 selecting a discount rate.
In determining life-cycle costs and d r e 22 benefits for energy efficiency and load management programs c e s k 23 directed to low-income customers, the commission shall either e a n b 24 quantify or assign a reasonable value to:
u [ (1) reductions in working capital;
.233401.1 - 5 - (2) reduced collection costs;
(3) lower bad-debt expense;
(4) improved customer service effectiveness;
and (5) other appropriate factors as utility system economic benefits.
D.
The commission shall act expeditiously on public utility requests for approval of energy efficiency or load management programs.
E.
Public utilities shall obtain commission approval of energy efficiency and load management programs before they are implemented.
Public utilities proposing new energy efficiency and load management programs shall, before seeking commission approval, solicit nonbinding recommendations on the design, implementation and use of third-party energy service contractors through competitive bidding on the programs e t 17 from commission staff, the attorney general, the energy, w l n d 18 minerals and natural resources department and other interested = = 19 a l parties.
The commission may for good cause require public i a e r 20 utilities to solicit competitive bids for energy efficiency and a t m m 21 load management resources.
d r e 22 F.
The commission shall:
c e s k 23 (1) upon petition or its own motion, identify e a n b 24 and remove regulatory disincentives or barriers for public u [ utility expenditures on energy efficiency and load management .233401.1 - 6 - measures in a manner that balances the public interest, consumers' interests and investors' interests;
(2) upon petition by a public utility, remove regulatory disincentives through the adoption of a rate adjustment mechanism that ensures that the revenue per customer approved by the commission in a general rate case proceeding is recovered by the public utility without regard to the quantity of electricity or natural gas actually sold by the public utility subsequent to the date the rate took effect.
Regulatory disincentives removed through a rate adjustment mechanism shall be separately calculated for the rate class or classes to which the mechanism applies and collected or refunded by the utility through a separately identified tariff rider that shall not be used to collect commission-approved energy efficiency and load management program costs and incentives;
e t 17 (3) provide public utilities an opportunity to w l n d 18 earn a profit on cost-effective energy efficiency and load = = 19 a l management resource development that, with satisfactory program i a e r 20 performance, is financially more attractive to the utility than a t m m 21 supply-side utility resources;
and d r e 22 (4) not reduce a utility's return on equity c e s k 23 based on approval of a disincentive removal mechanism or profit e a n b 24 incentives pursuant to the Efficient Use of Energy Act.
u [ G.
Public utilities providing electricity and .233401.1 - 7 - natural gas service to New Mexico customers shall, subject to commission approval, acquire the cost-effective and achievable energy efficiency and load management resources available in their service territories.
This requirement, however, for public utilities providing electricity service, shall not be less than savings of five percent of 2020 total retail kilowatt-hour sales to New Mexico customer classes that have the opportunity to participate in calendar year 2025 as a result of energy efficiency and load management programs implemented in years 2021 through 2025.
No later than June 30, 2025, the commission shall adopt, through rulemaking, energy savings targets for electric utilities for years 2026 through 2030 based on cost-effective and achievable energy savings and provide utility incentives based on savings achieved.
H.
A public utility that determines it cannot achieve the minimum requirements established in Subsection G of e t 17 this section shall report to the commission on why it cannot w l n d 18 meet those requirements and shall propose alternative = = 19 a l requirements based on acquiring cost-effective and achievable i a e r 20 energy efficiency and load management resources.
If the a t m m 21 commission determines, after hearing, that the minimum d r e 22 requirements of Subsection G of this section exceed the c e s k 23 achievable amount of energy efficiency and load management e a n b 24 available to the public utility or that the program costs of u [ energy efficiency and load management to achieve the minimum .233401.1 - 8 - requirements of Subsection G of this section exceed the program costs funding established in Subsection A of Section 62-17-6 NMSA 1978, the commission shall establish lower minimum energy savings requirements for the utility based on the maximum amount of energy efficiency and load management that it determines can be achieved." - 9 - 9 11 13 15 e t 17 w l n d 18 = = 19 a l i a e r 20 a t m m 21 d r e 22 c e s k 23 e a n b 24 u [ .233401.1
View plain text versions (2)

Action History

  1. action postponed indefinitely

  2. Sent to Senate Conservation Committee

  3. passed House

  4. DO PASS, as amended, committee report adopted

  5. DO PASS committee report adopted

  6. Sent to House Energy, Environment and Natural Resources Committee & House Government, Elections and Indian Affairs Committee

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 111 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (111)

111 members have not signed on to this bill.

Show all 111 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors HB 254?
HB 254 is sponsored by Kristina Ortez (Democrat).
What is the current status of HB 254?
This bill has passed the House. Introduced January 30, 2026. It now moves to the second chamber.
Where can I track HB 254?
Track HB 254 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 254

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 254

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →