California 2021-2022 Regular Session Status: In Committee 5 D cosponsors

AB 427 — Electricity: resource adequacy requirements.

Last action — From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2021-2022 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, in consultation with the Independent System Operator (ISO) , to establish resource adequacy requirements for all load-serving entities, defined to include electrical corporations, community choice aggregators, and electric service providers. Existing law requires that the resource adequacy program achieve specified objectives, including to establish new or maintain existing demand response products and tariffs that facilitate the economic dispatch and use of demand response that can either meet or reduce an electrical corporation's resource adequacy requirements, as determined by the PUC. This bill would require the PUC, by July 1, 2022, to establish a capacity valuation methodology for customer-sited energy storage resources and customer-sited hybrid resources, as defined, in consultation with the ISO and the State Energy Resources Conservation and Development Commission, for the 2023 resource adequacy year.

Bill Text

Action History

  1. From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.

  2. Died pursuant to Art. IV, Sec. 10(c) of the Constitution.

  3. In committee: Held under submission.

  4. In committee: Set, first hearing. Referred to APPR. suspense file.

  5. Re-referred to Com. on APPR.

  6. Read second time and amended.

  7. From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 11. Noes 2.) (April 21).

  8. Referred to Com. on U. & E.

  9. From printer. May be heard in committee March 7.

  10. Read first time. To print.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 5 co-sponsors · 116 not signed on · 1 voted No

Sponsors (1)

Co-sponsors (5)

Not signed on (116)

116 members have not signed on to this bill.

Show all 116 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 11 Yea · 2 Nay · 2 Other
Party YeaNayPresentNot Voting
Unaffiliated 7101
Democratic 4000
Republican 0101
Total 11202
% of votes cast 73%13%0%13%
How each member voted (15)
Member Party Vote
Ting — Yea
Burke — Yea
Santiago — Yea
Chau — Yea
Quirk — Yea
Cunningham — Nay
Mayes — Not Voting
Cristina Garcia — Yea
Eduardo Garcia — Yea
Bauer-Kahan, Rebecca Democratic Yea
Carrillo, Juan Democratic Yea
Muratsuchi, Al Democratic Yea
Reyes, Eloise Gómez Democratic Yea
Chen, Phillip Republican Nay
Patterson, Joe Republican Not Voting

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does AB 427 do?
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, in consultation with the Independent System Operator (ISO) , to establish resource adequacy requirements for all load-serving entities, defined to include electrical corporations, community choice aggregators, and electric service providers. Existing law requires that the resource adequacy program achieve specified objectives, including to establish new or maintain existing demand response products and tariffs that facilitate the economic dispatch and use of demand response that can either meet or reduce an electrical corporation's resource adequacy requirements, as determined by the PUC. This bill would require the PUC, by July 1, 2022, to establish a capacity valuation methodology for customer-sited energy storage resources and customer-sited hybrid resources, as defined, in consultation with the ISO and the State Energy Resources Conservation and Development Commission, for the 2023 resource adequacy year.
Who sponsors AB 427?
AB 427 is sponsored by Bauer-Kahan, Rebecca (Democratic), Stern, Henry I. (Democratic), Bennett, Steve (Democratic), Ward, Christopher M. (Democratic), Becker, Josh (Democratic), and Chiu.
What is the current status of AB 427?
This bill died with 2021-2022 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track AB 427?
Track AB 427 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 427

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 427

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →