California 2019-2020 Regular Session Status: In Committee 1 R cosponsors

AB 584 — Paradise Irrigation District: water pipeline: design-build process.

Last action — From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2019-2020 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Existing law authorizes, until January 1, 2025, local agencies, as defined, to use the design-build project delivery process, as specified, for specified public works. This bill would authorize the Paradise Irrigation District to utilize the design-build project delivery process to assign contracts for the construction of a water conveyance pipeline from the Town of Paradise to the City of Chico. This bill would make legislative findings and declarations as to the necessity of a special statute for the Paradise Irrigation District.

Bill Text

Action History

  1. From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.

  2. Died pursuant to Art. IV, Sec. 10(c) of the Constitution.

  3. Re-referred to Com. on L. GOV.

  4. From committee chair, with author's amendments: Amend, and re-refer to Com. on L. GOV. Read second time and amended.

  5. Referred to Com. on L. GOV.

  6. From printer. May be heard in committee March 17.

  7. Read first time. To print.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 121 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (121)

121 members have not signed on to this bill.

Show all 121 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does AB 584 do?
Existing law authorizes, until January 1, 2025, local agencies, as defined, to use the design-build project delivery process, as specified, for specified public works. This bill would authorize the Paradise Irrigation District to utilize the design-build project delivery process to assign contracts for the construction of a water conveyance pipeline from the Town of Paradise to the City of Chico. This bill would make legislative findings and declarations as to the necessity of a special statute for the Paradise Irrigation District.
Who sponsors AB 584?
AB 584 is sponsored by Gallagher, James (Republican).
What is the current status of AB 584?
This bill died with 2019-2020 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track AB 584?
Track AB 584 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 584

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 584

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →