California 2017-2018 Regular Session Status: In Committee 1 R cosponsors

AB 2809 — California Renewables Portfolio Standard Program: hydroelectric generation facilities.

Last action — In committee: Set, first hearing. Hearing canceled at the request of author.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2017-2018 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Existing law establishes the California Renewables Portfolio Standard Program, which requires the Public Utilities Commission to implement annual procurement targets for the procurement of eligible renewable energy resources, as defined, for all retail sellers, as defined, and requires local publicly owned electric utilities to adopt and implement a renewable energy resources procurement plan to achieve the targets and goals of the program. The existing definition of an eligible renewable energy resource includes small hydroelectric generation facilities of 30 megawatts or less that meet specified criteria. This bill would revise the definition of an eligible renewable energy resource for the purposes of the California Renewables Portfolio Standard Program to include hydroelectric generation facilities of greater than 30 megawatts, as specified. The bill would also make conforming changes.

Bill Text

What changed in the latest version

1 added · 1 removed

1 line(s) added, 1 removed.

→
Previous
Latest
Bill Number Bill Keyword Home Bill Information California Law Publications Other Resources My Subscriptions My Favorites Bill Information >> Bill Search >> Text Bill TextBill Information PDF2 Bill PDF |Add To My Favorites | Version:
Bill Number Bill Keyword Home Bill Information California Law Publications Other Resources My Subscriptions My Favorites Bill Information >> Bill Search >> Text Bill Text PDF2 Bill PDF |Add To My Favorites | Version:
View plain text versions (2)

Action History

  1. In committee: Set, first hearing. Hearing canceled at the request of author.

  2. Referred to Coms. on U. & E. and NAT. RES.

  3. From printer. May be heard in committee March 19.

  4. Read first time. To print.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 1 co-sponsors · 120 not signed on

Sponsors (1)

Co-sponsors (1)

  • Mathis

Not signed on (120)

120 members have not signed on to this bill.

Show all 120 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does AB 2809 do?
Existing law establishes the California Renewables Portfolio Standard Program, which requires the Public Utilities Commission to implement annual procurement targets for the procurement of eligible renewable energy resources, as defined, for all retail sellers, as defined, and requires local publicly owned electric utilities to adopt and implement a renewable energy resources procurement plan to achieve the targets and goals of the program. The existing definition of an eligible renewable energy resource includes small hydroelectric generation facilities of 30 megawatts or less that meet specified criteria. This bill would revise the definition of an eligible renewable energy resource for the purposes of the California Renewables Portfolio Standard Program to include hydroelectric generation facilities of greater than 30 megawatts, as specified. The bill would also make conforming changes.
Who sponsors AB 2809?
AB 2809 is sponsored by Mathis and Patterson, Joe (Republican).
What is the current status of AB 2809?
This bill died with 2017-2018 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track AB 2809?
Track AB 2809 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 2809

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 2809

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →