California 2017-2018 Regular Session Status: Enacted 1 R cosponsors

AB 759 — Electricity: electrical cooperatives: integrated resource plan.

Last action — Chaptered by Secretary of State - Chapter 140, Statutes of 2017.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Assembly
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced February 15, 2017. Enacted.

Prognosis

Advancing 60% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 5 sponsors

    1 primary, 4 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (1 R).

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity to file an integrated resource plan, and a schedule for periodic updates to the plan to ensure that load-serving entities meet specified requirements. Existing law requires each load-serving entity to prepare and file an integrated resource plan consistent with certain requirements on a time schedule directed by the commission and subject to commission review. This bill would provide that, for a load-serving entity that is electrical cooperative, the above requirements only apply if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined on a 3-year average commencing January 1, 2013.

Bill Text

Action History

  1. Chaptered by Secretary of State - Chapter 140, Statutes of 2017.

  2. Approved by the Governor.

  3. Enrolled and presented to the Governor at 4 p.m.

  4. Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 77. Noes 0. Page 2566.).

  5. In Assembly. Concurrence in Senate amendments pending. May be considered on or after July 13 pursuant to Assembly Rule 77.

  6. Read third time. Passed. Ordered to the Assembly. (Ayes 39. Noes 0. Page 1938.).

  7. Read second time. Ordered to third reading.

  8. From committee: Be ordered to second reading pursuant to Senate Rule 28.8.

  9. From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on APPR.

  10. From committee: Do pass and re-refer to Com. on APPR. (Ayes 10. Noes 0.) (June 6). Re-referred to Com. on APPR.

  11. Referred to Com. on E., U. & C.

  12. In Senate. Read first time. To Com. on RLS. for assignment.

  13. Read third time. Passed. Ordered to the Senate. (Ayes 76. Noes 0. Page 1391.)

  14. Read second time. Ordered to Consent Calendar.

  15. From committee: Do pass. To Consent Calendar. (Ayes 16. Noes 0.) (April 26).

  16. From committee: Do pass and re-refer to Com. on APPR. (Ayes 13. Noes 0.) (March 29). Re-referred to Com. on APPR.

  17. Referred to Com. on U. & E.

  18. From printer. May be heard in committee March 18.

  19. Read first time. To print.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 4 co-sponsors · 117 not signed on

Sponsors (1)

  • Dahle

Co-sponsors (4)

Not signed on (117)

117 members have not signed on to this bill.

Show all 117 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does AB 759 do?
Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity to file an integrated resource plan, and a schedule for periodic updates to the plan to ensure that load-serving entities meet specified requirements. Existing law requires each load-serving entity to prepare and file an integrated resource plan consistent with certain requirements on a time schedule directed by the commission and subject to commission review. This bill would provide that, for a load-serving entity that is electrical cooperative, the above requirements only apply if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined on a 3-year average commencing January 1, 2013.
Who sponsors AB 759?
AB 759 is sponsored by Dahle, Voepel, Patterson, Joe (Republican), Beth Gaines, and Mark Stone.
What is the current status of AB 759?
This bill has been enacted into law. Introduced February 15, 2017. Enacted.
Where can I track AB 759?
Track AB 759 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 759

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 759

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →