California 2015-2016 Regular Session Status: Enacted

AB 1923 — Bioenergy feed-in tariff.

Last action — Chaptered by Secretary of State - Chapter 663, Statutes of 2016.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Assembly
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced February 11, 2016. Enacted.

Prognosis

Likely to advance 70% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

  • Cleared a recorded vote

    Passed 6 recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law requires every electrical corporation to file with the commission a standard tariff for electricity generated by an electric generation facility, as defined, that qualifies for the tariff, is owned and operated by a retail customer of the electrical corporation, and is located within the service territory of, and developed to sell electricity to, the electrical corporation. The commission refers to this requirement as the renewable feed-in tariff. Existing law requires that, in order to qualify for the tariff, the electric generation facility: (1) have an effective capacity of not more than 3 megawatts, subject to the authority of the commission to reduce this megawatt limitation, (2) be interconnected and operate in parallel with the electric transmission and distribution grid, (3) be strategically located and interconnected to the electrical transmission and distribution system in a manner that optimizes the deliverability of electricity generated at the facility to load centers, and (4) meet the definition of an eligible renewable energy resource under the California Renewables Portfolio Standard Program. Existing law requires an electrical corporation to make the tariff available to the owner or operator of an electric generation facility within the service territory of the electrical corporation, upon request, on a first-come-first-served basis, until the electrical corporation meets its proportionate share of a statewide cap of 750 megawatts cumulative rated generation capacity served under the renewable feed-in tariff and a renewable feed-in tariff that is applicable to a local publicly owned electric utility. In addition to the 750 megawatt limitation, the renewable feed-in tariff requires the commission to direct the electrical corporations to collectively procure at least 250 megawatts of cumulative rated generating capacity from developers of bioenergy projects that commence operation on or after June 1, 2013 (bioenergy feed-in tariff) . The commission is required to undertake specific steps to implement the bioenergy feed-in tariff requirement. This bill would, for the purposes of the bioenergy feed-in tariff, revise a generally applicable interconnection requirement for electric generation facilities, as specified. The bill would also require the commission to direct the electrical corporations to authorize a bioenergy electric generation facility with an effective capacity of up to 5 megawatts to participate in the bioenergy feed-in tariff if the facility delivers no more than 3 megawatts to the grid at any time and complies with specified interconnection requirements. This bill would incorporate additional changes to Section 399.20 of the Public Utilities Code proposed by AB 1612 and SB 840 that would become operative if this bill and one or both of those bills are enacted and this bill is chaptered last.

Bill Text

Action History

  1. Chaptered by Secretary of State - Chapter 663, Statutes of 2016.

  2. Approved by the Governor.

  3. Enrolled and presented to the Governor at 12 p.m.

  4. Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 80. Noes 0. Page 6341.).

  5. In Assembly. Concurrence in Senate amendments pending. May be considered on or after August 26 pursuant to Assembly Rule 77.

  6. Read third time. Passed. Ordered to the Assembly. (Ayes 39. Noes 0. Page 5297.).

  7. Read second time. Ordered to third reading.

  8. Read third time and amended. Ordered to second reading.

  9. Read second time. Ordered to third reading.

  10. From committee: Be placed on second reading file pursuant to Senate Rule 28.8.

  11. From committee: Do pass and re-refer to Com. on APPR. (Ayes 10. Noes 0.) (June 21). Re-referred to Com. on APPR.

  12. In committee: Hearing postponed by committee.

  13. From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on E., U., & C.

  14. Referred to Com. on E., U., & C.

  15. In Senate. Read first time. To Com. on RLS. for assignment.

  16. Read third time. Passed. Ordered to the Senate. (Ayes 79. Noes 0. Page 4684.)

  17. Read second time. Ordered to Consent Calendar.

  18. From committee: Do pass. To Consent Calendar. (Ayes 19. Noes 0.) (April 27).

  19. In committee: Hearing postponed by committee.

  20. Re-referred to Com. on APPR.

  21. From committee chair, with author's amendments: Amend, and re-refer to Com. on APPR. Read second time and amended.

  22. In committee: Hearing postponed by committee.

  23. Re-referred to Com. on APPR. pursuant to Joint Rule 10.5.

  24. Read second time. Ordered to third reading.

  25. Read second time and amended. Ordered returned to second reading.

  26. From committee: Amend, and do pass as amended. (Ayes 15. Noes 0.) (March 30).

  27. In committee: Set, first hearing. Hearing canceled at the request of author.

  28. Referred to Com. on U. & C.

  29. From printer. May be heard in committee March 13.

  30. Read first time. To print.

Sponsors

  • Wood · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 121 not signed on

Sponsors (1)

  • Wood

Co-sponsors (0)

None.

Not signed on (121)

121 members have not signed on to this bill.

Show all 121 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 80 Yea · 0 Nay
Party YeaNayPresentNot Voting
Unaffiliated 70000
Democratic 5000
Republican 5000
Total 80000
% of votes cast 100%0%0%0%
How each member voted (80)
Member Party Vote
Achadjian — Yea
Alejo — Yea
Baker — Yea
Bloom — Yea
Brough — Yea
Brown — Yea
Holden — Yea
Levine — Yea
Linder — Yea
Mathis — Yea
Mullin — Yea
O'Donnell — Yea
Quirk — Yea
Ridley-Thomas — Yea
Thurmond — Yea
Weber — Yea
Wood — Yea
Eggman — Yea
Frazier — Yea
Burke — Yea
Harper — Yea
Salas — Yea
Low — Yea
Mayes — Yea
McCarty — Yea
Chau — Yea
Chiu — Yea
Chu — Yea
Cooley — Yea
Cooper — Yea
Nazarian — Yea
Obernolte — Yea
Olsen — Yea
Rendon — Yea
Rodriguez — Yea
Wilk — Yea
Williams — Yea
Campos — Yea
Gray — Yea
Gatto — Yea
Atkins — Yea
Chang — Yea
Bonilla — Yea
Lopez — Yea
Gordon — Yea
Jones-Sawyer — Yea
Kim — Yea
Maienschein — Yea
Bigelow — Yea
Chávez — Yea
Dababneh — Yea
Daly — Yea
Dodd — Yea
Medina — Yea
Melendez — Yea
Santiago — Yea
Steinorth — Yea
Ting — Yea
Wagner — Yea
Waldron — Yea
Gomez — Yea
Hadley — Yea
Beth Gaines — Yea
Cristina Garcia — Yea
Eduardo Garcia — Yea
Jim Patterson — Yea
Lorena Gonzalez — Yea
Mark Stone — Yea
Roger Hernández — Yea
Travis Allen — Yea
Arambula, Joaquin Democratic Yea
Bonta, Mia Democratic Yea
Calderon, Lisa Democratic Yea
Gipson, Mike A. Democratic Yea
Irwin, Jacqui Democratic Yea
Dahle, Megan Republican Yea
Gallagher, James Republican Yea
Grove, Shannon Republican Yea
Jones, Brian W. Republican Yea
Lackey, Tom Republican Yea

Official roll call →

Passed 39 Yea · 0 Nay
Party YeaNayPresentNot Voting
Unaffiliated 36000
Democratic 3000
Total 39000
% of votes cast 100%0%0%0%
How each member voted (39)
Member Party Vote
Anderson — Yea
Beall — Yea
Block — Yea
Hernandez — Yea
Lara — Yea
Leyva — Yea
Liu — Yea
Moorlach — Yea
Nielsen — Yea
Roth — Yea
Wolk — Yea
Cannella — Yea
Allen — Yea
Mitchell — Yea
De León — Yea
Hancock — Yea
Bates — Yea
Hertzberg — Yea
Hill — Yea
Hueso — Yea
Huff — Yea
Leno — Yea
Mendoza — Yea
Monning — Yea
Morrell — Yea
Pan — Yea
Pavley — Yea
Vidak — Yea
Wieckowski — Yea
Fuller — Yea
Galgiani — Yea
Glazer — Yea
Hall — Yea
Beth Gaines — Yea
Bill Berryhill — Yea
Mark Stone — Yea
Jackson, Corey A. Democratic Yea
McGuire, Mike Democratic Yea
Nguyen, Stephanie Democratic Yea

Official roll call →

Passed 79 Yea · 0 Nay · 1 Other
Party YeaNayPresentNot Voting
Unaffiliated 69001
Democratic 5000
Republican 5000
Total 79001
% of votes cast 99%0%0%1%
How each member voted (80)
Member Party Vote
Achadjian — Yea
Baker — Yea
Bloom — Yea
Brough — Yea
Brown — Yea
Holden — Yea
Levine — Yea
Maienschein — Yea
Mathis — Yea
Melendez — Yea
Ridley-Thomas — Yea
Steinorth — Yea
Ting — Yea
Waldron — Yea
Williams — Yea
Wood — Yea
Campos — Yea
Eggman — Yea
Cooper — Yea
Daly — Yea
Frazier — Yea
Salas — Yea
Gatto — Yea
Gomez — Yea
Gordon — Yea
Burke — Yea
Harper — Yea
Jones-Sawyer — Yea
Kim — Yea
Chang — Yea
Linder — Yea
Low — Yea
Mayes — Yea
McCarty — Yea
Gray — Yea
Nazarian — Yea
O'Donnell — Yea
Atkins — Yea
Chau — Yea
Alejo — Yea
Bigelow — Yea
Chiu — Yea
Chu — Yea
Chávez — Yea
Cooley — Yea
Dababneh — Yea
Dodd — Yea
Obernolte — Yea
Olsen — Yea
Rendon — Yea
Rodriguez — Yea
Thurmond — Yea
Weber — Yea
Wilk — Yea
Bonilla — Yea
Lopez — Yea
Hadley — Yea
Medina — Yea
Mullin — Yea
Quirk — Yea
Santiago — Yea
Wagner — Yea
Beth Gaines — Not Voting
Cristina Garcia — Yea
Eduardo Garcia — Yea
Jim Patterson — Yea
Lorena Gonzalez — Yea
Mark Stone — Yea
Roger Hernández — Yea
Travis Allen — Yea
Arambula, Joaquin Democratic Yea
Bonta, Mia Democratic Yea
Calderon, Lisa Democratic Yea
Gipson, Mike A. Democratic Yea
Irwin, Jacqui Democratic Yea
Dahle, Megan Republican Yea
Gallagher, James Republican Yea
Grove, Shannon Republican Yea
Jones, Brian W. Republican Yea
Lackey, Tom Republican Yea

Official roll call →

Passed 19 Yea · 0 Nay · 1 Other
Party YeaNayPresentNot Voting
Unaffiliated 15001
Democratic 2000
Republican 2000
Total 19001
% of votes cast 95%0%0%5%
How each member voted (20)
Member Party Vote
Bigelow — Yea
Bloom — Yea
Santiago — Yea
Wagner — Yea
Wood — Yea
Eggman — Yea
Holden — Yea
Bonilla — Yea
Obernolte — Yea
Chang — Yea
Daly — Yea
Quirk — Yea
Weber — Yea
Eduardo Garcia — Yea
Lorena Gonzalez — Yea
Roger Hernández — Not Voting
Bonta, Mia Democratic Yea
Calderon, Lisa Democratic Yea
Gallagher, James Republican Yea
Jones, Brian W. Republican Yea

Official roll call →

Do pass as amended.

Passed 15 Yea · 0 Nay
Party YeaNayPresentNot Voting
Unaffiliated 14000
Republican 1000
Total 15000
% of votes cast 100%0%0%0%
How each member voted (15)
Member Party Vote
Quirk — Yea
Burke — Yea
Eggman — Yea
Gatto — Yea
Chávez — Yea
Obernolte — Yea
Santiago — Yea
Ting — Yea
Williams — Yea
Hadley — Yea
Cristina Garcia — Yea
Eduardo Garcia — Yea
Jim Patterson — Yea
Roger Hernández — Yea
Dahle, Megan Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does AB 1923 do?
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law requires every electrical corporation to file with the commission a standard tariff for electricity generated by an electric generation facility, as defined, that qualifies for the tariff, is owned and operated by a retail customer of the electrical corporation, and is located within the service territory of, and developed to sell electricity to, the electrical corporation. The commission refers to this requirement as the renewable feed-in tariff. Existing law requires that, in order to qualify for the tariff, the electric generation facility: (1) have an effective capacity of not more than 3 megawatts, subject to the authority of the commission to reduce this megawatt limitation, (2) be interconnected and operate in parallel with the electric transmission and distribution grid, (3) be strategically located and interconnected to the electrical transmission and distribution system in a manner that optimizes the deliverability of electricity generated at the facility to load centers, and (4) meet the definition of an eligible renewable energy resource under the California Renewables Portfolio Standard Program. Existing law requires an electrical corporation to make the tariff available to the owner or operator of an electric generation facility within the service territory of the electrical corporation, upon request, on a first-come-first-served basis, until the electrical corporation meets its proportionate share of a statewide cap of 750 megawatts cumulative rated generation capacity served under the renewable feed-in tariff and a renewable feed-in tariff that is applicable to a local publicly owned electric utility. In addition to the 750 megawatt limitation, the renewable feed-in tariff requires the commission to direct the electrical corporations to collectively procure at least 250 megawatts of cumulative rated generating capacity from developers of bioenergy projects that commence operation on or after June 1, 2013 (bioenergy feed-in tariff) . The commission is required to undertake specific steps to implement the bioenergy feed-in tariff requirement. This bill would, for the purposes of the bioenergy feed-in tariff, revise a generally applicable interconnection requirement for electric generation facilities, as specified. The bill would also require the commission to direct the electrical corporations to authorize a bioenergy electric generation facility with an effective capacity of up to 5 megawatts to participate in the bioenergy feed-in tariff if the facility delivers no more than 3 megawatts to the grid at any time and complies with specified interconnection requirements. This bill would incorporate additional changes to Section 399.20 of the Public Utilities Code proposed by AB 1612 and SB 840 that would become operative if this bill and one or both of those bills are enacted and this bill is chaptered last.
Who sponsors AB 1923?
AB 1923 is sponsored by Wood.
What is the current status of AB 1923?
This bill has been enacted into law. Introduced February 11, 2016. Enacted.
Where can I track AB 1923?
Track AB 1923 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 1923

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 1923

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →