Electricity: eligible fuel cell customer-generators.
Do you support it?
Want to know if it passes?
We'll email you when AB 1228 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on AB 1228.
You're tracking AB 1228
We'll email you the moment it moves.
AB 1228 — Electricity: eligible fuel cell customer-generators.
Last action — From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
2In Committee
-
3Passed Assembly
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill died with 2013-2014 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Existing law establishes a net energy metering program that is available to an eligible fuel cell customer-generator, which is defined as a customer of an electrical corporation and, among other things, uses a fuel cell electrical generating facility with capacity of not more than one megawatt. Existing law requires that the net metering calculation be made by measuring the difference between the electricity supplied to the eligible fuel cell customer-generator and the electricity generated by the eligible fuel cell customer-generator and fed back to the electrical grid over a 12-month period. Existing law requires that an electrical corporation determine if the eligible fuel cell customer-generator was a net consumer or producer of electricity during the 12-month period. For purposes of making this determination, existing law requires that the electrical corporation aggregate the electrical load of the eligible fuel cell customer-generator under the same ownership. This bill would increase the capacity of a fuel cell electrical generating facility to not more than 3 megawatts. The bill would prohibit the net rate at which electricity fed back to the electrical grid by an eligible fuel cell customer-generator using a fuel cell electrical generating facility with a capacity of more than one megawatt from exceeding one megawatt. Existing law provides that a net energy metering contract or tariff must be identical, as specified, to the contract or tariff to which a customer would be assigned if the customer was not an eligible fuel cell customer-generator, and that any charge that would increase an eligible fuel cell customer-generator's costs beyond those of other customers in the rate class to which the eligible fuel cell customer-generator would otherwise be assigned, including an interconnection charge, may not form a part of net energy metering tariffs. The Public Utilities Commission's Electric Rule 21 establishes a tariff that describes the interconnection, operating, and metering requirements for generation facilities to be connected with an electrical corporation's distribution system. This bill would provide that fuel cell projects with a capacity of not more than one megawatt would not be exempt from reasonable interconnection charges established pursuant to Electric Rule 21. The bill would also require the commission, when revising Electric Rule 21, to consider the ratepayer and system benefits of larger baseload fuel cell projects. Because the bill would require an expansion of the above-described net energy metering programs and would require an order or decision of the commission to implement, a violation of which is a crime, these provisions would impose a state-mandated local program by expanding the definition of a crime. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Bill Text
- Amended 04/24/13 - Amended Assembly Current pdf April 24, 2013
- Introduced 02/22/13 - Introduced pdf February 22, 2013
- AB1228 View text html
Action History
-
From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.
-
Died pursuant to Art. IV, Sec. 10(c) of the Constitution.
-
In committee: Set, second hearing. Hearing canceled at the request of author.
-
Re-referred to Com. on U. & C.
-
From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & C. Read second time and amended.
-
In committee: Set, first hearing. Hearing canceled at the request of author.
-
Referred to Com. on U. & C.
-
Read first time.
-
From printer. May be heard in committee March 26.
-
Introduced. To print.
Sponsors
- V. Manuel Pérez · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 121 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (121)
121 members have not signed on to this bill.
Show all 121 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does AB 1228 do?
- Existing law establishes a net energy metering program that is available to an eligible fuel cell customer-generator, which is defined as a customer of an electrical corporation and, among other things, uses a fuel cell electrical generating facility with capacity of not more than one megawatt. Existing law requires that the net metering calculation be made by measuring the difference between the electricity supplied to the eligible fuel cell customer-generator and the electricity generated by the eligible fuel cell customer-generator and fed back to the electrical grid over a 12-month period. Existing law requires that an electrical corporation determine if the eligible fuel cell customer-generator was a net consumer or producer of electricity during the 12-month period. For purposes of making this determination, existing law requires that the electrical corporation aggregate the electrical load of the eligible fuel cell customer-generator under the same ownership. This bill would increase the capacity of a fuel cell electrical generating facility to not more than 3 megawatts. The bill would prohibit the net rate at which electricity fed back to the electrical grid by an eligible fuel cell customer-generator using a fuel cell electrical generating facility with a capacity of more than one megawatt from exceeding one megawatt. Existing law provides that a net energy metering contract or tariff must be identical, as specified, to the contract or tariff to which a customer would be assigned if the customer was not an eligible fuel cell customer-generator, and that any charge that would increase an eligible fuel cell customer-generator's costs beyond those of other customers in the rate class to which the eligible fuel cell customer-generator would otherwise be assigned, including an interconnection charge, may not form a part of net energy metering tariffs. The Public Utilities Commission's Electric Rule 21 establishes a tariff that describes the interconnection, operating, and metering requirements for generation facilities to be connected with an electrical corporation's distribution system. This bill would provide that fuel cell projects with a capacity of not more than one megawatt would not be exempt from reasonable interconnection charges established pursuant to Electric Rule 21. The bill would also require the commission, when revising Electric Rule 21, to consider the ratepayer and system benefits of larger baseload fuel cell projects. Because the bill would require an expansion of the above-described net energy metering programs and would require an order or decision of the commission to implement, a violation of which is a crime, these provisions would impose a state-mandated local program by expanding the definition of a crime. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
- Who sponsors AB 1228?
- AB 1228 is sponsored by V. Manuel Pérez.
- What is the current status of AB 1228?
- This bill died with 2013-2014 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track AB 1228?
- Track AB 1228 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on AB 1228
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of AB 1228
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →