California 2011-2012 Regular Session Status: In Committee

AB 2340 — Distribution grid: distributed generation.

Last action — In committee: Set, first hearing. Failed passage.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2011-2012 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, as defined. Existing law requires the PUC to administer, until January 1, 2016, a self-generation incentive program for distributed generation resources to facilitate the integration of those resources into the electrical grid, improve efficiency and reliability of the distribution and transmission system, and reduce emissions of greenhouse gases, peak demand, and ratepayer costs. This bill would require the PUC to convene a proceeding on or before July 1, 2013, to develop rules, as prescribed, for the reimbursement of distribution grid upgrade costs to developers of wholesale distribution generation facilities constructed subsequent to the completion of interconnection studies. The bill would require those costs to be included in each electrical corporation's rate base.

Bill Text

What changed in the latest version

1 added · 1 removed

1 line(s) added, 1 removed.

→
Previous
Latest
Bill Number Bill Keyword Home Bill Information California Law Publications Other Resources My Subscriptions My Favorites Bill Information >> Bill Search >> Text Bill TextBill Information PDF2 Add To My Favorites | Version:
Bill Number Bill Keyword Home Bill Information California Law Publications Other Resources My Subscriptions My Favorites Bill Information >> Bill Search >> Text Bill Text PDF2 Add To My Favorites | Version:
View plain text versions (2)

Action History

  1. In committee: Set, first hearing. Failed passage.

  2. Referred to Com. on U. & C.

  3. Read first time.

  4. From printer. May be heard in committee March 27.

  5. Introduced. To print.

Sponsors

  • Blumenfield · Cosponsor
  • Williams · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 1 co-sponsors · 120 not signed on

Sponsors (1)

  • Williams

Co-sponsors (1)

  • Blumenfield

Not signed on (120)

120 members have not signed on to this bill.

Show all 120 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Failed 6 Yea · 5 Nay · 4 Other
Party YeaNayPresentNot Voting
Unaffiliated 6504
Total 6504
% of votes cast 40%33%0%27%
How each member voted (15)
Member Party Vote
Gordon — Yea
Fong — Yea
Garrick — Nay
Gorell — Nay
Huffman — Yea
Knight — Nay
Nestande — Nay
Valadao — Nay
Bradford — Yea
Buchanan — Not Voting
Ma — Not Voting
Skinner — Yea
Swanson — Yea
Fuentes — Not Voting
Roger Hernández — Not Voting

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does AB 2340 do?
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, as defined. Existing law requires the PUC to administer, until January 1, 2016, a self-generation incentive program for distributed generation resources to facilitate the integration of those resources into the electrical grid, improve efficiency and reliability of the distribution and transmission system, and reduce emissions of greenhouse gases, peak demand, and ratepayer costs. This bill would require the PUC to convene a proceeding on or before July 1, 2013, to develop rules, as prescribed, for the reimbursement of distribution grid upgrade costs to developers of wholesale distribution generation facilities constructed subsequent to the completion of interconnection studies. The bill would require those costs to be included in each electrical corporation's rate base.
Who sponsors AB 2340?
AB 2340 is sponsored by Blumenfield and Williams.
What is the current status of AB 2340?
This bill died with 2011-2012 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track AB 2340?
Track AB 2340 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 2340

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 2340

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →