California 2011-2012 Regular Session Status: In Committee

SB 672 — Electricity: rates: interregional parity.

Last action — Returned to Secretary of Senate pursuant to Joint Rule 56.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed Assembly
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2011-2012 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations and gas corporations, as defined. Existing law authorizes the commission to fix the rates and charges for every public utility, and requires that those rates and charges be just and reasonable. Existing law, relative to electrical restructuring, requires the commission to authorize and facilitate direct transactions between electricity suppliers and retail end-use customers. Existing law, enacted during the energy crisis of 2000–01, authorized the Department of Water Resources, until January 1, 2003, to enter into contracts for the purchase of electricity, and to sell electricity to retail end-use customers at not more than the department's acquisition costs and to recover those costs through the issuance of bonds to be repaid by ratepayers. That law suspended the right of retail end-use customers, other than community choice aggregators and a qualifying direct transaction customer, as defined, to acquire service through a direct transaction until the Department of Water Resources no longer supplies electricity under that law. Existing law continues the suspension of direct transactions except as expressly authorized, until the Legislature, by statute, repeals the suspension or otherwise authorizes direct transactions. Existing law requires the commission to authorize direct transactions for nonresidential end-use customers subject to a reopening schedule that will phase in over a period of not less than 3 years and not more than 5 years, and is subject to an annual maximum allowable total kilowatthour limit established, as specified, for each electrical corporation. This bill would restrict the annual maximum allowable total kilowatthour limit for permissable direct transactions so that it is applicable only to nonresidential for-profit end-use customers and is not applicable to not-for-profit end-use customers.

Bill Text

Action History

  1. Returned to Secretary of Senate pursuant to Joint Rule 56.

  2. Set, first hearing. Hearing canceled at the request of author.

  3. Set for hearing May 3.

  4. Hearing postponed by committee.

  5. Set for hearing April 28.

  6. Re-referred to Com. on E., U., & C.

  7. From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS.

  8. Referred to Com. on RLS.

  9. From printer. May be acted upon on or after March 21.

  10. Introduced. Read first time. To Com. on RLS. for assignment. To print.

Sponsors

  • Fuller · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 121 not signed on

Sponsors (1)

  • Fuller

Co-sponsors (0)

None.

Not signed on (121)

121 members have not signed on to this bill.

Show all 121 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 672 do?
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations and gas corporations, as defined. Existing law authorizes the commission to fix the rates and charges for every public utility, and requires that those rates and charges be just and reasonable. Existing law, relative to electrical restructuring, requires the commission to authorize and facilitate direct transactions between electricity suppliers and retail end-use customers. Existing law, enacted during the energy crisis of 2000–01, authorized the Department of Water Resources, until January 1, 2003, to enter into contracts for the purchase of electricity, and to sell electricity to retail end-use customers at not more than the department's acquisition costs and to recover those costs through the issuance of bonds to be repaid by ratepayers. That law suspended the right of retail end-use customers, other than community choice aggregators and a qualifying direct transaction customer, as defined, to acquire service through a direct transaction until the Department of Water Resources no longer supplies electricity under that law. Existing law continues the suspension of direct transactions except as expressly authorized, until the Legislature, by statute, repeals the suspension or otherwise authorizes direct transactions. Existing law requires the commission to authorize direct transactions for nonresidential end-use customers subject to a reopening schedule that will phase in over a period of not less than 3 years and not more than 5 years, and is subject to an annual maximum allowable total kilowatthour limit established, as specified, for each electrical corporation. This bill would restrict the annual maximum allowable total kilowatthour limit for permissable direct transactions so that it is applicable only to nonresidential for-profit end-use customers and is not applicable to not-for-profit end-use customers.
Who sponsors SB 672?
SB 672 is sponsored by Fuller.
What is the current status of SB 672?
This bill died with 2011-2012 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 672?
Track SB 672 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 672

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 672

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →