Nebraska 109th Legislature (2025-2026) Status: Enacted

LB 43 — Change provisions relating to notice and certification requirements for electric generation facilities, transmission lines, and privately developed renewable energy generation facilities located near military installations

Last action — Provisions/portions of LB35 amended into LB43 by AM215

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Legislature
  4. ✓
    To Executive
  5. 5
    Enacted

This bill has been enacted into law. Introduced January 09, 2025. Enacted.

Signed by Governor Jim Pillen (Republican) on February 26, 2025.

Prognosis

Advancing 54% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

  • Mixed recorded votes

    2 passed, 2 failed in recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

407 added · 7 removed

Plain-language change summary

The changes to Bill LB 43 primarily involve clarifying definitions related to electric vehicle charging stations and updating various requirements for electric generation facilities near military installations. Specifically, terms such as "commercial electric vehicle charging station" and "commercial electric vehicle charging station operator" have been defined more clearly. These amendments are important because they establish guidelines for charging infrastructure as electric vehicle usage grows, ensuring that such facilities meet necessary regulations, especially in sensitive areas near military sites.

→
Previous
Latest
ER1 ER1 LB43 LB43 MJP - 01/31/2025 MJP - 01/31/2025 E AND R AMENDMENTS TO LB 43   Introduced by Guereca, 7, Chairman Enrollment and Review 1. On page 9, line 29, after "repair" insert an underscored comma.
LB43 LB43 2025 LEGISLATIVE BILL 43 Approved by the Governor February 25, 2025   Introduced by DeKay, 40;
Hardin, 48.
  A BILL FOR AN ACT relating to electricity;
to amend sections 70-1001.01, 70-1012, 70-1014.02, and 70-1015, Revised Statutes Cumulative Supplement, 2024;
to define and redefine terms;
to change provisions relating to notice and certification requirements for electric generation facilities, transmission lines, and privately developed renewable energy generation facilities located near military installations;
to harmonize provisions;
to repeal the original sections;
and to declare an emergency.
Be it enacted by the people of the State of Nebraska, Section 1.
Section 70-1001.01, Revised Statutes Cumulative Supplement, 2024, is amended to read:
70-1001.01 For purposes of sections 70-1001 to 70-1028.02, unless the context otherwise requires:
(1) Board means the Nebraska Power Review Board;
(2) Commercial electric vehicle charging station means equipment designed to provide electricity for a fee for the charging of an electric vehicle or a plug-in hybrid electric vehicle, including an electric vehicle direct-current charger or a super-fast charger, any successor technology, and all components thereof.
Commercial electric vehicle charging station does not include the residence of a person where an electric vehicle or a plug-in hybrid electric vehicle is charged if no customer usage fee is charged;
(3) Commercial electric vehicle charging station operator means a person, partnership, corporation, or other business entity or political subdivision that operates a commercial electric vehicle charging station;
(4) Direct-current, fast-charging station means a publicly available charging system capable of delivering at least fifty kilowatts of direct- current electrical power to an electric vehicle's rechargeable battery at a voltage of two hundred volts or greater;
(5) Direct-current, fast-charging station operator means a person, partnership, corporation, or other business entity that operates a direct- current, fast-charging station open to the public.
The term does not include an electric supplier or a political subdivision;
(6) Electric supplier or supplier of electricity means any legal entity supplying, producing, or distributing electricity within the state for sale at wholesale or retail.
Electric supplier does not include a commercial electric vehicle charging station operator that is a private person or privately owned partnership, privately owned corporation, or other privately owned business;
(7) Electronic-related means relating to electronic devices, circuits, or similar systems, or the components of such electronic devices, circuits, or similar systems, that require electrical currents or electromagnetism to operate;
(8) Foreign adversary means a foreign government or foreign nongovernment person determined to be a foreign adversary pursuant to 15 C.F.R.
791.4, as such regulation existed on February 7, 2025;
(9) (7) Military installation means:
a military base other than a National Guard base where fixed-wing aircraft or strategic weapon assets are on a permanent or temporary basis assigned, stored, operated from, or otherwise located;
(a) A United States Air Force ballistic missile silo located within the geographic area described in 31 C.F.R.
802.211(b)(3), as such regulation existed on January 1, 2025;
or (b) A United States Air Force base described in 31 C.F.R.
802.227(c), as such regulation existed on January 1, 2025;
(10) (8) Plug-in hybrid electric vehicle has the same meaning as in section 60-345.01;
(11) (9) Private electric supplier means an electric supplier producing electricity from a privately developed renewable energy generation facility that is not a public power district, a public power and irrigation district, a municipality, a registered group of municipalities, an electric cooperative, an electric membership association, any other governmental entity, or any combination thereof.
A private electric supplier is limited to the development of those facilities as provided in subdivision (12) (10) of this section;
(12) (10) Privately developed renewable energy generation facility means and is limited to a facility that (a) generates electricity using solar, wind, geothermal, biomass, landfill gas, or biogas, including all electrically connected equipment used to produce, collect, and store the facility output up to and including the transformer that steps up the voltage to sixty thousand volts or greater, and including supporting structures, buildings, and roads, unless otherwise agreed to in a joint transmission development agreement, (b) is developed, constructed, and owned, in whole or in part, by one or more private electric suppliers, and (c) is not wholly owned by a public power district, a public power and irrigation district, a municipality, a registered group of municipalities, an electric cooperative, an electric membership -1- LB43 LB43 2025 association, any other governmental entity, or any combination thereof;
(13) (11) Regional transmission organization means an entity independent from those entities generating or marketing electricity at wholesale or retail, which has operational control over the electric transmission lines in a designated geographic area in order to reduce constraints in the flow of electricity and ensure that all power suppliers have open access to transmission lines for the transmission of electricity;
(14) (12) Reliable or reliability means the ability of an electric supplier to supply the aggregate electric power and energy requirements of its electricity consumers in Nebraska at all times under normal operating conditions, taking into account scheduled and unscheduled outages, including sudden disturbances or unanticipated loss of system components that are to be reasonably expected for any electric utility following prudent utility practices, recognizing certain weather conditions and other contingencies may cause outages at the distribution, transmission, and generation level;
(15) (13) Representative organization means an organization designated by the board and organized for the purpose of providing joint planning and encouraging maximum cooperation and coordination among electric suppliers.
Such organization shall represent electric suppliers owning a combined electric generation plant accredited capacity of at least ninety percent of the total electric generation plant accredited capacity constructed and in operation within the state;
(16) (14) State means the State of Nebraska;
and (17) (15) Unbundled retail rates means the separation of utility bills into the individual price components for which an electric supplier charges its retail customers, including, but not limited to, the separate charges for the generation, transmission, and distribution of electricity.
Show all 126 changed rows (86 more)
Previous
Latest
Sec.
On page 13, line 24, strike "subdivision", show as stricken, and insert "subdivisions".
Section 70-1012, Revised Statutes Cumulative Supplement, 2024, is amended to read:
-1-
70-1012 (1) Before any electric generation facilities or any transmission lines or related facilities carrying more than seven hundred volts are constructed or acquired by any supplier, an application, filed with the board and containing such information as the board shall prescribe, shall be approved by the board, except that such approval shall not be required (a) for the construction or acquisition of a transmission line extension or related facilities within a supplier's own service area or for the construction or acquisition of a line not exceeding one-half mile outside its own service area when all owners of electric lines located within one-half mile of the extension consent thereto in writing and such consents are filed with the board, (b) for any generation facility when the board finds that (i) such facility is being constructed or acquired to replace a generating plant owned by an individual municipality or registered group of municipalities with a capacity not greater than that of the plant being replaced, (ii) such facility will generate less than twenty-five thousand kilowatts of electric energy at rated capacity, and (iii) the applicant will not use the plant or transmission capacity to supply wholesale power to customers outside the applicant's existing retail service area or chartered territory, (c) for acquisition of transmission lines or related facilities, within the state, carrying one hundred fifteen thousand volts or less, if the current owner of the transmission lines or related facilities notifies the board of the lines or facilities involved in the transaction and the parties to the transaction, or (d) for the construction of a qualified facility as defined in section 70-2002.
(2)(a) Before any electric supplier commences construction of or acquires an electric generation facility or transmission lines or related facilities carrying more than seven hundred volts that will be or are located within a ten-mile radius of a military installation, the owner of such proposed facility, transmission lines, or related facilities shall provide written notice certifying to the board that such facility or facilities contain no electronic-related equipment or electronic-related materials, electronics, or other components manufactured by any foreign government or foreign nongovernment person determined to be a foreign adversary pursuant to 15 C.F.R.
7.4.
(b) Any electric supplier supplying, producing, or distributing electricity within the state for sale at retail is exempt from subdivision (a) of this subsection if it is in compliance with the critical infrastructure protection requirements issued by the North American Electric Reliability Corporation.
To receive such exemption, the electric supplier shall submit written notice to the board certifying that it is in such compliance.
The electric supplier shall also submit written notice to the board at any time such supplier is no longer in such compliance.
(3)(a) Before any electric supplier not exempt from subdivision (2)(a) of this section commences construction of or acquires an electric generation facility or transmission lines or related facilities carrying more than seven hundred volts that will be or are located within a ten-mile radius of a military installation, the electric supplier shall, following consultation with such supplier's vendors, submit a one-time written notice to the board certifying that such facility or facilities continually contain no electronic- related equipment or electronic-related components manufactured by any foreign adversary.
(b) The electric supplier shall also submit written notice to the board at any time such facility or facilities are no longer in compliance with the certification provided under subdivision (a) of this subsection.
(4) Notwithstanding subsections (2) and (3) of this section, an electric -2- LB43 LB43 2025 supplier required to provide certification under subsection (2) of this section may use electronic-related equipment or electronic-related components manufactured by a foreign adversary if the board preapproves the use of such equipment or components after finding that:
(a) There is no other reasonable option for procuring such equipment or components;
and (b) Not procuring or using such equipment or components would cause a greater harm to the state or residents of the state than the harm associated with the equipment or components.
(5) (3) A privately developed renewable energy generation facility is exempt from this section if it complies with section 70-1014.02.
Sec.
3.
Section 70-1014.02, Revised Statutes Cumulative Supplement, 2024, is amended to read:
70-1014.02 (1) The Legislature finds that:
(a) Nebraska has the authority as a sovereign state to protect its land, natural resources, and cultural resources for economic and aesthetic purposes for the benefit of its residents and future generations by regulation of energy generation projects;
(b) The unique terrain and ecology of the Nebraska Sandhills provide an irreplaceable habitat for millions of migratory birds and other wildlife every year and serve as the home to numerous ranchers and farmers;
(c) The grasslands of the Nebraska Sandhills and other natural resources in Nebraska will become increasingly valuable, both economically and strategically, as the demand for food and energy increases;
and (d) The Nebraska Sandhills are home to priceless archaeological sites of historical and cultural significance to American Indians.
(2)(a) A privately developed renewable energy generation facility that meets the requirements of this section is exempt from sections 70-1012 to 70-1014.01 if, no less than thirty days prior to the commencement of construction, the owner of the facility:
(i) Notifies the board in writing of its intent to commence construction of a privately developed renewable energy generation facility;
(ii) Certifies to the board that the facility will meet the requirements for a privately developed renewable energy generation facility;
(iii) Certifies to the board that the private electric supplier will (A) comply with any decommissioning requirements adopted by the local governmental entities having jurisdiction over the privately developed renewable energy generation facility and (B) except as otherwise provided in subdivision (c) (b) of this subsection, submit a decommissioning plan to the board obligating the private electric supplier to bear all costs of decommissioning the privately developed renewable energy generation facility and requiring that the private electric supplier post a security bond or other instrument, no later than the sixth year following commercial operation, securing the costs of decommissioning the facility and provide a copy of the bond or instrument to the board;
(iv) Certifies to the board that the private electric supplier has entered into or prior to commencing construction will enter into a joint transmission development agreement pursuant to subdivision (d) (c) of this subsection with the electric supplier owning the transmission facilities of sixty thousand volts or greater to which the privately developed renewable energy generation facility will interconnect;
(v) Certifies to the board that the private electric supplier has consulted with the Game and Parks Commission to identify potential measures to avoid, minimize, and mitigate impacts to species identified under subsection (1) or (2) of section 37-806 during the project planning and design phases, if possible, but in no event later than the commencement of construction;
and (vi) Certifies in writing to the board that the facility, if located within a ten-mile radius of a military installation:
(A) Contains no materials, electronics, or other components manufactured by any foreign government or foreign nongovernment person determined to be a foreign adversary pursuant to 15 C.F.R.
7.4;
or (B) Is in compliance with the critical infrastructure protection requirements issued by the North American Electric Reliability Corporation if connected to the transmission grid at one hundred kilovolts or higher voltage and has to have a nameplate rating of twenty megavolt amperes for a single generation unit or injecting at an aggregate of seventy-five megavolt amperes or greater.
The private electric supplier shall also submit written notice to the board at any time such private electric supplier is no longer in such compliance;
and (vi) (vii) For a proposed privately developed renewable energy generation facility that has a generating capacity that is greater than ten megawatts, certifies to the board that the private electric supplier has held at least one public meeting with advanced publicized notice in one of the counties in which the proposed facility will be located at which (A) the private electric supplier explains the need for the proposed facility and the type of facility and (B) real property owners in any of the counties in which the proposed facility will be located are provided an opportunity to comment on the proposed facility.
The private electric supplier shall provide a report to the board containing the minutes of any such meeting and how many people commented on the proposed facility.
Documentation received at any such meeting shall be made available to the board upon its request.
A meeting described in this subdivision is not subject to the requirements described in subdivision (3)(b) (iv) of section 84-1411.
-3- LB43 LB43 2025 (b)(i) No less than thirty days prior to the commencement of construction of a privately developed renewable energy generation facility located within a ten-mile radius of a military installation, the owner of such facility shall:
(A) Provide written notice to the board under subdivision (2)(b)(ii)(A) of this section;
or (B) Certify in writing to the board that the facility will, upon reaching commercial operation, be in compliance with the critical infrastructure protection requirements issued by the North American Electric Reliability Corporation if such facility is connected to the transmission grid at one hundred kilovolts or higher voltage and has a nameplate rating of twenty megavolt amperes for a single generation unit or is injecting at an aggregate of seventy-five megavolt amperes or greater.
The owner of such facility shall also submit written notice to the board at any time such facility is no longer in compliance with such requirements.
(ii)(A) An owner of a facility choosing to proceed under subdivision (2) (b)(i)(A) of this section shall, following consultation with such owner's vendors, submit a one-time written notice to the board certifying that the facility continually contains no electronic-related equipment or electronic- related components manufactured by any foreign adversary.
(B) The owner shall also submit written notice to the board at any time such facility is no longer in compliance with the certification provided under subdivision (2)(b)(ii)(A) of this section.
(iii) Notwithstanding subdivisions (2)(b)(i) and (ii) of this section, the owner of a facility required to provide the certification under subsection (2) (b)(i) may use electronic-related equipment or electronic-related components manufactured by a foreign adversary if the board preapproves the use of such equipment or components after finding that:
(A) There is no other reasonable option for procuring such equipment or components;
and (B) Not procuring or using such equipment or components would cause a greater harm to the state than the harm associated with the equipment or components.
(c) (b) The board may bring an action in the name of the State of Nebraska for failure to comply with subdivision (a)(iii)(B) of this subsection, except that such subdivision does not apply if a local government entity with the authority to create requirements for decommissioning has enacted decommissioning requirements for the applicable jurisdiction.
(d) (c) A joint transmission development agreement shall be entered into to address construction, ownership, operation, and maintenance of such additions or upgrades to the transmission facilities as required for the privately developed renewable energy generation facility.
The joint transmission development agreement shall be negotiated and executed contemporaneously with the generator interconnection agreement or other directives of the applicable regional transmission organization with jurisdiction over the addition or upgrade of transmission, upon terms consistent with prudent electric utility practices for the interconnection of renewable generation facilities, the electric supplier's reasonable transmission interconnection requirements, and applicable transmission design and construction standards.
The electric supplier shall have the right to purchase and own transmission facilities as set forth in the joint transmission development agreement.
The private electric supplier of the privately developed renewable energy generation facility shall have the right to construct any necessary facilities or improvements set forth in the joint transmission development agreement pursuant to the standards set forth in the agreement at the private electric supplier's cost.
(3) Within ten days after receipt of a written notice complying with subsection (2) of this section, the executive director of the board shall issue a written acknowledgment that the privately developed renewable energy generation facility is exempt from sections 70-1012 to 70-1014.01 if such facility remains in compliance with the requirements of this section.
(4) The exemption allowed under this section for a privately developed renewable energy generation facility shall extend to and exempt all private electric suppliers owning any interest in the facility, including any successor private electric supplier which subsequently acquires any interest in the facility.
(5) No property owned, used, or operated as part of a privately developed renewable energy generation facility shall be subject to eminent domain by a consumer-owned electric supplier operating in the State of Nebraska.
Nothing in this section shall be construed to grant the power of eminent domain to a private electric supplier or limit the rights of any entity to acquire any public, municipal, or utility right-of-way across property owned, used, or operated as part of a privately developed renewable energy generation facility as long as the right-of-way does not prevent the operation of or access to the privately developed renewable energy generation facility.
(6) Only a consumer-owned electric supplier operating in the State of Nebraska may exercise eminent domain authority to acquire the land rights necessary for the construction of transmission lines and related facilities.
There is a rebuttable presumption that the exercise of eminent domain to provide needed transmission lines and related facilities for a privately developed renewable energy generation facility is a public use.
(7) Nothing in this section shall be construed to authorize a private electric supplier to sell or deliver electricity at retail in Nebraska.
(8) Nothing in this section shall be construed to limit the authority of -4- LB43 LB43 2025 or require a consumer-owned electric supplier operating in the State of Nebraska to enter into a joint agreement with a private electric supplier to develop, construct, and jointly own a privately developed renewable energy generation facility.
Sec.
4.
Section 70-1015, Revised Statutes Cumulative Supplement, 2024, is amended to read:
70-1015 (1) If any supplier violates Chapter 70, article 10, by either (a) commencing the construction or finalizing or attempting to finalize the acquisition of any generation facilities, any transmission lines, or any related facilities without first providing notice or obtaining board approval, whichever is required, or (b) serving or attempting to serve at retail any customers located in Nebraska or any wholesale customers in violation of section 70-1002.02, such construction, acquisition, or service of such customers shall be enjoined in an action brought in the name of the State of Nebraska until such supplier has complied with Chapter 70, article 10.
(2) If the executive director of the board determines that a private electric supplier commenced construction of a privately developed renewable energy generation facility less than thirty days prior to providing the notice and certification required in subdivisions subdivision (2)(a) and (b) of section 70-1014.02, the executive director shall send notice via certified mail to the private electric supplier, informing it of the determination that the private electric supplier is in violation of such subdivisions subdivision and is subject to a fine in the amount of five hundred dollars.
The private electric supplier shall have twenty days from the date on which the notice is received in which to submit the notice and certification described in such subdivisions subdivision and to pay the fine.
Within ten days after the private electric supplier submits a notice and certification compliant with subsection (2) of section 70-1014.02 and payment of the fine, the executive director of the board shall issue the written acknowledgment described in subsection (3) of section 70-1014.02.
If the private electric supplier fails to submit a notice and certification compliant with subsection (2) of section 70-1014.02 and pay the fine within twenty days after the date on which the private electric supplier receives the notice from the executive director of the board, the private electric supplier shall immediately cease construction or operation of the privately developed renewable energy generation facility.
(3) If the private electric supplier disputes that construction was commenced less than thirty days prior to submitting the written notice and certification required by subdivisions subdivision (2)(a) and (b) of section 70-1014.02, the private electric supplier may request a hearing before the board.
Such request shall be submitted within twenty days after the private electric supplier receives the notice sent by the executive director pursuant to subsection (2) of this section.
If the private electric supplier does not accept the certified mail sent pursuant to such subsection, the executive director shall send a second notice to the private electric supplier by first- class United States mail.
The private electric supplier may submit a request for hearing within twenty days after the date on which the second notice was mailed.
(4) Upon receipt of a request for hearing, the board shall set a hearing date.
Such hearing shall be held within sixty days after such receipt.
The board shall provide to the private electric supplier written notice of the hearing at least twenty days prior to the date of the hearing.
The board or its hearing officer may grant continuances upon good cause shown or upon the request of the private electric supplier.
Timely filing of a request for hearing by a private electric supplier shall stay any further enforcement under this section until the board issues an order pursuant to subsection (5) of this section or the request for hearing is withdrawn.
(5) The board shall issue a written decision within sixty days after conclusion of the hearing.
All costs of the hearing shall be paid by the private electric supplier if (a) the board determines that the private electric supplier commenced construction of the privately developed renewable energy generation facility less than thirty days prior to submitting the written notice and certification required pursuant to subsection (2) of section 70-1014.02 or (b) the private electric supplier withdraws its request for hearing prior to the board issuing its decision.
(6) A private electric supplier which the board finds to be in violation of the requirements of subsection (2) of section 70-1014.02 shall either (a) pay the fine described in this section and submit a notice and certification compliant with subsection (2) of section 70-1014.02 or (b) immediately cease construction or operation of the privately developed renewable energy generation facility.
Sec.
5.
Original sections 70-1001.01, 70-1012, 70-1014.02, and 70-1015, Revised Statutes Cumulative Supplement, 2024, are repealed.
Sec.
6.
Since an emergency exists, this act takes effect when passed and approved according to law.
-5-
View plain text versions (6)

Action History

  1. Provisions/portions of LB35 amended into LB43 by AM215

  2. Approved by Governor on February 25, 2025

  3. Dispensing of reading at large approved

  4. Passed on Final Reading with Emergency Clause 48-0-1

  5. President/Speaker signed

  6. Presented to Governor on February 21, 2025

  7. Placed on Final Reading

  8. Enrollment and Review ER1 adopted

  9. DeKay AM215 adopted

  10. Advanced to Enrollment and Review for Engrossment

  11. DeKay AM215 filed

  12. Placed on Select File with ER1

  13. Enrollment and Review ER1 filed

  14. Natural Resources AM43 adopted

  15. DeKay AM11 withdrawn

  16. Advanced to Enrollment and Review Initial

  17. Placed on General File with AM43

  18. Natural Resources AM43 filed

  19. DeKay AM11 filed

  20. Notice of hearing for January 22, 2025

  21. Referred to Natural Resources Committee

  22. Date of introduction

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 48 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (48)

48 members have not signed on to this bill.

Show all 48 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 48 Yea · 0 Nay · 1 Other
Party YeaNayPresentNot Voting
Unaffiliated 48001
Total 48001
% of votes cast 98%0%0%2%
How each member voted (49)
Member Party Vote
McKeon — Yea
Meyer — Yea
Ashlei Spivey — Yea
Barry DeKay — Yea
Beau Ballard — Yea
Ben Hansen — Yea
Bob Andersen — Yea
Bob Hallstrom — Yea
Brian Hardin — Yea
Carolyn Bosn — Yea
Christy Armendariz — Yea
Dan Lonowski — Yea
Dan Quick — Yea
Danielle Conrad — Yea
Dave Murman — Yea
Dave Wordekemper — Yea
Dunixi Guereca — Yea
Eliot Bostar — Yea
George Dungan — Yea
Jana Hughes — Yea
Jane Raybould — Yea
Jared Storm — Yea
Jason Prokop — Yea
John Arch — Yea
John Cavanaugh — Yea
John Fredrickson — Yea
Kathleen Kauth — Yea
Loren Lippincott — Yea
Machaela Cavanaugh — Yea
Margo Juarez — Yea
Megan Hunt — Yea
Merv Riepe — Yea
Mike Jacobson — Yea
Mike Moser — Yea
Myron Dorn — Yea
Paul Strommen — Yea
R. Brad von Gillern — Yea
Rick Holdcroft — Yea
Rita Sanders — Yea
Robert Clements — Yea
Robert Dover — Yea
Stan Clouse — Yea
Tanya Storer — Yea
Teresa Ibach — Yea
Terrell McKinney — Not Voting
Tom Brandt — Yea
Tony Sorrentino — Yea
Victor Rountree — Yea
Wendy DeBoer — Yea

Official roll call →

Failed 41 Yea · 0 Nay · 8 Other
Party YeaNayPresentNot Voting
Unaffiliated 41008
Total 41008
% of votes cast 84%0%0%16%
How each member voted (49)
Member Party Vote
McKeon — Yea
Meyer — Yea
Ashlei Spivey — Yea
Barry DeKay — Yea
Beau Ballard — Yea
Ben Hansen — Yea
Bob Andersen — Yea
Bob Hallstrom — Yea
Brian Hardin — Yea
Carolyn Bosn — Not Voting
Christy Armendariz — Yea
Dan Lonowski — Yea
Dan Quick — Yea
Danielle Conrad — Not Voting
Dave Murman — Yea
Dave Wordekemper — Yea
Dunixi Guereca — Yea
Eliot Bostar — Yea
George Dungan — Yea
Jana Hughes — Yea
Jane Raybould — Yea
Jared Storm — Yea
Jason Prokop — Yea
John Arch — Yea
John Cavanaugh — Yea
John Fredrickson — Not Voting
Kathleen Kauth — Yea
Loren Lippincott — Yea
Machaela Cavanaugh — Not Voting
Margo Juarez — Yea
Megan Hunt — Not Voting
Merv Riepe — Yea
Mike Jacobson — Yea
Mike Moser — Yea
Myron Dorn — Yea
Paul Strommen — Yea
R. Brad von Gillern — Not Voting
Rick Holdcroft — Yea
Rita Sanders — Yea
Robert Clements — Yea
Robert Dover — Not Voting
Stan Clouse — Yea
Tanya Storer — Yea
Teresa Ibach — Yea
Terrell McKinney — Not Voting
Tom Brandt — Yea
Tony Sorrentino — Yea
Victor Rountree — Yea
Wendy DeBoer — Yea

Official roll call →

Passed 39 Yea · 0 Nay · 10 Other
Party YeaNayPresentNot Voting
Unaffiliated 390010
Total 390010
% of votes cast 80%0%0%20%
How each member voted (49)
Member Party Vote
McKeon — Yea
Meyer — Yea
Ashlei Spivey — Not Voting
Barry DeKay — Yea
Beau Ballard — Yea
Ben Hansen — Yea
Bob Andersen — Yea
Bob Hallstrom — Yea
Brian Hardin — Yea
Carolyn Bosn — Not Voting
Christy Armendariz — Yea
Dan Lonowski — Yea
Dan Quick — Yea
Danielle Conrad — Not Voting
Dave Murman — Yea
Dave Wordekemper — Yea
Dunixi Guereca — Yea
Eliot Bostar — Yea
George Dungan — Yea
Jana Hughes — Not Voting
Jane Raybould — Yea
Jared Storm — Yea
Jason Prokop — Yea
John Arch — Yea
John Cavanaugh — Yea
John Fredrickson — Not Voting
Kathleen Kauth — Yea
Loren Lippincott — Yea
Machaela Cavanaugh — Not Voting
Margo Juarez — Yea
Megan Hunt — Not Voting
Merv Riepe — Yea
Mike Jacobson — Yea
Mike Moser — Yea
Myron Dorn — Yea
Paul Strommen — Yea
R. Brad von Gillern — Not Voting
Rick Holdcroft — Yea
Rita Sanders — Yea
Robert Clements — Yea
Robert Dover — Not Voting
Stan Clouse — Yea
Tanya Storer — Yea
Teresa Ibach — Yea
Terrell McKinney — Not Voting
Tom Brandt — Yea
Tony Sorrentino — Yea
Victor Rountree — Yea
Wendy DeBoer — Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors LB 43?
LB 43 is sponsored by Barry DeKay.
What is the current status of LB 43?
This bill has been enacted into law. Introduced January 09, 2025. Enacted.
Where can I track LB 43?
Track LB 43 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on LB 43

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of LB 43

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →