SB 1345 — An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in zoning, providing for optional temporary moratorium on acceptance or consideration of new applications for high impact data centers.

Last action — Re-referred to RULES AND EXECUTIVE NOMINATIONS, Sept. 30, 2026

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the Senate. Introduced June 04, 2026. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the Senate.

Prognosis

Stalled 24% · moderate confidence

Where this bill stands today.

Odds of enactment

Low

How often bills like it became law.

  • In Committee

    Current position in the legislative process.

  • 5 sponsors

    1 primary, 4 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (5 R).

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

In plain language

This bill allows municipalities to pause new applications for high impact data centers.

The bill amends zoning laws to let municipalities impose a temporary moratorium on new high impact data center applications. This measure empowers local governments to manage data center development in their areas.

What this means for you
  • Local Governments: This means you have the power to manage data center development in your community.

Summary

Empowering Municipalities to Place a Moratorium on Data Center Development

Bill Text

What changed in the latest version

122 added · 190 removed

Plain-language change summary

The recent amendments to Bill SB 1345 introduce an optional temporary moratorium for municipalities to pause the consideration of new applications for high-impact data centers. This moratorium can last up to 18 months and covers various types of applications related to zoning and land development. By allowing municipalities to implement this pause, the bill aims to give local governments the opportunity to review and plan for the impact of these facilities on their communities before new projects are approved. This change matters because it empowers local governments to manage growth and protect community interests effectively.

→
Previous
Latest
PRIOR PRINTER'S NO.
PRINTER'S NO.
1766 PRINTER'S NO.
1766 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL Session of No.
1889 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL Session of No.
1345 2026 INTRODUCED BY COLEMAN AND GEBHARD, JUNE 4, 2026 REFERRED TO LOCAL GOVERNMENT, JUNE 4, 2026 AN ACT Amending the act of July 31, 1968 (P.L.805, No.247), entitled "An act to empower cities of the second class A, and third class, boroughs, incorporated towns, townships of the first and second classes including those within a county of the second class and counties of the second through eighth and to govern the same by zoning, subdivision and landpment development ordinances, planned residential development and other ordinances, by official maps, by the reservation of certain land for future public purpose and by the acquisition of such land;
1345 2026 INTJUNE 4, 2026OLEMAN, GEBHARD, DUSH, PENNYCUICK AND BARTOLOTTA, SENATOR PITTMAN, RULES AND EXECUTIVE NOMINATIONS, RE-REPORTED AS AMENDED, JULY 11, 2026 AN ACT Amending the act of July 31, 1968 (P.L.805, No.247), entitled "An act to empower cities of the second class A, and third class, boroughs, incorporated towns, townships of the first second class and counties of the second through eighththe classes, individually or jointly, to plan their development and to govern the same by zoning, subdivision and land development ordinances, planned residential development and other ordinances, by official maps, by the reservation of certain land for future public purpose and by the acquisition of such land;
and repealing acts and moratorium on filing ACCEPTANCE or consideration of newRARY <-- applications for high impact data centers.
and repealing acts and parts of acts," in zoning, providing for optional moratorium on filing or consideration of new applications for high impact data centers.
Optional TEMPORARY Moratorium on Filing <-- ACCEPTANCE or Consideration of New Applications for High Impact <-- Data Centers.--(a) A municipality may impose by ordinance <-- RESOLUTION a temporary moratorium prohibiting the filing or <-- consideration of documents relating to ON ACCEPTANCE AND <-- CONSIDERATION OF NEW APPLICATIONS FOR high impact data centers as follows:
Optional Moratorium on Filing or Consideration of New Applications for High Impact Data Centers.--(a) A municipality may impose by ordinance a temporary moratorium prohibiting the filing or consideration of documents relating to high impact data centers as follows:
(1) A moratorium may last no longer than 18 months from <-- the ordinance's effective date.
(1) A moratorium may last no longer than 18 months from the ordinance's effective date.
THE DURATION OF A TEMPORARY <-- MORATORIUM MAY NOT EXCEED 18 MONTHS AND SHALL BE RETROACTIVE TO THE DATE WHEN THE GOVERNING BODY OF THE MUNICIPALITY GAVE PUBLIC NOTICE AS REQUIRED UNDER 65 PA.C.S.
(2) A prohibition may apply to an application, petition or submission seeking approval, review or relief for a high impact data center, including, but not limited to:
§ 709(C.1) (RELATING TO PUBLIC NOTICE).
(2) A prohibition TEMPORARY MORATORIUM may apply to an <-- application, petition or submission seeking THAT SEEKS <-- approval, review or relief for a high impact data center, including, but not limited to:
OR <-- (iii) land development plans or subdivision applications.;
(iii) land development plans or subdivision applications;
or <-- (iv) a building permit or certificate tied to an approval for a high impact data center when the permit or certificate requires prior land use or zoning approval.
or (iv) a building permit or certificate tied to an approval for a high impact data center when the permit or certificate requires prior land use or zoning approval.
(3) A TEMPORARY moratorium may not:
(3) A moratorium may not:
<-- (i) prohibit the consideration or filing of documents unrelated to high impact data centers;
(i) prohibit the consideration or filing of documents unrelated to high impact data centers;
(ii) affect data centers that do not meet the 20260SB1345PN1889 - 2 - definition of a "high impact data center" under subsection (i) (L);
(ii) affect data centers that do not meet the definition of a "high impact data center" under subsection (i);
<-- (iii) suspend enforcement actions or remedial proceedings for violations of law;
(iii) suspend enforcement actions or remedial proceedings for violations of law;
or (iv) impair routine maintenance or safety upgrades at existing HIGH IMPACT DATA CENTER facilities.
or (iv) impair routine maintenance or safety upgrades at existing facilities.
<-- (b) (1) A moratorium ordinance TEMPORARY MORATORIUM <-- RESOLUTION RELATED TO APPLICATIONS FOR HIGH IMPACT DATA CENTERS shall identify the planning, study or ordinance- development activities to be undertaken during the TEMPORARY <-- moratorium, which may include:
(b) (1) A moratorium ordinance shall identify the planning, study or ordinance-development activities to be undertaken 20260SB1345PN1766 - 2 - during the moratorium, which may include:
(i) infrastructure capacity assessments, including, but not limited to, assessments relating to water, wastewater or an electrical ELECTRIC grid;
(i) infrastructure capacity assessments, including, but not limited to, assessments relating to water, wastewater or an electrical grid;
<-- (ii) public safety and emergency services impact analysis;
(ii) public safety and emergency services impact analysis;
(2) A municipality shall make reasonable progress on the activities listed under paragraph (1) during the TEMPORARY <-- moratorium period identified in the ordinance.
(2) A municipality shall make reasonable progress on the activities listed under paragraph (1) during the moratorium period identified in the ordinance.
<-- (c) Prior to the adoption of a moratorium ordinance <-- TEMPORARY MORATORIUM RESOLUTION under this section, the <-- governing body shall conduct a public hearing with notice as required by this act.
(c) Prior to the adoption of a moratorium ordinance under this section, the governing body shall conduct a public hearing with notice as required by this act.
The ordinance shall include findings <-- supporting the necessity of the moratorium and identifying the moratorium's relationship to the planning activities in 20260SB1345PN1889 - 3 - subsection (b).
The ordinance shall include findings supporting the necessity of the moratorium and identifying the moratorium's relationship to the planning activities in subsection (b).
UNDER 65 PA.C.S.
(e) (1) A moratorium ordinance shall provide a process by which an applicant may request a waiver upon a showing that:
§ 709(C.1).
(i) strict application of the moratorium would result in substantial, unique and demonstrable hardship not created by the applicant;
THE PUBLIC <-- HEARING NOTICE SHALL CLEARLY STATE THAT THE MUNICIPALITY INTENDS TO CONSIDER A TEMPORARY MORATORIUM ON ACCEPTANCE AND CONSIDERATION OF NEW APPLICATIONS FOR HIGH IMPACT DATA CENTERS.
and (ii) granting the waiver would be consistent with the public interest and the purposes of this section.
(D) A MUNICIPALITY MAY NOT ACCEPT OR CONSIDER AN APPLICATION FOR A HIGH IMPACT DATA CENTER BY CHANGING THE AGENDA UNDER 65 PA.C.S.
(2) The governing body of the municipality may grant, 20260SB1345PN1766 - 3 - grant with conditions or deny a waiver after a public meeting.
§ 712.1(E) (RELATING TO NOTIFICATION OF AGENCY BUSINESS REQUIRED AND EXCEPTIONS).
(E) THE RESOLUTION SHALL INCLUDE FINDINGS SUPPORTING THE NECESSITY OF THE MORATORIUM AND IDENTIFYING THE MORATORIUM'S RELATIONSHIP TO THE PLANNING ACTIVITIES IN SUBSECTION (B).
(F) (1) THE TEMPORARY MORATORIUM SHALL NOT APPLY TO THE FOLLOWING:
(I) APPLICATIONS OR PERMITS PREVIOUSLY APPROVED OR GRANTED BY THE MUNICIPALITY PRIOR TO THE EFFECTIVE DATE OF THE TEMPORARY MORATORIUM.
(II) ACCEPTANCE OR CONSIDERATION OF AN APPLICATION FOR A HIGH IMPACT DATA CENTER THAT HAS, PRIOR TO THE EFFECTIVE DATE OF THE TEMPORARY MORATORIUM, ENTERED INTO AN AGREEMENT WITH A POWER GENERATION FACILITY BY WHICH THE HIGH IMPACT DATA CENTER AND THE POWER GENERATION FACILITY AGREE TO THE CONSTRUCTION AND OPERATION OF THE HIGH IMPACT DATA CENTER AT THE SITE OF THE POWER GENERATION FACILITY, AND FURTHER AGREE THAT THE POWER GENERATION FACILITY WILL SUPPLY ENERGY TO THE HIGH IMPACT DATA CENTER.
(2) AN APPLICATION FOR A HIGH IMPACT DATA CENTER THAT MEETS THE REQUIREMENTS OF PARAGRAPH (1)(II) SHALL BE ACCEPTED 20260SB1345PN1889 - 4 - AND CONSIDERED BY THE MUNICIPALITY IN ACCORDANCE WITH LOCAL ORDINANCES AND THE PROVISIONS OF THIS ACT IN EFFECT ON THE DATE OF THE MUNICIPALITY'S ISSUANCE OF A BUILDING PERMIT FOR THE POWER GENERATION FACILITY.
(e) (G) (1) A moratorium ordinance TEMPORARY MORATORIUM <-- RESOLUTION shall provide a process by which an applicant may request a waiver upon a showing that:
(i) strict application of the TEMPORARY moratorium <-- would result in substantial, unique and demonstrable <-- UNDUE hardship not created by the applicant;
and <-- (ii) granting the waiver would be consistent with the public interest and the purposes of this section.
<-- (2) The governing body of the municipality may grant, grant with conditions or deny a waiver REQUEST after a public <-- meeting.
(f) (H) During a moratorium period TEMPORARY MORATORIUM, the <-- municipality shall consult, as applicable, with the county planning agency regarding planning and ordinance updates contemplated under subsection (b).
(f) During a moratorium period, the municipality shall consult, as applicable, with the county planning agency regarding planning and ordinance updates contemplated under subsection (b).
(I) IF A MUNICIPALITY ADOPTS, AMENDS OR REPEALS PROVISIONS <-- OF AN ORDINANCE RELATED TO HIGH IMPACT DATA CENTERS DURING A TEMPORARY MORATORIUM, THE CHANGE TO THE ORDINANCE SHALL NOT BECOME EFFECTIVE PRIOR TO THE EXPIRATION OF THE TEMPORARY MORATORIUM AND SHALL NOT APPLY TO ANY APPLICATION FOR A HIGH IMPACT DATA CENTER RECEIVED BY THE MUNICIPALITY PRIOR TO THE EFFECTIVE DATE OF THE TEMPORARY MORATORIUM.
(g) A moratorium authorized under this section and implemented in compliance with this act is a reasonable, time- limited planning measure and shall not be construed to effect a taking or to create liability for damages if the municipality affords the exemptions and procedures required under this section.
AN APPLICATION THAT IS RECEIVED BY A MUNICIPALITY DURING A TEMPORARY MORATORIUM SHALL BE DEEMED RECEIVED ON THE DAY AFTER THE EXPIRATION OF THE TEMPORARY MORATORIUM.
(h) (1) Nothing in this section shall:
Show all 52 changed rows (12 more)
Previous
Latest
20260SB1345PN1889 - 5 - (g) (J) A TEMPORARY moratorium authorized under this section <-- and implemented in compliance with this act is a reasonable, <-- time-limited planning measure and shall not be construed to effect a taking or to create MUNICIPAL liability for damages if <-- the municipality affords the exemptions and procedures required under this section.
(i) be construed to limit any other municipal powers or procedures authorized under this act, nor to mandate the adoption of a moratorium;
(h) (K) (1) Nothing in this section shall:
or (ii) alter or diminish the rights of public utilities or electric cooperatives under other applicable statutes.
<-- (i) be construed to limit any other municipal powers or procedures authorized under this act, nor to mandate the adoption of a TEMPORARY moratorium;
(2) In the event of a conflict with another provision of law, this section shall be harmonized with other provisions of this act to the maximum extent possible.
or <-- (ii) alter or diminish the rights of public utilities or electric cooperatives under other applicable <-- statutes LAW.
(i) As used in this section, the following words and phrases shall have the meanings given to them in this subsection unless the context clearly indicates otherwise:
<-- (2) In the event of a conflict with another provision of law, this section shall be harmonized with other provisions of this act to the maximum extent possible.
(i) (L) As used in this section, the following words and <-- phrases shall have the meanings given to them in this subsection unless the context clearly indicates otherwise:
"Data center." A facility or group of facilities that is <-- used to house and operate equipment that:
20260SB1345PN1766 - 4 - "Data center." A facility or group of facilities that is used to house and operate equipment that:
ALL OR <-- 20260SB1345PN1889 - 6 - PART OF A FACILITY THAT MAY BE COMPOSED OF ONE OR MORE BUSINESSES, OWNERS OR TENANTS, THAT IS OR WILL BE PREDOMINANTLY USED TO HOUSE WORKING SERVERS OR SIMILAR DATA STORAGE SYSTEMS AND THAT MAY HAVE UNINTERRUPTIBLE ENERGY SUPPLY OR GENERATOR BACKUP POWER, OR BOTH, COOLING SYSTEMS, TOWERS AND OTHER TEMPERATURE CONTROL INFRASTRUCTURE.
AND <-- (2) consists of one or more parcels in this <-- Commonwealth, along with the buildings, substations and other infrastructure, fixtures and personal property located on the parcels;
(2) consists of one or more parcels in this Commonwealth, along with the buildings, substations and other infrastructure, fixtures and personal property located on the parcels;
and (4) (2) has a critical IT load of 25 megawatts or <-- higher.
and (4) has a critical IT load of 25 megawatts or higher.
"POWER GENERATION FACILITY." A FACILITY THAT IS OPERATIONAL <-- OR UNDER CONSTRUCTION ON THE EFFECTIVE DATE OF THIS SECTION AND WHICH, WHEN CONSTRUCTED, WILL GENERATE ELECTRICITY THAT WILL SUPPLY POWER TO A HIGH IMPACT DATA CENTER AND TO AN ELECTRIC GRID BY INTERCONNECTION TO A REGIONAL TRANSMISSION SYSTEM IN ACCORDANCE WITH THE APPLICABLE REGIONAL TRANSMISSION OPERATOR'S INTERCONNECTION STANDARDS.
20260SB1345PN1889 - 7 -
20260SB1345PN1766 - 5 -
View plain text versions (2)

How this bill changes current law

5 changes Share ↗

Compared against the Pennsylvania Consolidated Statutes as published AI-generated reading aid — verify against the official bill.

The bill adds a new section to the Pennsylvania Municipalities Planning Code allowing municipalities to impose a temporary moratorium on the acceptance or consideration of applications for high impact data centers.

  • 65 Pa.C.S. § 709(c.1)

    THE DURATION OF A TEMPORARY MORATORIUM MAY NOT EXCEED 18 MONTHS AND SHALL BE RETROACTIVE TO THE DATE WHEN THE GOVERNING BODY OF THE MUNICIPALITY GAVE PUBLIC NOTICE AS REQUIRED UNDER 65 PA.C.S. § 709(C.1) (RELATING TO PUBLIC NOTICE).

    This establishes that the temporary moratorium duration is limited to 18 months and can be retroactive based on public notice.

  • A municipality may impose by ordinance RESOLUTION a temporary moratorium prohibiting the filing or consideration of documents relating to ON ACCEPTANCE AND CONSIDERATION OF NEW APPLICATIONS FOR high impact data centers.

    Allows municipalities to enact a temporary moratorium on high impact data center applications.

  • THE RESOLUTION SHALL INCLUDE FINDINGS SUPPORTING THE NECESSITY OF THE MORATORIUM AND IDENTIFYING THE MORATORIUM'S RELATIONSHIP TO THE PLANNING ACTIVITIES IN SUBSECTION (B).

    Requires the resolution for the moratorium to include justification for its necessity.

  • A TEMPORARY moratorium may not: (i) prohibit the consideration or filing of documents unrelated to high impact data centers;

    Clarifies that the moratorium does not affect unrelated applications.

  • AN APPLICATION THAT IS RECEIVED BY A MUNICIPALITY DURING A TEMPORARY MORATORIUM SHALL BE DEEMED RECEIVED ON THE DAY AFTER THE EXPIRATION OF THE TEMPORARY MORATORIUM.

    Establishes that applications received during the moratorium are considered after it ends.

Action History

  1. Re-referred to RULES AND EXECUTIVE NOMINATIONS, Sept. 30, 2026

  2. Second consideration, July 12, 2026

  3. Re-reported as amended, July 11, 2026

  4. Re-referred to RULES AND EXECUTIVE NOMINATIONS, June 30, 2026

  5. First consideration, June 30, 2026

  6. Reported as committed, June 30, 2026

  7. Referred to LOCAL GOVERNMENT, June 4, 2026

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 4 co-sponsors · 248 not signed on

Sponsors (1)

Co-sponsors (4)

Not signed on (248)

248 members have not signed on to this bill.

Show all 248 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 1345 do?
Empowering Municipalities to Place a Moratorium on Data Center Development
Who sponsors SB 1345?
SB 1345 is sponsored by Jarrett Coleman (Republican), Chris Gebhard (Republican), Cris Dush (Republican), Tracy Pennycuick (Republican), and Camera Bartolotta (Republican).
What is the current status of SB 1345?
This bill is in committee in the Senate. Introduced June 04, 2026. It must pass committee before a floor vote.
Where can I track SB 1345?
Track SB 1345 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 1345

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.