Modifies provisions related to net metering
Do you support it?
Want to know if it passes?
We'll email you when SB 1208 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on SB 1208.
You're tracking SB 1208
We'll email you the moment it moves.
SB 1208 — Modifies provisions related to net metering
Last action — Hearing Conducted S Commerce, Consumer Protection, Energy & the Environment Committee
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill is in committee in the Senate. Introduced December 01, 2025. It must pass committee before a floor vote.
Next likely step: a committee vote, then a floor vote in the Senate.
Prognosis
Where this bill stands today.
Odds of enactment
LowHow often bills like it became law.
-
In Committee
Current position in the legislative process.
-
1 sponsor
1 primary, 0 co-sponsors signed on.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
Summary
SB 1208 - Under the act, a retail electric supplier shall offer net metering, as defined in the act, to customer-generators pursuant to a Public Service Commission approved tariff of an electrical corporation or contract approved by the governing body of other retail electric supplies under certain options described in the act. A customer-generator's facility shall be equipped with certain equipment including, but not limited to, necessary electric distribution system upgrades. If the electricity generated by the customer-generator exceeds the electricity supplied by the supplier during a billing cycle, the customer-generator shall demand charges for the billing cycle. Each qualified electric energy generation unit used by a customer-generator shall be installed, maintained, and repaired in accordance with all applicable industry standards described in current law. All qualified electric energy generation units utilizing battery backup shall be installed to operate completely isolated from the retail electric supplier's system including all neutral connections and grounding points during times of back up operation. Unless allowed under the provisions of the act, no retail electric supplier shall impose any fee or other requirement as described in current law, except that a retail electric supplier may require that a customer-generator's system contain adequate surge protection, or other accessible device that would allow emergency response personnel to disconnect from the electric distribution system. Applications by a customer-generator for interconnection of a qualified electric energy generation shall be accompanied by a plan for the customer-generator's electrical generating system and reviewed by a retail electric supplier, unless mutually agreed to. Prior to the interconnection of the qualified electric energy generation to the retail electric supplier's system, the customer-generator will furnish a retail electric supplier a certification from a professional electrician or an engineer deemed qualified by the retail electric supplier. If the professional electrician or engineer is not licensed, the retail electric supplier may require a bond or other form of financial security to ensure the safe installation and operation of the qualified electric energy generation unit. The estimated generating capacity of all net metering systems shall count for purposes of compliance with any applicable federal law. Any non-retail electric supplier who sells a qualified electric energy generation unit or who provides a net metering service to a customer-generator under the act shall be subject to certain requirements described in the act. Provisions of the act shall be enforced by the Attorney General under the Missouri Merchandising Practices Act as described in the act. The act is identical SB 467 (2025), SB 855 (2024), HB 1705 (2024), HB 1854 (2024), substantially similar to HB 370 (2025), HB 940 (2025), and similar to SB 642 (2023), HB 709 (2023) and HB 991 (2023). JULIA SHEVELEVA
Bill Text
- Introduced 5509S.01I - Introduced Current pdf
Action History
-
Hearing Conducted S Commerce, Consumer Protection, Energy & the Environment Committee
-
Second Read and Referred S Commerce, Consumer Protection, Energy & the Environment Committee
-
S First Read
-
Prefiled
Sponsors
- Kurtis Gregory (21) · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 198 not signed on
Sponsors (1)
- Gregory (21), Kurtis
Co-sponsors (0)
None.
Not signed on (198)
198 members have not signed on to this bill.
Show all 198 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does SB 1208 do?
- SB 1208 - Under the act, a retail electric supplier shall offer net metering, as defined in the act, to customer-generators pursuant to a Public Service Commission approved tariff of an electrical corporation or contract approved by the governing body of other retail electric supplies under certain options described in the act. A customer-generator's facility shall be equipped with certain equipment including, but not limited to, necessary electric distribution system upgrades. If the electricity generated by the customer-generator exceeds the electricity supplied by the supplier during a billing cycle, the customer-generator shall demand charges for the billing cycle. Each qualified electric energy generation unit used by a customer-generator shall be installed, maintained, and repaired in accordance with all applicable industry standards described in current law. All qualified electric energy generation units utilizing battery backup shall be installed to operate completely isolated from the retail electric supplier's system including all neutral connections and grounding points during times of back up operation. Unless allowed under the provisions of the act, no retail electric supplier shall impose any fee or other requirement as described in current law, except that a retail electric supplier may require that a customer-generator's system contain adequate surge protection, or other accessible device that would allow emergency response personnel to disconnect from the electric distribution system. Applications by a customer-generator for interconnection of a qualified electric energy generation shall be accompanied by a plan for the customer-generator's electrical generating system and reviewed by a retail electric supplier, unless mutually agreed to. Prior to the interconnection of the qualified electric energy generation to the retail electric supplier's system, the customer-generator will furnish a retail electric supplier a certification from a professional electrician or an engineer deemed qualified by the retail electric supplier. If the professional electrician or engineer is not licensed, the retail electric supplier may require a bond or other form of financial security to ensure the safe installation and operation of the qualified electric energy generation unit. The estimated generating capacity of all net metering systems shall count for purposes of compliance with any applicable federal law. Any non-retail electric supplier who sells a qualified electric energy generation unit or who provides a net metering service to a customer-generator under the act shall be subject to certain requirements described in the act. Provisions of the act shall be enforced by the Attorney General under the Missouri Merchandising Practices Act as described in the act. The act is identical SB 467 (2025), SB 855 (2024), HB 1705 (2024), HB 1854 (2024), substantially similar to HB 370 (2025), HB 940 (2025), and similar to SB 642 (2023), HB 709 (2023) and HB 991 (2023). JULIA SHEVELEVA
- Who sponsors SB 1208?
- SB 1208 is sponsored by Gregory (21), Kurtis.
- What is the current status of SB 1208?
- This bill is in committee in the Senate. Introduced December 01, 2025. It must pass committee before a floor vote.
- Where can I track SB 1208?
- Track SB 1208 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 1208
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 1208
Last checked for changes 2 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →