HB 1331 — An Act providing for the capital budget for fiscal year 2025-2026; itemizing public improvement projects, furniture and equipment projects, transportation assistance, redevelopment assistance projects, flood control projects and Pennsylvania Fish and Boat Commission projects leased or assisted by the Department of General Services and other State agencies, together with their estimated financial costs; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services and other State agencies; authorizing the use of current revenue for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services and other State agencies stating the estimated useful life of the projects; and making appropriations.
Last action — Referred to APPROPRIATIONS, Oct. 3, 2025
-
✓Introduced
-
✓In Committee
-
3Passed House
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill has passed the House. Introduced May 06, 2025. It now moves to the second chamber.
Next likely step: consideration and a floor vote in the Senate.
Odds of enactment
Moderate chanceBased on the sponsor, cosponsors, and committee posture, this bill has a moderate chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
-
Passed House
Current position in the legislative process.
-
1 sponsor
1 primary, 0 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (1 D).
-
Cleared a recorded vote
Passed 1 recorded vote so far.
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
Bill Text
What changed in the latest version
4014 added · 7963 removedPlain-language change summary
The recent amendment to Bill HB 1331 has increased the total funding for various projects financed by state debt. For example, the budget for redevelopment assistance has jumped from $0 to over $6 billion, and transportation assistance projects have also seen a significant increase from about $1.7 billion to almost $1.8 billion. These changes matter because they reflect a substantial investment in infrastructure and redevelopment, which can lead to improved public services and economic growth in the state.
PRIOR PRINTER'S NO.
1629 PRINTER'STHE NO.GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL Session of No.
19451331 THE2025 GENERALINTRODUCED ASSEMBLYBY OFJ.HARRIS, PENNSYLVANIAMAY HOUSE6, BILL2025 SessionREFERRED ofTO No.COMMITTEE ON APPROPRIATIONS, MAY 6, 2025 AN ACT Providing for the capital budget for fiscal year 2025-2026;
1331itemizing 2025public INTRODUCEDimprovement BYprojects, J.furniture and equipment projects, transportation assistance, redevelopment assistance projects, flood control projects and Pennsylvania Fish and Boat Commission projects leased or assisted by the together with their estimated financial costs;
HARRIS, MAY 6, 2025 AS REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF REPRESENTATIVES, AS AMENDED, JUNE 17, 2025 AN ACT Providing for the capital budget for fiscal year 2025-2026;
itemizing public improvement projects, furniture and equipment projects, transportation assistance, redevelopment assistance projects, flood control projects and Pennsylvania Department of General Services and other State agencies,the together with their estimated financial costs;
(a) Public improvements.--The total authorization for the additional capital projects in the category of public improvement projects itemized in section 3 and to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt shall be $21,480,216,000$21,480,216,000. $22,393,910,000.
<-- (b) Furniture and equipment.--The total authorization for the additional capital projects in the category of public improvement projects consisting of the acquisition of original movable furniture and equipment to complete public improvement projects itemized in section 4 and to be acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt shall be $633,994,000$633,994,000. <-- $654,994,000.
<-- (c) Transportation assistance.--The total authorization for the capital projects in the category of transportation assistance projects itemized in section 5 with respect to which an interest is to be acquired in or constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt shall be $1,686,000,000$1,686,000,000. <-- $1,808,850,000.
<-- (d) Redevelopment assistance.--The total authorization for the capital projects in the category of redevelopment capital projects itemized in section 6 for capital grants by the Department of Community and Economic Development, its successors or assigns and to be financed by the incurring of debt shall be $0$0. $6,143,330,500.
<-- (e) Flood control.--The total authorization for the capital projects in the category of flood control projects itemized in section 7 and to be constructed by the Department of Environmental Protection, its successors or assigns and to be financed by the incurring of debt shall be $9,900,000$9,900,000. <-- $109,900,000.
<-- 20250HB1331PN1945 - 2 - (f) Fish Fund and Boat Fund.--The total authorization for the capital projects in the category of public improvement projects itemized in section 8 to be acquired or developed by 20250HB1331PN1629 - 2 - the Pennsylvania Fish and Boat Commission and to be financed by the incurring of debt or by current revenues of the Fish Fund and the Boat Fund pursuant to executive authorization shall be $199,400,000.
Total Project Project Allocation (1) Department of Agriculture (i) Pennsylvania State University College of Agricultural Sciences, Centre County (A) Plant Science Facility to allow for cross-disciplinary innovation and research, including research facility, greenhouse, head house and climate- controlled plant production features Project Allocation 30,000,000 (B) Animal Diagnostic Laboratory construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition 20250HB1331PN1945 - 3 - Project Allocation 6,127,000 (ii) Livestock Evaluation Center, Centre County 20250HB1331PN1629 - 3 - (A) Construction, alterations, renovations, site improvements and infrastructure upgrades Project Allocation 10,000,000 (iii) New Bolton Center, Chester County (A) Construction of Pennsylvania Equine Toxicology and Research Laboratory on New Bolton Campus of The University of Pennsylvania Project Allocation 20,000,000 (iv) Annex, Dauphin County (A) New construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 8,000,000 (v) Farm Show Complex, Dauphin County (A) Construction, alterations, renovations, site improvements and infrastructure upgrades Project Allocation 35,000,000 (vi) Headquarters, Veterinary Laboratory and Farm Show Complex, Dauphin County (A) Upgrade security system and cameras Project Allocation 10,000,000 (vii) Entomology Laboratory, Dauphin County (A) New construction, alterations, 20250HB1331PN1945 - 4 - renovations, site improvements, infrastructure upgrades and land acquisition 20250HB1331PN1629 - 4 - Project Allocation 10,000,000 (viii) Greenhouse and Nematology Laboratory, Dauphin County (A) New construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 10,000,000 (ix) Animal Health Diagnostic Laboratory (A) Renovations, additions and construction, including site and infrastructure improvements for design and construction to satisfy modern testing procedures Project Allocation 75,500,000 (x) Headquarters, Department of Agriculture, Dauphin County (A) Renovations, additions and construction, including site and infrastructure improvements Project Allocation 25,000,000 (2) Department of Conservation and Natural Resources (i) Point State Park, Allegheny County (A) Portal bridge replacement and park sidewalk rehabilitation and ADA improvements 20250HB1331PN1945 - 5 - Project Allocation 3,750,000 (B) Construct new parking facilities, park office, rehabilitate flag bastion 20250HB1331PN1629 - 5 - area and install solar arrays Project Allocation 14,000,000 (ii) Blue Knob State Park, Bedford County (A) Rehabilitation of Blue Knob Ski area, including improved facilities, parking, roadway and viewscapes to promote year-round recreation Project Allocation 25,000,000 (iii) Delaware Canal State Park, Bucks County (A) Visitor center, park office and site rehabilitation Project Allocation 25,000,000 (iv) Gallitzin State Forest, Cambria County (A) Construct new district office Project Allocation 12,000,000 (v) Elk State Forest, Cameron County (A) Replace Brooks Run forest maintenance headquarters and storage building Project Allocation 3,750,000 (B) Hicks Run Forest maintenance headquarters and five-bay pole building Project Allocation 1,250,000 (V.1) GLEN ONOKO, CARBON COUNTY <-- (A) DESIGN AND BUILD THE TRAIL SYSTEM AT GLEN ONOKO PROJECT ALLOCATION 7,000,000 20250HB1331PN1945 - 6 - (vi) Forest Fire Protection, Centre County (A) Construct new regional air operations facility Project Allocation 3,750,000 (VI.1) MIRA LLOYD DOCK CONSERVATION CENTER, <-- CENTRE COUNTY (A) REPAIRS TO PENN NURSERY DAM OR BREACH DAM AND CONSTRUCT ALTERNATIVE WATER SUPPLY FOR IRRIGATION SYSTEM PROJECT ALLOCATION 4,000,000 (vii) Penn Nursery, Centre County (A) Construct new seed extraction building 20250HB1331PN1629 - 6 - Project Allocation 1,250,000 (viii) Sproul State Forest, Centre County (A) Replace Snowshoe maintenance headquarters Project Allocation 2,500,000 (ix) Big Elk Creek State Park, Chester County (A) State park development phase 2 and land acquisition Project Allocation 17,500,000 (x) Moshannon State Forest, Clearfield County (A) Demolish Dague Mechanics Shop and replace with modern mechanics shop Project Allocation 2,500,000 (B) Repairs to Shaggers Inn Dam Project Allocation 5,000,000 (xi) Parker Dam State Park, Clearfield County (A) Dam repairs and lake dredging 20250HB1331PN1945 - 7 - Project Allocation 11,250,000 (xii) Bald Eagle State Forest, Clinton County (A) Construct new wood shop, groomer storage and pole storage building Project Allocation 5,625,000 (xiii) Forestry Lab, Dauphin County (A) Construction of new laboratory, including site and infrastructure improvements and land acquisition Project Allocation 35,000,000 (xiv) Geologic Survey Headquarters, Dauphin County (A) Construct a new headquarters building 20250HB1331PN1629 - 7 - for the Bureau of Geologic Survey Project Allocation 30,000,000 (xv) Presque Isle State Park, Erie County (A) Sand nourishment Project Allocation 25,000,000 (B) Dune replacement and resource work Project Allocation 12,500,000 (C) Roads and multipurpose trail rehabilitation Project Allocation 8,750,000 (XV.1) LAUREL CAVERNS, FAYETTE COUNTY <-- (A) DEVELOPMENT OF DAY-USE FACILITIES, VISITOR CENTER AND OVERNIGHT FACILITIES AND ACQUISITION PROJECT ALLOCATION 30,000,000 (xvi) Cornplanter State Park, Forest County (A) Construct new resource management 20250HB1331PN1945 - 8 - center and storage building Project Allocation 7,000,000 (xvii) Michaux State Forest, Franklin County (A) Construct resource management center and storage building Project Allocation 21,500,000 (xviii) Buchanan State Forest, Fulton County (A) Replace Sideling Hill maintenance headquarters and mechanics shop Project Allocation 2,500,000 (XVIII.1) COWANS GAP STATE PARK, FULTON <-- COUNTY (A) REHABILITATE COWANS GAP DAM PROJECT ALLOCATION 7,000,000 (xix) Ryerson State State Park, Greene County (A) Resource and recreation improvements Phase 2 Project Allocation 12,500,000 (xx) Yellow Creek State Park, Indiana County (A) Day use rehabilitation Project Allocation 7,500,000 (xxi) Clear Creek State Forest, Jefferson 20250HB1331PN1629 - 8 - County (A) New maintenance shop and equipment storage Project Allocation 1,875,000 (xxii) Pinchot State Forest, Lackawanna County (A) Breach and remove Edgerton Dam Project Allocation 1,250,000 20250HB1331PN1945 - 9 - (B) Breach and remove Olyphant Dam No.
3 Project Allocation 1,875,000 (xxiii) Memorial Lake State Park, Lebanon County (A) Rehabilitate dam Project Allocation 14,000,000 (xxiv) Forest Fire Protection, Luzerne County (A) Rebuild Hazelton Air Operations building, including site improvements Project Allocation 5,000,000 (xxv) Pinchot State Forest, Luzerne County (A) Construct Pinchot forest district resource management center complex Project Allocation 16,500,000 (xxvi) Tiadaghton State Forest, Lycoming County (A) Construct new Waterville mechanics garage and storage Project Allocation 5,000,000 (xxvii) Tuscarora State Forest, Mifflin County (A) Replace East Licking Creek forest 20250HB1331PN1629 - 9 - maintenance headquarters Project Allocation 5,000,000 (xxviii) Norristown Farm Park, Montgomery County (A) Replace multiple vehicular and pedestrian bridges Project Allocation 6,250,000 (B) TRANSPORTATION INFRASTRUCTURE AND <-- 20250HB1331PN1945 - 10 - BRIDGES PROJECT ALLOCATION 25,000,000 (xxix) Shikellamy State Park, Northumberland County (A) Full replacement of dam and permanent causeway Project Allocation 37,500,000 (xxx) Delaware State Forest, Pike County (A) Lilly Pond Dam spillway repair and replacement Project Allocation 1,250,000 <-- PROJECT ALLOCATION 2,250,000 <-- (xxxi) Denton Hill State Park, Potter County (A) Upgrade, rehabilitation or replacement of ski lift, lighting, equipment, parking and structures to improve operations, recreation and public safety Project Allocation 18,400,000 (xxxii) Gallitzin State Forest, Somerset County (A) Raze and replace the Babcock Forest maintenance headquarters and storage building Project Allocation 5,625,000 (xxxiii) Kooser State Park, Somerset County 20250HB1331PN1629 - 10 - (A) Day use and dam rehabilitation Project Allocation 6,250,000 (xxxiv) Leonard Harrison State Park, Tioga County 20250HB1331PN1945 - 11 - (A) Turkey Path Trail rehabilitation and realignment Project Allocation 3,750,000 (xxxv) Tioga State Forest, Tioga County (A) Construct new maintenance headquarters Project Allocation 2,500,000 (B) Construct new resource management center Project Allocation 40,000,000 (XXXV.1) PROMPTON STATE PARK, WAYNE COUNTY <-- (A) CONSTRUCTION, RENOVATION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR IMPROVEMENTS TO PROMPTON STATE PARK PROJECT ALLOCATION 750,000 (xxxvi) Vosburg Neck State Park, Wyoming County (A) State park development and land acquisition Phase 2 Project Allocation 17,500,000 (xxxvii) Susquehanna Riverlands State Park, York County (A) State park development and land acquisition Phase 2 Project Allocation 17,500,000 (xxxviii) State Parks - Statewide (A) Upgrades and improvements to campground washhouses, utilities, site work and other amenities, including 20250HB1331PN1945 - 12 - new construction, renovations and alterations 20250HB1331PN1629 - 11 - Project Allocation 25,000,000 (B) Rehabilitate historic structures Project Allocation 12,500,000 (C) Critical regulatory system repairs and replacements at multiple water and wastewater treatment plants Project Allocation 12,500,000 (D) New construction, renovations and alterations at roofed overnight colonies, including improvements to supporting infrastructure at multiple locations Project Allocation 6,250,000 (E) Improvements to training academy infrastructure and range Project Allocation 37,500,000 (F) Dam rehabilitation, lake dredging and various dam impoundments Project Allocation 46,000,000 (G) Replacement and rehabilitation of multiple maintenance facilities Project Allocation 12,500,000 (3) Department of Corrections (i) State Correctional Institution at Benner, Centre County (A) Design and construction of building expansion, new construction, renovations and alterations, including 20250HB1331PN1945 - 13 - upgrade of utilities and related infrastructure, land development and 20250HB1331PN1629 - 12 - site infrastructure improvements Project Allocation 22,769,000 (ii) State Correctional Institution at Rockview, Centre County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 79,151,000 (iii) State Correctional Institution at Houtzdale, Clearfield County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 25,040,000 (iv) Quehanna Boot Camp, Clearfield County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 10,150,000 20250HB1331PN1945 - 14 - (v) State Correctional Institution at Cambridge Springs, Crawford County 20250HB1331PN1629 - 13 - (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 14,629,000 (vi) State Correctional Institution at Camp Hill, Cumberland County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 212,961,000 (vii) State Correctional Institution at Chester, Delaware County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 15,450,000 (viii) State Correctional Institution at Albion, Erie County (A) Design and construction of building 20250HB1331PN1945 - 15 - expansion, new construction, renovations and alterations, including 20250HB1331PN1629 - 14 - upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 27,877,000 (ix) State Correctional Institution at Fayette, Fayette County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 11,625,000 (x) State Correctional Institution at Forest, Forest County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 42,053,000 (xi) State Correctional Institution at Greene, Greene County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related 20250HB1331PN1945 - 16 - infrastructure land development and site infrastructure improvements 20250HB1331PN1629 - 15 - Project Allocation 23,945,000 (xii) State Correctional Institution at Huntingdon, Huntingdon County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 18,670,000 (xiii) State Correctional Institution at Smithfield, Huntingdon County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 21,726,000 (xiv) State Correctional Institution at Pine Grove, Indiana County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 55,985,000 20250HB1331PN1945 - 17 - (xv) Elizabethtown Training Facility, Lancaster County 20250HB1331PN1629 - 16 - (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 12,888,000 (xvi) State Correctional Institution at Dallas, Luzerne County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 24,395,000 <-- PROJECT ALLOCATION 34,000,000 <-- (xvii) State Correctional Institution at Muncy, Lycoming County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 61,411,000 <-- PROJECT ALLOCATION 96,000,000 <-- (xviii) State Correctional Institution at 20250HB1331PN1945 - 18 - Mercer, Mercer County (A) Design and construction of building expansion, new construction, renovations and alterations, including 20250HB1331PN1629 - 17 - upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 14,837,000 (xix) State Correctional Institution at Graterford, Montgomery County (A) Demolition of facility, including code, permit, site, utility and infrastructure-related issues Project Allocation 50,173,000 (xx) State Correctional Institution at Phoenix, Montgomery County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 14,826,000 (xxi) State Correctional Institution at Coal Township, Northumberland County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and 20250HB1331PN1945 - 19 - site infrastructure improvements Project Allocation 31,543,000 (xxii) State Correctional Institution at Frackville, Schuylkill County 20250HB1331PN1629 - 18 - (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 42,136,000 (xxiii) State Correctional Institution at Mahanoy, Schuylkill County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 41,252,000 (xxiv) State Correctional Institution at Laurel Highlands, Somerset County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 22,471,000 (xxv) State Correctional Institution at 20250HB1331PN1945 - 20 - Somerset, Somerset County (A) Design and construction of building expansion, new construction, renovations and alterations, including 20250HB1331PN1629 - 19 - upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 30,623,000 (xxvi) State Correctional Institution at Waymart, Wayne County (A) Design and construction of building expansion, new construction, renovations and alterations, including upgrade of utilities and related infrastructure land development and site infrastructure improvements Project Allocation 44,318,000 (4) Department of Education (i) Department of Education Headquarters (Reserved) (ii) University of Pittsburgh (A) Building to connect the multiple mid- campus buildings - Oakland Campus, Allegheny County.
Renovation, new construction and alterations, including land development and site infrastructure improvements Project Allocation 180,000,000 (B) Campuswide programmatic and infrastructure upgrades to buildings - 20250HB1331PN1945 - 21 - Oakland Campus, Allegheny County.
New construction, land development, site acquisition and site infrastructure improvements and/or renovation and 20250HB1331PN1629 - 20 - upgrades to teaching, research, office and support space, including upgrades to mechanical, electric, plumbing and fire protection systems Project Allocation 100,000,000 (C) Existing apartment building or hotel for student housing - Oakland Campus, Allegheny County.
Renovation, new construction and alterations, including land development and site infrastructure improvements Project Allocation 480,000,000 (F) Old Engineering Hall - Oakland 20250HB1331PN1945 - 22 - Campus, Allegheny County.
Renovation, new construction and alterations, including land development and site infrastructure improvements 20250HB1331PN1629 - 21 - Project Allocation 480,000,000 (G) Parking garages - Oakland Campus, Allegheny County.
Renovation, new construction and alterations, including land development and site infrastructure improvements Project Allocation 360,000,000 20250HB1331PN1945 - 23 - (K) New indoor track and band facility - Oakland Campus, Allegheny County.
New construction, land development, site acquisition and site infrastructure 20250HB1331PN1629 - 22 - improvements Project Allocation 180,000,000 (L) New multisport athletic and entertainment facility - Oakland Campus, Allegheny County.
New construction, land development, site 20250HB1331PN1945 - 24 - acquisition and site infrastructure improvements Project Allocation 150,000,000 (P) New School of Nursing building - 20250HB1331PN1629 - 23 - Oakland Campus, Allegheny County.
Renovation, new construction, alterations, land development, site infrastructure improvements, including improvements to meet current building codes and ADA, and mechanical, electrical and fire protection systems upgrades Project Allocation 200,000,000 20250HB1331PN1945 - 25 - (T) Twentieth Century Club building - Oakland Campus, Allegheny County.
Renovation, new construction, alterations, land development, site 20250HB1331PN1629 - 24 - infrastructure improvement, including improvements to meet current building codes and ADA, and mechanical, electrical and fire protection systems upgrades Project Allocation 100,000,000 (U) Western Psychiatric Hospital and Clinic (WPIC) parking garage - Oakland Campus, Allegheny County.
Renovation, new construction, alterations, land development and site infrastructure improvement, including improvements to meet current building codes and ADA Project Allocation 100,000,000 (V) ACQUISITION, DEMOLITION, <-- CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE UNIVERSITY OF PITTSBURGH AT TITUSVILLE, INCLUDING RENOVATION AND REHABILITATION OF EXISTING FACILITIES AND CONSTRUCTION OF NEW FACILITIES IN THE CITY OF TITUSVILLE PROJECT ALLOCATION 10,000,000 (W) ACQUISITION, DEMOLITION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE UNIVERSITY OF PITTSBURGH AT 20250HB1331PN1945 - 26 - BRADFORD, INCLUDING RENOVATION AND REHABILITATION OF EXISTING FACILITIES AND CONSTRUCTION OF NEW FACILITIES PROJECT ALLOCATION 10,000,000 (iii) The Pennsylvania State University (A) Smith Building - Altoona Campus, Blair County.
In order to increase both the recruitment and retention of students, the proposed renovations will provide one-stop shopping for student support as well as provide a more-accessible and 20250HB1331PN1629 - 25 - visible space for the Robert L.
The construction will both 20250HB1331PN1945 - 27 - meet all current building code requirements and provide for barrier- free access as required by the Americans with Disabilities Act and related codes.
This project involves the installation of a new steam line that traverses Atherton Street and will connect West Campus 20250HB1331PN1629 - 26 - with the central steam system.
The construction will both meet all current building code 20250HB1331PN1945 - 28 - requirements and provide for barrier- free access as required by the Americans with Disabilities Act and related codes.
Funding will be used for both design and construction costs, as well as 20250HB1331PN1629 - 27 - necessary utility upgrades and extensions, site improvements and code-related upgrades.
The construction will both meet all current building code requirements and provide for barrier- free access as required by the Americans with Disabilities Act and 20250HB1331PN1945 - 29 - related codes.
All costs for both occupant and program relocation 20250HB1331PN1629 - 28 - or interim facilities will be included.
20250HB1331PN1945 - 30 - Design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for electrical interconnection work at Penn State University Park.
All costs for both occupant and program relocation or interim 20250HB1331PN1629 - 29 - facilities will be included.
Design, construction (new space or 20250HB1331PN1945 - 31 - addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Former Palmer Museum of Art at Penn State University Park.
All costs for both occupant and program relocation 20250HB1331PN1629 - 30 - or interim facilities will be included.
20250HB1331PN1945 - 32 - Design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the renovation of a general academic building at Penn State University Park.
All costs for both occupant and program relocation 20250HB1331PN1629 - 31 - or interim facilities will be included.
20250HB1331PN1945 - 33 - Design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the renovation of a general research building at Penn State University Park.
All costs for both occupant 20250HB1331PN1629 - 32 - and program relocation or interim facilities will be included.
Project Allocation 70,000,000 (I) Greenhouses and headhouse complexes relocation (PlantWorks) - University 20250HB1331PN1945 - 34 - Park, Centre County.
Show all 284 changed lines (244 more)
All costs for 20250HB1331PN1629 - 33 - both occupant and program relocation or interim facilities will be included.
Project Allocation 200,000,000 (J) Hot water distribution system - 20250HB1331PN1945 - 35 - University Park, Centre County.
All costs for both occupant and program relocation or interim facilities will be 20250HB1331PN1629 - 34 - included.
Design, construction (new space or 20250HB1331PN1945 - 36 - addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Millennium Science Complex II at Penn State University Park.
All costs for both occupant and program relocation or interim facilities will be 20250HB1331PN1629 - 35 - included.
Design, construction (new space or 20250HB1331PN1945 - 37 - addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Pasquerilla Spiritual Center at Penn State University Park.
The construction will both meet all current building code 20250HB1331PN1629 - 36 - requirements and provide for barrier- free access as required by the Americans with Disabilities Act and related codes Project Allocation 25,000,000 (M) Reclaimed water system - University Park, Centre County.
Design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of 20250HB1331PN1945 - 38 - hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a reclaimed water system at Penn State University Park.
The construction will both meet all current building code requirements and provide for barrier- free access as required by the Americans with Disabilities Act and 20250HB1331PN1629 - 37 - related codes Project Allocation 10,500,000 (N) Sackett Building Renovation - University Park, Centre County.
Additional funding for the design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other 20250HB1331PN1945 - 39 - infrastructure needs) and other related costs for the Sackett Building at Penn State University Park.
The construction will both meet all current building code requirements and provide for barrier- free access as required by the Americans with Disabilities Act and related codes Project Allocation 20,000,000 20250HB1331PN1629 - 38 - (O) South chiller plant - heat recovery chillers - University Park, Centre County.
Design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for heat recovery chillers at the South 20250HB1331PN1945 - 40 - chiller plant at Penn State University Park.
The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes Project Allocation 25,000,000 (P) Systems Renewal Program - University 20250HB1331PN1629 - 39 - Park, Centre County.
This project will allow the university 20250HB1331PN1945 - 41 - to replace, install or upgrade as appropriate systems in major academic, research and administrative buildings across Penn State University Park.
20250HB1331PN1629 - 40 - Design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a thermal energy storage tank at Penn State University Park.
A thermal energy storage tank will provide much- 20250HB1331PN1945 - 42 - needed flexibility and improved infrastructure to the central chilled water system, all while saving energy and reducing the university's overall carbon footprint.
20250HB1331PN1629 - 41 - Design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the XLP Cable Replacement Program at Penn State University Park.
Replacement of the faulty, 1980s-era XLP cable is a 20250HB1331PN1945 - 43 - significant safety initiative of the university.
Additional funding for the design, construction (new space or addition to and/or renovation of existing space, 20250HB1331PN1629 - 42 - including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a classroom/class lab building at Penn State University Park.
This project will include new classrooms, science teaching laboratories, computer labs, seminar rooms, classroom support space and 20250HB1331PN1945 - 44 - teaching auditoria.
This 20250HB1331PN1629 - 43 - project is part of a continuing effort to make significant, comprehensive upgrades to infrastructure in the College of Medicine facilities at the Milton S.
All costs for 20250HB1331PN1945 - 45 - both occupant and program relocation or interim facilities will be included.
A water re-use 20250HB1331PN1629 - 44 - system would treat on-site generated wastewater in order to re-use the treated water.
The 20250HB1331PN1945 - 46 - construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes Project Allocation 10,000,000 (V) Stone Valley Forestry Building - University Park, Huntingdon County.
This opportunity to erect a new, modern and efficient Stone Valley Forestry Building will certainly enhance the 20250HB1331PN1629 - 45 - Forestland Management Office's ability to meet its mission, vision and strategic objectives.
The 20250HB1331PN1945 - 47 - construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes Project Allocation 10,000,000 (W) Systems Renewal Program - Statewide Campuses.
This project will allow the University to replace, install or upgrade as appropriate systems in major academic, research and administrative buildings across 20250HB1331PN1629 - 46 - the Commonwealth Campuses.
The construction will both meet all current building code 20250HB1331PN1945 - 48 - requirements and provide for barrier- free access as required by the Americans with Disabilities Act and related codes Project Allocation 60,000,000 (iv) Temple University (A) Alternative energy infrastructure - Main Campus, Philadelphia County.
Design, infrastructure, abatement of hazardous materials and construction or renovation of a microgrid facility, 20250HB1331PN1629 - 47 - including utility upgrades and extensions, site improvements, code- related upgrades and ADA compliance- related upgrades Project Allocation 125,000,000 (C) Science, Technology, Engineering and Mathematics (STEM) Academic Building - Main Campus, Philadelphia County.
Design, infrastructure, abatement of hazardous materials and construction 20250HB1331PN1945 - 49 - or renovation of an energy services facility, including utility upgrades and extensions, and site improvements Project Allocation 300,000,000 (D) Facilities and infrastructure renewal - various campuses, Philadelphia County.
Design, infrastructure, abatement of hazardous materials and 20250HB1331PN1629 - 48 - construction or renovation of a research building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance- related upgrades Project Allocation 250,000,000 (F) Klein Hall - Main Campus, Philadelphia County.
Design, infrastructure, abatement of hazardous 20250HB1331PN1945 - 50 - materials and construction of an academic/administrative building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades Project Allocation 185,000,000 (G) Microgrid facility - Main Campus, Philadelphia County.
Design, infrastructure, abatement of hazardous materials, renovations and addition to existing historical building for an 20250HB1331PN1629 - 49 - adaptive reuse as a multiuse facility, including utility upgrades and extensions, site improvements, code- related upgrades and ADA compliance- related upgrades.
Design, infrastructure, abatement of hazardous 20250HB1331PN1945 - 51 - materials and construction or renovation of a multiuse facility, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance related upgrades Project Allocation 100,000,000 (J) Storm water management systems - Main Campus, Philadelphia County.
Acquisition, design, infrastructure improvements, 20250HB1331PN1629 - 50 - abatement of hazardous materials, demolition, renovations and additions to multiple facilities, including utility upgrades and extensions, site improvements, code-related upgrades and ADA compliance-related upgrades Project Allocation 300,000,000 (v) Lincoln University (A) 3020 Market Street, University City District, Philadelphia County.
20250HB1331PN1945 - 52 - Renovation and alterations to third and fourth floor, addition of exterior signage and alterations, including land development and site infrastructure improvements Project Allocation 2,000,000 (B) Campuswide fire alarm panel upgrades, Chester County.
Active shooter 20250HB1331PN1629 - 51 - hardware upgrades for building doors throughout campus Project Allocation 750,000 (E) Campuswide HVAC Improvements, Chester County.
Renovation, new construction 20250HB1331PN1945 - 53 - and alterations, including land development and site infrastructure improvements Project Allocation 25,000,000 (G) Faculty and staff housing upgrades, Chester County.
Renovation, new construction and alterations, including land development and site infrastructure improvements 20250HB1331PN1629 - 52 - Project Allocation 12,500,000 (J) Houston Hall, Chester County.
Renovation, new construction and alterations, including land 20250HB1331PN1945 - 54 - development and site infrastructure improvements Project Allocation 30,000,000 (L) Lucy Laney, Library and Amos House, Chester County.
Renovation, new construction and alterations, including land development and site infrastructure improvements 20250HB1331PN1629 - 53 - Project Allocation 31,250,000 (O) McRary Hall, Chester County.
Renovation, new construction and alterations, including land 20250HB1331PN1945 - 55 - development and site infrastructure improvements Project Allocation 25,000,000 (Q) Perimeter road, Chester County.
Renovation, new construction and alterations, including land development and site infrastructure improvements Project Allocation 62,500,000 (T) Thurgood Marshall Living Learning 20250HB1331PN1629 - 54 - Center, Chester County.
Renovation, new construction and alterations, including land development and site infrastructure improvements Project Allocation 31,250,000 20250HB1331PN1945 - 56 - (V) Ware Center for the Performing Arts, Chester County.
Renovations, repairs, alterations, additions, infrastructure upgrades, HVAC improvements and associated design and construction 20250HB1331PN1629 - 55 - Project Allocation 14,400,000 (C) Hartzell Building, Lancaster County.
Renovation, replacement and upgrade of all systems, roof, HVAC, infrastructure and interiors to standards and code, including alterations, new construction, infrastructure upgrades and associated design and construction Project Allocation 17,250,000 20250HB1331PN1945 - 57 - (D) Historic Almshouse Building, Lancaster County.
20250HB1331PN1629 - 56 - Replacement and upgrade of campus athletic center roof Project Allocation 6,000,000 (H) Schwalm Building Student Center, Lancaster County.
Renovate existing facility to provide expanded and improved student center adjacent to planned new dormitory and dining facility Project Allocation 15,350,000 20250HB1331PN1945 - 58 - (I) Snyder Building, Lancaster County.
Improvements to meet current and future demands, including land 20250HB1331PN1629 - 57 - acquisition, site and building infrastructure improvements, new construction, renovations, additions and building system upgrades and improvements, including associated design and construction Project Allocation 34,000,000 (M) Safety and security upgrades, campuswide, Lancaster County.
Renovations, alterations, 20250HB1331PN1945 - 59 - infrastructure upgrades and associated design and construction to update and provide for missing and outdated safety and security equipment, including replacement and upgrade of door entrances, swipe card systems and camera monitoring systems Project Allocation 12,000,000 (N) Safety and security upgrades, campuswide, Lancaster County.
Sidewalk and road repairs20250HB1331PN1629 Project Allocation 6,000,000 (VII) BEAVER COUNTY COMMUNITY COLLEGE SCHOOL <-- OF AVIATION (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR HANGARS AND FACILITIES, CLASSROOMS AND A CONTROL TOWER AT THE BEAVER COUNTY COMMUNITY COLLEGE SCHOOL OF AVIATION IN CHIPPEWA 20250HB1331PN1945 - 6058 - TOWNSHIPrepairs PROJECTProject ALLOCATIONAllocation 3,750,0006,000,000 (5) Pennsylvania Emergency Management Agency (i) Headquarters building, Dauphin County (A) Infrastructure improvements, including replacement of electrical switch gear Project Allocation 6,000,000 (B) Renovations, alterations and new construction, including site improvements Project Allocation 5,000,000 (II) WESTERN AREA OFFICE, INDIANA COUNTY <-- (A) CONSTRUCTION OF A STATE-OF-THE-ART EMERGENCY OPERATIONS AND COORDINATION CENTER IN THE WESTERN AREA OF THIS COMMONWEALTH, INCLUDING LAND ACQUISITION, SITE DEVELOPMENT AND INFRASTRUCTURE IMPROVEMENTS PROJECT ALLOCATION 6,000,000 (III) STATE FIRE ACADEMY, MIFFLIN COUNTY (A) CONSTRUCTION OF A STATE-OF-THE-ART TRAINING FACILITY, INCLUDING LAND ACQUISITION, SITE DEVELOPMENT AND INFRASTRUCTURE IMPROVEMENTS PROJECT ALLOCATION 10,000,000 (ii) (IV) Special Operations Center <-- (A) Construction of a state-of-the-art training facility, including land acquisition, site development and 20250HB1331PN1945 - 61 - infrastructure improvements Project Allocation 95,000,000 (6) Department of Environmental Protection (i) Pitcairn Borough Flood Control Project, Allegheny County (A) New flood protection project along Dirty Camp Run Project Allocation 4,000,000 (ii) Streets Run Flood Control Project, Allegheny County (A) New flood protection project along Streets Run Project Allocation 20,000,000 (iii) New Kernsville, Berks County 20250HB1331PN1629 - 59 - (A) Demolition of warehouse structure and scrap removal Project Allocation 700,000 (iv) Northern Cambria Borough flood control, Cambria County (A) Rehabilitation project Project Allocation 2,400,000 (v) Wilmore Borough Flood Protection Project, Cambria County (A) New levee project along Little Conemaugh River and North Branch of Little Conemaugh River Project Allocation 3,000,000 (vi) Solomon Run Flood Protection Project, Cambria County (A) Rehabilitation project 20250HB1331PN1945 - 62 - Project Allocation 10,000,000 (vii) Saint Clair Run Flood Protection Project, Cambria County (A) Rehabilitation project Project Allocation 2,000,000 (viii) Sam's Run Flood Protection Project, Cambria County (A) Rehabilitation project Project Allocation 7,000,000 (ix) Pine Glen/Avery Cola Company, Centre County (A) Upgrade and rebuild aging lime plant used to treat acid mine drainage Project Allocation 3,700,000 20250HB1331PN1629 - 60 - (x) Alder Run/Thompson Brother Coal Company, Centre County (A) Upgrade and rebuild aging lime plant used to treat acid mine drainage Project Allocation 2,700,000 (xi) Fye/Larry D.
Keck/Keck 1, Clarion County (A) Reclamation of dangerous highwalls and revegetation of the site Project Allocation 1,100,000 (xiii) Buck Run/Al Hamilton Treatment Trust, Clearfield County 20250HB1331PN1945 - 63 - (A) Upgrade and rehabilitate failing passive treatment system Project Allocation 600,000 (xiv) Reed/Sky Haven Treatment Trust, Clearfield County (A) Upgrade and rehabilitate failing passive treatment system Project Allocation 425,000 (xv) Manor Mine/Al Hamilton Treatment Trust, Clearfield County (A) Upgrade and rebuild aging lime plant used to treat acid mine drainage Project Allocation 5,175,000 (xvi) Stinky Run Flood Control Project, 20250HB1331PN1629 - 61 - Clearfield County (A) Culvert project Project Allocation 6,000,000 (xvii) Big Run/Avery Coal, Clinton County (A) Rehabilitate failing passive treatment system Project Allocation 2,000,000 (XVII.1) RACHEL CARSON STATE OFFICE BUILDING, <-- DAUPHIN COUNTY (A) STATEWIDE PROJECTS FOR SPACE CONSOLIDATION EFFORTS PROJECT ALLOCATION 11,000,000 (xviii) Isabella Mine Site, Fayette County (A) Comprehensive reclamation project to address land reclamation, primary discharge structure and conveyance 20250HB1331PN1945 - 64 - channel for freshwater impoundment and AMD discharge collection and treatment system Project Allocation 25,000,000 (xix) Brockway Clay Company, Jefferson County (A) Reclamation of two abandoned noncoal mining permits Project Allocation 1,480,000 (xx) Weisner Hollow Slurry Dam Reclamation, Jefferson County (A) Regrade a stream channel and close off a coal refuse channel, including the overflow channels Project Allocation 27,200,000 (xxi) Hull Creek, Lackawanna County (A) Rehabilitation project Project Allocation 1,000,000 (xxii) Roaring Brook Flood Protection Project, Lackawanna County 20250HB1331PN1629 - 62 - (A) Rehabilitation project Project Allocation 11,000,000 (xxiii) Ashley - Sulfur Run, Luzerne County (A) Flood protection project Project Allocation 6,000,000 (xxiv) Brown Creek Flood Protection Project, Luzerne County (A) Rehabilitation project Project Allocation 10,000,000 (xxv) 21st Centuramics, McKean County (A) Reclamation of dangerous highwalls 20250HB1331PN1945 - 65 - and revegetation of the site Project Allocation 2,860,000 (xxvi) Port Allegany Borough Flood Control, McKean County (A) Levee project Project Allocation 25,000,000 (xxvii) Glenside Area Flood Protection Project, Montgomery County (A) Flood protection project Project Allocation 5,000,000 (xxviii) Flat Rock Dam facilities, Philadelphia County (A) Rehabilitation of canal wall and erosion protection Project Allocation 19,600,000 (xxix) Auburn Dam, Schuylkill County (A) Dewatering outfall structure for the dam and dredging/desilting of the reservoir 20250HB1331PN1629 - 63 - Project Allocation 63,600,000 (xxx) Auburn Dam, Schuylkill County (A) Rehabilitation of warehouse and scrap removal Project Allocation 700,000 (xxxi) Tamaqua Dam facilities, Schuylkill County (A) Demolition of warehouse and scrap removal Project Allocation 700,000 (XXXI.1) ELKLAND BOROUGH FLOOD PROTECTION <-- 20250HB1331PN1945 - 66 - PROJECT, TIOGA COUNTY (A) FLOOD PROTECTION PROJECT PROJECT ALLOCATION 17,000,000 (XXXI.2) HARVEY'S LAKE - WORDON PLACE FLOOD PROTECTION PROJECT, TIOGA COUNTY (A) REHABILITATION OF FLOOD PROTECTION PROJECT PROJECT ALLOCATION 2,000,000 (xxxii) S&K Energy, Inc., Lounder Mine, Washington County (A) Reclamation of highwalls and revegetate the site Project Allocation 3,220,000 (xxxiii) Banning #4 and Euclid Combination Treatment Facility, Westmoreland County (A) Combination treatment facility will be constructed to eliminate the two independent facilities that maintain the underground mine pool Project Allocation 22,000,000 (xxxiv) Northmont Area-Greensburg City Flood Control, Westmoreland County (A) Culvert channel and culvert improvement Project Allocation 5,000,000 (xxxv) Jeannette - Brush Creek, Westmoreland County (A) Rehabilitation and extension of levee 20250HB1331PN1629 - 64 - and floodwall flood protection system Project Allocation 5,000,000 20250HB1331PN1945 - 67 - (xxxvi) Flood Protection Reconstruction Project, Statewide (A) Reconstruction of multiple existing levee street and railroad closure projects Project Allocation 30,000,000 (xxxvii) New laboratory (A) Construction of new laboratory, including site and infrastructure improvements and land acquisition Project Allocation 45,500,000 (7) Department of General Services (i) Pedestrian bridges, Dauphin County (A) Construction of bridges across Forster Street and 7th Street, including site acquisition and land development, design and construction and utility work Project Allocation 45,000,000 (I.1) STATE STREET BRIDGE, DAUPHIN COUNTY <-- (A) RENOVATIONS AND IMPROVEMENT TO STATE STREET BRIDGE PROJECT ALLOCATION 50,000,000 (ii) Warehouse and fleet garage (A) Construction of warehouse and garage facilities, including auxiliary support buildings, site acquisition and land development, design and construction and utility work Project Allocation 200,000,000 20250HB1331PN1945 - 68 - (iii) Statewide (A) Renovations, alterations, 20250HB1331PN1629 - 65 - construction, site improvements, infrastructure upgrades and land acquisition for Department of General Services-owned buildings and structures Project Allocation 200,000,000 (B) Design and construct solar panel and electric vehicle charging stations at Commonwealth facilities, including land acquisition and site and utility work Project Allocation 10,000,000 (C) Professional services for the development of agency facility strategic master plans and capital planning Project Allocation 40,000,000 (8) DEPARTMENT OF HEALTH <-- (I) BUREAU OF LABORATORIES (A) CONSTRUCT NEW LABORATORY, INCLUDING SITE AND INFRASTRUCTURE IMPROVEMENTS AND LAND ACQUISITION PROJECT ALLOCATION 30,500,000 (8) (9) Pennsylvania Historical and Museum <-- Commission (i) Fort Pitt, Allegheny County (A) Building, site and infrastructure improvements 20250HB1331PN1945 - 69 - Project Allocation 1,000,000 (ii) Old Economy Village, Beaver County (A) Exhibit upgrades Project Allocation 2,000,000 (iii) Conrad Weiser Homestead, Berks County (A) Building, site and infrastructure improvements Project Allocation 5,000,000 20250HB1331PN1629 - 66 - (B) Exhibit improvements Project Allocation 1,500,000 (iv) Daniel Boone Homestead, Berks County (A) Building, site and infrastructure improvements Project Allocation 10,000,000 (v) Pennsbury Manor, Bucks County (A) Building, infrastructure and site improvements Project Allocation 10,000,000 (vi) Eckley Miners Village, Carbon County (A) Building, site and infrastructure improvements Project Allocation 10,000,000 (vii) Pennsylvania Military Museum, Centre County (A) Building, site and infrastructure improvements Project Allocation 10,000,000 (viii) State Museum of Pennsylvania, Dauphin County (A) Building, site and infrastructure 20250HB1331PN1945 - 70 - improvements Project Allocation 20,000,000 (B) Exhibit improvements Project Allocation 30,000,000 (ix) State Archives, Dauphin County (A) Building, site and infrastructure improvements Project Allocation 4,000,000 20250HB1331PN1629 - 67 - (x) Anthracite Heritage Museum, Lackawanna County (A) Building, site and infrastructure improvements Project Allocation 10,000,000 (xi) Landis Valley Village and Farm Museum, Lancaster County (A) Building, site and infrastructure improvements Project Allocation 10,000,000 (xii) Railroad Museum of Pennsylvania, Lancaster County (A) Exhibit upgrades Project Allocation 2,000,000 (B) Building, site and infrastructure improvements Project Allocation 10,000,000 (xiii) Cornwall Iron Furnace, Lebanon County (A) Building, site and infrastructure improvements Project Allocation 5,000,000 (B) Exhibit improvements 20250HB1331PN1945 - 71 - Project Allocation 2,000,000 (xiv) Hope Lodge, Montgomery County (A) Building, site and infrastructure improvements Project Allocation 3,000,000 (xv) Joseph Priestley House, Northumberland County (A) Building, site and infrastructure 20250HB1331PN1629 - 68 - improvements Project Allocation 1,000,000 (xvi) Pennsylvania Lumber Museum, Potter County (A) Building, site and infrastructure improvements Project Allocation 5,000,000 (xvii) Somerset Historical Center, Somerset County (A) Building, site and infrastructure improvements Project Allocation 3,000,000 (B) Exhibit upgrades Project Allocation 1,000,000 (xviii) Drake Well Museum, Venango County (A) Building, site and infrastructure improvements Project Allocation 10,000,000 (xix) Bushy Run Battlefield, Westmoreland County (A) Building, site and infrastructure improvements 20250HB1331PN1945 - 72 - Project Allocation 7,000,000 (B) Exhibit improvements Project Allocation 2,000,000 (xx) Statewide historic sites (A) Renovations, alterations and site upgrades for long-term maintenance, ADA, code and energy improvements Project Allocation 15,000,000 (9)20250HB1331PN1629 (10)- 69 - (9) Department of Human Services <-- (i) Wernersville State Hospital, Berks County (A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades and land acquisition Project Allocation 50,000,000 (ii) Western Secure Treatment Unit, Butler County (A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades and land acquisition Project Allocation 50,000,000 (iii) Ebensburg Center, Cambria County (A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades and land acquisition 20250HB1331PN1945 - 73 - Project Allocation 50,000,000 (iv) South Mountain Restoration Center, Franklin County (A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades and land acquisition 20250HB1331PN1629 - 70 - Project Allocation 50,000,000 (v) South Mountain Secure Treatment Unit, Franklin County (A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades and land acquisition Project Allocation 50,000,000 (vi) Youth Forestry Camp No.
3, Huntingdon County (A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades and land acquisition Project Allocation 50,000,000 (vii) Clarks Summit State Hospital, Lackawanna County (A) Renovate the institution, including new construction, alterations, renovations, site improvements and 20250HB1331PN1945 - 74 - infrastructure upgrades and land acquisition Project Allocation 50,000,000 (viii) North East Secure Treatment Unit, Luzerne County (A) Renovate the institution, including new construction, alterations, renovations, site improvements and 20250HB1331PN1629 - 71 - infrastructure upgrades and land acquisition Project Allocation 50,000,000 (ix) Norristown State Hospital, Montgomery County (A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades and land acquisition Project Allocation 50,000,000 (B) Additional funds for the design and construction of a psychiatric forensic building on existing lands of the Commonwealth at Norristown State Hospital in West Norriton Township to be utilized for the care and treatment of clients admitted to the institution Project Allocation 250,000,000 (x) South East Youth Development Center, Montgomery County (A) Renovate the institution, including 20250HB1331PN1945 - 75 - new construction, alterations, renovations, site improvements and infrastructure upgrades and land acquisition Project Allocation 50,000,000 (xi) Danville State Hospital, Montour County (A) Renovate the institution, including new construction, alterations, 20250HB1331PN1629 - 72 - renovations, site improvements and infrastructure upgrades and land acquisition Project Allocation 50,000,000 (xii) North Central Secure Treatment Unit, Montour County (A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades and land acquisition Project Allocation 50,000,000 (xiii) Loysville Youth Development Center, Perry County (A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades and land acquisition Project Allocation 50,000,000 (xiv) Selinsgrove Center, Snyder County (A) Renovate the institution, including 20250HB1331PN1945 - 76 - new construction, alterations, renovations, site improvements and infrastructure upgrades and land acquisition Project Allocation 50,000,000 (xv) Warren State Hospital, Warren County (A) Renovate the institution, including new construction, alterations, 20250HB1331PN1629 - 73 - renovations, site improvements and infrastructure upgrades and land acquisition Project Allocation 50,000,000 (xvi) Torrance State Hospital, Westmoreland County (A) Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades and land acquisition Project Allocation 50,000,000 (10) (11) Department of Military and Veterans <-- Affairs (i) Gettysburg Readiness Center, Adams County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 20,000,000 (ii) Combined Support Maintenance Shop, West 20250HB1331PN1945 - 77 - Pittsburgh, Allegheny County (A) Renovate the facilities, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 25,000,000 (iii) Pittsburgh Crane Readiness Center, Allegheny County 20250HB1331PN1629 - 74 - (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 15,000,000 (iv) Ford City Readiness Center, Armstrong County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 15,000,000 (v) Beaver Falls Readiness Center, Beaver County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades 20250HB1331PN1945 - 78 - Project Allocation 10,000,000 (vi) Bedford Readiness Center land, Bedford County (A) Acquisition of land and/or facilities to build or renovate buildings for a new Readiness Center Project Allocation 5,000,000 (vii) Berks County Readiness Centers, Berks County 20250HB1331PN1629 - 75 - (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 10,000,000 (viii) Hollidaysburg Readiness Center, Blair County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 27,000,000 (ix) Bucks County Readiness Centers, Bucks County (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades 20250HB1331PN1945 - 79 - Project Allocation 62,000,000 (x) Bucks County Readiness Centers and maintenance facilities, Bucks County (A) Renovate the facilities, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 15,000,000 20250HB1331PN1629 - 76 - (xi) Butler Readiness Center, Butler County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 25,000,000 (xii) Cambria County Readiness Centers, Cambria County (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 35,000,000 (xiii) Cambria County Readiness Centers and maintenance facilities, Cambria County (A) Renovate the facilities, including demolition, new construction, correcting structure and infrastructure deficiencies and 20250HB1331PN1945 - 80 - security system upgrades Project Allocation 10,000,000 (xiv) New Cambria Readiness Center, Cambria County (A) Acquisition of land and/or facilities to build or renovate buildings for a new Readiness Center Project Allocation 5,000,000 (xv) Lehighton Readiness Center, Carbon 20250HB1331PN1629 - 77 - County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 20,000,000 (xvi) Centre County Readiness Centers, Centre County (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 12,000,000 (xvii) Centre County Readiness Centers and maintenance facilities, Centre County (A) Renovate the facilities, including demolition, new construction, correcting structure and infrastructure deficiencies and 20250HB1331PN1945 - 81 - security system upgrades Project Allocation 20,000,000 (xviii) State College Army and Air Readiness Center, Centre County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades 20250HB1331PN1629 - 78 - Project Allocation 10,000,000 (xix) Chester County Readiness Centers, Chester County (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 25,000,000 (xx) Chester County Readiness Centers and maintenance facilities, Chester County (A) Renovate the facilities, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 15,000,000 (xxi) Southeastern Veterans Center, Spring City, Chester County (A) Construction of new replacement Community Living Center 20250HB1331PN1945 - 82 - Project Allocation 14,400,000 (xxii) Clearfield Readiness Center, Clearfield County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 15,000,000 20250HB1331PN1629 - 79 - (xxiii) Lock Haven Readiness Center, Clinton County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 19,000,000 (xxiv) Crawford County Readiness Centers and maintenance facilities, Crawford County (A) Renovate the facilities, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 15,000,000 (xxv) Carlisle Readiness Center, Cumberland County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and 20250HB1331PN1945 - 83 - infrastructure deficiencies and security system upgrades Project Allocation 15,000,000 (xxvi) Cumberland Readiness Centers and maintenance facilities, Cumberland County (A) Renovate the facilities, including demolition, new construction, correcting structure and infrastructure deficiencies and 20250HB1331PN1629 - 80 - security system upgrades Project Allocation 15,000,000 (xxvii) Dauphin County Readiness Centers, Dauphin County (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 60,000,000 (xxviii) Erie Readiness Center, Erie County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 70,000,000 (xxix) Fayette County Readiness Centers, Fayette County (A) Renovate the Readiness Center, including demolition, new 20250HB1331PN1945 - 84 - construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 20,000,000 (xxx) Chambersburg Readiness Center, Franklin County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and 20250HB1331PN1629 - 81 - infrastructure deficiencies and security system upgrades Project Allocation 5,000,000 (xxxi) Indiana Readiness Center, Indiana County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 12,000,000 (xxxii) Carbondale Readiness Center, Lackawanna County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 15,000,000 (xxxiii) Lackawanna County Readiness Center/Field Maintenance Shop, Lackawanna 20250HB1331PN1945 - 85 - County (A) Renovate facilities, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 15,000,000 (xxxiv) Scranton Maintenance Shop, Lackawanna County 20250HB1331PN1629 - 82 - (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 10,000,000 (xxxv) Elizabethtown Readiness Center, Lancaster County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 22,000,000 (xxxvi) New Castle Readiness Center, Lawrence County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 65,000,000 20250HB1331PN1945 - 86 - (xxxvii) Fort Indiantown Gap, Lebanon County (A) Renovate facilities, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 140,000,000 (B) Acquisition of privately owned properties within boundaries of Fort 20250HB1331PN1629 - 83 - Indiantown Gap for training and activities of the installation Project Allocation 8,000,000 (C) Purchase in-holdings on Fort Indiantown Gap property and/or surrounding property for Joint Land Use agreements/Army Compatible Use Buffers, including acquisition of land Project Allocation 8,000,000 (xxxviii) New Lehigh County Readiness Center, Lehigh County (A) Acquisition of land and/or facilities to build or renovate buildings for a new readiness center Project Allocation 10,000,000 (xxxix) New Lehigh County Readiness Center, Lehigh County (A) Acquisition of land and/or facilities to build or renovate buildings for a new readiness center Project Allocation 10,000,000 20250HB1331PN1945 - 87 - (xl) Allentown Readiness Center, Lehigh County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 70,000,000 (xli) Luzerne County Readiness Centers, 20250HB1331PN1629 - 84 - Luzerne County (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 75,000,000 (xlii) New Luzerne County Readiness Center, Luzerne County (A) Acquisition of land and/or facilities to build or renovate buildings for a new readiness center Project Allocation 15,000,000 (xliii) Williamsport Readiness Center, Lycoming County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 15,000,000 20250HB1331PN1945 - 88 - (xliv) Mercer County Readiness Centers, Mercer County (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 30,000,000 (xlv) Mercer County Readiness Centers and 20250HB1331PN1629 - 85 - maintenance facilities, Mercer County (A) Renovate the facilities, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 15,000,000 (xlvi) Montgomery County Readiness Centers, Montgomery County (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 25,000,000 (xlvii) Montgomery Readiness Centers and maintenance facilities, Montgomery County (A) Renovate the facilities, including demolition, new construction, correcting structure and infrastructure deficiencies and 20250HB1331PN1945 - 89 - security system upgrades Project Allocation 50,000,000 (xlviii) Danville Field Maintenance Building, Montour County (A) Renovate facilities, including new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 5,000,000 20250HB1331PN1629 - 86 - (xlix) Montour County Readiness Centers and maintenance facilities, Montour County (A) Renovate the facilities, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 10,000,000 (l) Easton Readiness Center, Northampton County (A) Renovate facilities, including new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 20,000,000 (li) Philadelphia County Readiness Centers, Philadelphia County (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and 20250HB1331PN1945 - 90 - security system upgrades Project Allocation 30,000,000 (lii) Schuylkill Readiness Center, Schuylkill County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades 20250HB1331PN1629 - 87 - Project Allocation 20,000,000 (liii) Friedens Readiness Center, Somerset County (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 10,000,000 (liv) Washington County Readiness Centers, Washington County (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 17,000,000 (lv) Honesdale Readiness Center, Wayne County (A) Renovate the Readiness Center, including demolition, new construction, correcting structure and 20250HB1331PN1945 - 91 - infrastructure deficiencies and security system upgrades Project Allocation 5,000,000 (lvi) Westmoreland County Readiness Centers, Westmoreland County (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and 20250HB1331PN1629 - 88 - security system upgrades Project Allocation 55,000,000 (lvii) York County Readiness Centers, York County (A) Renovate the Readiness Centers, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades Project Allocation 10,000,000 (lviii) New Central Pennsylvania Readiness Center (A) Acquisition of land and/or facilities to build or renovate buildings for a new readiness center Project Allocation 10,000,000 (lix) New Northeastern Pennsylvania Readiness Center (A) Acquisition of land and/or facilities to build or renovate buildings for a new readiness center 20250HB1331PN1945 - 92 - Project Allocation 2,000,000 (lx) New Southeastern Pennsylvania Readiness Center (A) Acquisition of land and/or facilities to build or renovate buildings for a new readiness center Project Allocation 30,000,000 (lxi) Veterans Homes, Statewide (A) Feasibility study, design and 20250HB1331PN1629 - 89 - construction of building upgrades.
Demolition, renovation, general repairs and expansion, including land development and site infrastructure improvements of the six Veterans Homes Project Allocation 126,000,000 (lxii) Military and Veterans Affairs buildings, Statewide (A) Improvements, including the addition of veterans outreach centers, to provide services in areas that have demonstrated the greatest need Project Allocation 21,000,000 (11) (12) Office of Administration <-- (i) Commonwealth Technology Center, Dauphin County (A) Miscellaneous replacement of building systems equipment, including mechanical, electrical and plumbing equipment Project Allocation 11,500,000 20250HB1331PN1945 - 93 - (B) UPS system replacement.
Miscellaneous replacement of building systems equipment, including mechanical, electrical and plumbing equipment Project Allocation 2,500,000 (12) (13) Pennsylvania State Police <-- (i) Pennsylvania State Police Academy, Dauphin County (A) Rehabilitate the Academy complex, 20250HB1331PN1629 - 90 - including site acquisition and development Project Allocation 163,000,000 (ii) Regional forensic laboratory (A) Renovate and/or construct new laboratory in Central Pennsylvania, including site and infrastructure improvements and land acquisition Project Allocation 90,500,000 (iii) Statewide (A) Capital renewal of facilities and new construction, including site and building improvements, interior renovations, building system upgrades, code-required improvements, security enhancements such as perimeter fencing and upgrade or replacement of fueling stations, including, if applicable, establishment of electric vehicle charging stations Project Allocation 200,000,000 20250HB1331PN1945 - 94 - (B) Land acquisition or purchase of facility to replace buildings or provide new facilities to further the mission of the State Police, to include exercising an option to purchase real property contained in a lease that was fully executed before the effective date of this statute, and deemed in the best interest of the 20250HB1331PN1629 - 91 - Commonwealth and State Police Project Allocation 250,000,000 (13) (14) State System of Higher Education <-- (i) Commonwealth University (A) Lock Haven University, Clinton County.
Provide for deferred maintenance needs and capital renewal repairs Project Allocation 20,000,000 20250HB1331PN1945 - 95 - (ii) PennWest University (A) Clarion, Clarion County.
Construction, renovation and acquisition of student housing facilities 20250HB1331PN1629 - 92 - Project Allocation 29,000,000 (C) Edinboro, Erie County.
Construction, renovation and acquisition of student housing facilities Project Allocation 30,000,000 (iii) Kutztown University, Berks County (A) Demolition of underutilized and obsolete buildings 20250HB1331PN1945 - 96 - Project Allocation 30,000,000 (B) Renovations, new construction, alterations and infrastructure upgrades to Old Main Project Allocation 15,000,000 (C) Renovations, new construction, alterations and infrastructure upgrades Project Allocation 15,000,000 20250HB1331PN1629 - 93 - (iv) Slippery Rock University, Butler County (A) Renovations, new construction, alterations and infrastructure upgrades to Eisenberg classroom building Project Allocation 40,000,000 (B) Renovation, replacement or upgrade of campus infrastructure Project Allocation 40,000,000 (v) West Chester University, Chester County (A) Renovation, replacement or upgrade of campus infrastructure Project Allocation 40,000,000 (vi) Cheyney University, Chester and Delaware Counties (A) Renovation, replacement or upgrades to campus infrastructure Project Allocation 25,000,000 (B) Renovations, new construction, alterations and infrastructure upgrades to Dudley Center for the Arts 20250HB1331PN1945 - 97 - Project Allocation 8,000,000 (vii) Shippensburg University, Cumberland County (A) Heiges Field House renovation and addition Project Allocation 20,000,000 (B) Renovation, replacement or upgrade of campus infrastructure Project Allocation 25,000,000 20250HB1331PN1629 - 94 - (viii) Indiana University, Indiana County (A) Renovation, replacement or upgrade of campus infrastructure Project Allocation 15,000,000 (B) New construction, alterations, and infrastructure upgrades for a new academic commons replacement Project Allocation 45,000,000 (ix) Millersville University, Lancaster County (A) Renovations, new construction, alterations and infrastructure upgrades to Pucillo Hall Project Allocation 15,000,000 (B) Renovations, new construction, alterations, and infrastructure upgrade Project Allocation 15,000,000 (C) Renovation, replacement or upgrade of campus ADA infrastructure Project Allocation 15,000,000 20250HB1331PN1945 - 98 - (D) Renovations, new construction, alterations and infrastructure upgrades to Biemsderfer Stadium Project Allocation 8,000,000 (x) East Stroudsburg University, Monroe County (A) Renovations, new construction, alterations and infrastructure upgrades to Linden Hall 20250HB1331PN1629 - 95 - Project Allocation 50,000,000 (B) Renovations, new construction, alterations and infrastructure upgrades Project Allocation 15,000,000 (xi) State System of Higher Education, Systemwide (A) Renovations, replacement or upgrade of campus infrastructure Project Allocation 30,000,000 (B) Demolition of underutilized and obsolete buildings Project Allocation 20,000,000 (14) (15) Department of Transportation <-- (i) Adams County (A) General storage buildings.
20250HB1331PN1945 - 99 - Construct new, upgrade or replace to provide for the construction or renovation of facility.
Construct new, upgrade or replace to 20250HB1331PN1629 - 96 - provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 3,780,000 (D) Maintenance vehicle wash facility.
Renovate, construct new, and expand, including 20250HB1331PN1945 - 100 - roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 13,400,000 (C) Fleet Management (Western).
New construction, renovations, expansion and alterations to existing Western training facility, including site 20250HB1331PN1629 - 97 - acquisition and development, design, construction and utility work Project Allocation 10,000,000 (D) General storage buildings.
Construct new, upgrade or replace to provide for the construction or renovation of facility to combine the Allegheny, Beaver and 20250HB1331PN1945 - 101 - Fort Pitt Tunnel maintenance units into a combined garage and administration building, including auxiliary buildings.
20250HB1331PN1629 - 98 - Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 1,000,000 (H) Maintenance vehicle wash facility.
Construct new, upgrade or replace to provide for the construction or 20250HB1331PN1945 - 102 - renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 37,850,000 (C) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing 20250HB1331PN1629 - 99 - stockpile facility to meet code and program requirements Project Allocation 1,000,000 (D) Winter material storage building.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design 20250HB1331PN1945 - 103 - and construction of buildings and utility work Project Allocation 10,450,000 (C) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements 20250HB1331PN1629 - 100 - Project Allocation 4,000,000 (v) Bedford County (A) General storage buildings.
Replace salt storage building, including demolition of existing salt building and demolition and replacement of liquid de-icing containment structures 20250HB1331PN1945 - 104 - Project Allocation 8,300,000 (vi) Berks County (A) General storage buildings.
Construct new, upgrade or replace to 20250HB1331PN1629 - 101 - provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 17,775,000 (C) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction or renovation of a Transportation/State Police inspection facility, including site acquisition and development, design and construction of buildings and utility work 20250HB1331PN1945 - 105 - Project Allocation 60,000,000 (vii) Blair County (A) District office.
Provide for renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 9-0 Project Allocation 41,000,000 20250HB1331PN1629 - 102 - (B) General storage buildings.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 3,335,000 (viii) Bradford County 20250HB1331PN1945 - 106 - (A) General storage buildings.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site 20250HB1331PN1629 - 103 - acquisition and development, design and construction of buildings and utility work Project Allocation 43,425,000 (C) Maintenance facility-county office.
Construct 20250HB1331PN1945 - 107 - new, upgrade or replace to provide for the construction or renovation of four general storage buildings Project Allocation 5,000,000 (B) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design 20250HB1331PN1629 - 104 - and construction of buildings and utility work Project Allocation 39,000,000 (C) Maintenance facility-county office.
Renovate and expand Rest Site P, including roof replacement, building systems 20250HB1331PN1945 - 108 - upgrades, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 10,157,000 (F) Welcome Center.
Renovate and expand Welcome Center Site P, including roof replacement, building systems upgrades, sidewalks, curbing, step replacement, parking lot upgrades and 20250HB1331PN1629 - 105 - sewage plant upgrades Project Allocation 40,000,000 (x) Butler County (A) General storage buildings.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and 20250HB1331PN1945 - 109 - program requirements Project Allocation 5,000,000 (xi) Cambria County (A) Driver Licensing Center.
Renovate, construct new and expand, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades 20250HB1331PN1629 - 106 - Project Allocation 13,750,000 (B) General storage buildings.
20250HB1331PN1945 - 110 - Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 16,825,000 (C) Maintenance facility-stockpile.
Construct new, upgrade or replace to 20250HB1331PN1629 - 107 - provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 12,000,000 (xiii) Carbon County (A) General storage buildings.
Construct new, upgrade or replace to 20250HB1331PN1945 - 111 - provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 20,000,000 (D) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new 20250HB1331PN1629 - 108 - or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 12,000,000 (E) Paint truck storage building.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing 20250HB1331PN1945 - 112 - stockpile facility to meet code and program requirements Project Allocation 12,000,000 (C) Winter material storage building.
Replace salt storage building, including demolition of existing salt building and demolition and replacement of liquid de-icing containment structures 20250HB1331PN1629 - 109 - Project Allocation 1,800,000 (xv) Chester County (A) General storage buildings.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements 20250HB1331PN1945 - 113 - Project Allocation 12,000,000 (D) Winter material storage building.
Replace salt storage building, including demolition of existing salt building and demolition and replacement of liquid de-icing containment structures Project Allocation 5,500,000 (xvi) Clarion County 20250HB1331PN1629 - 110 - (A) General storage buildings.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 5,000,000 (xvii) Clearfield County 20250HB1331PN1945 - 114 - (A) District Office.
Construct new, upgrade or replace to provide for the construction or 20250HB1331PN1629 - 111 - renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 9,700,000 (C) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction or 20250HB1331PN1945 - 115 - renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 27,500,000 (C) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing 20250HB1331PN1629 - 112 - stockpile facility to meet code and program requirements Project Allocation 12,000,000 (xix) Columbia County (A) General storage buildings.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing 20250HB1331PN1945 - 116 - stockpile facility to meet code and program requirements Project Allocation 12,000,000 (xx) Crawford County (A) Driver Licensing Center.
Renovate, construct new and expand, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and 20250HB1331PN1629 - 113 - sewage plant upgrades Project Allocation 13,750,000 (B) General storage buildings.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements 20250HB1331PN1945 - 117 - Project Allocation 12,000,000 (E) Maintenance vehicle wash facility.
Construct 20250HB1331PN1629 - 114 - new, upgrade or replace to provide for the construction or renovation of four general storage buildings Project Allocation 3,500,000 (B) Maintenance facility-county office.
To provide for the 20250HB1331PN1945 - 118 - reorganization of Transportation Offices to meet changing program needs Project Allocation 3,000,000 (B) District Office.
New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work Project Allocation 39,000,000 20250HB1331PN1629 - 115 - (C) Fleet management facility.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 6,700,000 20250HB1331PN1945 - 119 - (F) Materials testing laboratory.
Renovate and 20250HB1331PN1629 - 116 - expand Rest Site 46, including roof replacement, building systems upgrades, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 10,000,000 (H) Roadside rest facility.
Construct new, 20250HB1331PN1945 - 120 - upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 20,000,000 (K) Winter material storage building.
Replace salt storage building, 20250HB1331PN1629 - 117 - including demolition of existing salt building and demolition and replacement of liquid de-icing containment structures Project Allocation 4,200,000 (xxiii) Delaware County (A) General storage buildings.
Construct new, upgrade or replace to 20250HB1331PN1945 - 121 - provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 6,000,000 (D) Maintenance vehicle wash facility.
Construct new or retrofit to provide for the new construction or retrofitting of facility, including 20250HB1331PN1629 - 118 - site work, utilities and equipment Project Allocation 1,000,000 (E) Welcome Center.
Construct new, upgrade or replace to provide for the construction of a new 20250HB1331PN1945 - 122 - or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 12,000,000 (xxv) Erie County (A) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site 20250HB1331PN1629 - 119 - acquisition and development, design and construction of buildings and utility work Project Allocation 18,638,000 (B) Maintenance facility-stockpile.
Renovate, expand or replace Welcome Center Site L, including roof replacement, building systems upgrades, sidewalks, curbing, 20250HB1331PN1945 - 123 - step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 34,000,000 (E) Welcome Center.
Renovate, expand or replace Welcome Center Site M, including roof replacement, building systems upgrades, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades 20250HB1331PN1629 - 120 - Project Allocation 20,000,000 (xxvi) Fayette County (A) District Office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and 20250HB1331PN1945 - 124 - utility work Project Allocation 29,000,000 (D) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 6,000,000 20250HB1331PN1629 - 121 - (xxvii) Forest County (A) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site 20250HB1331PN1945 - 125 - acquisition and development, design and construction of buildings and utility work Project Allocation 15,625,000 (B) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and 20250HB1331PN1629 - 122 - program requirements Project Allocation 7,560,000 (C) Welcome Center.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site 20250HB1331PN1945 - 126 - acquisition and development, design and construction of buildings and utility work Project Allocation 10,075,000 (B) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and 20250HB1331PN1629 - 123 - program requirements Project Allocation 12,000,000 (C) Maintenance vehicle wash facility.
Renovate, expand or replace Welcome Center Site B, including roof replacement, building systems upgrades, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades 20250HB1331PN1945 - 127 - Project Allocation 22,450,000 (xxx) Greene County (A) Driver Licensing Center.
Renovate, construct new and expand, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 13,750,000 20250HB1331PN1629 - 124 - (B) Maintenance facility-county office.
Renovate, expand or replace Welcome Center Site D, including roof replacement, building systems upgrades, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades 20250HB1331PN1945 - 128 - Project Allocation 32,200,000 (xxxi) Huntingdon County (A) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and utility work 20250HB1331PN1629 - 125 - Project Allocation 9,770,000 (B) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and 20250HB1331PN1945 - 129 - utility work Project Allocation 15,603,000 (C) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 8,950,000 20250HB1331PN1629 - 126 - (D) Maintenance vehicle wash facility.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and utility work 20250HB1331PN1945 - 130 - Project Allocation 25,350,000 (B) Maintenance facility-stockpile.
20250HB1331PN1629 - 127 - Construct new or retrofit to provide for the new construction or retrofitting of facility, including site work, utilities and equipment Project Allocation 1,500,000 (D) Roadside rest facility.
20250HB1331PN1945 - 131 - Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 24,750,000 (B) Maintenance facility-stockpile.
Construct new, upgrade or replace to 20250HB1331PN1629 - 128 - provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 12,000,000 (C) Maintenance vehicle wash facility.
Construct new, upgrade or replace to provide for the construction or 20250HB1331PN1945 - 132 - renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 10,285,000 (C) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing 20250HB1331PN1629 - 129 - stockpile facility to meet code and program requirements Project Allocation 4,000,000 (D) Maintenance vehicle wash facility.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site 20250HB1331PN1945 - 133 - acquisition and development, design and construction of buildings and utility work Project Allocation 36,400,000 (B) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and 20250HB1331PN1629 - 130 - program requirements Project Allocation 3,780,000 (C) Maintenance vehicle wash facility.
Renovate, construct new and expand, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and 20250HB1331PN1945 - 134 - sewage plant upgrades Project Allocation 13,750,000 (B) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and utility work 20250HB1331PN1629 - 131 - Project Allocation 22,275,000 (C) Maintenance facility-stockpile.
Replace salt storage building, including demolition of existing salt building and demolition and replacement of liquid de-icing containment structures Project Allocation 5,500,000 20250HB1331PN1945 - 135 - (xxxviii) Lebanon County (A) Driver licensing center.
New 20250HB1331PN1629 - 132 - construction, renovations, expansion and alterations to existing Eastern training facility, including site acquisition and development, design, construction and utility work Project Allocation 10,000,000 (C) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 12,000,000 20250HB1331PN1945 - 136 - (E) Maintenance vehicle wash facility.
New construction, renovations, expansion and alterations 20250HB1331PN1629 - 133 - to existing district office, including site acquisition and development, design, construction and utility work Project Allocation 40,425,000 (B) Maintenance facility-county office.
Construct new or retrofit to provide 20250HB1331PN1945 - 137 - for the new construction or retrofitting of facility, including site work, utilities and equipment Project Allocation 1,500,000 (E) Winter material storage building.
Replace salt storage building, including demolition of existing salt building and demolition and replacement of liquid de-icing 20250HB1331PN1629 - 134 - containment structures Project Allocation 5,000,000 (xl) Luzerne County (A) Maintenance facility-county office.
Replace salt storage building, including demolition of existing salt 20250HB1331PN1945 - 138 - building and demolition and replacement of liquid de-icing containment structures Project Allocation 3,000,000 (xli) Lycoming County (A) District office.
New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, 20250HB1331PN1629 - 135 - design, construction and utility work Project Allocation 38,500,000 (B) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or 20250HB1331PN1945 - 139 - renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 18,125,000 (B) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing 20250HB1331PN1629 - 136 - stockpile facility to meet code and program requirements Project Allocation 12,000,000 (C) Winter material storage building.
Construct new, upgrade or replace to provide for the construction or 20250HB1331PN1945 - 140 - renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 17,000,000 (C) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing 20250HB1331PN1629 - 137 - stockpile facility to meet code and program requirements Project Allocation 12,000,000 (D) Roadside rest facility.
Renovate, expand or replace Welcome Center Site E, including roof replacement, building systems upgrades, sidewalks, curbing, 20250HB1331PN1945 - 141 - step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 14,225,000 (xliv) Mifflin County (A) Driver licensing center.
Renovate, construct new and expand, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and 20250HB1331PN1629 - 138 - sewage plant upgrades Project Allocation 13,750,000 (B) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or 20250HB1331PN1945 - 142 - renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 29,050,000 (B) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing 20250HB1331PN1629 - 139 - stockpile facility to meet code and program requirements Project Allocation 12,000,000 (C) Maintenance vehicle wash facility.
New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, 20250HB1331PN1945 - 143 - design, construction and utility work Project Allocation 41,260,000 (B) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and utility work 20250HB1331PN1629 - 140 - Project Allocation 29,100,000 (C) Maintenance facility-stockpile.
New construction, renovations, expansion and alterations to existing parking garage at the District 6 Engineering Office, including site acquisition and development, design, construction and utility work 20250HB1331PN1945 - 144 - Project Allocation 14,000,000 (F) Regional traffic management center.
New construction, renovations, expansion and alterations to existing regional traffic management center at the District 6 Engineering Office, including site acquisition and development, design, construction and utility work 20250HB1331PN1629 - 141 - Project Allocation 70,000,000 (G) Winter material storage building.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing 20250HB1331PN1945 - 145 - stockpile facility to meet code and program requirements Project Allocation 4,000,000 (xlviii) Northampton County (A) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design 20250HB1331PN1629 - 142 - and construction of buildings and utility work Project Allocation 36,425,000 (B) Maintenance facility-stockpile.
Construct new, upgrade or replace to 20250HB1331PN1945 - 146 - provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 12,000,000 (l) Perry County (A) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or 20250HB1331PN1629 - 143 - renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 37,000,000 (B) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and utility work 20250HB1331PN1945 - 147 - Project Allocation 25,000,000 (B) Maintenance facility-stockpile.
20250HB1331PN1629 - 144 - Design, construction and general improvements to all Philadelphia Regional Port Authority PROPERTIES, <-- INCLUDING NEW LAND ACQUISITION Project Allocation 150,000,000 (D) Philadelphia Regional Port Authority.
General improvements to include acquisition and development of infrastructure to support the handling of both general and passenger cargo at 20250HB1331PN1945 - 148 - Philadelphia Regional Port Authority facilities Project Allocation 160,600,000 (G) Philadelphia Regional Port Authority.
Acquisition of Ship to Store Cranes 20250HB1331PN1629 - 145 - for use at Philadelphia Regional Port Authority facilities Project Allocation 85,800,000 (I) Philadelphia Regional Port Authority.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site 20250HB1331PN1945 - 149 - acquisition and development, design and construction of buildings and utility work Project Allocation 25,800,000 (B) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements 20250HB1331PN1629 - 146 - Project Allocation 12,000,000 (C) Welcome Center.
Construct new, upgrade or replace to provide for the construction of a new 20250HB1331PN1945 - 150 - or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 12,000,000 (liv) Schuylkill County (A) Driver licensing center.
Renovate, construct new and expand, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and 20250HB1331PN1629 - 147 - sewage plant upgrades Project Allocation 13,750,000 (B) Maintenance facility-county office.
Construct new or retrofit to provide for the new construction or 20250HB1331PN1945 - 151 - retrofitting of facility, including site work, utilities and equipment Project Allocation 1,500,000 (lv) Snyder County (A) Driver licensing center.
Renovate, construct new and expand, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades 20250HB1331PN1629 - 148 - Project Allocation 13,750,000 (B) Maintenance facility-county office.
Renovate, construct new and expand, including roof replacement, upgrade building 20250HB1331PN1945 - 152 - systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 13,750,000 (B) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and 20250HB1331PN1629 - 149 - utility work Project Allocation 17,500,000 (C) Maintenance facility-stockpile.
Construct new, upgrade or replace to 20250HB1331PN1945 - 153 - provide for the construction of a new or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 12,000,000 (lviii) Susquehanna County (A) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site 20250HB1331PN1629 - 150 - acquisition and development, design and construction of buildings and utility work Project Allocation 19,650,000 (B) Maintenance facility-stockpile.
Renovate, expand or replace Welcome Center Site H, including roof replacement, building 20250HB1331PN1945 - 154 - systems upgrades, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 33,180,000 (lix) Tioga County (A) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design 20250HB1331PN1629 - 151 - and construction of buildings and utility work Project Allocation 11,825,000 (B) Maintenance facility-stockpile.
Renovate, expand or replace Welcome Center Site T, including roof replacement, building systems upgrades, sidewalks, curbing, 20250HB1331PN1945 - 155 - step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 18,500,000 (E) Winter material storage building.
Replace salt storage building, including demolition of existing salt building and demolition and replacement of liquid de-icing containment structures Project Allocation 5,500,000 20250HB1331PN1629 - 152 - (lx) Union County (A) Maintenance facility-county office.
Provide for renovation and expansion for code compliance, upgraded building systems, 20250HB1331PN1945 - 156 - improved program requirements and energy efficiency at District Office 1-0 Project Allocation 31,905,000 (B) Driver licensing center.
Renovate, construct new and expand, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades 20250HB1331PN1629 - 153 - Project Allocation 13,750,000 (C) Maintenance facility-county office.
Renovate, construct new and expand, including roof replacement, upgrade building 20250HB1331PN1945 - 157 - systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 13,750,000 (B) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design and construction of buildings and 20250HB1331PN1629 - 154 - utility work Project Allocation 17,925,000 (C) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction or 20250HB1331PN1945 - 158 - renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 16,250,000 (B) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and 20250HB1331PN1629 - 155 - program requirements Project Allocation 7,000,000 (C) Welcome Center.
Construct new, upgrade or replace to provide for the construction or 20250HB1331PN1945 - 159 - renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 8,600,000 (B) Maintenance facility-stockpile.
Construct new, upgrade or replace to provide for the construction of a new or a renovation of an existing stockpile facility to meet code and 20250HB1331PN1629 - 156 - program requirements Project Allocation 12,000,000 (C) Maintenance vehicle wash facility.
Construct new, upgrade or replace to provide for the construction of a new 20250HB1331PN1945 - 160 - or a renovation of an existing stockpile facility to meet code and program requirements Project Allocation 4,800,000 (C) Maintenance vehicle wash facility.
Construct new or retrofit to provide for the new construction or retrofitting of facility, including site work, utilities and equipment Project Allocation 1,500,000 20250HB1331PN1629 - 157 - (lxvi) Wyoming County (A) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or 20250HB1331PN1945 - 161 - renovation of facility, including site acquisition and development, design and construction of buildings and utility work Project Allocation 26,550,000 (B) Maintenance facility-county office.
Construct new, upgrade or replace to provide for the construction or renovation of facility, including site acquisition and development, design 20250HB1331PN1629 - 158 - and construction of buildings and utility work Project Allocation 25,000,000 (C) Maintenance facility-stockpile.
Replace salt storage building, including demolition of existing salt 20250HB1331PN1945 - 162 - building and demolition and replacement of liquid de-icing containment structures Project Allocation 2,500,000 (LXVII.1)(lxviii) MULTICOUNTYStatewide <-- (A) DISTRICTWeigh OFFICE/COUNTYstations. MAINTENANCE OFFICE AND GARAGE/REAL ID DRIVERS LICENSING CENTER, LEHIGH, CARBON, MONROE, NORTHAMPTON, SCHUYLKILL AND BERKS COUNTIES.
COMBININGConstruct THEnew, DISTRICTupgrade, 5replace ENGINEERINGto OFFICEprovide ANDfor COUNTYthe MAINTENANCEconstruction OFFICESor INrenovation THEof DISTRICTTransportation/State 5Police REGION,inspection INCLUDINGfacilities, BERKS,including SCHUYLKILL,site LEHIGH,acquisition CARBON,20250HB1331PN1629 MONROE- AND159 NORTHAMPTON- COUNTYand MAINTENANCEdevelopment, OFFICEdesign ANDand GARAGEconstruction FACILITIES,of INCLUDINGbuildings ASSOCIATEDand STOCKPILES,utility INTOwork. ONE COMBINED FACILITY COMPLEX, INCLUDING A REAL ID DRIVER LICENSING AND VEHICLE SERVICE CENTER, INCLUDING THE DEMOLITION OF EXISTING STRUCTURES, CONSTRUCTION OF NEW DISTRICT AND COUNTY MAINTENANCE OFFICES AND GARAGE FACILITIES, DRIVER LICENSING AND VEHICLE SERVICE CENTER, INCLUDING AUXILIARY SUPPORT BUILDINGS.
THEConstruction PROJECTof MAYsix INCLUDEfacilities SITEStatewide ACQUISITION,Project LANDAllocation DEVELOPMENT,360,000,000 DESIGN(15) ANDDepartment CONSTRUCTIONof OFHealth BUILDINGS,(i) UTILITYBureau INFRASTRUCTURE,of ROADWAYSLaboratories AND(A) SECURITYConstruct SYSTEMSnew TOlaboratory, MEETincluding PENNDOTsite OPERATIONALand 20250HB1331PN1945infrastructure -improvements 163and -land NEEDSacquisition PROJECTProject ALLOCATIONAllocation 500,000,00030,500,000 (B)Section DISTRICT4. OFFICE, LEHIGH, CARBON, MONROE, NORTHAMPTON, SCHUYLKILL AND BERKS COUNTIES.
REPLACEMENT OF THE DISTRICT 5 ENGINEERING OFFICE, INCLUDING THE CONSTRUCTION OF AUXILIARY SUPPORT BUILDINGS.
THE PROJECT MAY INCLUDE SITE ACQUISITION, LAND DEVELOPMENT, DESIGN AND CONSTRUCTION OF BUILDINGS AND UTILITY INFRASTRUCTURE PROJECT ALLOCATION 100,000,000 (lxviii) Statewide (A) Weigh stations.
Construct new, upgrade, replace to provide for the construction or renovation of Transportation/State Police inspection facilities, including site acquisition and development, design and construction of buildings and utility work.
Construction of six facilities Statewide Project Allocation 360,000,000 (15) Department of Health <-- (i) Bureau of Laboratories (A) Construct new laboratory, including site and infrastructure improvements and land acquisition Project Allocation 30,500,000 20250HB1331PN1945 - 164 - (B) INTERCITY PASSENGER AND FREIGHT RAIL.
<-- REHABILITATE OR CONSTRUCT INTERCITY PASSENGER AND FREIGHT RAIL INFRASTRUCTURE, INCLUDING BRIDGES, TO ACCOMMODATE CURRENT AND FUTURE DEMANDS PROJECT ALLOCATION 75,000,000 Section 4.
Total Project Project Allocation (1) Department of Agriculture (Reserved) (2) Department of Conservation and Natural Resources (i) Point State Park, Allegheny County (A) Provide original furniture and equipment for park office renovations Project Allocation 819,000 (ii) Delaware Canal State Park, Bucks County (A) Provide original furniture and 20250HB1331PN1629 - 160 - equipment for new resource center with storage building Project Allocation 1,000,000 (iii) Big Elk Creek State Park, Chester County 20250HB1331PN1945 - 165 - (A) Provide original furniture and equipment for State Park Development Phase 2 Project Allocation 2,000,000 (iv) Forestry Lab, Dauphin County (A) Provide original furniture and equipment for new laboratory Project Allocation 3,000,000 (v) Geologic Survey Headquarters, Dauphin County (A) Provide original furniture and equipment for new headquarters of the Bureau of Geologic Survey Project Allocation 2,000,000 (vi) Pinchot State Forest, Luzerne County (A) Provide original furniture and equipment for Pinchot Forest District resource management center complex Project Allocation 700,000 (vii) Maurice K.
Goddard State Park, Mercer County (A) Provide original furniture and equipment for redevelopment of park facilities Project Allocation 750,000 20250HB1331PN1629 - 161 - (viii) Denten Hill State Park, Potter County (A) Provide original furniture and equipment for redevelopment of park facilities Project Allocation 500,000 20250HB1331PN1945 - 166 - (ix) Vosburg Neck State Park, Wyoming County (A) Provide original furniture and equipment for State Park Development Phase 2 Project Allocation 2,000,000 (x) Susquehanna Riverlands State Park, York County (A) Provide original furniture and equipment for State Park Development Phase 2 Project Allocation 2,000,000 (xi) Training Academy and Range, Statewide (A) Provide original furniture and equipment for Bureau of State Parks Training Academy infrastructure and range Project Allocation 2,000,000 (3) Department of Corrections (i) State Correctional Institution at Benner, Centre County (A) Provide original furniture and equipment for renovations Project Allocation 1,050,000 (ii) State Correctional Institution at Rockview, Centre County 20250HB1331PN1629 - 162 - (A) Provide original furniture and equipment for renovations Project Allocation 7,500,000 (iii) Quehanna Boot Camp, Clearfield County (A) Provide original furniture and 20250HB1331PN1945 - 167 - equipment for renovations Project Allocation 1,000,000 (iv) State Correctional Institution at Cambridge Springs, Crawford County (A) Provide original furniture and equipment for renovations Project Allocation 1,000,000 (v) State Correctional Institution at Camp Hill, Cumberland County (A) Provide original furniture and equipment for renovations Project Allocation 15,000,000 (vi) State Correctional Institution at Chester, Delaware County (A) Provide original furniture and equipment for renovations Project Allocation 1,000,000 (vii) State Correctional Institution at Forest, Forest County (A) Provide original furniture and equipment for renovations Project Allocation 1,000,000 (viii) State Correctional Institution at Pine Grove, Indiana County (A) Provide original furniture and 20250HB1331PN1629 - 163 - equipment for renovations Project Allocation 1,000,000 (ix) State Correctional Institution at Elizabethtown Training Academy, Lancaster County 20250HB1331PN1945 - 168 - (A) Provide original furniture and equipment for renovations Project Allocation 1,000,000 (x) State Correctional Institution at Muncy, Lycoming County (A) Provide original furniture and equipment for renovations Project Allocation 8,000,000 (xi) State Correctional Institution at Mercer, Mercer County (A) Provide original furniture and equipment for renovations Project Allocation 1,000,000 (xii) State Correctional Institution at Phoenix, Montgomery County (A) Provide original furniture and equipment for renovations Project Allocation 1,050,000 (xiii) State Correctional Institution at Frackville, Schuylkill County (A) Provide original furniture and equipment for renovations Project Allocation 500,000 (xiv) State Correctional Institution at Mahanoy, Schuylkill County 20250HB1331PN1629 - 164 - (A) Provide original furniture and equipment for renovations Project Allocation 1,500,000 (xv) State Correctional Institution at Waymart, Wayne County 20250HB1331PN1945 - 169 - (A) Provide original furniture and equipment for renovations Project Allocation 4,000,000 (4) Department of Education (i) The Pennsylvania State University (A) Smith Building - Altoona Campus, Blair County.
Original furniture and equipment for new space or addition to and/or 20250HB1331PN1629 - 165 - renovation of existing space Project Allocation 7,000,000 (E) General research building - University Park, Centre County.
Original furniture and equipment for 20250HB1331PN1945 - 170 - new space or addition to and/or renovation of existing space Project Allocation 7,000,000 (F) Greenhouse and headhouse complexes relocation (PlantWorks) - University Park, Centre County.
Original furniture and equipment for new space or addition to and/or renovation of existing space Project Allocation 3,000,000 (I) Classroom/class lab building - 20250HB1331PN1629 - 166 - University Park, Centre County.
Original furniture and equipment for new space or addition to and/or renovation of existing space Project Allocation 5,050,000 20250HB1331PN1945 - 171 - (J) Stone Valley Forestry Building - University Park, Huntingdon County.
Original furniture and equipment for upgrades and improvements Project Allocation 1,250,000 20250HB1331PN1629 - 167 - (E) Heritage Center, Chester County.
20250HB1331PN1945 - 172 - Original furniture and equipment for renovation Project Allocation 3,000,000 (G) Lincoln Hall, Chester County.
20250HB1331PN1629 - 168 - Original furniture and equipment for new residence hall Project Allocation 5,000,000 (M) Physical plant, Chester County.
Original furniture and equipment for 20250HB1331PN1945 - 173 - new residence hall Project Allocation 2,500,000 (N) University Hall, Chester County.
Original furniture and equipment for 20250HB1331PN1629 - 169 - renovations Project Allocation 2,500,000 (D) Jones Building, Lancaster County.
Original furniture and equipment for renovations 20250HB1331PN1945 - 174 - Project Allocation 4,000,000 (E) Leonard Hall, Lancaster County.
Original furniture and equipment for renovations and addition Project Allocation 4,000,000 (5) Pennsylvania Emergency Management Agency (Reserved) (6) Department of Environmental Protection (Reserved) 20250HB1331PN1629 - 170 - (7) Department of General Services (i) Statewide (A) Furniture, fixtures and equipment for space consolidation efforts Project Allocation 100,000,000 20250HB1331PN1945 - 175 - (II) RACHEL CARSON BUILDING, DAUPHIN COUNTY <-- (A) PROVIDE NEW FIXTURES, FURNISHINGS AND EQUIPMENT FOR THE RACHEL CARSON BUILDING PROJECT ALLOCATION 20,000,000 (8) Pennsylvania Historical and Museum Commission (i) State Museum of Pennsylvania, Dauphin County (A) Provide original furniture and equipment for renovated State Museum Project Allocation 15,000,000 (B) Furniture and equipment for building rehabilitation Project Allocation 20,000,000 (ii) State Archives, Dauphin County (A) Provide original furniture and equipment for renovated State Archives building Project Allocation 8,000,000 (iii) Landis Valley Village and Farm Museum, Lancaster County (A) Provide original furniture and equipment for renovated Visitor Center Project Allocation 2,000,000 (9) Department of Human Services (i) South Mountain Secure Treatment Unit, Franklin County (A) Provide original furniture and equipment to support building 20250HB1331PN194520250HB1331PN1629 - 176171 - renovation projects Project Allocation 5,000,000 (ii) Norristown Forensic Building, Montgomery County (A) Provide original furniture and equipment for the Norristown Forensic Building Project Allocation 20,000,000 (iii) Selinsgrove Center, Snyder County (A) Provide original furniture and equipment to support central building renovation project Project Allocation 5,000,000 (iv) Torrance State Hospital, Westmoreland County (A) Fixtures, furnishings and equipment to support building renovation projects Project Allocation 5,000,000 (10) Department of Military and Veterans Affairs (i) Gettysburg Readiness Center, Adams County (A) Provide original furniture and equipment Project Allocation 1,000,000 (ii) Combined Support Maintenance Shop, West Pittsburgh, Allegheny County (A) Provide original furniture and equipment Project Allocation 1,000,000 (iii) Pittsburgh Crane Readiness Center, 20250HB1331PN194520250HB1331PN1629 - 177172 - Allegheny County (A) Provide original furniture and equipment Project Allocation 1,000,000 (iv) Ford City Readiness Center, Armstrong County (A) Provide original furniture and equipment Project Allocation 1,000,000 (v) Beaver Falls Readiness Center, Beaver County (A) Provide original furniture and equipment Project Allocation 1,000,000 (vi) Berks County Readiness Center, Berks County (A) Provide original furniture and equipment Project Allocation 1,000,000 (vii) Hollidaysburg Readiness Center, Blair County (A) Provide original furniture and equipment Project Allocation 1,000,000 (viii) Bucks County Readiness Centers, Bucks County (A) Provide original furniture and equipment Project Allocation 5,000,000 (ix) Bucks County Readiness Centers and 20250HB1331PN194520250HB1331PN1629 - 178173 - Maintenance Facilities, Bucks County (A) Provide original furniture and equipment Project Allocation 2,000,000 (x) Butler Readiness Center, Butler County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xi) Cambria County Readiness Centers, Cambria County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xii) Cambria County Readiness Centers and Maintenance Facilities, Cambria County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xiii) Lehighton Readiness Centers, Carbon County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xiv) Centre County Readiness Centers, Centre County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xiv) Centre County Readiness Centers and Maintenance Facilities, Centre County 20250HB1331PN194520250HB1331PN1629 - 179174 - (A) Provide original furniture and equipment Project Allocation 1,000,000 (xvi) State College Army and Air Readiness Center, Centre County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xvii) Chester County Readiness Centers, Chester County (A) Provide original furniture and equipment Project Allocation 3,000,000 (xviii) Chester County Readiness Centers and Maintenance Facilities, Chester County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xix) Southeastern Veterans Center, Chester County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xx) Clearfield Readiness Center, Clearfield County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxi) Lock Haven Readiness Center, Clinton County 20250HB1331PN194520250HB1331PN1629 - 180175 - (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxii) Crawford County Readiness Centers and Maintenance Facilities, Crawford County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxiii) Carlisle Readiness Center, Cumberland County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxiv) Cumberland County Readiness Centers and Maintenance Facilities, Cumberland County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxv) Dauphin County Readiness Centers, Dauphin County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxvi) Erie Readiness Center, Erie County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxvii) Fayette County Readiness Center, Fayette County 20250HB1331PN194520250HB1331PN1629 - 181176 - (A) Provide original furniture and equipment Project Allocation 2,000,000 (xxviii) Chambersburg Readiness Center, Franklin County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxix) Indiana Readiness Center, Indiana County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxx) Carbondale Readiness Center, Lackawanna County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxxi) Lackawanna County Readiness Center/Field Maintenance Shop, Lackawanna County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxxii) Scranton Maintenance Shop, Lackawanna County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxxiii) Elizabethtown Readiness Center, 20250HB1331PN194520250HB1331PN1629 - 182177 - Lancaster County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxxiv) New Castle Readiness Center, Lawrence County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxxv) Fort Indiantown Gap, Lebanon County (A) Provide original furniture and equipment Project Allocation 3,000,000 (xxxvi) Allentown Readiness Center, Lehigh County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxxvii) Luzerne County Readiness Centers, Luzerne County (A) Provide original furniture and equipment Project Allocation 2,000,000 (xxxviii) Williamsport Readiness Center, Lycoming County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxxix) Mercer County Readiness Centers, Mercer County 20250HB1331PN194520250HB1331PN1629 - 183178 - (A) Provide original furniture and equipment Project Allocation 1,000,000 (xl) Mercer County Readiness Centers and Maintenance Facilities, Mercer County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xli) Montgomery County Readiness Centers, Montgomery County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xlii) Montgomery County Readiness Centers and Maintenance Facilities, Montgomery County (A) Provide original furniture and equipment Project Allocation 5,000,000 (xliii) Danville Field Maintenance Building, Montour County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xliv) Montour County Readiness Centers and Maintenance Facilities, Montour County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xlv) Easton Readiness Center, Northampton 20250HB1331PN194520250HB1331PN1629 - 184179 - County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xlvi) Philadelphia County Readiness Centers, Philadelphia County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xlvii) Schuylkill Readiness Center, Schuylkill County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xlviii) Friedens Readiness Centers, Somerset County (A) Provide original furniture and equipment Project Allocation 1,000,000 (xlix) Washington Readiness Center, Washington County (A) Provide original furniture and equipment Project Allocation 1,000,000 (l) Honesdale Readiness Center, Wayne County (A) Provide original furniture and equipment Project Allocation 1,000,000 (li) Westmoreland County Readiness Centers, Westmoreland County 20250HB1331PN194520250HB1331PN1629 - 185180 - (A) Provide original furniture and equipment Project Allocation 1,000,000 (lii) York County Readiness Centers, York County (A) Provide original furniture and equipment Project Allocation 1,000,000 (liii) Veterans Homes, Statewide (A) Provide original furniture and equipment for renovations to six Veterans Homes Project Allocation 3,000,000 (liv) Veterans Homes, Statewide (A) Provide original furniture and equipment for renovations to six Veterans Homes Project Allocation 5,000,000 (11) State System of Higher Education (i) Commonwealth University (A) Lock Haven University, Clinton County.
Original furniture and equipment for Wiley Hall Project Allocation 1,500,000 (iii) Kutztown University, Berks County (A) Original furniture and equipment for 20250HB1331PN194520250HB1331PN1629 - 186181 - Beekey Education Building Project Allocation 2,000,000 (B) Original furniture and equipment for Rickenbach Education Building Project Allocation 2,000,000 (C) Original furniture and equipment for Keystone Hall/fieldhouse upgrades Project Allocation 1,000,000 (iv) West Chester University, Chester County (A) Renovation, replacement or upgrade of campus infrastructure Project Allocation 4,000,000 (v) Cheyney University, Chester and Delaware Counties (A) Original furniture and equipment for Ada Georges Dining Hall Project Allocation 4,100,000 (vi) Indiana University, Indiana County (A) Original furniture and equipment for academic building Project Allocation 6,800,000 (vii) Millersville University, Lancaster County (A) Original furniture and equipment for Pucillo Hall Project Allocation 1,700,000 (B) ORIGINAL FURNITURE AND EQUIPMENT FOR <-- BROOKS HALL RENOVATION TO BECOME LOMBARDO COLLEGE OF BUSINESS PROJECT ALLOCATION 1,000,000 20250HB1331PN1945 - 187 - (12) Office of Administration (Reserved) (13) Pennsylvania State Police (i) Statewide (A) Provide original furniture and 20250HB1331PN1629 - 182 - equipment Project Allocation 100,000,000 (14) Department of Transportation (i) Lackawanna County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 Section 5.
Improvements to stations, signals, track, power, fixed guideways, bridges, tunnels, incline 20250HB1331PN1945 - 188 - and operating/maintenance facilities Project Allocation 50,000,000 (C) Bus and Rail Vehicle Overhaul Program.
Overhaul of existing bus and 20250HB1331PN1629 - 183 - rail car assets Project Allocation 50,000,000 (D) ITS Hardware/Software Program.
This project will provides Pittsburgh Regional Transit a new operating facility with the capacity of 230 buses, and supports both diesel and electric buses Project Allocation 236,000,000 (2) BEAVER COUNTY <-- (I) CENTER TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, RENOVATION AND OTHER RELATED COSTS FOR IMPROVEMENTS AT BEAVER COUNTY TRANSIT AUTHORITY'S CENTER TOWNSHIP TERMINAL FACILITY PROJECT ALLOCATION 1,500,000 (3) DAUPHIN COUNTY (I) CITY OF HARRISBURG (A) ACQUISITION, CONSTRUCTION, 20250HB1331PN1945 - 189 - DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE RELOCATION OF A MASS TRANSIT OPERATION WITHIN THE CITY OF HARRISBURG PROJECT ALLOCATION 25,000,000 (2) (4) Bucks, Chester, Delaware, Montgomery and <-- Philadelphia Counties (i) Southeastern Pennsylvania Transportation Authority (A) Urbanized Area Formula Program of Projects.
Provide funds to match Federal capital funding to rehabilitate or replace 20250HB1331PN1629 - 184 - existing facilities, vehicles and infrastructure to bring them to a state of good repair Project Allocation 220,000,000 (C) Bus and Bus Facilities Program.
Provide funds to match Federal capital funding to rehabilitate or replace existing bus facilities and vehicles to bring them to a state of good 20250HB1331PN1945 - 190 - repair Project Allocation 70,000,000 (D) Bus Purchase Flex Program.
Rehabilitate or replace existing facilities and infrastructure to bring them to a state of good 20250HB1331PN1629 - 185 - repair Project Allocation 250,000,000 (G) State of Good Repair Program.
Improve transit service in Southeastern 20250HB1331PN1945 - 191 - Pennsylvania Project Allocation 150,000,000 (B)Section RURAL6. AND INTERCITY RAIL.--ADDITIONAL CAPITAL PROJECTS <-- IN THE CATEGORY OF TRANSPORTATION ASSISTANCE PROJECTS FOR RURAL AND INTERCITY RAIL SERVICE PROJECTS TO BE CONSTRUCTED OR WITH RESPECT TO WHICH AN INTEREST IS TO BE ACQUIRED BY THE DEPARTMENT OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS AND TO BE FINANCED BY THE INCURRING OF DEBT ARE HEREBY ITEMIZED, TOGETHER WITH THEIR RESPECTIVE ESTIMATED FINANCIAL COSTS, AS FOLLOWS:
TOTAL PROJECT PROJECT ALLOCATION (1) ADAMS COUNTY (I) SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR ECONOMIC DEVELOPMENT INITIATIVES AT GETTYSBURG REGIONAL AIRPORT PROJECT ALLOCATION 2,500,000 (B) INFRASTRUCTURE, SITE WORK AND OTHER COSTS ASSOCIATED WITH THE REHABILITATION OF EXISTING AVIATION FACILITIES AND CONSTRUCTION OF NEW AVIATION FACILITIES AT GETTYSBURG REGIONAL AIRPORT PROJECT ALLOCATION 2,500,000 (2) BEAVER COUNTY (I) BEAVER COUNTY AIRPORT AUTHORITY (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, 20250HB1331PN1945 - 192 - RENOVATION AND OTHER RELATED COSTS FOR HANGARS AND FACILITY IMPROVEMENTS PROJECT ALLOCATION 2,500,000 (II) CHIPPEWA TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR HANGARS AND FACILITIES, CLASSROOMS AND A CONTROL TOWER AT THE BEAVER COUNTY COMMUNITY COLLEGE SCHOOL OF AVIATION PROJECT ALLOCATION 3,750,000 (3) YORK COUNTY (I) SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY (A) INFRASTRUCTURE, SITE WORK AND OTHER COSTS ASSOCIATED WITH THE REHABILITATION OF EXISTING AVIATION FACILITIES AND CONSTRUCTION OF NEW AVIATION FACILITIES AT THE CAPITAL CITY AIRPORT IN FAIRVIEW TOWNSHIP PROJECT ALLOCATION 2,500,000 (C) AIR TRANSPORTATION.--ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF TRANSPORTATION ASSISTANCE PROJECTS FOR AIR TRANSPORTATION SERVICE TO WHICH AN INTEREST IS TO BE ACQUIRED BY THE DEPARTMENT OF TRANSPORTATION, IT SUCCESSORS OR ASSIGNS AND TO BE FINANCED BY THE INCURRING OF DEBT ARE HEREBY ITEMIZED, TOGETHER WITH THEIR RESPECTIVE ESTIMATED FINANCIAL COSTS, AS FOLLOWS:
TOTAL PROJECT PROJECT ALLOCATION 20250HB1331PN1945 - 193 - (1) NORTHUMBERLAND COUNTY (I) BOYD STATION (A) CONSTRUCT RAIL INFRASTRUCTURE IN NORTHUMBERLAND COUNTY TO FACILITATE AN EXPANSION OF THE RAILROAD TERMINAL, INCLUDING ENGINEERING, SITE PREPARATION, GRADING, RAIL, TIES, BALLAST, TURNOUTS, BUMPERS, DERAILS, BRIDGE, RAIL SCALE, LOADING/UNLOADING EQUIPMENT, CANOPY AND PRODUCT STORAGE PROJECT ALLOCATION 9,100,000 (2) YORK COUNTY (I) YORK COUNTY ECONOMIC ALLIANCE (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS, MACHINERY AND EQUIPMENT AND OTHER RELATED COSTS FOR THE STEAM INTO HISTORY RAIL LINE EXTENSION PROJECT PROJECT ALLOCATION 7,500,000 (3) MULTIPLE COUNTIES (I) NORTH SHORE RAILROAD (A) REHABILITATE RAIL INFRASTRUCTURE, INCLUDING RAIL REPLACEMENT, TIES, BALLAST, SWITCHES, SIGNALS, CROSSINGS, BRIDGES AND ALL MATERIALS NECESSARY FOR THE IMPROVEMENT OF EXISTING TRACK IN AREAS OPERATED BY NORTH SHORE RAILROAD COMPANY PROJECT ALLOCATION 7,000,000 20250HB1331PN1945 - 194 - (II) SOUTHWEST PENNSYLVANIA RAILROAD (A) REHABILITATE EXISTING RAILROAD INFRASTRUCTURE TO IMPROVE OPERATIONAL CAPACITY AND EFFICIENCY, INCLUDING PLANNING AND ENGINEERING, DRAINAGE, RAIL REPLACEMENT, TIES, RELATED TRACK MATERIALS, BRIDGES AND GRADE CROSSINGS IN WESTMORELAND AND FAYETTE COUNTIES PROJECT ALLOCATION 8,400,000 (B) CONSTRUCT NEW SIDETRACKS AND YARD TRACKS TO INCREASE CAPACITY TO SUPPORT CUSTOMER AND INTERMODAL DEVELOPMENT IN WESTMORELAND AND FAYETTE COUNTIES PROJECT ALLOCATION 5,600,000 (III) R.J.
CORMAN RAILROAD GROUP (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR REHABILITATION OF THE RAIL LINE LOCATED IN CAMBRIA, CENTRE, CLEARFIELD, CLINTON AND INDIANA COUNTIES, INCLUDING RAILBED, TIES, RAIL AND OTHER MATERIALS TO SUPPORT BUSINESS GROWTH AND IMPROVE SAFETY PROJECT ALLOCATION 20,000,000 (IV) WEST CHESTER PASSENGER RAIL SERVICE RESTORATION (A) CONSTRUCTION AND REHABILITATION OF TRACK, SIGNAL, STATION, PEDESTRIAN/ANCILLARY FACILITIES AND SAFETY INFRASTRUCTURE FOR OPERATION OF 20250HB1331PN1945 - 195 - WEST CHESTER RAILROAD TOURIST TRAINS, RESTORATION OF COMMON CARRIER PASSENGER RAIL SERVICE TO WEST CHESTER, WEST CHESTER UNIVERSITY, CHEYNEY UNIVERSITY AND WAWA AND RESTORATION OF FREIGHT RAIL SERVICE PROJECT ALLOCATION 25,000,000 Section 6.
Total Project Project Allocation (1) (Reserved) <--Section (1)7. ADAMS COUNTY <-- (I) COUNTY PROJECTS (A) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE AND/OR OTHER COSTS ASSOCIATED WITH THE DEVELOPMENT OF A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 20,000,000 (II) ADAMS COUNTY INDUSTRIAL DEVELOPMENT 20250HB1331PN1945 - 196 - AUTHORITY (A) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE AND/OR OTHER COSTS ASSOCIATED WITH DEVELOPING, EXPANDING AND/OR IMPROVING ADAMS COUNTY TECHNICAL INSTITUTE FACILITIES PROJECT ALLOCATION 10,000,000 (B) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, REMEDIATION, INFRASTRUCTURE AND/OR OTHER ASSOCIATED COSTS TO IMPROVE OR EXPAND TRUENORTH WELLNESS SERVICES FACILITIES IN ADAMS COUNTY PROJECT ALLOCATION 3,000,000 (C) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, REMEDIATION, INFRASTRUCTURE AND/OR OTHER ASSOCIATED COSTS TO IMPROVE OR EXPAND TRUENORTH WELLNESS SERVICES FACILITIES IN ADAMS COUNTY PROJECT ALLOCATION 10,000,000 (D) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REMEDIATION, INFRASTRUCTURE AND/OR OTHER ASSOCIATED COSTS TO REDEVELOP A FORMER FOUNDRY SITE IN CUMBERLAND TOWNSHIP 20250HB1331PN1945 - 197 - PROJECT ALLOCATION 5,000,000 (E) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE AND/OR OTHER COSTS ASSOCIATED WITH DEVELOPING, EXPANDING AND/OR IMPROVING ADAMS COUNTY CHILDREN'S ADVOCACY CENTER FACILITIES PROJECT ALLOCATION 3,500,000 (F) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE, AND/OR OTHER ASSOCIATED COSTS FOR THE DEVELOPMENT OF A PENNSYLVANIA AGRICULTURAL DISCOVERY CENTER PROJECT ALLOCATION 10,000,000 (III) SUSQUEHANNA REGIONAL AIRPORT AUTHORITY (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR ECONOMIC DEVELOPMENT INITIATIVES AT GETTYSBURG REGIONAL AIRPORT PROJECT ALLOCATION 2,500,000 (IV) CARROLL VALLEY BOROUGH (A) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND/OR OTHER ASSOCIATED COSTS FOR A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT 20250HB1331PN1945 - 198 - PROJECT ALLOCATION 5,000,000 (V) CUMBERLAND TOWNSHIP (A) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE AND/OR OTHER ASSOCIATED COSTS FOR THE CONSTRUCTION OF A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 5,000,000 (2) ALLEGHENY COUNTY (I) COUNTY PROJECTS (A) ABATEMENT, ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND REHABILITATION FOR ECONOMIC DEVELOPMENT PROJECTS LOCATED IN ALLEGHENY COUNTY PROJECT ALLOCATION 500,000,000 (B) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR IMPROVEMENTS WITHIN THE NORTH ALLEGHENY SCHOOL DISTRICT PROJECT ALLOCATION 10,000,000 (II) ALLEGHENY COUNTY DEPARTMENT OF ECONOMIC DEVELOPMENT (A) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR ST.
CLAIR HEALTH 20250HB1331PN1945 - 199 - PROJECT ALLOCATION 18,000,000 (III) MCCANDLESS TOWNSHIP SANITARY AUTHORITY (A) INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT IN MCCANDLESS TOWNSHIP PROJECT ALLOCATION 2,500,000 (IV) REDEVELOPMENT AUTHORITY OF ALLEGHENY COUNTY (A) INFRASTRUCTURE, RENOVATION AND OTHER RELATED COSTS TO UPGRADE INFRASTRUCTURE EQUIPMENT IN THE PITTSBURGH SUPERCOMPUTING CENTER DATA CENTER PROJECT ALLOCATION 2,000,000 (V) URBAN REDEVELOPMENT AUTHORITY OF PITTSBURGH (A) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE NINE MILE RUN PHASE III, SWISSHELM PARK SOLAR AND EXPANSION OF FRICK PARK PROJECTS PROJECT ALLOCATION 20,000,000 (VI) CITY OF PITTSBURGH (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE DEVELOPMENT, REDEVELOPMENT, ABATEMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR POINT PARK UNIVERSITY'S (PPU) DOWNTOWN PITTSBURGH RENAISSANCE III 20250HB1331PN1945 - 200 - PROJECT, LOCATED IN THE DOWNTOWN AREA OF THE CITY OF PITTSBURGH PROJECT ALLOCATION 25,000,000 (B) CONSTRUCTION, REDEVELOPMENT AND RELATED COSTS FOR THE MANCHESTER ACADEMIC CHARTER SCHOOL'S EXPANDED CAMPUS PROJECT ALLOCATION 6,000,000 (C) CONSTRUCTION AND RELATED COSTS FOR A HEALTH SCIENCES BUILDING AT DUQUESNE UNIVERSITY PROJECT ALLOCATION 3,000,000 (D) ACQUISITION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR A MIXED-USE DEVELOPMENT WITH AN EMPHASIS ON TECHNOLOGY AND RESEARCH AND DEVELOPMENT LOCATED IN THE HAZELWOOD AND OAKLAND NEIGHBORHOODS PROJECT ALLOCATION 4,000,000 (E) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REHABILITATION AND OTHER RELATED COSTS FOR THE PITTSBURGH DOWNTOWN COMMERCIAL OFFICE CONVERSION PROGRAM PROJECT PROJECT ALLOCATION 50,000,000 (F) CONSTRUCTION, INFRASTRUCTURE, ENVIRONMENTAL REMEDIATION, ACQUISITION AND OTHER RELATED COSTS FOR THE FORMER ST.
CLAIR VILLAGE SITE PROJECT ALLOCATION 20,000,000 20250HB1331PN1945 - 201 - (G) FACILITIES CONSTRUCTION, INFRASTRUCTURE IMPROVEMENTS, RENOVATIONS AND OTHER COSTS FOR CARNEGIE SCIENCE CENTER PROJECT ALLOCATION 10,000,000 (H) FACILITIES CONSTRUCTION, INFRASTRUCTURE IMPROVEMENTS, RENOVATIONS AND OTHER COSTS FOR THE ANDY WARHOL MUSEUM PROJECT ALLOCATION 10,000,000 (I) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT AND OTHER RELATED COSTS FOR IMPROVEMENTS AT THE CARNEGIE MUSEUM OF NATURAL HISTORY PROJECT ALLOCATION 10,000,000 (J) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE CARNEGIE MUSEUMS PROJECT ALLOCATION 10,000,000 (K) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR IMPROVEMENTS TO THE CARNEGIE LIBRARY OF PITTSBURGH LIBRARY SYSTEM AND BRANCHES PROJECT ALLOCATION 7,500,000 (L) ACQUISITION, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR BUILDING UPGRADES AND OUTDOOR IMPROVEMENTS FOR BROOKLINE TEEN OUTREACH 20250HB1331PN1945 - 202 - PROJECT ALLOCATION 1,000,000 (M) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT AND OTHER RELATED COSTS FOR IMPROVEMENTS TO THE CARNEGIE MUSEUM OF ART PROJECT ALLOCATION 10,000,000 (N) CONSTRUCTION AND OTHER RELATED COSTS FOR THE RENOVATION OF A HISTORIC LANDMARK IN THE STRIP DISTRICT PROJECT ALLOCATION 500,000 (O) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT FOR POINT PARK UNIVERSITY PROJECT ALLOCATION 2,500,000 (P) FACILITIES CONSTRUCTION, INFRASTRUCTURE IMPROVEMENTS, RENOVATIONS AND OTHER COSTS FOR CARNEGIE MUSEUM OF ART PROJECT ALLOCATION 20,000,000 (Q) ACQUISITION, REMEDIATION, REDEVELOPMENT, CONSTRUCTION AND OTHER RELATED COSTS FOR A FACILITY OR CAMPUS TO SUPPORT THE OPERATIONS AND EXPANSION OF THE PITTSBURGH ROBOTICS NETWORK AND ITS MEMBER ORGANIZATIONS PROJECT ALLOCATION 20,000,000 (VII) BELLEVUE BOROUGH (A) ACQUISITION, DESIGN, CONSTRUCTION, 20250HB1331PN1945 - 203 - INFRASTRUCTURE REDEVELOPMENT, REHABILITATION, RENOVATION, FACILITY IMPROVEMENTS, MACHINERY AND EQUIPMENT AND OTHER COSTS RELATED TO THE MID- ATLANTIC MOTHER'S MILK BANK EXPANSION PROJECT PROJECT ALLOCATION 6,000,000 (VIII) BETHEL PARK BOROUGH (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND/OR RELATED COSTS FOR A REDEVELOPMENT PROJECT PROJECT ALLOCATION 10,000,000 (IX) MOUNT OLIVER BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, REHABILITATION AND RELATED COSTS FOR THE TRANSVERSE PARK PHASE 1 IMPROVEMENTS PROJECT ALLOCATION 1,000,000 (B) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT AND OTHER RELATED COSTS FOR A PARTNERSHIP BETWEEN LEVEL AND THE MUNICIPALITY TO ACQUIRE FIVE VACANT LOTS PROJECT ALLOCATION 7,000,000 (X) WILKINSBURG BOROUGH (A) CONSTRUCTION, RENOVATION AND OTHER 20250HB1331PN1945 - 204 - RELATED COSTS FOR IMPROVEMENTS TO A MUNICIPAL BUILDING PROJECT ALLOCATION 5,000,000 (B) ACQUISITION, CONSTRUCTION, RENOVATION, INFRASTRUCTURE AND OTHER COSTS RELATED TO PUBLIC IMPROVEMENTS AND ECONOMIC DEVELOPMENT PROJECTS IN THE BOROUGH OF WILKINSBURG PROJECT ALLOCATION 25,000,000 (XI) ELIZABETH TOWNSHIP (A) ACQUISITION, RENOVATION, INFRASTRUCTURE, SITE PREPARATION, CONSTRUCTION, REDEVELOPMENT, ABATEMENT AND OTHER COSTS ASSOCIATED WITH THE ELIZABETH TOWNSHIP MUNICIPAL COMPLEX, COMMUNITY CENTER AND EMERGENCY SERVICES CENTER PROJECT ALLOCATION 15,000,000 (XII) HAMPTON TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR THE CONSTRUCTION OF PUBLIC SAFETY FACILITIES WITHIN THE TOWNSHIP PROJECT ALLOCATION 5,000,000 (B) ACQUISITION, CONSTRUCTION, RENOVATION AND/OR OTHER RELATED COSTS FOR THE CONSTRUCTION OF NEW AND ENHANCEMENTS TO EXISTING RECREATIONAL AND PUBLIC SAFETY FACILITIES 20250HB1331PN1945 - 205 - PROJECT ALLOCATION 7,000,000 (C) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (XIII) MCCANDLESS TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR RENOVATIONS TO LA ROCHE UNIVERSITY, INCLUDING A HEALTH AND WELLNESS CENTER AND CYBERCRIME LAB PROJECT ALLOCATION 2,512,000 (XIV) PINE TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR POLICE BARRACKS PROJECT ALLOCATION 2,500,000 (B) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND/OR OTHER COSTS RELATED TO THE EXPANSION OF A COMMUNITY CENTER AND PARK PROJECT ALLOCATION 10,000,000 (C) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND/OR OTHER COSTS RELATED TO BUILDING A NEW PUBLIC SAFETY BUILDING PROJECT ALLOCATION 10,000,000 (XV) OHIO TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, 20250HB1331PN1945 - 206 - ACQUISITION, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS TO CONSTRUCT A SATELLITE EMS FACILITY, A FIRE AND RESCUE TRAINING FACILITY AND ACQUIRE AND DEVELOP ADDITIONAL PROPERTIES PROJECT ALLOCATION 10,850,000 (XVI) RICHLAND TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, RENOVATION AND OTHER COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (XVII) WEST DEER TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, RENOVATION AND OTHER COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (3) ARMSTRONG COUNTY (I) ARMSTRONG COUNTY INDUSTRIAL DEVELOPMENT COUNCIL (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, SITE IMPROVEMENTS, POSSIBLE ABATEMENT OF HAZARDOUS MATERIALS, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT LOCATED IN THE ARMSTRONG INNOVATION PARK IN SOUTH BUFFALO TOWNSHIP 20250HB1331PN1945 - 207 - PROJECT ALLOCATION 15,000,000 (B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, SITE IMPROVEMENTS, POSSIBLE ABATEMENT OF HAZARDOUS MATERIALS, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT RELATING TO THE REDEVELOPMENT OF THE FORMER ARMSTRONG COUNTY POWER PLANT IN WASHINGTON TOWNSHIP PROJECT ALLOCATION 15,000,000 (4) BEAVER COUNTY (I) COUNTY PROJECTS (A) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR ECONOMIC DEVELOPMENT, COMMERCIAL, PUBLIC IMPROVEMENT, SEWAGE, BLIGHT REMOVAL, ROAD, BRIDGE, RAIL, WATERWAY AND AVIATION PROJECTS IN BEAVER COUNTY PROJECT ALLOCATION 50,000,000 (B) ACQUISITION, INFRASTRUCTURE, CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR RIVERFRONT DEVELOPMENT ALONG THE OHIO RIVER PROJECT ALLOCATION 25,000,000 (C) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, 20250HB1331PN1945 - 208 - ACQUISITION, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR THE NEIGHBORHOOD NORTH MUSEUM OF PLAY PROJECT ALLOCATION 5,000,000 (D) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR A PROJECT ASSOCIATED WITH HOSPITALITY, AGRICULTURE OR CULINARY PROJECT ALLOCATION 2,500,000 (E) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 5,000,000 (II) BEAVER COUNTY AIRPORT AUTHORITY (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR HANGARS AND FACILITY IMPROVEMENTS IN CHIPPEWA TOWNSHIP PROJECT ALLOCATION 2,500,000 (III) REDEVELOPMENT AUTHORITY OF BEAVER COUNTY (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE RECONSTRUCTION OF 3RD STREET IN MIDLAND BOROUGH 20250HB1331PN1945 - 209 - PROJECT ALLOCATION 3,500,000 (B) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR DEVELOPMENT OF THE BET-TECH INDUSTRIAL PARK IN HOPEWELL TOWNSHIP PROJECT ALLOCATION 3,500,000 (IV) CITY OF ALIQUIPPA (A) RENOVATION, REHABILITATION, REDEVELOPMENT, ACQUISITION, ABATEMENT OF HAZARDOUS MATERIALS, INFRASTRUCTURE, CONSTRUCTION AND RELATED COSTS FOR THE DEVELOPMENT OF AN ANCHOR BUILDING PROJECT PROJECT ALLOCATION 5,000,000 (V) CITY OF BEAVER FALLS (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR STUDENT, ACADEMIC AND/OR ATHLETIC FACILITIES AT GENEVA COLLEGE PROJECT ALLOCATION 2,500,000 (B) CONSTRUCTION, INFRASTRUCTURE, RENOVATION AND/OR RELATED COSTS TO MODERNIZE AND PROVIDE ADA ACCESSIBILITY TO OLD MAIN ON THE CAMPUS OF GENEVA COLLEGE PROJECT ALLOCATION 4,000,000 (C) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND 20250HB1331PN1945 - 210 - OTHER RELATED COSTS TO RENOVATE, EXPAND AND/OR BUILD NEW FACILITIES FOR THE NEIGHBORHOOD NORTH MUSEUM OF PLAY PROJECT ALLOCATION 2,000,000 (D) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (E) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND RELATED COSTS FOR THE TRANSFORMATION OF THE CARNEGIE FREE LIBRARY OF BEAVER FALLS INTO A RESTORED CULTURAL ARTS CENTER PROJECT ALLOCATION 3,000,000 (VI) AMBRIDGE BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR THE DEVELOPMENT OF AN ANCHOR BUILDING PROJECT PROJECT ALLOCATION 5,000,000 (B) ACQUISITION, ABATEMENT, INFRASTRUCTURE AND CONSTRUCTION OF A ROAD TO CONNECT 19TH STREET (SR 0989) TO MERCHANT STREET AND SR 0065 PROJECT ALLOCATION 10,000,000 (VII) BIG BEAVER BOROUGH 20250HB1331PN1945 - 211 - (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR ECONOMIC DEVELOPMENT AT THE PENNSYLVANIA TURNPIKE INTERSECTIONS PROJECT ALLOCATION 7,000,000 (B) ACQUISITION, SITE DEVELOPMENT, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR IMPROVEMENT AND EXPANSION PROJECTS AT PITTSBURGH INTERNATIONAL RACE COMPLEX PROJECT ALLOCATION 3,750,000 (C) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (VIII) BRIDGEWATER BOROUGH (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (IX) ECONOMY BOROUGH (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION 20250HB1331PN1945 - 212 - AND/OR OTHER COSTS RELATED TO AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (X) FREEDOM BOROUGH (A) ACQUISITION, REHABILITATION, INFRASTRUCTURE, ABATEMENT, REDEVELOPMENT, CONSTRUCTION AND RENOVATION OF AN ANCHOR BUILDING PROJECT PROJECT ALLOCATION 5,000,000 (XI) MIDLAND BOROUGH (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR LINCOLN PARK PERFORMING ARTS CHARTER SCHOOL EXPANSION PROJECT PROJECT ALLOCATION 6,000,000 (XII) MONACA BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS OF AN ANCHOR BUILDING PROJECT PROJECT ALLOCATION 5,000,000 (B) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR DEVELOPMENT OF THE 20250HB1331PN1945 - 213 - GEORGE WASHINGTON PLAZA PROJECT ALLOCATION 2,500,000 (XIII) NEW BRIGHTON BOROUGH (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (XIV) ROCHESTER BOROUGH (A) ACQUISITION, REHABILITATION, INFRASTRUCTURE, ABATEMENT, REDEVELOPMENT, CONSTRUCTION AND RENOVATION OF AN ANCHOR BUILDING PROJECT PROJECT ALLOCATION 5,000,000 (B) REHABILITATION, INFRASTRUCTURE, ABATEMENT, REDEVELOPMENT, CONSTRUCTION AND RENOVATION OF THE ROCHESTER BOROUGH MUNICIPAL BUILDING, INCLUDING THE PUBLIC THEATER, MUSEUM AND POLICE FACILITY PROJECT ALLOCATION 5,000,000 (XV) BRIGHTON TOWNSHIP (A) ACQUISITION, CONSTRUCTION, REDEVELOPMENT, RENOVATION AND/OR RELATED COSTS FOR UPGRADED HEALTHCARE FACILITIES AT HERITAGE VALLEY HEALTH SYSTEM BEAVER HOSPITAL PROJECT ALLOCATION 2,500,000 20250HB1331PN1945 - 214 - (XVI) CENTER TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR DEVELOPMENT OF THE RETAIL CORRIDOR ON BRODHEAD ROAD PROJECT ALLOCATION 15,000,000 (B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR A SPORTS- RELATED FACILITY PROJECT ALLOCATION 5,000,000 (C) ACQUISITION, SITE DEVELOPMENT, INFRASTRUCTURE IMPROVEMENTS, CONSTRUCTION AND RELATED COSTS FOR YOUTH SPORTS AND RECREATION FACILITIES AT THE M:7 SPORTS PITTSBURGH SPORTS COMPLEX PROJECT ALLOCATION 4,500,000 (D) CONSTRUCTION, INFRASTRUCTURE, RENOVATION AND OTHER RELATED COSTS FOR IMPROVEMENTS AT BEAVER COUNTY TRANSIT AUTHORITY'S CENTER TOWNSHIP TERMINAL FACILITY PROJECT ALLOCATION 1,500,000 (XVII) CHIPPEWA TOWNSHIP (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS 20250HB1331PN1945 - 215 - MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (B) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR HANGARS, FACILITIES, CLASSROOMS AND A CONTROL TOWER AT THE BEAVER COUNTY COMMUNITY COLLEGE SCHOOL OF AVIATION PROJECT ALLOCATION 3,750,000 (XVIII) DARLINGTON TOWNSHIP (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR IMPROVEMENTS TO CANNELTON ROAD INDUSTRIAL PARK PROJECT ALLOCATION 2,500,000 (XIX) FRANKLIN TOWNSHIP (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO AN ECONOMIC DEVELOPMENT PROJECT 20250HB1331PN1945 - 216 - PROJECT ALLOCATION 2,500,000 (XX) HARMONY TOWNSHIP (A) ACQUISITION, CONSTRUCTION, EQUIPMENT, INFRASTRUCTURE, REHABILITATION, ENVIRONMENTAL IMPROVEMENTS AND OTHER RELATED COSTS FOR PARKS, RECREATIONAL SPACE AND OPEN SPACE IN THE TOWNSHIP PROJECT ALLOCATION 3,000,000 (XXI) HOPEWELL TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR DEVELOPMENT OF THE RETAIL CORRIDOR ON BRODHEAD ROAD PROJECT ALLOCATION 15,000,000 (B) INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR THE DEVELOPMENT OF NEW MULTIPURPOSE GOVERNMENT, COMMUNITY AND EMERGENCY RESPONDERS BUILDING OR BUILDINGS PROJECT ALLOCATION 5,000,000 (C) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR THE DEVELOPMENT OF 20250HB1331PN1945 - 217 - THE HOPEWELL SHOPPING CENTER PROJECT ALLOCATION 5,000,000 (D) RENOVATION, REHABILITATION, REDEVELOPMENT, ACQUISITION, ABATEMENT OF HAZARDOUS MATERIALS, INFRASTRUCTURE, CONSTRUCTION AND OTHER RELATED COSTS FOR DEVELOPMENT OF AN INDOOR/OUTDOOR SPORTS AND RECREATION COMPLEX PROJECT ALLOCATION 3,000,000 (5) BEDFORD COUNTY (I) BEDFORD COUNTY DEVELOPMENT ASSOCIATION (A) ACQUISITION, CONSTRUCTION, SITE DEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, EQUIPMENT, REDEVELOPMENT AND OTHER RELATED COSTS FOR EXPANSION AND/OR RENOVATION OF THE BEDFORD COUNTY TECHNICAL CENTER IN SNAKE SPRING TOWNSHIP PROJECT ALLOCATION 5,000,000 (II) BEDFORD BOROUGH (A) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE IMPROVEMENTS, REDEVELOPMENT, ABATEMENT OF NATURAL HAZARDOUS MATERIALS, RENOVATION AND REHABILITATION AND OTHER RELATED COSTS FOR IMPROVEMENTS AT THE GREEN PROJECT ALLOCATION 1,300,000 (B) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE IMPROVEMENTS, 20250HB1331PN1945 - 218 - REDEVELOPMENT, ABATEMENT OF NATURAL HAZARDOUS MATERIALS, RENOVATION AND REHABILITATION AND OTHER RELATED COSTS FOR IMPROVEMENTS TO PUBLIC SAFETY AND EMERGENCY SERVICES PROJECT ALLOCATION 1,000,000 (C) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF NATURAL HAZARDOUS MATERIALS, RENOVATION AND REHABILITATION AND OTHER RELATED COSTS FOR IMPROVEMENTS AT FORT BEDFORD PARK PROJECT ALLOCATION 3,600,000 (6) BERKS COUNTY (I) CITY OF READING (A) ACQUISITION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE, RENOVATION AND REHABILITATION OF SITES AND OTHER RELATED COSTS FOR OPPORTUNITY HOUSE FACILITIES PROJECT ALLOCATION 5,000,000 (B) ACQUISITION, CONSTRUCTION AND OTHER RELATED COSTS FOR THE ROSE CORPORATION EXPANSION PROJECT ALLOCATION 6,000,000 (II) LAURELDALE BOROUGH (A) CONSTRUCTION AND OTHER RELATED COSTS FOR A NEW FIRE STATION IN THE BOROUGH OF LAURELDALE PROJECT ALLOCATION 1,000,000 20250HB1331PN1945 - 219 - (III) NEW MORGAN BOROUGH (A) ACQUISITION, SITE PREPARATION, REMEDIATION, INFRASTRUCTURE, CONSTRUCTION AND/OR RENOVATION ACTIVITIES RELATED TO THE DEVELOPMENT AND/OR REDEVELOPMENT OF THE SOUTHERN BERKS INDUSTRIAL PARK PROJECT ALLOCATION 25,000,000 (IV) WYOMISSING BOROUGH (A) ACQUISITION, DEMOLITION, SITE PREPARATION, ENVIRONMENTAL REMEDIATION, INFRASTRUCTURE, CONSTRUCTION, EQUIPMENT AND OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT OR COMMUNITY DEVELOPMENT PROJECT UNDERTAKEN BY OR IN CONJUNCTION WITH THE BOROUGH OF WYOMISSING PROJECT ALLOCATION 20,000,000 (V) SPRING TOWNSHIP (A) ACQUISITION, DEMOLITION, SITE PREPARATION, ENVIRONMENTAL REMEDIATION, INFRASTRUCTURE, CONSTRUCTION, EQUIPMENT AND OTHER RELATED COSTS FOR THE BROADCASTING VILLAGE MIXED-USE DEVELOPMENT PROJECT AT THE INTERSECTION OF ROUTE 222 AND BROADCASTING ROAD IN SPRING TOWNSHIP PROJECT ALLOCATION 20,000,000 (7) BLAIR COUNTY (RESERVED) 20250HB1331PN1945 - 220 - (8) BRADFORD COUNTY (RESERVED) (9) BUCKS COUNTY (I) COUNTY PROJECTS (A) LAND ACQUISITION, CONSTRUCTION, DEMOLITION, SITE PREPARATION, INFRASTRUCTURE IMPROVEMENTS AND OTHER RELATED COSTS FOR TRINITY HEALTH PROJECT ALLOCATION 7,000,000 (II) BUCKS COUNTY REDEVELOPMENT AUTHORITY (A) CONSTRUCTION, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR THE THIRD DISTRICT VOLUNTEER FIRE COMPANY STATE RENOVATION PROJECT PROJECT ALLOCATION 750,000 (III) BENSALEM TOWNSHIP (A) ACQUISITION, SITE PREPARATION, CONSTRUCTION, REHABILITATION AND RENOVATION ACTIVITIES RELATED TO THE DEVELOPMENT OF A CAPITAL IMPROVEMENT OR ECONOMIC DEVELOPMENT PROJECT CONSTRUCTED BY BENSALEM TOWNSHIP PROJECT ALLOCATION 25,000,000 (IV) BRISTOL TOWNSHIP (A) REDEVELOPMENT, CONSTRUCTION AND OTHER RELATED COSTS TO EXPAND THE FAMILY SERVICE ASSOCIATION OF BUCKS COUNTY'S HOMELESS SHELTER PROJECT ALLOCATION 7,500,000 (V) WEST ROCKHILL TOWNSHIP (A) ACQUISITION, INFRASTRUCTURE AND OTHER 20250HB1331PN1945 - 221 - COSTS RELATED TO THE REPLACEMENT OF A PET SCANNER AT GRAND VIEW HEALTH LOCATED AT THE SELLERSVILLE OUTPATIENT CENTER PROJECT ALLOCATION 1,000,000 (10) BUTLER COUNTY (I) EAST BUTLER BOROUGH (A) ACQUISITION, CONSTRUCTION AND/OR OTHER COSTS RELATED TO ACQUISITION OF FACILITIES, INFRASTRUCTURE IMPROVEMENTS, INCLUDING ROOF REPLACEMENT, CREATION OF A BALLISTICS TESTING LABORATORY AND VARIOUS FACILITY UPGRADES DESIGNED TO ENHANCE ENERGY EFFICIENCY, REDUCE CARBON EMISSIONS AND LESSEN DEPENDENCE ON THE ELECTRICAL GRID, AND EXPANSION AND ENHANCEMENT OF THE PARKING LOT PROJECT ALLOCATION 2,000,000 (11) CAMBRIA COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, ABATEMENT OF HAZARDOUS MATERIALS, INFRASTRUCTURE, CONSTRUCTION, REDEVELOPMENT, SITE DEVELOPMENT AND OTHER RELATED COSTS OF A PROJECT FOR THE NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION AND ITS MEMBERSHIP PROJECT ALLOCATION 7,000,000 (II) SUSQUEHANNA TOWNSHIP 20250HB1331PN1945 - 222 - (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE DESIGN AND CONSTRUCTION OF A NEW FIRE STATION/PUBLIC SAFETY BUILDING FOR THE HOPE FIRE COMPANY IN NORTHERN CAMBRIA BOROUGH PROJECT ALLOCATION 1,500,000 (12) CAMERON COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, INFRASTRUCTURE, CONSTRUCTION AND OTHER RELATED COSTS FOR A HEALTH CARE FACILITY THAT WOULD PROVIDE MATERNAL CARE, INCLUDING CHILDBIRTH SERVICES PROJECT ALLOCATION 10,000,000 (13) CARBON COUNTY (I) PARRYVILLE BOROUGH (A) CONSTRUCTION AND OTHER RELATED COSTS FOR THE CONSOLIDATION OF A MUNICIPAL HALL, FIRE DEPARTMENT AND EMERGENCY SHELTER INTO ONE CENTRALIZED LOCATION PROJECT ALLOCATION 1,250,000 (14) CENTRE COUNTY (I) BELLEFONTE BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND/OR OTHER COSTS ASSOCIATED WITH THE BELLEFONTE WATERFRONT PROJECT PROJECT ALLOCATION 2,000,000 (II) STATE COLLEGE BOROUGH 20250HB1331PN1945 - 223 - (A) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, IMPROVEMENTS, RENOVATIONS, UPGRADES, ENVIRONMENTAL REMEDIATION, REPAIRS AND OTHER RELATED COSTS FOR THE REDEVELOPMENT OF A CONDOMINIUM PROJECT ALLOCATION 20,000,000 (III) COLLEGE TOWNSHIP (A) CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR RENOVATION OF TWO HISTORIC BUILDINGS AT THE CLEARWATER CONSERVANCY PROJECT ALLOCATION 3,000,000 (15) CHESTER COUNTY (I) COUNTY PROJECTS (A) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED COSTS FOR KENNETT CONSOLIDATED SCHOOL DISTRICT PROJECTS PROJECT ALLOCATION 20,000,000 (B) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED COSTS TO UPGRADE AND RENOVATE A FARMHOUSE AND NEIGHBORING FACILITIES PROJECT ALLOCATION 10,000,000 (C) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, SITE IMPROVEMENTS, RENOVATION, ENVIRONMENTAL REMEDIATION, 20250HB1331PN1945 - 224 - REPAIR AND OTHER RELATED COSTS WITH UPGRADES FOR FARMHOUSE ENTERPRISES, LLC, AND THE SURROUNDING SPACE, FACILITIES AND LAND PROJECT ALLOCATION 10,000,000 (D) ACQUISITION, CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE REDEVELOPMENT AND IMPROVEMENT OF THE PAOLI TRAIN STATION PROJECT ALLOCATION 10,000,000 (E) ACQUISITION, DEMOLITION, SITE PREPARATION, RENOVATION, CONSTRUCTION, REMEDIATION, INFRASTRUCTURE AND/OR OTHER ASSOCIATED COSTS TO SUPPORT DEVELOPMENT WITHIN ANSON B.
NIXON PARK PROJECT ALLOCATION 5,000,000 (F) ACQUISITION, SITE PREPARATION, RENOVATION, CONSTRUCTION, REMEDIATION, INFRASTRUCTURE AND OTHER ASSOCIATED COSTS RELATED TO AN ECONOMIC OR COMMUNITY DEVELOPMENT PROJECT ADVANCED BY SQUARE ROOTS COLLECTIVE PROJECT ALLOCATION 5,000,000 (II) DOWNINGTOWN BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED COSTS TO UPGRADE, RELOCATE AND 20250HB1331PN1945 - 225 - RENOVATE THE BOROUGH HALL, POLICE STATION AND OTHER MUNICIPAL BUILDINGS PROJECT ALLOCATION 10,000,000 (III) KENNETT SQUARE BOROUGH (A) ACQUISITION, SITE PREPARATION, RENOVATION, CONSTRUCTION, REMEDIATION, INFRASTRUCTURE AND/OR OTHER ASSOCIATED COSTS RELATED TO AN ECONOMIC AND/OR COMMUNITY DEVELOPMENT PROJECT IN KENNETT SQUARE PROJECT ALLOCATION 10,000,000 (IV) PHOENIXVILLE BOROUGH (A) ACQUISITION, INFRASTRUCTURE, DEVELOPMENT, SITE PREPARATION, CONSTRUCTION, REHABILITATION RENOVATION AND OTHER RELATED EXPENSES TO SUPPORT AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 40,000,000 (V) EASTTOWN TOWNSHIP (A) ACQUISITION, CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 15,000,000 (VI) EAST MARLBOROUGH TOWNSHIP (A) ACQUISITION, SITE PREPARATION, RENOVATION, CONSTRUCTION, REMEDIATION, INFRASTRUCTURE AND OTHER COSTS 20250HB1331PN1945 - 226 - ASSOCIATED COSTS TO IMPROVE OR EXPAND LONGWOOD GARDENS FACILITIES IN CHESTER COUNTY PROJECT ALLOCATION 10,000,000 (VII) KENNETT TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED COSTS TO RECONSTRUCT GREENWOOD ELEMENTARY SCHOOL PROJECT ALLOCATION 14,000,000 (VIII) NEW GARDEN TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED COSTS TO RECONSTRUCT NEW GARDEN ELEMENTARY SCHOOL PROJECT ALLOCATION 14,000,000 (IX) RICHLAND TOWNSHIP (A) INFRASTRUCTURE UPDATES AND IMPROVEMENTS, ENVIRONMENTAL REMEDIATION, CONSTRUCTION AND OTHER RELATED COSTS FOR THE LEHIGH VALLEY HOSPITAL - CEDAR CREST AND EXPANSION OF LEHIGH VALLEY HEALTH NETWORK PROJECT ALLOCATION 10,000,000 (X) SCHUYLKILL TOWNSHIP (A) ACQUISITION, CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER 20250HB1331PN1945 - 227 - RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 15,000,000 (XI) TREDYFFRIN TOWNSHIP (A) ACQUISITION, CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 15,000,000 (XII) WILLISTOWN TOWNSHIP (A) ACQUISITION, CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 15,000,000 (16) CLARION COUNTY (RESERVED) (17) CLEARFIELD COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS, RENOVATION AND/OR OTHER COSTS FOR REDEVELOPMENT PROJECTS PROJECT ALLOCATION 10,000,000 (B) ACQUISITION, ABATEMENT OF HAZARDOUS MATERIALS, INFRASTRUCTURE, CONSTRUCTION, REDEVELOPMENT, SITE DEVELOPMENT AND OTHER RELATED COSTS OF 20250HB1331PN1945 - 228 - A PROJECT FOR THE NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION AND ITS MEMBERSHIP PROJECT ALLOCATION 7,000,000 (II) CLEARFIELD COUNTY ECONOMIC DEVELOPMENT CORPORATION (A) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO THE REMOVAL OF TWO DAMS, CREATION OF TWO WHITEWATER PARKS AND CONSTRUCTION OF A WHITEWATER VILLAGE PROJECT ALLOCATION 8,000,000 (III) NORTH CENTRAL PENNSYLVANIA REGIONAL PLANNING AND DEVELOPMENT COMMISSION (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO THE CONSTRUCTION OF A MULTISTORY BUILDING WITH APARTMENTS FOR OLDER RESIDENTS WITH PARKING, GARAGES AND STORAGE UNITS IN THE CITY OF DUBOIS PROJECT ALLOCATION 5,150,000 (IV) CITY OF DUBOIS (A) CONSTRUCTION, INFRASTRUCTURE AND/OR OTHER COSTS RELATED TO RENOVATION OF THE SALVATION ARMY'S DUBOIS LOCATION PROJECT ALLOCATION 600,000 (V) MORRIS TOWNSHIP 20250HB1331PN1945 - 229 - (A) ACQUISITION, DESIGN, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS, INCLUDING MACHINERY AND EQUIPMENT, FOR A PROJECT AT WEST BRANCH SCHOOL DISTRICT PROJECT ALLOCATION 7,000,000 (VI) SANDY TOWNSHIP (A) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REMEDIATION, INFRASTRUCTURE AND/OR OTHER COSTS ASSOCIATED WITH FACILITIES AT DUBOIS - TREASURE LAKE KOA PROJECT ALLOCATION 5,000,000 (B) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REMEDIATION, INFRASTRUCTURE AND/OR OTHER COSTS ASSOCIATED WITH AN ECONOMIC AND/OR FACILITIES DEVELOPMENT PROJECT AT TREASURE LAKE PROJECT ALLOCATION 5,000,000 (18) CLINTON COUNTY (I) MILL HALL BOROUGH (A) ACQUISITION, SITE PREPARATION, INFRASTRUCTURE, REMEDIATION, RENOVATION, CONSTRUCTION AND/OR OTHER RELATED COSTS ASSOCIATED WITH THE DEVELOPMENT AND/OR EXPANSION OF A WHEAT AND RYE PROCESSING FACILITY 20250HB1331PN1945 - 230 - PROJECT ALLOCATION 4,000,000 (19) COLUMBIA COUNTY (I) COUNTY PROJECTS (A) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE AND/OR OTHER ASSOCIATED COSTS FOR IMPROVEMENTS TO AND/OR EXPANSIONS OF BLOOMSBURG AREA YMCA'S FACILITY PROJECT ALLOCATION 8,000,000 (20) CRAWFORD COUNTY (I) TITUSVILLE REDEVELOPMENT AUTHORITY (A) ACQUISITION, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE UNIVERSITY OF PITTSBURGH AT TITUSVILLE, INCLUDING RENOVATION AND REHABILITATION OF EXISTING FACILITIES AND CONSTRUCTION OF NEW FACILITIES PROJECT ALLOCATION 10,000,000 (21) CUMBERLAND COUNTY (I) COUNTY PROJECTS (A) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE AND OTHER ASSOCIATED COSTS FOR THE DEVELOPMENT OF THE CARLISLE SPORTS EMPORIUM PROJECT ALLOCATION 5,000,000 (B) ACQUISITION, SITE PREPARATION, 20250HB1331PN1945 - 231 - REMEDIATION, INFRASTRUCTURE, CONSTRUCTION AND RENOVATION ACTIVITIES RELATED TO THE DEVELOPMENT OR REDEVELOPMENT OF A LARGE-SCALE INDUSTRIAL SITE OR FACILITY IN CUMBERLAND COUNTY PROJECT ALLOCATION 10,000,000 (C) ACQUISITION, CONSTRUCTION AND INFRASTRUCTURE DEVELOPMENT FOR A NEIGHBORHOOD REDEVELOPMENT PROJECT PROJECT ALLOCATION 1,000,000 (D) ACQUISITION, SITE DEVELOPMENT, CONSTRUCTION, RENOVATION, INFRASTRUCTURE, EQUIPMENT AND OTHER RELATED COSTS FOR FACILITIES, FIXED OR MOBILE, IN WHICH TO CONDUCT CUMBERLAND COUNTY GOVERNMENT BUSINESS PROJECT ALLOCATION 15,000,000 (II) CAPITAL REGION ECONOMIC DEVELOPMENT CORPORATION (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR THE PENN STATE HEALTH HOLY SPIRIT MEDICAL CENTER FACILITY AND CAMPUS IN EAST PENNSBORO TOWNSHIP PROJECT ALLOCATION 20,000,000 (III) CUMBERLAND AREA ECONOMIC DEVELOPMENT CORPORATION (A) SITE PREPARATION, REMEDIATION, 20250HB1331PN1945 - 232 - ACQUISITION, DEMOLITION, RENOVATION, CONSTRUCTION, INFRASTRUCTURE IMPROVEMENTS AND/OR OTHER ASSOCIATED COSTS FOR THE REDEVELOPMENT OF BROWNFIELD SITES IN CUMBERLAND COUNTY PROJECT ALLOCATION 10,000,000 (B) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE AND OTHER ASSOCIATED COSTS FOR THE DEVELOPMENT OF THE CARLISLE SPORTS EMPORIUM PROJECT ALLOCATION 5,000,000 (IV) CUMBERLAND COUNTY INDUSTRIAL DEVELOPMENT AUTHORITY (A) ACQUISITION, DEMOLITION, SITE WORK, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND CONSTRUCTION RELATED TO REDEVELOPMENT PROJECTS LOCATED IN BUSINESS DISTRICTS AND DOWNTOWN AREAS PROJECT ALLOCATION 1,792,500 (B) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, RENOVATION, REHABILITATION AND OTHER COSTS RELATED TO AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 30,000,000 (V) CARLISLE BOROUGH (A) SITE PREPARATION, REMEDIATION, ACQUISITION, DEMOLITION, RENOVATION, CONSTRUCTION, INFRASTRUCTURE 20250HB1331PN1945 - 233 - IMPROVEMENTS AND/OR OTHER ASSOCIATED COSTS FOR THE REDEVELOPMENT OF THE FORMER FROG SWITCH & MANUFACTURING SITE IN CARLISLE BOROUGH PROJECT ALLOCATION 10,000,000 (VI) HAMPDEN TOWNSHIP (A) ACQUISITION, SITE PREPARATION, CONSTRUCTION, REHABILITATION AND RENOVATION ACTIVITIES RELATED TO THE DEVELOPMENT OF A COMMUNITY OR ECONOMIC DEVELOPMENT PROJECT IN HAMPDEN TOWNSHIP PROJECT ALLOCATION 10,000,000 (VII) MIDDLESEX TOWNSHIP (A) ACQUISITION, SITE PREPARATION, RENOVATION, CONSTRUCTION, EQUIPMENT, INFRASTRUCTURE AND/OR OTHER ASSOCIATED COSTS FOR IMPROVEMENTS TO PROPERTY AND FACILITIES AT A FAMILY-ORIENTED SOCIAL AND SPORTS CLUB PROJECT ALLOCATION 5,000,000 (VIII) MONROE TOWNSHIP (A) ACQUISITION, SITE PREPARATION, RENOVATION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR A COMMUNITY REVITALIZATION AND ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 7,500,000 (IX) NORTH MIDDLETON TOWNSHIP (A) ACQUISITION, SITE PREPARATION, 20250HB1331PN1945 - 234 - CONSTRUCTION, REHABILITATION AND RENOVATION ACTIVITIES RELATED TO THE DEVELOPMENT OF A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT IN NORTH MIDDLETON TOWNSHIP PROJECT ALLOCATION 10,000,000 (X) SHIPPENSBURG BOROUGH (A) ACQUISITION, SITE PREPARATION, DEMOLITION, REMEDIATION, INFRASTRUCTURE, CONSTRUCTION, RENOVATIONS AND/OR OTHER ASSOCIATED COSTS RELATED TO A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 4,000,000 (B) CONSTRUCTION, SITE IMPROVEMENT, INFRASTRUCTURE, REMEDIATION, REDEVELOPMENT, EQUIPMENT AND/OR OTHER RELATED COSTS TO IMPROVE OR EXPAND SCHREIBER FOODS, INC.'S, SHIPPENSBURG FACILITY PROJECT ALLOCATION 15,000,000 (XI) SILVER SPRING TOWNSHIP (A) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE AND/OR OTHER COSTS ASSOCIATED WITH DEVELOPING A COMMUNITY CENTER, WORK FORCE DEVELOPMENT CENTER AND DENTAL CLINIC IN SILVER SPRING TOWNSHIP PROJECT ALLOCATION 7,500,000 20250HB1331PN1945 - 235 - (XII) SOUTH MIDDLETON TOWNSHIP (A) ACQUISITION, SITE PREPARATION, CONSTRUCTION, REHABILITATION, INFRASTRUCTURE AND/OR RENOVATION ACTIVITIES RELATED TO THE DEVELOPMENT OF A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 5,000,000 (B) ACQUISITION, SITE PREPARATION, CONSTRUCTION, REHABILITATION AND RENOVATION ACTIVITIES RELATED TO THE DEVELOPMENT OF A RECREATIONAL AND SPORTS FACILITY PROJECT PROJECT ALLOCATION 5,000,000 (XIII) UPPER ALLEN TOWNSHIP (A) ACQUISITION, SITE PREPARATION, RENOVATION, CONSTRUCTION, EQUIPMENT, INFRASTRUCTURE AND/OR OTHER ASSOCIATED COSTS FOR IMPROVEMENTS TO PROPERTY AND FACILITIES PROJECT ALLOCATION 7,500,000 (22) DAUPHIN COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR ECONOMIC DEVELOPMENT PROJECTS WITHIN THE COUNTY PROJECT ALLOCATION 30,000,000 (B) ACQUISITION, CONSTRUCTION, 20250HB1331PN1945 - 236 - DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR AFFORDABLE HOUSING WITHIN THE COUNTY PROJECT ALLOCATION 15,000,000 (C) CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR IMPROVEMENTS TO COUNTY-OWNED BUILDINGS PROJECT ALLOCATION 40,000,000 (D) ACQUISITION, CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE CONSOLIDATION OF COUNTY HEALTH AND HUMAN SERVICES OPERATIONS PROJECT ALLOCATION 20,000,000 (E) ACQUISITION, CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR A MEMORIAL HONORING FALLEN POLICE OFFICERS PROJECT ALLOCATION 2,000,000 (II) CAPITAL REGION ECONOMIC DEVELOPMENT CORPORATION (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR THE PENN STATE HEALTH MILTON S.
HERSHEY MEDICAL 20250HB1331PN1945 - 237 - CENTER FACILITY AND CAMPUS, TO INCLUDE PENN STATE COLLEGE OF MEDICINE PROJECT ALLOCATION 35,000,000 (B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO SPIRIT PRODUCTION AND PACKAGING BUILDING RENOVATION AND NEW BUILDING CONSTRUCTION IN DERRY TOWNSHIP PROJECT ALLOCATION 7,500,000 (III) CAPITAL REGION WATER (A) ACQUISITION, DEMOLITION, SITE PREPARATION, REMEDIATION AND NEW CONSTRUCTION FOR ACTIVITIES RELATED TO IMPROVING THE AGING INFRASTRUCTURE IN THE CITY OF HARRISBURG PROJECT ALLOCATION 50,000,000 (IV) DAUPHIN COUNTY REDEVELOPMENT AUTHORITY (A) CONSTRUCTION, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR THE HISTORIC TRACY MANSION PROJECT ALLOCATION 4,500,000 (V) CITY OF HARRISBURG (A) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED COSTS TO UPGRADE AND RENOVATE THE JEWISH FAMILY SERVICES OF GREATER HARRISBURG FACILITY 20250HB1331PN1945 - 238 - PROJECT ALLOCATION 10,000,000 (B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS, RENOVATION AND REHABILITATION OF SITE AND OTHER RELATED COSTS FOR THE JEWISH FEDERATION OF GREATER HARRISBURG FACILITIES LOCATED IN THE CITY OF HARRISBURG PROJECT ALLOCATION 5,000,000 (C) REDEVELOPMENT, CONSTRUCTION, INFRASTRUCTURE, REHABILITATION AND OTHER RELATED COSTS FOR THE HISTORIC TRACY MANSION RENOVATION PROJECT LOCATED AT 1829 NORTH FRONT STREET PROJECT ALLOCATION 4,500,000 (D) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT AND OTHER RELATED COSTS ASSOCIATED WITH THE JEWISH FEDERATION OF GREATER HARRISBURG FACILITIES, INCLUDING THE ALEXANDER GRASS CAMPUS FOR JEWISH LIFE PROJECT ALLOCATION 5,000,000 (E) ACQUISITION, CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE RELOCATION OF A MASS TRANSIT OPERATION WITHIN THE CITY OF HARRISBURG PROJECT ALLOCATION 25,000,000 20250HB1331PN1945 - 239 - (F) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS, MACHINERY AND EQUIPMENT AND OTHER RELATED COSTS FOR THE DECHANNELIZATION OF PAXTON CREEK TO ALLOW FOR FLOOD MITIGATION AND ADDITIONAL REDEVELOPMENT PROJECT ALLOCATION 60,000,000 (VI) DAUPHIN BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE AND/OR OTHER COSTS RELATED TO A COMMUNITY BUILDING PROJECT PROJECT ALLOCATION 1,500,000 (VII) HUMMELSTOWN BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO THE RESTORATION OF THE HISTORIC HOTEL WARWICK PROJECT ALLOCATION 1,750,000 (VIII) PENBROOK BOROUGH (A) CONSTRUCTION AND REDEVELOPMENT OF A BOROUGH MUNICIPAL BUILDING PROJECT ALLOCATION 4,200,000 (IX) STEELTON BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE STEELTON HIGHSPIRE SCHOOL DISTRICT SPORTS COMPLEX MULTIPHASED PROJECT PROJECT ALLOCATION 4,000,000 20250HB1331PN1945 - 240 - (X) LOWER PAXTON TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE AND/OR OTHER COSTS RELATED TO A PROJECT AT HARRISBURG CHRISTIAN SCHOOL PROJECT ALLOCATION 1,000,000 (XI) LOWER SWATARA TOWNSHIP (A) SITE PREPARATION, ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER ASSOCIATED COSTS FOR IMPROVEMENTS TO OR EXPANSION OF WILSBACH DISTRIBUTOR, INC.'S, FACILITY IN SUPPORT OF A CARBON NEUTRALITY INITIATIVE PROJECT ALLOCATION 5,000,000 (XII) SUSQUEHANNA TOWNSHIP (A) CONSTRUCTION, RENOVATION, IMPROVEMENTS, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, INFRASTRUCTURE, MACHINERY AND EQUIPMENT, HVAC AND OTHER RELATED COSTS FOR THE CAPITAL BLUE CROSS OFFICE IN SUSQUEHANNA TOWNSHIP PROJECT ALLOCATION 5,000,000 (B) ACQUISITION, CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR SUSQUEHANNA UNION GREEN PROJECT ALLOCATION 2,500,000 20250HB1331PN1945 - 241 - (XIII) SWATARA TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION AND OTHER RELATED COSTS FOR FACILITY AND EQUIPMENT UPGRADES AT WITF PROJECT ALLOCATION 10,000,000 (23) DELAWARE COUNTY (I) COUNTY PROJECTS (A) LAND ACQUISITION, CONSTRUCTION, DEMOLITION, SITE PREPARATION, INFRASTRUCTURE IMPROVEMENTS AND OTHER RELATED COSTS FOR TRINITY HEALTH PROJECT ALLOCATION 75,000,000 (II) DELAWARE COUNTY REDEVELOPMENT AUTHORITY (A) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT, RENOVATIONS, REHABILITATION AND OTHER RELATED COSTS FOR HEALTHCARE FACILITIES IN THE CITY OF CHESTER AND UPLAND BOROUGH PROJECT ALLOCATION 20,000,000 (B) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT, RENOVATIONS, REHABILITATION AND OTHER RELATED COSTS FOR CAPITAL PROJECTS AT NEUMANN UNIVERSITY PROJECT ALLOCATION 15,000,000 (III) HAVERFORD TOWNSHIP 20250HB1331PN1945 - 242 - (A) CONSTRUCTION AND OTHER RELATED COSTS FOR BROOKLINE PARK PROJECT ALLOCATION 500,000 (IV) MARPLE TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, AND OTHER COSTS ASSOCIATED WITH REPAIRING THE BRICK FACADE AT ST.
PIUS X CATHOLIC CHURCH AND SCHOOL PROJECT ALLOCATION 6,100,000 (V) RADNOR TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR PROJECTS IN FENIMORE WOODS PARK PROJECT ALLOCATION 700,000 (B) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PROJECTS RELATING TO RADNOR TOWNSHIP BUILDING PROJECT ALLOCATION 500,000 (C) UPGRADES AND DEFERRED MAINTENANCE, PHASE VII, FOR NORTH WAYNE FLOOD MITIGATION PROJECT ALLOCATION 550,000 (VI) UPPER PROVIDENCE TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, AND OTHER RELATED COSTS FOR THE BENCHMARK SCHOOL PROJECT ALLOCATION 2,500,000 (B) CONSTRUCTION, INFRASTRUCTURE, 20250HB1331PN1945 - 243 - ACQUISITION AND OTHER RELATED COSTS TO CONSTRUCT A MULTIUSE BUILDING FOR THE DEPARTMENT OF PUBLIC WORKS PROJECT ALLOCATION 5,000,000 (C) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION AND OTHER RELATED COSTS FOR A COMMUNITY ROOM PROJECT ALLOCATION 3,000,000 (D) INFRASTRUCTURE, RENOVATION, REHABILITATION, CONSTRUCTION AND OTHER RELATED COSTS FOR LOUIS SCOTT MEMORIAL PARK PROJECT ALLOCATION 500,000 (E) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS TO SUSTAIN AND INCREASE THE QUALITY OF LIFE IN UPPER PROVIDENCE TOWNSHIP PROJECT ALLOCATION 15,000,000 (F) CONSTRUCTION, INFRASTRUCTURE, RENOVATION, REHABILITATION, REDEVELOPMENT AND OTHER RELATED COSTS TO EXPAND A TOWNSHIP MUNICIPAL BUILDING PROJECT ALLOCATION 5,000,000 (24) ELK COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, CONSTRUCTION AND OTHER 20250HB1331PN1945 - 244 - COSTS RELATED TO THE ABBOTT FURNACE EXPANSION PROJECT ALLOCATION 6,000,000 (B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS, RENOVATION AND/OR OTHER COSTS FOR REDEVELOPMENT PROJECTS PROJECT ALLOCATION 10,000,000 (II) RIDGWAY BOROUGH (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT AND/OR OTHER COSTS RELATED TO THE RENOVATION OF A BUILDING FOR SOCIAL SERVICES IN THE REGION PROJECT ALLOCATION 2,000,000 (25) ERIE COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR ZURN ELKAY WATER SOLUTIONS PROJECT ALLOCATION 10,000,000 (II) NORTH EAST COMMUNITY AUTHORITY (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR A COMPREHENSIVE REHABILITATION OF THE NORTH EAST 20250HB1331PN1945 - 245 - MARINA, INCLUDING DREDGING AND FIXING THE MARINA WALL AND UPGRADES TO THE SLIPS, FUEL DOCK AND OTHER FACILITIES PROJECT ALLOCATION 15,000,000 (26) FAYETTE COUNTY (RESERVED) (27) FOREST COUNTY (RESERVED) (28) FRANKLIN COUNTY (I) COUNTY PROJECTS (A) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE, REMEDIATION AND/OR OTHER ASSOCIATED COSTS FOR THE CONSTRUCTION OF A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT IN FRANKLIN COUNTY PROJECT ALLOCATION 10,000,000 (II) FRANKLIN COUNTY AREA DEVELOPMENT CORPORATION (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO AN ECONOMIC DEVELOPMENT PROJECT WITHIN THE GREENCASTLE-ANTRIM SCHOOL DISTRICT OR THE WAYNESBORO AREA SCHOOL DISTRICT PROJECT ALLOCATION 5,000,000 (III) ANTRIM TOWNSHIP (A) FOR THE SITE WORK, CONSTRUCTION, INFRASTRUCTURE AND COSTS ASSOCIATED WITH AN ECONOMIC DEVELOPMENT, 20250HB1331PN1945 - 246 - HEALTHCARE OR RELATED PROJECT PROJECT ALLOCATION 15,000,000 (IV) BOROUGH OF CHAMBERSBURG (A) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE AND/OR OTHER COSTS ASSOCIATED WITH THE DEVELOPMENT OF COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 5,000,000 (V) BOROUGH OF WAYNESBORO (A) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE AND/OR OTHER ASSOCIATED COSTS FOR THE RENOVATION AND/OR CONSTRUCTION OF A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 5,000,000 (VI) GREENE TOWNSHIP (A) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE AND/OR OTHER ASSOCIATED COSTS FOR THE CONSTRUCTION OF A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 5,000,000 (B) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE AND/OR 20250HB1331PN1945 - 247 - OTHER ASSOCIATED COSTS FOR THE DEVELOPMENT OF THE LETTERKENNY SPORTS COMPLEX PROJECT ALLOCATION 10,000,000 (VII) GUILFORD TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE AND/OR OTHER COSTS RELATED TO THE BUILDING OF A TRAINING HOUSE TO BE USED FOR FIRE, EMS AND POLICE TRAINING EXERCISES PROJECT ALLOCATION 2,000,000 (VIII) QUINCY TOWNSHIP (A) SITE WORK, CONSTRUCTION AND/OR OTHER ASSOCIATED COSTS RELATED TO UPGRADES TO MUNICIPAL BUILDINGS PROJECT ALLOCATION 500,000 (IX) WASHINGTON TOWNSHIP (A) ACQUISITION, SITE DEVELOPMENT, INFRASTRUCTURE, CONSTRUCTION, ABATEMENT, EQUIPMENT AND OTHER RELATED COSTS FOR A COMMUNITY OR ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 10,000,000 (29) FULTON COUNTY (RESERVED) (30) GREENE COUNTY (RESERVED) (31) HUNTINGDON COUNTY (RESERVED) (32) INDIANA COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, REHABILITATION, INFRASTRUCTURE IMPROVEMENTS, CONSTRUCTION AND RELATED COSTS FOR 20250HB1331PN1945 - 248 - INDUSTRIAL BUILDING DEVELOPMENT PROJECTS PROJECT ALLOCATION 15,000,000 (B) ACQUISITION, ABATEMENT, RENOVATION, REHABILITATION, REDEVELOPMENT, INFRASTRUCTURE IMPROVEMENTS, CONSTRUCTION AND RELATED COSTS FOR ECONOMIC DEVELOPMENT PROJECTS PROJECT ALLOCATION 10,000,000 (C) ACQUISITION, REHABILITATION, INFRASTRUCTURE IMPROVEMENTS, CONSTRUCTION AND RELATED COSTS FOR COMMUNITY/ECONOMIC DEVELOPMENT REVITALIZATION AND BLIGHT-RELATED PROJECTS PROJECT ALLOCATION 10,000,000 (D) ACQUISITION, REHABILITATION, INFRASTRUCTURE IMPROVEMENTS, CONSTRUCTION AND RELATED COSTS FOR BUSINESS PARK DEVELOPMENT PROJECTS PROJECT ALLOCATION 10,000,000 (E) ACQUISITION, REHABILITATION, RENOVATIONS, INFRASTRUCTURE IMPROVEMENTS, CONSTRUCTION AND RELATED COSTS FOR BUILDING REVITALIZATION PROJECTS, INCLUDING HISTORICAL STRUCTURES PROJECT ALLOCATION 10,000,000 (33) JEFFERSON COUNTY (I) COUNTY PROJECTS 20250HB1331PN1945 - 249 - (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND/OR OTHER RELATED COSTS FOR A VISITOR'S CENTER PROJECT ALLOCATION 500,000 (B) ACQUISITION, CONSTRUCTION, REDEVELOPMENT, RENOVATION AND/OR OTHER RELATED COSTS TO DEVELOP A NEW SPACE FOR JEFFERSON COUNTY DOMESTIC RELATIONS AND MAGISTERIAL DISTRICT JUDGE 54-3-03 PROJECT ALLOCATION 1,000,000 (C) CONSTRUCTION, RENOVATION AND/OR OTHER RELATED COSTS FOR A NEW 911 CENTER PROJECT ALLOCATION 5,000,000 (D) ACQUISITION, ABATEMENT, RENOVATION, REHABILITATION, REDEVELOPMENT, INFRASTRUCTURE IMPROVEMENTS, CONSTRUCTION AND RELATED COSTS FOR ECONOMIC DEVELOPMENT PROJECTS PROJECT ALLOCATION 10,000,000 (II) BROOKVILLE BOROUGH (A) ACQUISITION, CONSTRUCTION, RENOVATION, REDEVELOPMENT, SITE DEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, EQUIPMENT AND OTHER RELATED COSTS FOR COMMUNITY REVITALIZATION AND ECONOMIC DEVELOPMENT PROJECTS PROJECT ALLOCATION 10,000,000 20250HB1331PN1945 - 250 - (B) CONSTRUCTION, RENOVATION AND/OR OTHER RELATED COSTS TO ADDRESS SAFETY CONCERNS AT JEFFERSON COUNTY FACILITIES, INCLUDING STEPS TO THE COURTHOUSE AND SIDEWALKS IN FRONT OF THE COURTHOUSE AND JEFFERSON PLACE PROJECT ALLOCATION 1,000,000 (34) JUNIATA COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER COSTS RELATED TO ECONOMIC DEVELOPMENT PROJECT ALLOCATION 10,000,000 (35) LACKAWANNA COUNTY (I) COUNTY PROJECTS (A) CONSTRUCTION, INFRASTRUCTURE, IMPROVEMENTS, ACQUISITION, RENOVATIONS, ABATEMENT AND OTHER RELATED COSTS FOR AN ECONOMIC OR COMMUNITY DEVELOPMENT PROJECT IN THE COUNTY PROJECT ALLOCATION 50,000,000 (B) ACQUISITION, CONSTRUCTION, RENOVATION, INFRASTRUCTURE AND OTHER COSTS RELATED TO PROPERTIES OWNED OR TO BE ACQUIRED BY THE FELLOWSHIP HOUSE FOUNDATION PROJECT ALLOCATION 4,000,000 20250HB1331PN1945 - 251 - (II) CITY OF CARBONDALE (A) ACQUISITION, CONSTRUCTION, RENOVATION, INFRASTRUCTURE AND OTHER COSTS RELATED TO PROPERTIES OWNED OR TO BE ACQUIRED BY CARBONDALE DEVELOPMENT PARTNERS II, LLC PROJECT ALLOCATION 2,500,000 (III) CITY OF SCRANTON (A) ACQUISITION, CONSTRUCTION, RENOVATION, INFRASTRUCTURE AND OTHER COSTS RELATED TO THE MEDICAL ARTS BUILDING LOCATED AT 327 N.
WASHINGTON AVENUE, SCRANTON, PENNSYLVANIA PROJECT ALLOCATION 4,000,000 (B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (IV) TAYLOR BOROUGH (A) CONSTRUCTION AND INFRASTRUCTURE RELATED TO SCHIFF'S FOOD SERVICE, INC., WAREHOUSE EXPANSION PROJECT ALLOCATION 1,750,000 (36) LANCASTER COUNTY (I) COUNTY PROJECTS (A) DESIGN, DEMOLITION, ABATEMENT OF HAZARDOUS MATERIALS, EXTENSIONS OR UPGRADING OF UTILITIES, SITE GRADING, 20250HB1331PN1945 - 252 - CONSTRUCTION OF NEW SPACE, FACADE PRESERVATION, FIT-OUT OF EXISTING SPACE, INFRASTRUCTURE UPGRADE AND OTHER RELATED COSTS IN LANCASTER COUNTY PROJECT ALLOCATION 15,000,000 (B) ACQUISITION, SITE PREPARATION, RENOVATION, CONSTRUCTION, REMEDIATION, INFRASTRUCTURE, AND/OR OTHER ASSOCIATED COSTS FOR A UNITED DISABILITIES SERVICES FOUNDATION PROJECT IN LANCASTER COUNTY PROJECT ALLOCATION 5,000,000 (C) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, MACHINERY, EQUIPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR DEVELOPMENT PROJECTS AT FRANKLIN AND MARSHALL COLLEGE IN LANCASTER COUNTY PROJECT ALLOCATION 10,000,000 (II) LANCASTER COUNTY HOUSING AND REDEVELOPMENT AUTHORITY (A) ACQUISITION, REDEVELOPMENT, RENOVATION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR ECONOMIC DEVELOPMENT PROJECTS IN LANCASTER COUNTY PROJECT ALLOCATION 10,000,000 (III) LITITZ REGIONAL COMMUNITY DEVELOPMENT CORPORATION 20250HB1331PN1945 - 253 - (A) ACQUISITION, DESIGN, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS, INCLUDING EQUIPMENT AND MACHINERY, FOR A COMMUNITY ASSET PROJECT IN ELIZABETH TOWNSHIP PROJECT ALLOCATION 15,000,000 (B) ACQUISITION, DESIGN, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS, INCLUDING EQUIPMENT AND MACHINERY, FOR AN ECONOMIC DEVELOPMENT PROJECT IN ELIZABETH TOWNSHIP PROJECT ALLOCATION 30,000,000 (C) ACQUISITION, DESIGN, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS, INCLUDING EQUIPMENT AND MACHINERY, FOR A COMMUNITY ASSET PROJECT IN LITITZ BOROUGH PROJECT ALLOCATION 15,000,000 (D) ACQUISITION, DESIGN, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS, INCLUDING EQUIPMENT AND MACHINERY, FOR AN ECONOMIC DEVELOPMENT 20250HB1331PN1945 - 254 - PROJECT IN LITITZ BOROUGH PROJECT ALLOCATION 30,000,000 (E) ACQUISITION, DESIGN, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS, INCLUDING EQUIPMENT AND MACHINERY, RELATED TO REDEVELOPMENT OF PROPERTIES SITUATED BETWEEN NORTH BROAD STREET AND NORTH CEDAR STREET ADJACENT TO THE NORFOLK SOUTHERN RAIL LINE IN LITITZ BOROUGH PROJECT ALLOCATION 20,000,000 (F) ACQUISITION, DESIGN, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS, INCLUDING EQUIPMENT AND MACHINERY, FOR AN ECONOMIC DEVELOPMENT PROJECT IN WARWICK TOWNSHIP PROJECT ALLOCATION 30,000,000 (G) ACQUISITION, DESIGN, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS, INCLUDING EQUIPMENT AND MACHINERY, FOR A COMMUNITY ASSET PROJECT IN WARWICK TOWNSHIP PROJECT ALLOCATION 15,000,000 (IV) CITY OF LANCASTER 20250HB1331PN1945 - 255 - (A) CONSTRUCTION, RENOVATION, REHABILITATION AND OTHER RELATED COSTS ASSOCIATED WITH RENOVATIONS TO THE YWCA IN LANCASTER CITY PROJECT ALLOCATION 7,600,000 (B) CONSTRUCTION, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, RENOVATION, REHABILITATION AND OTHER RELATED COSTS TO RENOVATE PRICE ELEMENTARY SCHOOL PROJECT ALLOCATION 12,500,000 (C) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE WHEATLAND AVENUE HABITAT CONDOMINIUMS PROJECT ALLOCATION 3,500,000 (D) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS, MACHINERY AND EQUIPMENT AND OTHER RELATED COSTS FOR PUBLIC WORKS INFRASTRUCTURE PROJECT ALLOCATION 4,000,000 (E) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS, MACHINERY AND EQUIPMENT FOR CAPITAL IMPROVEMENTS AND EXPANSION OF AMENITIES AT THE CONESTOGA PINES PARK AND SE PARKS PROJECT ALLOCATION 5,000,000 20250HB1331PN1945 - 256 - (F) ACQUISITION, INFRASTRUCTURE, REMEDIATION, ABATEMENT OF HAZARDOUS MATERIALS, RENOVATION, CONSTRUCTION AND OTHER COSTS RELATED TO THE DEVELOPMENT AND EXPANSION OF MULTIMODAL TRANSPORTATION SAFETY INITIATIVES PROJECT ALLOCATION 5,000,000 (V) EPHRATA BOROUGH (A) ACQUISITION, SITE PREPARATION, CONSTRUCTION, REHABILITATION AND RENOVATION ACTIVITIES RELATED TO THE DEVELOPMENT OF A CIVIC AND/OR ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 5,000,000 (VI) EAST HEMPFIELD TOWNSHIP (A) ACQUISITION, SITE PREPARATION, RENOVATION, CONSTRUCTION, REMEDIATION, INFRASTRUCTURE AND/OR OTHER ASSOCIATED COSTS TO IMPROVE OR EXPAND UNITED DISABILITIES SERVICES FOUNDATION FACILITIES IN EAST HEMPFIELD TOWNSHIP PROJECT ALLOCATION 5,000,000 (VII) MANHEIM TOWNSHIP (A) DESIGN, CONSTRUCTION, INFRASTRUCTURE AND RELATED COSTS FOR PHASE II AND PHASE III OF OVERLOOK COMMUNITY PARK MASTER PLAN PROJECT ALLOCATION 1,500,000 (B) ACQUISITION, CONSTRUCTION, 20250HB1331PN1945 - 257 - INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER ASSOCIATED COSTS, INCLUDING MACHINERY AND EQUIPMENT, RELATED TO THE CONSTRUCTION OF A NEW POLICE STATION AND ADMINISTRATION BUILDING IN MANHEIM TOWNSHIP, LANCASTER COUNTY PROJECT ALLOCATION 20,000,000 (C) ACQUISITION, DESIGN, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS, INCLUDING MACHINERY AND EQUIPMENT, FOR A COMMUNITY ASSET PROJECT IN MANHEIM TOWNSHIP, LANCASTER COUNTY PROJECT ALLOCATION 15,000,000 (D) ACQUISITION, DESIGN, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS, INCLUDING MACHINERY AND EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT PROJECT IN MANHEIM TOWNSHIP, LANCASTER COUNTY PROJECT ALLOCATION 30,000,000 (VIII) PENN TOWNSHIP (A) ACQUISITION, SITE PREPARATION, INFRASTRUCTURE, REMEDIATION, 20250HB1331PN1945 - 258 - RENOVATION, CONSTRUCTION AND/OR OTHER RELATED COSTS ASSOCIATED WITH THE DEVELOPMENT AND/OR EXPANSION OF A WHEAT AND RYE PROCESSING FACILITY PROJECT ALLOCATION 4,000,000 (37) LAWRENCE COUNTY (I) LAWRENCE COUNTY ECONOMIC DEVELOPMENT CORPORATION (A) ACQUISITION, INFRASTRUCTURE, REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION AND OTHER RELATED COSTS FOR ARTS AND CULTURAL INSTITUTIONS IN LAWRENCE COUNTY PROJECT ALLOCATION 8,000,000 (B) ACQUISITION, INFRASTRUCTURE, REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION AND OTHER RELATED COSTS FOR PUBLIC SERVICES BUILDINGS IN LAWRENCE COUNTY PROJECT ALLOCATION 2,500,000 (C) ACQUISITION, INFRASTRUCTURE, REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION AND OTHER RELATED COSTS FOR LIBRARIES IN LAWRENCE COUNTY PROJECT ALLOCATION 2,000,000 (D) ACQUISITION, INFRASTRUCTURE, REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION AND OTHER RELATED COSTS FOR HOSPITALS, MEDICAL 20250HB1331PN1945 - 259 - CENTERS AND PUBLIC SERVICES FACILITIES IN LAWRENCE COUNTY PROJECT ALLOCATION 10,000,000 (E) ACQUISITION, INFRASTRUCTURE, REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION AND OTHER RELATED COSTS FOR DOWNTOWN REDEVELOPMENT AND REVITALIZATION IN LAWRENCE COUNTY PROJECT ALLOCATION 7,500,000 (F) ACQUISITION, INFRASTRUCTURE, REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION AND OTHER RELATED COSTS FOR INDUSTRIAL DEVELOPMENT IN LAWRENCE COUNTY PROJECT ALLOCATION 20,000,000 (G) ACQUISITION, INFRASTRUCTURE, REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION AND OTHER RELATED COSTS FOR COMMERCIAL DEVELOPMENT IN LAWRENCE COUNTY PROJECT ALLOCATION 3,500,000 (H) ACQUISITION, INFRASTRUCTURE, REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION AND OTHER RELATED COSTS FOR THE DEVELOPMENT OF AN INDUSTRIAL MULTITENANT FACILITY IN LAWRENCE COUNTY PROJECT ALLOCATION 3,500,000 (I) ACQUISITION, INFRASTRUCTURE, 20250HB1331PN1945 - 260 - REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION AND OTHER RELATED COSTS FOR BROWNFIELD REDEVELOPMENT IN LAWRENCE COUNTY PROJECT ALLOCATION 10,000,000 (J) ACQUISITION, INFRASTRUCTURE, REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION AND OTHER RELATED COSTS OF DEVELOPMENT ASSOCIATED WITH AGRICULTURE PROCESSORS IN LAWRENCE COUNTY PROJECT ALLOCATION 10,000,000 (K) ACQUISITION, INFRASTRUCTURE, REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION AND OTHER RELATED COSTS OF DEVELOPMENT ASSOCIATED WITH INSTITUTIONS OF HIGHER EDUCATION IN LAWRENCE COUNTY PROJECT ALLOCATION 8,000,000 (L) ACQUISITION, INFRASTRUCTURE, REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION AND OTHER RELATED COSTS OF INDUSTRIAL/COMMERCIAL DEVELOPMENT OR REVITALIZATION IN MAHONING TOWNSHIP PROJECT ALLOCATION 15,000,000 (38) LEBANON COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, SITE PREPARATION, REMEDIATION, INFRASTRUCTURE, 20250HB1331PN1945 - 261 - CONSTRUCTION AND/OR RENOVATION ACTIVITIES RELATED TO THE DEVELOPMENT AND/OR REDEVELOPMENT OF A LARGE-SCALE INDUSTRIAL SITE AND/OR FACILITY PROJECT ALLOCATION 10,000,000 (II) CITY OF LEBANON (A) ACQUISITION, DEMOLITION, SITE PREPARATION, INFRASTRUCTURE, NEW CONSTRUCTION FOR ACTIVITIES RELATED TO A NEIGHBORHOOD REVITALIZATION STRATEGY, BOTH COMMERCIAL AND RESIDENTIAL, FROM CUMBERLAND STREET TO MAPLE STREET AND 5TH AVENUE WEST TO 12TH STREET PROJECT ALLOCATION 25,000,000 (B) ACQUISITION, DEMOLITION, NEW CONSTRUCTION, INFRASTRUCTURE, REMEDIATION FOR HOUSING AND OTHER DEVELOPMENT PROJECTS IN THE CITY OF LEBANON IN COORDINATION WITH THE CITY OF LEBANON LAND BANK AND/OR THE LEBANON COUNTY REDEVELOPMENT AUTHORITY PROJECT ALLOCATION 5,000,000 (C) ACQUISITION, DESIGN, DEMOLITION, REDEVELOPMENT, CONSTRUCTION, INFRASTRUCTURE AND OTHER COSTS RELATED TO HOUSING AND OTHER ECONOMIC DEVELOPMENT PROJECT ALLOCATION 3,600,000 (39) LEHIGH COUNTY 20250HB1331PN1945 - 262 - (I) COUNTY PROJECTS (A) ACQUISITION, SITE PREPARATION, REMEDIATION, INFRASTRUCTURE, CONSTRUCTION AND/OR RENOVATION ACTIVITIES RELATED TO THE DEVELOPMENT AND/OR REDEVELOPMENT OF A LARGE-SCALE INDUSTRIAL SITE AND/OR FACILITY IN LEHIGH COUNTY PROJECT ALLOCATION 10,000,000 (II) CITY OF ALLENTOWN (A) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND RELATED ASSISTANCE FOR CREATION OF A TRUCKING PARKING LOT PROJECT ALLOCATION 500,000 (B) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, RENOVATIONS, UPGRADES AND OTHER RELATED COSTS TO A YOUTH FACILITY/COMMUNITY CENTER IN CENTRAL ALLENTOWN PROJECT ALLOCATION 7,500,000 (C) CONSTRUCTION, INFRASTRUCTURE, RENOVATIONS, UPGRADES AND OTHER RELATED COSTS FOR REHABILITATION OF THE FORMER HISTORIC LIBERTY BELL SITE IN DOWNTOWN ALLENTOWN PROJECT ALLOCATION 1,500,000 (III) SALISBURY TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE LEHIGH VALLEY HOSPITAL CEDAR 20250HB1331PN1945 - 263 - CREST CAMPUS TO EXPAND THE CHILDREN'S HOSPITAL PROJECT ALLOCATION 20,000,000 (40) LUZERNE COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, CONSTRUCTION, REDEVELOPMENT, RENOVATION, REHABILITATION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, SITE PREPARATION AND OTHER RELATED COSTS ASSOCIATED WITH AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 10,000,000 (B) ACQUISITION, DESIGN, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS, INCLUDING MACHINERY AND EQUIPMENT, FOR A PROJECT AT THE HAZLETON AREA SCHOOL DISTRICT PROJECT ALLOCATION 10,000,000 (II) CAN DO, INC.
(A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE CROSSROADS EAST ECONOMIC DEVELOPMENT PROJECT AND SURROUNDING LANDS IN HAZLE TOWNSHIP PROJECT ALLOCATION 15,000,000 (III) THE GREATER WILKES-BARRE INDUSTRIAL FUND 20250HB1331PN1945 - 264 - (A) ACQUISITION, CONSTRUCTION, RENOVATION, INFRASTRUCTURE AND OTHER COSTS RELATED TO PROPERTIES OWNED OR TO BE ACQUIRED BY TRUE NORTH OF NEPA, LLC PROJECT ALLOCATION 3,500,000 (IV) CITY OF NANTICOKE (A) ACQUISITION, CONSTRUCTION, REDEVELOPMENT, RENOVATION, REHABILITATION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, SITE PREPARATION AND OTHER RELATED COSTS ASSOCIATED WITH AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 10,000,000 (V) CITY OF PITTSTON (A) ACQUISITION, CONSTRUCTION, SITE DEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, EQUIPMENT AND OTHER RELATED COSTS FOR COMMUNITY REVITALIZATION AND ECONOMIC DEVELOPMENT PROJECTS AT 234 N.
MAIN STREET PROJECT ALLOCATION 2,600,000 (VI) EDWARDSVILLE BOROUGH (A) ACQUISITION, CONSTRUCTION, REDEVELOPMENT, RENOVATION, REHABILITATION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, SITE PREPARATION AND OTHER RELATED COSTS 20250HB1331PN1945 - 265 - ASSOCIATED WITH AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 10,000,000 (VII) EXETER BOROUGH (A) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, RENOVATION, REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR MAIN STREETSCAPE AND COMMERCIAL DEVELOPMENT PROJECT ALLOCATION 2,500,000 (VIII) FORTY FORT BOROUGH (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE REDEVELOPMENT OF LAND FOR THE HEADQUARTERS OF FORTY FORT PUBLIC WORKS AND THE WEST SIDE COUNCIL OF GOVERNMENTS PROJECT ALLOCATION 2,000,000 (IX) KINGSTON BOROUGH (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 5,000,000 (B) CONSTRUCTION, RENOVATION AND OTHER RELATED COSTS FOR REDEVELOPING CHURCH STREET AND OTHER KINGSTON BOROUGH PARKS 20250HB1331PN1945 - 266 - PROJECT ALLOCATION 750,000 (C) REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR REDEVELOPING RIVERBEND PARK AREA PROJECT ALLOCATION 1,500,000 (D) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,000,000 (E) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (F) CONSTRUCTION, INFRASTRUCTURE, RENOVATION AND OTHER RELATED COSTS FOR THE REDEVELOPMENT OF BLIGHTED PROPERTY PROJECT ALLOCATION 1,500,000 (X) LUZERNE BOROUGH (A) ACQUISITION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR ECONOMIC DEVELOPMENT PROJECTS IN THE HISTORIC AND BUSINESS DISTRICTS PROJECT ALLOCATION 2,000,000 (XI) SWOYERSVILLE BOROUGH (A) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, RENOVATION, 20250HB1331PN1945 - 267 - REHABILITATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR MIXED-USE HOUSING AND COMMERCIAL DEVELOPMENT PROJECT ALLOCATION 7,500,000 (XII) WEST HAZLETON BOROUGH (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (XIII) WYOMING BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE, RENOVATION AND OTHER RELATED COSTS FOR REDEVELOPING WYOMING BOROUGH'S ECONOMIC AND HISTORIC DISTRICT PROJECT ALLOCATION 2,000,000 (XIV) HANOVER TOWNSHIP (A) ACQUISITION, CONSTRUCTION, REDEVELOPMENT, RENOVATION, REHABILITATION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, SITE PREPARATION AND OTHER RELATED COSTS ASSOCIATED WITH AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 5,000,000 (B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION 20250HB1331PN1945 - 268 - AND/OR OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,500,000 (XV) HAZLE TOWNSHIP (A) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR A NEW AMBULATORY HEALTH CARE CAMPUS FOR LEHIGH VALLEY HEALTH NETWORK PROJECT ALLOCATION 10,000,000 (B) DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, RENOVATION AND/OR OTHER COSTS ASSOCIATED WITH THE DEMOLITION OF AN EXISTING HOTEL AND CONSTRUCTION OF A COUNTRY INN & SUITES HOTEL PROJECT ALLOCATION 5,000,000 (C) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 3,000,000 (XVI) JENKINS TOWNSHIP (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, AND OTHER RELATED COSTS FOR THE CENTERPOINT EAST EXPANSION ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 2,600,000 20250HB1331PN1945 - 269 - (XVII) RICE TOWNSHIP (A) ACQUISITION, CONSTRUCTION, REDEVELOPMENT, RENOVATION, REHABILITATION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, SITE PREPARATION AND OTHER RELATED COSTS ASSOCIATED WITH AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 10,000,000 (XVIII) WRIGHT TOWNSHIP (A) ACQUISITION, CONSTRUCTION, REDEVELOPMENT, RENOVATION, REHABILITATION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, SITE PREPARATION AND OTHER RELATED COSTS ASSOCIATED WITH AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 10,000,000 (41) LYCOMING COUNTY (I) CITY OF WILLIAMSPORT (A) ACQUISITION, RECLAMATION, INFRASTRUCTURE IMPROVEMENTS AND CONSTRUCTION TO LAND AND FACILITIES AT THE PENNSYLVANIA COLLEGE OF TECHNOLOGY IN THE CITY OF WILLIAMSPORT PROJECT ALLOCATION 10,000,000 (B) ACQUISITION, CONSTRUCTION, RENOVATION, REDEVELOPMENT, SITE DEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, EQUIPMENT AND 20250HB1331PN1945 - 270 - OTHER RELATED COSTS FOR COMMUNITY REVITALIZATION AND ECONOMIC DEVELOPMENT PROJECTS PROJECT ALLOCATION 20,000,000 (42) MCKEAN COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, INFRASTRUCTURE, CONSTRUCTION AND OTHER RELATED COSTS FOR A HEALTH CARE FACILITY THAT WILL PROVIDE MATERNAL CARE, INCLUDING CHILDBIRTH SERVICES PROJECT ALLOCATION 10,000,000 (B) ACQUISITION, INFRASTRUCTURE, CONSTRUCTION, REDEVELOPMENT OR OTHER RELATED COSTS FOR A HOUSING OR ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 10,000,000 (II) CITY OF BRADFORD (A) RENOVATION OF AN EXISTING BUILDING FOR A NEW POLICE STATION FACILITY AND THE CONSTRUCTION OF A NEW FIRE STATION TO REPLACE ANTIQUATED AND UNDERSIZED FACILITIES PROJECT ALLOCATION 5,000,000 (B) ACQUISITION, DEMOLITION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE UNIVERSITY OF PITTSBURGH AT BRADFORD, INCLUDING RENOVATION AND REHABILITATION OF EXISTING FACILITIES AND CONSTRUCTION OF NEW FACILITIES 20250HB1331PN1945 - 271 - PROJECT ALLOCATION 10,000,000 (C) ACQUISITION, DEMOLITION, CONSTRUCTION, RENOVATION AND OTHER RELATED COSTS ASSOCIATED WITH IMPROVEMENTS TO THE MARILYN HORNE HALL BUILDING AND AFFILIATED PARKING LOTS AT THE UNIVERSITY OF PITTSBURGH AT BRADFORD PROJECT ALLOCATION 10,000,000 (D) ACQUISITION OF PROPERTY, DEMOLITION, RENOVATION, CONSTRUCTION AND OTHER RELATED COSTS, INCLUDING RELATED INFRASTRUCTURE IMPROVEMENTS, FOR THE DEVELOPMENT OF HOUSING PROJECT ALLOCATION 5,000,000 (E) RENOVATION OR REPLACEMENT OF THE SWIMMING POOL, SPLASH PAD AND ADJOINING BATHHOUSE FACILITY ALONG WITH THE RENOVATION OF OTHER RECREATIONAL FACILITIES IN CALLAHAN PARK AND IMPROVEMENTS TO THE RECREATIONAL FACILITIES AT KESSEL FIELD PROJECT ALLOCATION 5,000,000 (F) ACQUISITION, DEMOLITION, RENOVATION, CONSTRUCTION AND OTHER RELATED COSTS ASSOCIATED WITH THE DEVELOPMENT OF A SOCCER/LACROSSE STADIUM, PRESS BOX, CONCESSION, LOCKER ROOM FACILITY AND FIELD HOUSE, FIELD LIGHTING AND 20250HB1331PN1945 - 272 - ROADWAY IMPROVEMENTS LOCATED AT THE KESSEL ATHLETIC COMPLEX PROJECT ALLOCATION 10,000,000 (G) PROPERTY ACQUISITION AND BUILDING RENOVATION/CONSTRUCTION RELATED TO THE DEVELOPMENT OF THE TRIANGLE WORKS COLLABORATIVE, LLC, MCKEAN COUNTY INCUBATOR-ACCELERATOR FACILITY IN THE CITY OF BRADFORD PROJECT ALLOCATION 5,000,000 (H) ACQUISITION OF LAND AND/OR BUILDINGS, CAPITAL BUILDING IMPROVEMENTS, INCLUDING CONSTRUCTION OR RENOVATION, AND INFRASTRUCTURE AND SITE DEVELOPMENT COSTS TO PROMOTE ECONOMIC DEVELOPMENT, COMMUNITY DEVELOPMENT, DOWNTOWN REVITALIZATION, RECREATION AND HEALTH CARE NEEDS PROJECT ALLOCATION 10,000,000 (III) PORT ALLEGANY BOROUGH (A) ACQUISITION AND OTHER COSTS ASSOCIATED WITH THE RELOCATION OF ALL UTILITY INFRASTRUCTURE RELATED TO THE CONSTRUCTION OF A LEVEE PROJECT ALLOCATION 1,750,000 (43) MERCER COUNTY (I) PENN NORTHWEST DEVELOPMENT CORPORATION (A) CONSTRUCTION, INFRASTRUCTURE, MACHINERY AND/OR OTHER COSTS RELATED TO A FACILITY EXPANSION, DEVELOPMENT 20250HB1331PN1945 - 273 - OF A GCFU MOLDING MACHINE, MATERIAL HANDLING SYSTEM AND TWO COMPOUNDING LINES FOR MOXIETEC IN PINE TOWNSHIP PROJECT ALLOCATION 11,850,000 (II) CLARK BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED COSTS TO UPGRADE AND RENOVATE THE MUNICIPAL AND FIRE DEPARTMENT BUILDINGS PROJECT ALLOCATION 10,000,000 (44) MIFFLIN COUNTY (RESERVED) (45) MONROE COUNTY (I) MONROE COUNTY INDUSTRIAL DEVELOPMENT AUTHORITY (A) CONSTRUCTION, INFRASTRUCTURE AND/OR OTHER COSTS RELATED TO RENOVATIONS FOR THE PLEASANT VALLEY SCHOOL DISTRICT IN CHESTNUTHILL TOWNSHIP PROJECT ALLOCATION 4,000,000 (II) STROUDSBURG BOROUGH (A) ACQUISITION, CONSTRUCTION, SITE DEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, EQUIPMENT AND OTHER RELATED COSTS FOR COMMUNITY REVITALIZATION AND ECONOMIC DEVELOPMENT PROJECTS IN STROUDSBURG BOROUGH PROJECT ALLOCATION 10,000,000 20250HB1331PN1945 - 274 - (B) ACQUISITION, CONSTRUCTION, SITE DEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, EQUIPMENT AND OTHER RELATED COSTS FOR RENOVATION OF STROUDSBURG BOROUGH HALL PROJECT ALLOCATION 5,000,000 (46) MONTGOMERY COUNTY (I) COUNTY PROJECTS (A) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED COSTS TO UPGRADE AND RENOVATE THE MONTGOMERY COUNTY 4-H FACILITY PROJECT ALLOCATION 10,000,000 (B) ABATEMENT, SITE WORK, ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND REDEVELOPMENT ASSISTANCE, ENVIRONMENTAL REMEDIATION AND OTHER RELATED COSTS FOR THE REDEVELOPMENT OF ELMWOOD PARK ZOO PROJECT ALLOCATION 30,000,000 (C) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED COSTS TO REDEVELOP, RECONSTRUCT AND RECREATE METHACTON HIGH SCHOOL PROJECT ALLOCATION 20,000,000 (D) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED 20250HB1331PN1945 - 275 - COSTS TO REDEVELOP, RECONSTRUCT AND RECREATE THE LA SALLE COLLEGE HIGH SCHOOL CAMPUS PROJECT ALLOCATION 20,000,000 (E) ACQUISITION, DEMOLITION, SITE INFRASTRUCTURE, INCLUDING GRADING, ENVIRONMENTAL, SITE AND CIVIL ENGINEERING, ARCHITECTURAL DESIGN, MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL ENGINEERING, DEVELOPMENT FEES, STORM WATER, E&S CONTROLS, PAVING, CONCRETE CURBING, CONCRETE SIDEWALKS, SITE LIGHTING, NEW WATER AND SEWER LINES, NEW GAS LINES, NEW SITE ELECTRIC, ELECTRICAL SUBSTATION AND TELECOMMUNICATION INFRASTRUCTURE, INCLUDING NEW FIBER LINES, FOR MONTGOMERY COUNTY SUPPORTING INFRASTRUCTURE PROJECT ALLOCATION 75,000,000 (F) ACQUISITION, SITE PREPARATION, RENOVATION, CONSTRUCTION, INFRASTRUCTURE AND OTHER ASSOCIATED COSTS FOR THE IMPROVEMENT, EXPANSION, REDEVELOPMENT AND REVITALIZATION OF A NEMOURS CHILDREN'S HEALTH SYSTEM PEDIATRIC FACILITY LOCATED IN MONTGOMERY COUNTY PROJECT ALLOCATION 20,000,000 (II) MONTGOMERY COUNTY REDEVELOPMENT 20250HB1331PN1945 - 276 - AUTHORITY (A) ACQUISITION, CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE REDEVELOPMENT AND IMPROVEMENT OF THE NORRISTOWN STATE HOSPITAL PROPERTY AND ITS IMMEDIATE SURROUNDING AREA PROJECT ALLOCATION 20,000,000 (B) CONSTRUCTION, INFRASTRUCTURE AND RENOVATIONS TO THE LANSDALE HOSPITAL PROJECT ALLOCATION 5,000,000 (III) ABINGTON TOWNSHIP ECONOMIC DEVELOPMENT CORPORATION (A) ACQUISITION, CONSTRUCTION, SITE DEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, EQUIPMENT AND OTHER RELATED COSTS FOR COMMUNITY REVITALIZATION AND ECONOMIC DEVELOPMENT PROJECTS IN ABINGTON TOWNSHIP PROJECT ALLOCATION 15,000,000 (IV) CONSHOHOCKEN BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE AND REDEVELOPMENT OF A BOROUGH PUBLIC SAFETY BUILDING PROJECT ALLOCATION 5,000,000 (V) JENKINTOWN BOROUGH (A) CONSTRUCTION, ACQUISITION, REDEVELOPMENT, INFRASTRUCTURE AND 20250HB1331PN1945 - 277 - OTHER RELATED COSTS FOR THE JENKINTOWN SCHOOL DISTRICT TO RENOVATE RECENTLY ACQUIRED PROPERTY PROJECT ALLOCATION 17,000,000 (VI) NORRISTOWN BOROUGH (A) CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR RENOVATIONS AND CONSTRUCTION OF PORTIONS OF THE HISTORIC CENTRE THEATER PROJECT ALLOCATION 1,000,000 (VII) PENNSBURG BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE RENOVATION AND IMPROVEMENT OF THE PENNSBURG BOROUGH HALL BUILDING AND THE MUNICIPAL GARAGE PROJECT ALLOCATION 976,000 (VIII) TRAPPE BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE CONSTRUCTION OF A WELCOME CENTER AND MUSEUM COLLECTIONS FACILITY PROJECT ALLOCATION 3,000,000 (IX) WEST CONSHOHOCKEN BOROUGH (A) SITE INFRASTRUCTURE, CONSTRUCTION, RENOVATION AND OTHER RELATED COSTS, INCLUDING ACQUISITION, GRADING, ENVIRONMENTAL, SITE AND CIVIL ENGINEERING, ARCHITECTURAL DESIGN, MECHANICAL, ELECTRICAL, PLUMBING, AND 20250HB1331PN1945 - 278 - STRUCTURAL ENGINEERING, DEVELOPMENT FEES, STORM WATER, E&S CONTROLS, PAVING, CONCRETE CURBING, CONCRETE SIDEWALKS, SITE LIGHTING, NEW WATER AND SEWER LINES, NEW SITE ELECTRIC, ELECTRICAL SUBSTATION AND TELECOMMUNICATION INFRASTRUCTURE, INCLUDING NEW FIBER LINES, BUILDING CORE AND SHELL INFRASTRUCTURE, INCLUDING BUILDING STRUCTURE AND EXTERIOR SHELL, MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS, ELEVATORS AND STANDBY POWER SYSTEMS PROJECT ALLOCATION 60,000,000 (X) ABINGTON TOWNSHIP (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND OTHER RELATED COSTS FOR IMPROVEMENT PROJECTS AT ABINGTON HOSPITAL PROJECT ALLOCATION 5,000,000 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR RENOVATIONS AND UPGRADES TO THE ABINGTON TOWNSHIP POLICE DEPARTMENT'S TRAINING FACILITY PROJECT ALLOCATION 4,000,000 (XI) CHELTENHAM TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE IMPROVEMENTS, DEVELOPMENT AND OTHER RELATED COSTS FOR THE MOSSSMART CENTER 20250HB1331PN1945 - 279 - AT EINSTEIN MEDICAL CENTER IN ELKINS PARK PROJECT ALLOCATION 5,000,000 (B) CONSTRUCTION, INFRASTRUCTURE, REHABILITATION, ACQUISITION, RENOVATION AND OTHER RELATED COSTS FOR THE CHELTENHAM TOWNSHIP ADMINISTRATION SERVICES BUILDING PROJECT ALLOCATION 2,500,000 (C) CONSTRUCTION AND OTHER RELATED COSTS FOR CONKLIN POOL IN CHELTENHAM TOWNSHIP PROJECT ALLOCATION 2,000,000 (D) CONSTRUCTION, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR THE CHELTENHAM TOWNSHIP EMERGENCY MEDICAL SERVICES BUILDING PROJECT ALLOCATION 1,000,000 (E) CONSTRUCTION AND OTHER RELATED COSTS FOR THE GLENSIDE COMMUNITY CENTER PROJECT ALLOCATION 1,000,000 (F) CONSTRUCTION AND OTHER RELATED COSTS FOR GLENSIDE POOL IN CHELTENHAM TOWNSHIP PROJECT ALLOCATION 2,000,000 (G) CONSTRUCTION AND OTHER RELATED COSTS FOR THE CHELTENHAM LIBRARY PROJECT ALLOCATION 5,000,000 (H) CONSTRUCTION AND OTHER RELATED COSTS FOR THE CHELTENHAM POLICE DEPARTMENT 20250HB1331PN1945 - 280 - PROJECT ALLOCATION 2,500,000 (I) CONSTRUCTION AND OTHER RELATED COSTS FOR THE CHELTENHAM PUBLIC WORKS FACILITY PROJECT ALLOCATION 2,000,000 (J) CONSTRUCTION AND OTHER RELATED COSTS FOR THE ROWLAND COMMUNITY CENTER PROJECT ALLOCATION 2,500,000 (K) CONSTRUCTION, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR THE LAMOTT FIRE COMPANY PROJECT ALLOCATION 2,000,000 (XII) DOUGLASS TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, RENOVATION AND/OR OTHER COSTS RELATED TO THE DOUGLAS TOWNSHIP ADMINISTRATION BUILDING RENOVATION PROJECT PROJECT ALLOCATION 1,500,000 (XIII) EAST NORRITON TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED COSTS TO UPGRADE AND RENOVATE A FIREHOUSE PROJECT ALLOCATION 10,000,000 (XIV) FRANCONIA TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, RENOVATION AND/OR OTHER COSTS RELATED TO THE MEMORY CARE HOUSEHOLD MODEL AT PETER BECKER COMMUNITY PROJECT 20250HB1331PN1945 - 281 - PROJECT ALLOCATION 6,250,000 (XV) LIMERICK TOWNSHIP (A) DEMOLITION, SITE PREPARATION, CONSTRUCTION, INFRASTRUCTURE, REHABILITATION EQUIPMENT AND OTHER RELATED COSTS FOR THE EXPANSION OF A PHARMACEUTICAL PRODUCT AND TECHNOLOGY DEVELOPMENT AND COMMERCIAL MANUFACTURING CENTER PROJECT ALLOCATION 10,000,000 (XVI) LOWER FREDERICK TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED COSTS TO UPGRADE AND RENOVATE THE LOWER FREDERICK FIRE COMPANY BUILDING PROJECT ALLOCATION 5,000,000 (XVII) LOWER GWYNEDD TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, RENOVATIONS, REHABILITATION AND OTHER RELATED COSTS FOR GWYNEDD MERCY UNIVERSITY'S CAMPUS PROJECT ALLOCATION 12,500,000 (B) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION AND OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 14,000,000 (XVIII) LOWER MERION TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, SITE 20250HB1331PN1945 - 282 - PREPARATION, IMPROVEMENTS, RENOVATIONS, UPGRADES, ENVIRONMENTAL REMEDIATION, REPAIRS AND OTHER RELATED COSTS FOR THE REDEVELOPMENT OF ROSEMONT COLLEGE PROJECT ALLOCATION 10,000,000 (B) CONSTRUCTION, INFRASTRUCTURE AND REDEVELOPMENT OF THE MERION MERCY ACADEMY PROJECT ALLOCATION 10,000,000 (XIX) LOWER MORELAND TOWNSHIP (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER RELATED COSTS FOR THE CONSTRUCTION OF A NEW FIRE STATION FOR THE FETTERS MILL FIRE RESCUE PROJECT ALLOCATION 10,000,000 (XX) LOWER PROVIDENCE TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED COSTS TO SUPPORT IMPROVEMENTS AND UPGRADES FOR THE ARC ALLIANCE PROJECT ALLOCATION 1,000,000 (XXI) SPRINGFIELD TOWNSHIP (A) CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE SPRINGFIELD TOWNSHIP RECREATION CENTER PROJECT ALLOCATION 10,000,000 (XXII) TOWAMENCIN TOWNSHIP (A) CONSTRUCTION AND OTHER RELATED COSTS 20250HB1331PN1945 - 283 - FOR VETERANS MEMORIAL PARK PROJECT ALLOCATION 1,250,000 (B) CONSTRUCTION AND OTHER RELATED COSTS FOR PICKLEBALL COURTS AT BUTCH CLEMENS PARK PROJECT ALLOCATION 500,000 (C) CONSTRUCTION AND OTHER RELATED COSTS FOR THE CENTRAL DRIVE STORM SEWER PROJECT PROJECT ALLOCATION 600,000 (D) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR THE TOWAMENCIN FIRE COMPANY BUILDING IMPROVEMENTS PROJECT ALLOCATION 1,200,000 (XXIII) UPPER GWYNEDD TOWNSHIP (A) ACQUISITION, CONSTRUCTION, RENOVATION, REHABILITATION AND RELATED COSTS FOR THE JAISOHN COMMUNITY WELLNESS PLAZA PROJECT ALLOCATION 3,000,000 (XXIV) UPPER MERION TOWNSHIP (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL REMEDIATION, REPAIR AND OTHER RELATED COSTS TO SUPPORT THE DEVELOPMENT AND REDEVELOPMENT OF THE DISCOVERY LABS PROJECT ALLOCATION 125,000,000 20250HB1331PN1945 - 284 - (B) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, REHABILITATION, RENOVATION AND OTHER RELATED COSTS FOR PROPERTIES LOCATED AT 411 SWEDELAND ROAD PROJECT ALLOCATION 48,000,000 (C) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, REHABILITATION, RENOVATION AND OTHER RELATED COSTS FOR PROPERTIES LOCATED AT 3200 HORIZON DRIVE PROJECT ALLOCATION 18,000,000 (D) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, REHABILITATION, RENOVATION AND OTHER RELATED COSTS FOR PROPERTIES LOCATED AT 3400 HORIZON DRIVE PROJECT ALLOCATION 15,000,000 (E) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, REHABILITATION, RENOVATION AND OTHER RELATED COSTS FOR PROPERTIES LOCATED AT 2100 RENAISSANCE BOULEVARD PROJECT ALLOCATION 20,000,000 (F) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, REHABILITATION, RENOVATION AND OTHER RELATED COSTS FOR PROPERTIES LOCATED AT 2501 RENAISSANCE BOULEVARD PROJECT ALLOCATION 40,000,000 20250HB1331PN1945 - 285 - (G) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, REHABILITATION, RENOVATION AND OTHER RELATED COSTS FOR PROPERTIES LOCATED AT 2520 RENAISSANCE BOULEVARD PROJECT ALLOCATION 6,000,000 (H) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, REHABILITATION, RENOVATION AND OTHER RELATED COSTS FOR PROPERTIES LOCATED AT 2560 RENAISSANCE BOULEVARD PROJECT ALLOCATION 5,000,000 (I) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, REHABILITATION, RENOVATION AND OTHER RELATED COSTS FOR PROPERTIES LOCATED ON THE 600 BLOCK OF SCHUYLKILL RIVER ROAD PROJECT ALLOCATION 50,000,000 (J) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, REHABILITATION, RENOVATION AND OTHER RELATED COSTS FOR PROPERTIES LOCATED IN THE 600 BLOCK OF FRONT STREET PROJECT ALLOCATION 60,000,000 (K) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT, REHABILITATION, RENOVATION AND OTHER RELATED COSTS FOR PROPERTIES LOCATED IN THE 500 BLOCK OF SWEDELAND ROAD 20250HB1331PN1945 - 286 - PROJECT ALLOCATION 60,000,000 (XXV) UPPER DUBLIN TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR UPGRADES TO FAIRWOLD ACADEMY PROJECT ALLOCATION 2,500,000 (XXVI) WHITEMARSH TOWNSHIP (A) CONSTRUCTION AND INFRASTRUCTURE IMPROVEMENTS RELATED TO THE MIQUON SCHOOL'S REDEVELOPMENT AND EXPANSION PROJECT ALLOCATION 5,000,000 (XXVII) WORCESTER TOWNSHIP (A) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE RENOVATION AND EXPANSION OF THE VARIETY, THE CHILDREN'S CHARITY OF THE DELAWARE VALLEY CAMPUS PROJECT ALLOCATION 10,000,000 (47) MONTOUR COUNTY (I) COUNTY PROJECTS (A) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR ECONOMIC AND COMMUNITY DEVELOPMENT PROJECTS PROJECT ALLOCATION 25,000,000 (48) NORTHAMPTON COUNTY (I) CITY OF EASTON (A) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, REDEVELOPMENT AND 20250HB1331PN1945 - 287 - OTHER COSTS ASSOCIATED WITH RENOVATING THE 6TH STREET FIRE STATION PROJECT ALLOCATION 3,500,000 (B) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER COSTS ASSOCIATED WITH RENOVATING THE COLLEGE HILL FIRE STATION PROJECT ALLOCATION 2,000,000 (C) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER COSTS ASSOCIATED WITH RENOVATING THE SOUTH SIDE FIRE STATION PROJECT ALLOCATION 2,500,000 (D) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER COSTS ASSOCIATED WITH THE CREATION OF A COMMUNITY CENTER PROJECT ALLOCATION 4,000,000 (E) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR SHILOH COMMONS PROJECT ALLOCATION 5,000,000 (F) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS TO SUPPORT A TOURISM FACILITY PROJECT ALLOCATION 10,000,000 (G) LAND ACQUISITION, CONSTRUCTION AND OTHER RELATED COSTS TO DEVELOP A FULL SERVICE COMMUNITY CENTER IN THE CITY'S WEST WARD 20250HB1331PN1945 - 288 - PROJECT ALLOCATION 4,000,000 (H) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE GREATER COMMUNITY EMPOWERMENT CENTER PROJECT ALLOCATION 5,500,000 (I) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR A COMMUNITY CENTER PROJECT ALLOCATION 4,000,000 (II) WILSON BOROUGH (A) CONSTRUCTION, INFRASTRUCTURE, RENOVATION, REHABILITATION ABATEMENT OF HAZARDOUS MATERIALS AND OTHER COSTS RELATED TO THE REDEVELOPMENT OF THE FORMER DIXIE CUP SITE IN WILSON BOROUGH PROJECT ALLOCATION 25,000,000 (B) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, ACQUISITION, REDEVELOPMENT, RENOVATION AND REHABILITATION OF THE DIXIE CUP FACTORY REDEVELOPMENT AND NEW LIFE DISTRICT PROJECT ALLOCATION 25,000,000 (49) NORTHUMBERLAND COUNTY (RESERVED) (50) PERRY COUNTY (I) COUNTY PROJECTS (A) LAND ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, DEVELOPMENT, DESIGN, EQUIPMENT OR OTHER COSTS RELATED TO A 20250HB1331PN1945 - 289 - MEDICAL FACILITY PROJECT ALLOCATION 20,000,000 (B) LAND ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, DEVELOPMENT, DESIGN, EQUIPMENT, REDEVELOPMENT, RENOVATION AND OTHER COSTS RELATED TO AN EMERGENCY SERVICES FACILITY PROJECT ALLOCATION 15,000,000 (C) LAND ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, DEVELOPMENT, DESIGN, EQUIPMENT AND OTHER COSTS RELATED TO A MULTIUSE MUNICIPAL BUILDING, INCLUDING TRAINING SPACE AND OTHER EVENTS PROJECT ALLOCATION 10,000,000 (D) LAND ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, DEVELOPMENT, DESIGN, EQUIPMENT AND OTHER COSTS RELATED TO A HOTEL AND CONFERENCE CENTER PROJECT ALLOCATION 15,000,000 (E) LAND ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, DEVELOPMENT, DESIGN, EQUIPMENT OR OTHER COSTS RELATED TO A REGIONAL SPORTS, RECREATIONAL, HEALTH AND WELLNESS FACILITY PROJECT ALLOCATION 15,000,000 (F) ACQUISITION OF LAND, INFRASTRUCTURE, DEVELOPMENT, REDEVELOPMENT OF A BUILDING SITE OR BUILDING RENOVATION, DESIGN, CONSTRUCTION FOR SITE IMPROVEMENTS AND OTHER RELATED COSTS 20250HB1331PN1945 - 290 - FOR HOUSING FACILITIES TO SERVE SENIORS AND/OR THOSE OF LOW-TO- MODERATE INCOME PROJECT ALLOCATION 20,000,000 (G) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION AND OTHER RELATED DEVELOPMENT COSTS FOR A NEW GOVERNMENT CENTER PROJECT ALLOCATION 10,000,000 (H) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT OR OTHER RELATED COSTS TO IMPROVE DOWNTOWN PUBLIC SPACES AND AMENITIES, ASSIST LAND AND BUSINESS OWNERS WITH FACADE AND INFRASTRUCTURE, IMPROVEMENTS TO REDEVELOP AND/OR REHABILITATE BUSINESS IN THE COUNTY'S BOROUGHS PROJECT ALLOCATION 5,000,000 (51) PHILADELPHIA COUNTY (I) PHILADELPHIA AUTHORITY FOR INDUSTRIAL DEVELOPMENT (A) CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR REPAIRS TO THE FIRST UNITARIAN CHURCH OF PHILADELPHIA PROJECT ALLOCATION 10,000,000 (II) CITY OF PHILADELPHIA (A) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, RENOVATION, ENVIRONMENTAL 20250HB1331PN1945 - 291 - REMEDIATION, REPAIR AND OTHER RELATED COSTS FOR AMERICA250PA PREPARATION PROJECT ALLOCATION 20,000,000 (B) CONSTRUCTION, INFRASTRUCTURE, RENOVATIONS AND OTHER RELATED COSTS FOR THE AVENUE OF THE ARTS, INC., TO MAINTAIN, EXPAND, REPAIR AND ENHANCE SOUTH BROAD STREET IN PHILADELPHIA PROJECT ALLOCATION 50,000,000 (C) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION, IMPROVEMENTS, RENOVATIONS, UPGRADES, ENVIRONMENTAL REMEDIATION, REPAIRS AND OTHER RELATED COSTS FOR THE DEVELOPMENT OF AHARI'S VETERANS VILLAGE HOUSING PROJECT PROJECT ALLOCATION 4,000,000 (D) DEMOLITION, ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER COSTS FOR LIDDONFIELD REVITALIZATION, RENOVATION AND REHABILITATION PROJECT PROJECT ALLOCATION 35,000,000 (E) ACQUISITION, CONSTRUCTION, REDEVELOPMENT AND INFRASTRUCTURE RELATED TO ONE RIVER MARINA PROJECT ALLOCATION 10,000,000 (F) REDEVELOPMENT, INFRASTRUCTURE AND OTHER RELATED COSTS FOR RENOVATION OF RUSSO PARK IN THE CITY OF PHILADELPHIA PROJECT ALLOCATION 4,100,000 (G) CONSTRUCTION, INFRASTRUCTURE, 20250HB1331PN1945 - 292 - ACQUISITION, REDEVELOPMENT AND OTHER RELATED COSTS FOR CAPITAL IMPROVEMENTS AND RENOVATIONS TO THE ST.
HUBERT HIGH SCHOOL BUILDINGS AND CAMPUS AT THE NORTHEAST PHILADELPHIA CAMPUS PROJECT ALLOCATION 10,000,000 (H) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS AT FDR PARK IN SOUTH PHILADELPHIA PROJECT ALLOCATION 20,000,000 (I) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS AT WEST FAIRMOUNT PARK IN WEST PHILADELPHIA PROJECT ALLOCATION 8,000,000 (J) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS AT THE R.W.
BROWN BOYS & GIRLS CLUB IN NORTH CENTRAL PHILADELPHIA PROJECT ALLOCATION 10,000,000 (K) CONSTRUCTION, INFRASTRUCTURE, ACQUISITION, REDEVELOPMENT AND OTHER RELATED COSTS FOR CAPITAL IMPROVEMENTS AND RENOVATIONS TO THE PAUL ROBESON HOUSE AND MUSEUM PROJECT ALLOCATION 1,500,000 (L) CONSTRUCTION, INFRASTRUCTURE AND RELATED COSTS FOR IMPROVEMENTS TO LEE CULTURAL CENTER PROJECT ALLOCATION 7,000,000 20250HB1331PN1945 - 293 - (M) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR RECREATION CENTER AND PLAYGROUND IMPROVEMENTS IN PHILADELPHIA PROJECT ALLOCATION 11,500,000 (N) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, RENOVATIONS AND OTHER RELATED COSTS FOR RHOADS INDUSTRIES INDUSTRIAL AND MANUFACTURING CENTER AT THE NAVY YARD PROJECT ALLOCATION 50,000,000 (O) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, RENOVATIONS AND OTHER RELATED COSTS FOR THE WOODMERE ART MUSEUM RESTORATION AND EXPANSION OF THE FRANCES M.
MAGUIRE HALL PROJECT ALLOCATION 10,000,000 (P) CONSTRUCTION, INFRASTRUCTURE, SITE PREPARATION AND OTHER RELATED COSTS TO SUPPORT THE DEVELOPMENT OF THE AFRICAN AMERICAN MUSEUM IN PHILADELPHIA PROJECT ALLOCATION 50,000,000 (Q) DESIGN, DEMOLITION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION, INFRASTRUCTURE UPGRADES, SIDEWALK AND STREETSCAPE IMPROVEMENTS AND OTHER RELATED COSTS WITHIN AN AREA BOUNDED BY 23RD STREET, MARKET STREET, CHESTNUT STREET AND PREVIOUSLY VACATED 24TH STREET IN PHILADELPHIA 20250HB1331PN1945 - 294 - PROJECT ALLOCATION 20,000,000 (R) DESIGN, DEMOLITION AND DECONSTRUCTION OF DECOMMISSIONED EQUIPMENT, ABATEMENT OF HAZARDOUS MATERIALS, EXTENSIONS OR UPGRADING OF UTILITIES, SITE GRADING, STORM WATER MANAGEMENT, CONSTRUCTION OF NEW SPACE, RENOVATION OF EXISTING SPACE, INFRASTRUCTURE UPGRADES, INSTALLATION OF ELECTRIC BOILERS, INSTALLATION OF AN INDUSTRIAL SCALE HEAT PUMP COMPLEX AND OTHER RELATED COSTS WITHIN AN AREA BOUNDED BY:
39.942855, -75.190676;
39.9443160, -75.190155;
39.942541, -75.186930;
39.941051, -75.186806 PROJECT ALLOCATION 15,000,000 (S) DESIGN, DEMOLITION, ABATEMENT OF HAZARDOUS MATERIALS, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS WITHIN AN AREA BOUNDED BY D STREET, E.
LUZERNE STREET, E.
ERIE AVE, AND I STREET IN PHILADELPHIA PROJECT ALLOCATION 15,000,000 (T) MODERNIZATION, CONSTRUCTION, REHABILITATION SITE WORK AND OTHER RELATED COSTS FOR THE RETROFIT, ADAPTION OF AND IMPROVEMENTS TO THE INGLIS HOUSE CAMPUS LOCATED AT 2600 BELMONT AVENUE PROJECT ALLOCATION 20,000,000 20250HB1331PN1945 - 295 - (U) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE AND REDEVELOPMENT FOR THE COTTMAN/EDMUND REVITALIZATION PROJECT PROJECT ALLOCATION 2,750,000 (V) CONSTRUCTION, INFRASTRUCTURE AND RELATED COSTS FOR RENOVATIONS TO THE LAWNCREST RECREATION CENTER PROJECT ALLOCATION 3,500,000 (W) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER COSTS ASSOCIATED WITH HISPANIC NORTH PHILADELPHIA COMMUNITY IMPROVEMENTS AND INSTITUTIONAL GROWTH PROJECT ALLOCATION 10,000,000 (X) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS TO BUILD THE PHILADELPHIA MUSEUM OF SPORTS IN THE PHILADELPHIA SPORTS COMPLEX PROJECT ALLOCATION 5,000,000 (Y) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR RENOVATIONS THE WEITZMAN MUSEUM ON INDEPENDENCE MALL PROJECT ALLOCATION 10,000,000 (Z) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE RESTORATION OF THE COBBS CREEK GOLF COURSE AND SURROUNDING AREAS PROJECT ALLOCATION 25,000,000 20250HB1331PN1945 - 296 - (AA) DREDGING AND IMPROVEMENTS OF THE PONDS AT FRANKLIN DELANO ROOSEVELT PARK IN THE CITY OF PHILADELPHIA PROJECT ALLOCATION 3,000,000 (BB) ACQUISITION, DEMOLITION, SITE PREPARATION, RENOVATION, CONSTRUCTION, REMEDIATION, INFRASTRUCTURE AND/OR OTHER ASSOCIATED COSTS TO SUPPORT MOORE COLLEGE'S CAMPUS AND FACILITIES PROJECT ALLOCATION 10,000,000 (CC) RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR REDEVELOPMENT AT THE NATIONAL CONSTITUTION CENTER PROJECT ALLOCATION 10,000,000 (DD) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR WALNUT PARK PLAZA PROJECT ALLOCATION 3,000,000 (EE) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE EXPANSION OF CORNERSTONE CHRISTIAN ACADEMY PROJECT ALLOCATION 5,000,000 (FF) CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR IMPROVEMENTS IN THE UNIVERSITY CITY NEIGHBORHOOD PROJECT ALLOCATION 30,000,000 (GG) CONSTRUCTION, ACQUISITION, ABATEMENT OF HAZARDOUS MATERIALS AND RELATED COSTS FOR THE MUMMER'S MUSEUM 20250HB1331PN1945 - 297 - PROJECT ALLOCATION 2,500,000 (HH) LAND ACQUISITION, SITE PREPARATION, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THOMAS JEFFERSON UNIVERSITY PROJECT ALLOCATION 30,000,000 (II) ACQUISITION, ABATEMENT, INFRASTRUCTURE, CONSTRUCTION, RENOVATION AND OTHER RELATED COSTS FOR THE EXPANSION OF THOMAS JEFFERSON UNIVERSITY HOSPITAL POST-ANESTHESIA CARE UNITS PROJECT ALLOCATION 4,000,000 (JJ) ACQUISITION, DEMOLITION, RENOVATION, CONSTRUCTION AND OTHER RELATED COSTS FOR THOMAS JEFFERSON UNIVERSITY HOSPITAL FACILITIES PROJECT ALLOCATION 50,000,000 (KK) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE IMPROVEMENTS, REDEVELOPMENT, RENOVATION AND RELATED PROJECT COSTS AT TEMPLE UNIVERSITY DOMESTIC CAMPUSES PROJECT ALLOCATION 50,000,000 (LL) CONSTRUCTION, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION, REHABILITATION, ACQUISITION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE PHILADELPHIA YOUTH ORCHESTRA 20250HB1331PN1945 - 298 - MUSIC INSTITUTE PROJECT ALLOCATION 10,000,000 (MM) CONSTRUCTION, RENOVATION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE BROAD STREET LOVE BUILDING REHABILITATION PROJECT PROJECT ALLOCATION 10,000,000 (NN) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE COMMUNITY COLLEGE OF PHILADELPHIA CAPITAL FACILITIES PLAN PROJECT ALLOCATION 25,000,000 (OO) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE FORMAN ARTS INITIATIVE COMMUNITY COMPLEX PROJECT ALLOCATION 20,000,000 (PP) CONSTRUCTION, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE BARNES FOUNDATION FACILITY IMPROVEMENTS PROJECT ALLOCATION 10,000,000 (QQ) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR CAPITAL NEEDS AT THE PHILADELPHIA ZOO PROJECT ALLOCATION 15,000,000 (RR) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE BUILDOUT OF THE UNIVERSITY 20250HB1331PN1945 - 299 - CITY SCIENCE CENTER CAMPUS PROJECT ALLOCATION 20,000,000 (SS) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR REDEVELOPMENT OF THE PHMC PUBLIC HEALTH CAMPUS ON CEDAR PROJECT ALLOCATION 40,000,000 (TT) CONSTRUCTION, ACQUISITION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE WHARTON PIERS WATERFRONT DEVELOPMENT PROJECT PROJECT ALLOCATION 25,000,000 (UU) CONSTRUCTION, SITE PREPARATION, EXPANSION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR RENOVATION OF AN APPRENTICESHIP SCHOOL CAMPUS OR ACADEMIC FACILITY LOCATED IN THE NORTHEAST SECTION OF PHILADELPHIA CONTAINING ZIP CODE 19154 OR 19114 PROJECT ALLOCATION 10,000,000 (VV) CONSTRUCTION, SITE PREPARATION, EXPANSION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR CONSTRUCTION OF A HIGH SCHOOL ACADEMIC FACILITY LOCATED IN THE NORTHEAST SECTION OF PHILADELPHIA CONTAINING ZIP CODES 19114, 19136, 19152 AND/OR 19154 PROJECT ALLOCATION 5,000,000 (WW) CONSTRUCTION, SITE PREPARATION, EXPANSION, INFRASTRUCTURE AND OTHER 20250HB1331PN1945 - 300 - RELATED COSTS FOR CONSTRUCTION OF A FACILITY LOCATED IN THE NORTHEAST SECTION OF PHILADELPHIA CONTAINING ZIP CODES 19114 AND/OR 19154 PROJECT ALLOCATION 10,000,000 (XX) ACQUISITION, CONSTRUCTION, REHABILITATION, RENOVATION, ENVIRONMENTAL AND HAZARDOUS ASSESSMENT REMEDIATION AND OTHER RELATED COSTS FOR THE DEVELOPMENT OF INDUSTRIAL WAREHOUSE FACILITIES LOCATED IN THE NORTHEAST SECTION OF PHILADELPHIA CONTAINING ZIP CODES 19114 AND/OR 19154 PROJECT ALLOCATION 10,000,000 (YY) INFRASTRUCTURE AND OTHER RELATED COSTS FOR UPGRADES AT READING TERMINAL MARKET PROJECT ALLOCATION 5,000,000 (52) PIKE COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE PIKE COUNTY HOSPITAL PROJECT ALLOCATION 10,000,000 (B) ACQUISITION, SITE DEVELOPMENT, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, EQUIPMENT AND OTHER RELATED COSTS FOR A CAREER AND TECHNICAL CENTER 20250HB1331PN1945 - 301 - PROJECT ALLOCATION 15,000,000 (II) DINGMAN TOWNSHIP (A) SITE PREPARATION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION AND/OR OTHER RELATED COSTS FOR NJY CAMPS FACILITIES PROJECT ALLOCATION 5,500,000 (B) SECURITY INFRASTRUCTURE, PLANNING, CONSTRUCTION, EQUIPMENT AND RELATED COSTS FOR NJY CAMPS PROJECT ALLOCATION 500,000 (III) LACKAWAXEN TOWNSHIP (A) CONSTRUCTION, SITE IMPROVEMENT, INFRASTRUCTURE, ENVIRONMENTAL REMEDIATION, REDEVELOPMENT AND OTHER RELATED COSTS FOR THE FOR PETE'S SAKE CANCER RESPITE CENTER AT WOODLOCH PROJECT ALLOCATION 15,000,000 (53) POTTER COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, INFRASTRUCTURE, CONSTRUCTION AND OTHER RELATED COSTS FOR A HEALTH CARE FACILITY THAT WILL PROVIDE MATERNAL CARE, INCLUDING CHILDBIRTH SERVICES PROJECT ALLOCATION 10,000,000 (54) SCHUYLKILL COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, SITE PREPARATION, CONSTRUCTION, REHABILITATION AND 20250HB1331PN1945 - 302 - RENOVATION ACTIVITIES RELATED TO THE DEVELOPMENT OF AN AGRICULTURAL COMMUNITY AND OR ECONOMIC DEVELOPMENT PROJECT IN SCHUYLKILL COUNTY PROJECT ALLOCATION 15,000,000 (B) ACQUISITION, DESIGN, DEMOLITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS, INCLUDING MACHINERY AND EQUIPMENT, FOR A PROJECT AT THE HAZLETON AREA SCHOOL DISTRICT PROJECT ALLOCATION 10,000,000 (II) CAN DO, INC.
(A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE CROSSROADS EAST ECONOMIC DEVELOPMENT PROJECT AND SURROUNDING LANDS IN EAST UNION TOWNSHIP PROJECT ALLOCATION 15,000,000 (III) SCHUYLKILL COUNTY INDUSTRIAL DEVELOPMENT AUTHORITY (A) SITE PREPARATION, ACQUISITION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND/OR OTHER ASSOCIATED COSTS FOR A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT OF THE FORMER ASHLAND STATE HOSPITAL IN ASHLAND, SCHUYLKILL COUNTY 20250HB1331PN1945 - 303 - PROJECT ALLOCATION 15,000,000 (B) SITE PREPARATION, RENOVATION, BUILDING CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND/OR OTHER ASSOCIATED COSTS FOR A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT IN HIGHRIDGE BUSINESS PARK, LOT 6 IN CASS TOWNSHIP PROJECT ALLOCATION 2,500,000 (C) SITE PREPARATION, RENOVATION, BUILDING CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND/OR OTHER ASSOCIATED COSTS FOR A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT IN HIGHRIDGE BUSINESS PARK, LOT 12 IN FOSTER TOWNSHIP PROJECT ALLOCATION 7,500,000 (D) SITE PREPARATION, RENOVATION, CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND/OR OTHER ASSOCIATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT AT KEYSTONE POTATO PRODUCTS FACILITY IN FRAILEY TOWNSHIP PROJECT ALLOCATION 35,000,000 (E) SITE PREPARATION, RENOVATION, DEMOLITION, BUILDING CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS 20250HB1331PN1945 - 304 - AND/OR OTHER ASSOCIATED COSTS FOR A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT IN SCHUYLKILL HAVEN BOROUGH PROJECT ALLOCATION 7,500,000 (F) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER ASSOCIATED COSTS FOR THE CONSTRUCTION AND EXPANSION OF THE KOWALONEK'S KIELBASY SHOP PROJECT ALLOCATION 5,000,000 (G) SITE PREPARATION, RENOVATION, BUILDING CONSTRUCTION, REDEVELOPMENT, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS AND/OR OTHER ASSOCIATED COSTS FOR A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT IN FRACKVILLE INDUSTRIAL PARK, WEST MAHANOY AND RYAN TOWNSHIPS, SCHUYLKILL COUNTY PROJECT ALLOCATION 7,500,000 (IV) HUBLEY TOWNSHIP (A) ACQUISITION, SITE PREPARATION, CONSTRUCTION, REHABILITATION AND RENOVATION ACTIVITIES RELATED TO THE DEVELOPMENT OF AN AGRICULTURAL COMMUNITY AND OR ECONOMIC DEVELOPMENT PROJECT IN SCHUYLKILL COUNTY PROJECT ALLOCATION 15,000,000 (55) SNYDER COUNTY (RESERVED) (56) SOMERSET COUNTY (RESERVED) 20250HB1331PN1945 - 305 - (57) SULLIVAN COUNTY (RESERVED) (58) SUSQUEHANNA COUNTY (RESERVED) (59) TIOGA COUNTY (RESERVED) (60) UNION COUNTY (I) COUNTY PROJECTS (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE AND OTHER RELATED COSTS FOR ECONOMIC DEVELOPMENT PROJECTS IN THE COUNTY PROJECT ALLOCATION 20,000,000 (61) VENANGO COUNTY (RESERVED) (62) WARREN COUNTY (RESERVED) (63) WASHINGTON COUNTY (I) REDEVELOPMENT AUTHORITY OF THE COUNTY OF WASHINGTON (A) ACQUISITION, RENOVATION, INFRASTRUCTURE, SITE PREPARATION, CONSTRUCTION, REDEVELOPMENT, ABATEMENT AND OTHER COSTS ASSOCIATED WITH WASHINGTON-EAST WASHINGTON JOINT AUTHORITY PROJECTS IN THE CITY OF WASHINGTON PROJECT ALLOCATION 50,000,000 (B) ACQUISITION, RENOVATION, INFRASTRUCTURE, SITE PREPARATION, CONSTRUCTION, REDEVELOPMENT, ABATEMENT AND OTHER COSTS ASSOCIATED WITH THE WASHINGTON & JEFFERSON COLLEGE FACILITIES EXPANSION AND RENOVATION AND FOOTBALL STADIUM IN THE CITY OF 20250HB1331PN1945 - 306 - WASHINGTON PROJECT ALLOCATION 30,000,000 (II) PETERS TOWNSHIP (A) CONSTRUCTION, RENOVATION AND OTHER RELATED COSTS TO REHABILITATE THE PETERS LAKE DAM, INCLUDING ARMORING THE BREASTWORKS OF THE DAM WITH A NONEROSIVE TREATMENT TO COMPLY WITH CURRENT REGULATIONS PROJECT ALLOCATION 3,850,000 (B) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS AND/OR RELATED COSTS FOR A REDEVELOPMENT PROJECT PROJECT ALLOCATION 10,000,000 (64) WAYNE COUNTY (I) GREATER HONESDALE PARTNERSHIP (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND/OR OTHER COSTS RELATED TO IMPROVEMENTS TO THE MAIN STREET CORRIDOR IN HONESDALE BOROUGH PROJECT ALLOCATION 5,000,000 (II) BERLIN TOWNSHIP (A) CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR A FIRST RESPONDERS' TRAINING CENTER PROJECT ALLOCATION 1,000,000 (III) PROMPTON BOROUGH 20250HB1331PN1945 - 307 - (A) CONSTRUCTION, RENOVATION, INFRASTRUCTURE, REDEVELOPMENT AND OTHER RELATED COSTS FOR PARK IMPROVEMENT PROJECT ALLOCATION 750,000 (IV) TEXAS TOWNSHIP (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, ABATEMENT OF HAZARDOUS MATERIALS, REDEVELOPMENT, RENOVATION AND/OR OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 3,000,000 (65) WESTMORELAND COUNTY (I) REDEVELOPMENT AUTHORITY OF THE COUNTY OF WESTMORELAND (A) ACQUISITION, CONSTRUCTION, REDEVELOPMENT, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS TO ADAPTIVELY REUSE A BUILDING IN THE CITY OF GREENSBURG PROJECT ALLOCATION 500,000 (II) LATROBE INDUSTRIAL DEVELOPMENT AUTHORITY (A) CONSTRUCTION, RENOVATION, REDEVELOPMENT, INFRASTRUCTURE IMPROVEMENTS, CAPITAL IMPROVEMENTS AND RELATED COSTS FOR FACILITIES ON THE CAMPUS OF SAINT VINCENT COLLEGE IN LATROBE PROJECT ALLOCATION 10,000,000 (III) EAST HUNTINGDON TOWNSHIP 20250HB1331PN1945 - 308 - (A) REDEVELOPMENT, CONSTRUCTION, SITE AND INFRASTRUCTURE IMPROVEMENTS, ROOF REPLACEMENTS, RENOVATIONS, REHABILITATION AND OTHER RELATED COSTS FOR AN ECONOMIC DEVELOPMENT PROJECT AT THE WESTMORELAND INNOVATION FACILITY PROJECT ALLOCATION 10,000,000 (B) CONSTRUCTION, SITE AND INFRASTRUCTURE IMPROVEMENTS AND OTHER RELATED COSTS FOR THE DEVELOPMENT OF A STATE-OF-THE- ART TRANSPORTATION TESTING FACILITY AT THE WESTMORELAND INNOVATION FACILITY PROJECT ALLOCATION 15,000,000 (IV) HEMPFIELD TOWNSHIP (A) ACQUISITION, RENOVATION, INFRASTRUCTURE, SITE PREPARATION, CONSTRUCTION, REDEVELOPMENT, ABATEMENT AND OTHER COSTS ASSOCIATED WITH THE HEMPFIELD AREA SCHOOL DISTRICT EXPANSION AND RENOVATION PROJECT ALLOCATION 30,000,000 (B) ACQUISITION, RENOVATION, INFRASTRUCTURE, SITE PREPARATION, CONSTRUCTION, REDEVELOPMENT, ABATEMENT AND OTHER COSTS ASSOCIATED WITH THE HEMPFIELD TOWNSHIP CONFERENCE AND COMMUNITY CENTER PROJECT PROJECT ALLOCATION 30,000,000 (V) NEW STANTON BOROUGH (A) ACQUISITION, RENOVATION, 20250HB1331PN1945 - 309 - INFRASTRUCTURE, SITE PREPARATION, CONSTRUCTION, REDEVELOPMENT, ABATEMENT AND OTHER COSTS ASSOCIATED WITH THE CENTRAL WESTMORELAND CAREER AND TECHNOLOGY CENTER PROJECT ALLOCATION 20,000,000 (VI) NORTH HUNTINGDON TOWNSHIP (A) ACQUISITION, RENOVATION, INFRASTRUCTURE, SITE PREPARATION, CONSTRUCTION, REDEVELOPMENT, ABATEMENT AND OTHER COSTS ASSOCIATED WITH THE NORWIN SCHOOL DISTRICT EXPANSION AND RENOVATION PROJECT ALLOCATION 30,000,000 (VII) PENN TOWNSHIP (A) ACQUISITION, RENOVATION, INFRASTRUCTURE, SITE PREPARATION, CONSTRUCTION, REDEVELOPMENT, ABATEMENT AND OTHER COSTS ASSOCIATED WITH THE PENN TOWNSHIP MUNICIPAL COMPLEX, EMERGENCY SERVICES BUILDING AND COMMUNITY CENTER PROJECT ALLOCATION 20,000,000 (VIII) ROSTRAVER TOWNSHIP (A) ACQUISITION, RENOVATION, INFRASTRUCTURE, SITE PREPARATION, CONSTRUCTION, REDEVELOPMENT, ABATEMENT AND OTHER COSTS ASSOCIATED WITH THE ROSTRAVER TOWNSHIP EXPANSION AND RENOVATIONS OF FACILITIES, MUNICIPAL 20250HB1331PN1945 - 310 - COMPLEX AND EMERGENCY SERVICES PROJECT ALLOCATION 20,000,000 (IX) UNITY TOWNSHIP (A) ACQUISITION, RENOVATION, INFRASTRUCTURE, SITE PREPARATION, CONSTRUCTION, REDEVELOPMENT, ABATEMENT AND OTHER COSTS ASSOCIATED WITH THE UNITY TOWNSHIP EXPANSION AND RENOVATIONS OF FACILITIES, MUNICIPAL COMPLEX AND EMERGENCY SERVICES PROJECT ALLOCATION 15,000,000 (66) WYOMING COUNTY (RESERVED) (67) YORK COUNTY (I) SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY (A) ABATEMENT OF HAZARDOUS MATERIALS, SITE WORK, CONSTRUCTION, RENOVATIONS AND OTHER COSTS ASSOCIATED FOR ECONOMIC DEVELOPMENT OF BUSINESS AND AVIATION FACILITIES AND INFRASTRUCTURE AT CAPITAL CITY AIRPORT IN FAIRVIEW TOWNSHIP PROJECT ALLOCATION 2,500,000 (II) YORK COUNTY ECONOMIC ALLIANCE (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REDEVELOPMENT, RENOVATION, ABATEMENT OF HAZARDOUS MATERIALS, MACHINERY AND EQUIPMENT AND OTHER RELATED COSTS FOR THE STEAM INTO HISTORY RAIL LINE EXTENSION PROJECT 20250HB1331PN1945 - 311 - PROJECT ALLOCATION 7,500,000 (B) ACQUISITION, REDEVELOPMENT, RENOVATION, CONSTRUCTION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR THE MODERNIZATION, EXPANSION OR CREATION OF NEW OR EXISTING MANUFACTURING FACILITIES IN YORK COUNTY PROJECT ALLOCATION 8,000,000 (C) ACQUISITION, REDEVELOPMENT, RENOVATION, CONSTRUCTION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR THE MODERNIZATION, EXPANSION OR CREATION OF NEW OR EXISTING BUSINESS OPERATIONS IN YORK COUNTY PROJECT ALLOCATION 8,000,000 (D) ACQUISITION, REDEVELOPMENT, RENOVATION, CONSTRUCTION, ABATEMENT OF HAZARDOUS MATERIALS AND OTHER RELATED COSTS FOR THE RESTORATION AND REUSE OF A PROPERTY IN HANOVER BOROUGH PROJECT ALLOCATION 20,000,000 (E) ACQUISITION, REDEVELOPMENT, RENOVATION, CONSTRUCTION, ABATEMENT OF HAZARDOUS MATERIALS AND/OR OTHER RELATED COSTS FOR CAPITAL IMPROVEMENTS TO EXPAND ABLE SERVICES' ABILITY TO SERVE INDIVIDUALS WITH INTELLECTUAL DISABILITIES IN YORK COUNTY PROJECT ALLOCATION 2,000,000 20250HB1331PN1945 - 312 - (III) DOVER TOWNSHIP (A) CONSTRUCTION, ACQUISITION, SITE IMPROVEMENT, INFRASTRUCTURE, ENVIRONMENTAL REMEDIATION, REDEVELOPMENT AND/OR OTHER RELATED COSTS FOR A COMMUNITY OR ECONOMIC DEVELOPMENT PROJECT PROJECT ALLOCATION 8,000,000 (IV) SPRING GARDEN TOWNSHIP (A) CONSTRUCTION, SITE IMPROVEMENT, INFRASTRUCTURE, ENVIRONMENTAL REMEDIATION, REDEVELOPMENT AND OTHER RELATED COSTS TO CONSTRUCT A NEW FIRE AND RESCUE SERVICE STATION IN SPRING GARDEN TOWNSHIP PROJECT ALLOCATION 5,000,000 (B) ACQUISITION, SITE PREPARATION, ENVIRONMENTAL REMEDIATION, CONSTRUCTION, REHABILITATION AND RENOVATION ACTIVITIES RELATED TO THE DEVELOPMENT OF A COMMUNITY AND/OR ECONOMIC DEVELOPMENT PROJECT IN SPRING GARDEN TOWNSHIP PROJECT ALLOCATION 10,000,000 (68) MULTIPLE COUNTIES (I) BERKS, CHESTER, DELAWARE, MONTGOMERY AND PHILADELPHIA COUNTIES (A) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE, REHABILITATION AND OTHER RELATED COSTS FOR RENOVATIONS OR 20250HB1331PN1945 - 313 - UPGRADES TO EXISTING GREATER PHILADELPHIA YMCA FACILITIES AND NEW YMCA FACILITIES PROJECT ALLOCATION 70,000,000 (II) CHESTER AND DELAWARE COUNTIES (A) CONSTRUCTION, INFRASTRUCTURE, RENOVATION, REHABILITATION AND OTHER RELATED COSTS FOR RESTORATION OF PASSENGER RAIL SERVICE AND IMPROVEMENT TO TOURIST AND FREIGHT TRAINS PROJECT ALLOCATION 25,000,000 (III) PIKE AND WAYNE COUNTIES (A) ACQUISITION, CONSTRUCTION, DEMOLITION, RENOVATIONS, SITE IMPROVEMENTS, INFRASTRUCTURE AND OTHER RELATED COSTS FOR THE DEVELOPMENT OF A CAREER AND TECHNICAL EDUCATIONAL SCHOOL PROJECT ALLOCATION 20,000,000 Section 7.
20250HB1331PN1629 - 186 - Total Project Project Allocation (1) Department of Environmental Protection (i) Core Creek Dam, Bucks County (A) Rehabilitation project 20250HB1331PN1945 - 314 - Project Allocation 3,300,000 (ii) Thatcher Run Dam, Crawford County (A) Rehabilitation project Project Allocation 850,000 (iii) Rainbow Dam, Crawford County (A) Rehabilitation project Project Allocation 1,000,000 (iv) Kintz Creek Dam, Pike County (A) Rehabilitation project Project Allocation 850,000 (v) Hamilton Dam, Tioga County (A) Rehabilitation project Project Allocation 3,900,000 (VI) FLAT ROCK DAM, MONTGOMERY AND <-- PHILADELPHIA COUNTIES (A) DREDGING OF FLAT ROCK DAM PROJECT ALLOCATION 100,000,000 (2) (Reserved) Section 8.
Total Project Project Allocation (1) Fish and Boat Commission 20250HB1331PN1629 - 187 - (i) Fisheries Area 6 Office, Bucks County 20250HB1331PN1945 - 315 - (A) Design, permit, acquire properties and construct, rehabilitate or replace an office and storage facility for fisheries and related operations Project Allocation 3,000,000 (ii) Bellefonte State Fish Hatchery, Centre County (A) Design, permit, acquire properties and construct fish rearing facilities, buildings, effluent treatment, influent treatment and related infrastructure Project Allocation 5,000,000 (B) Design, permit, acquire properties and construct, rehabilitate or replace a pedestrian bridge, including repair and replacement of amenities and appurtenances Project Allocation 1,600,000 (iii) Benner Spring State Fish Hatchery, Centre County (A) Design, permit, acquire properties and construct fish rearing facilities, buildings, effluent treatment, influent treatment and related infrastructure Project Allocation 5,000,000 (B) Design, permit, acquire properties and construct, rehabilitate or replace 20250HB1331PN1629 - 188 - bridge, including repair and 20250HB1331PN1945 - 316 - replacement of amenities and appurtenances Project Allocation 3,400,000 (iv) Pleasant Gap State Fish Hatchery, Centre County (A) Design, permit, acquire properties and construct fish rearing facilities, buildings, effluent treatment, influent treatment and related infrastructure Project Allocation 7,500,000 (v) Spring Creek Canyon Trail, Centre County (A) Design, permit, acquire properties and construct, rehabilitate or replace a two-lane bridge, including repair and replacement of amenities and appurtenances Project Allocation 2,800,000 (B) Design, permit, acquire properties and construct, rehabilitate, remove or replace a pedestrian bridge, including repair and replacement of amenities and appurtenances Project Allocation 500,000 (C) Design, permit, acquire properties and construct, rehabilitate or replace a one-lane bridge, including repair and replacement of amenities and appurtenances Project20250HB1331PN1629 Allocation- 2,200,000189 20250HB1331PN1945 - 317Project -Allocation 2,200,000 (vi) Kahle Lake, Clarion and Venango Counties (A) Design, permit, acquire properties and construct a dam rehabilitation project, including repair and replacement of amenities, appurtenances, ADA accessibility and sediment removal operations as necessary Project Allocation 2,000,000 (vii) Tylersville State Fish Hatchery, Clinton County (A) Design, permit, acquire properties and construct fish rearing facilities, buildings, effluent treatment, influent treatment and related infrastructure Project Allocation 8,000,000 (viii) Huntsdale State Fish Hatchery, Cumberland County (A) Design, permit, acquire properties and construct fish rearing facilities, buildings, effluent treatment, influent treatment and related infrastructure Project Allocation 26,500,000 (B) Design, permit and construct facilities for the remediation of PCB contaminated soils and monitor environmental remediations Project20250HB1331PN1629 Allocation- 7,500,000190 20250HB1331PN1945 - 318Project -Allocation 7,500,000 (ix) Lake Erie State Fish Hatchery, Erie County (A) Design, permit, acquire properties to construct fish rearing and research facilities, buildings, effluent treatment, influent treatment and related infrastructure for the acquisition and development of the Lake Erie State Fish Hatchery, or for the expansion and development of another fish rearing facility in Erie County Project Allocation 25,000,000 (x) North East Marina, Erie County (A) Design, permit, acquire properties and construct new or rehabilitate existing infrastructure to support a day use/seasonal public access area and boat launch Project Allocation 18,000,000 (xi) Trout Run Steel Head Collection Facility, Erie County (A) Design, permit, construct, rehabilitate or improve fish collection facilities and related infrastructure and demolition of existing in-stream concrete structures, retaining walls and related infrastructure Project20250HB1331PN1629 Allocation- 5,000,000191 20250HB1331PN1945 - 319Project -Allocation 5,000,000 (xii) Union City State Fish Hatchery, Erie County (A) Design, permit, acquire properties and construct fish rearing facilities, buildings, effluent treatment, influent treatment and related infrastructure Project Allocation 2,500,000 (xiii) Walnut Creek Marina, Erie County (A) Design, permit, acquire properties and construct or rehabilitate marina- related infrastructure to improve slip capacity, parking and boating and fishing access Project Allocation 12,000,000 (xiv) Maintenance Area 1/Fisheries Area 2 Office, Forest County (A) Design, permit, acquire properties and construct, rehabilitate or replace an office and storage facility for fisheries and related operations Project Allocation 3,000,000 (xv) Tionesta State Fish Hatchery, Forest County (A) Design, permit, acquire properties and construct fish rearing facilities, buildings, effluent treatment, influent treatment and related infrastructure Project20250HB1331PN1629 Allocation- 5,000,000192 20250HB1331PN1945 - 320Project -Allocation 5,000,000 (xvi) Hemlock Lake, Indiana County (A) Design, permit, acquire properties and construct a dam rehabilitation project, including repair and replacement of amenities, appurtenances, ADA accessibility and sediment removal operations as necessary, at Hemlock Lake Project Allocation 2,000,000 (xvii) Cloe Lake, Jefferson County (A) Design, permit, acquire properties and construct a dam rehabilitation project, including repair and replacement of amenities, appurtenances, ADA accessibility and sediment removal operations as necessary Project Allocation 8,500,000 (xviii) Fords Lake, Lackawanna County (A) Design, permit, acquire properties and construct a dam rehabilitation project, including repair and replacement of amenities, appurtenances, ADA accessibility and sediment removal operations as necessary Project Allocation 2,000,000 (xix) Harris Pond, Luzerne County (A) Design, permit, acquire properties 20250HB1331PN1629 - 193 - and construct a dam rehabilitation 20250HB1331PN1945 - 321 - project, including repair and replacement of amenities, appurtenances, ADA accessibility and sediment removal operations as necessary Project Allocation 2,000,000 (xx) Minsi Lake, Northampton County (A) Design, permit, acquire properties and construct, rehabilitate or replace a bridge, including repair and replacement of amenities and appurtenances Project Allocation 5,200,000 (xxi) Oswayo State Fish Hatchery, Potter County (A) Design, permit, acquire properties and construct fish rearing facilities, buildings, effluent treatment, influent treatment and related infrastructure Project Allocation 6,500,000 (xxii) High Point Lake, Somerset County (A) Design, permit, acquire properties and construct a dam rehabilitation project, including repair and replacement of amenities, appurtenances, ADA accessibility and sediment removal operations as necessary, at High Point Lake Project20250HB1331PN1629 Allocation- 2,000,000194 20250HB1331PN1945 - 322Project -Allocation 2,000,000 (xxiii) Hunters Lake, Sullivan County (A) Design, permit, acquire properties and construct a dam rehabilitation project, including repair and replacement of amenities, appurtenances, ADA accessibility and sediment removal operations as necessary Project Allocation 1,500,000 (xxiv) Fisheries Area 5 Office, Wayne County (A) Design, permit, acquire properties and construct, rehabilitate or replace an office and storage facility for fisheries and related operations Project Allocation 3,000,000 (xxv) Miller Pond, Wayne County (A) Design, permit, acquire properties and construct a dam rehabilitation project, including repair and replacement of amenities, appurtenances, ADA accessibility and sediment removal operations as necessary at Miller Pond Project Allocation 1,500,000 (xxvi) Pleasant Mount State Fish Hatchery, Wayne County (A) Design, permit, acquire properties and construct fish rearing facilities, buildings, effluent treatment, 20250HB1331PN1629 - 195 - influent treatment and related 20250HB1331PN1945 - 323 - infrastructure Project Allocation 9,500,000 (B) Design, permit, acquire properties and construct, rehabilitate or replace bridges, including repair and replacement of amenities and appurtenances Project Allocation 5,600,000 (C) Design, permit, acquire properties and construct, rehabilitate or replace a pedestrian bridge, including repair and replacement of amenities and appurtenances Project Allocation 1,600,000 (xxvii) White Oak Pond, Wayne County (A) Design, permit, acquire properties and construct a dam rehabilitation project, including repair and replacement of amenities, appurtenances, ADA accessibility and sediment removal operations as necessary at White Oak Pond Project Allocation 1,500,000 (xxviii) Polk/Sandy Creek bridge removal, Venango County (A) Design, permit, acquire properties and construct, rehabilitate or remove an abandoned railroad bridge, including repair and replacement of amenities20250HB1331PN1629 and- appurtenances196 20250HB1331PN1945 - 324amenities -and appurtenances Project Allocation 1,500,000 (2) (Reserved) Section 9.
20250HB1331PN1629 - 197 - (d) Redevelopment assistance.--Subject to the limitations in 20250HB1331PN1945 - 325 - section 2.1 of the act of May 29, 2020 (P.L.205, No.25), known as the Capital Budget Act of 2019-2020, the Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(d) as may be found necessary to carry out the redevelopment assistance capital projects specifically itemized in the capital budget.
20250HB1331PN1629 - 198 - The indebtedness authorized in this act shall be incurred 20250HB1331PN1945 - 326 - from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, the Auditor General and the State Treasurer shall determine, but the latest stated maturity date shall not exceed the estimated useful life of the projects being financed as stated in section 11.
After reserving or paying the expenses of the sale of 20250HB1331PN1629 - 199 - the obligation, the State Treasurer shall pay to the Department 20250HB1331PN1945 - 327 - of General Services the money as required and certified by it to be legally due and payable.
(d) Redevelopment assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Community and Economic Development in the maximum amount specified in section 2(d) to be used by it exclusively to defray the financial cost of the redevelopment assistance capital 20250HB1331PN1629 - 200 - projects specifically itemized in a capital budget.
After 20250HB1331PN1945 - 328 - reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community and Economic Development the money as required and certified by it to be legally due and payable.
The Legislative Reference Bureau shall also revise the total monetary amounts for the total authorization, debt authorization, appropriations 20250HB1331PN1629 - 201 - and department totals as necessary to agree with the total 20250HB1331PN1945 - 329 - monetary amounts of the projects.
20250HB1331PN194520250HB1331PN1629 - 330202 -
Show all 284 changed rows (244 more)
Action History
-
Referred to APPROPRIATIONS, Oct. 3, 2025
-
In the Senate
-
Third consideration and final passage, Oct. 1, 2025 (185-18)
-
Re-reported as amended, Oct. 1, 2025
-
Amended in House Committee on APPROPRIATIONS, Sept. 30, 2025
-
Re-committed to APPROPRIATIONS, Sept. 30, 2025
-
Second consideration, Oct. 1, 2025
-
Removed from table, Sept. 10, 2025
-
Laid on the table, Sept. 10, 2025
-
Re-reported as committed, Sept. 10, 2025
-
Re-committed to RULES, June 17, 2025
-
First consideration, June 17, 2025
-
Reported as amended, June 17, 2025
-
Referred to APPROPRIATIONS, May 6, 2025
Sponsors
- Jordan A. Harris · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 252 not signed on · 18 voted No
Sponsors (1)
- Jordan A. Harris Democratic
Co-sponsors (0)
None.
Not signed on (252)
252 members have not signed on to this bill.
Show all 252 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democratic | 100 | 0 | 0 | 0 |
| Republican | 79 | 18 | 0 | 0 |
| Unaffiliated | 6 | 0 | 0 | 0 |
| Total | 185 | 18 | 0 | 0 |
| % of votes cast | 91% | 9% | 0% | 0% |
How each member voted (203)
| Member | Party | Vote |
|---|---|---|
| Dan Miller | — | Yea |
| Joshua Siegel | — | Yea |
| Louis Schmitt | — | Yea |
| Seth Grove | — | Yea |
| Stephenie Scialabba | — | Yea |
| Torren Ecker | — | Yea |
| Abigail Salisbury | Democratic | Yea |
| Aerion Abney | Democratic | Yea |
| Amen Brown | Democratic | Yea |
| Andre D. Carroll | Democratic | Yea |
| Anita Astorino Kulik | Democratic | Yea |
| Anthony A. Bellmon | Democratic | Yea |
| Arvind Venkat | Democratic | Yea |
| Ben Waxman | Democratic | Yea |
| Benjamin V. Sanchez | Democratic | Yea |
| Brandon J. Markosek | Democratic | Yea |
| Brian Munroe | Democratic | Yea |
| Bridget M. Kosierowski | Democratic | Yea |
| Carol Hill-Evans | Democratic | Yea |
| Carol Kazeem | Democratic | Yea |
| Chris Pielli | Democratic | Yea |
| Christina D. Sappey | Democratic | Yea |
| Christopher M. Rabb | Democratic | Yea |
| Dan Frankel | Democratic | Yea |
| Dan Goughnour | Democratic | Yea |
| Dan K. Williams | Democratic | Yea |
| Daniel J. Deasy | Democratic | Yea |
| Danielle Friel Otten | Democratic | Yea |
| Danilo Burgos | Democratic | Yea |
| Darisha K. Parker | Democratic | Yea |
| Dave Madsen | Democratic | Yea |
| David M. Delloso | Democratic | Yea |
| Ed Neilson | Democratic | Yea |
| Eddie Day Pashinski | Democratic | Yea |
| Elizabeth Fiedler | Democratic | Yea |
| Emily Kinkead | Democratic | Yea |
| Frank Burns | Democratic | Yea |
| G. Roni Green | Democratic | Yea |
| Gina H. Curry | Democratic | Yea |
| Greg Scott | Democratic | Yea |
| Greg Vitali | Democratic | Yea |
| Heather Boyd | Democratic | Yea |
| Ismail Smith-Wade-El | Democratic | Yea |
| Jacklyn Rusnock | Democratic | Yea |
| Jared G. Solomon | Democratic | Yea |
| Jason Dawkins | Democratic | Yea |
| Jeanne McNeill | Democratic | Yea |
| Jennifer O'Mara | Democratic | Yea |
| Jessica Benham | Democratic | Yea |
| Jim Haddock | Democratic | Yea |
| Jim Prokopiak | Democratic | Yea |
| Joanna E. McClinton | Democratic | Yea |
| Joe Ciresi | Democratic | Yea |
| Joe McAndrew | Democratic | Yea |
| Joe Webster | Democratic | Yea |
| Johanny Cepeda-Freytiz | Democratic | Yea |
| John C. Inglis III | Democratic | Yea |
| Jordan A. Harris | Democratic | Yea |
| Jose Giral | Democratic | Yea |
| Joseph C. Hohenstein | Democratic | Yea |
| Justin C. Fleming | Democratic | Yea |
| Keith S. Harris | Democratic | Yea |
| Kristine C. Howard | Democratic | Yea |
| Kyle Donahue | Democratic | Yea |
| Kyle J. Mullins | Democratic | Yea |
| La'Tasha D. Mayes | Democratic | Yea |
| Leanne Krueger | Democratic | Yea |
| Lindsay Powell | Democratic | Yea |
| Lisa A. Borowski | Democratic | Yea |
| Liz Hanbidge | Democratic | Yea |
| Malcolm Kenyatta | Democratic | Yea |
| Mandy Steele | Democratic | Yea |
| Manuel Guzman | Democratic | Yea |
| Mary Jo Daley | Democratic | Yea |
| MaryLouise Isaacson | Democratic | Yea |
| Matthew D. Bradford | Democratic | Yea |
| Maureen E. Madden | Democratic | Yea |
| Melissa Cerrato | Democratic | Yea |
| Melissa L. Shusterman | Democratic | Yea |
| Michael H. Schlossberg | Democratic | Yea |
| Morgan Cephas | Democratic | Yea |
| Nancy Guenst | Democratic | Yea |
| Napoleon J. Nelson | Democratic | Yea |
| Nathan Davidson | Democratic | Yea |
| Nikki Rivera | Democratic | Yea |
| Pat Gallagher | Democratic | Yea |
| Patrick J. Harkins | Democratic | Yea |
| Paul Friel | Democratic | Yea |
| Paul Takac | Democratic | Yea |
| Perry S. Warren | Democratic | Yea |
| Peter Schweyer | Democratic | Yea |
| Regina G. Young | Democratic | Yea |
| Rick Krajewski | Democratic | Yea |
| Robert E. Merski | Democratic | Yea |
| Robert F. Matzie | Democratic | Yea |
| Robert Freeman | Democratic | Yea |
| Ryan A. Bizzarro | Democratic | Yea |
| Scott Conklin | Democratic | Yea |
| Sean Dougherty | Democratic | Yea |
| Steve Samuelson | Democratic | Yea |
| Steven R. Malagari | Democratic | Yea |
| Tarah Probst | Democratic | Yea |
| Tarik Khan | Democratic | Yea |
| Tim Brennan | Democratic | Yea |
| Tim Briggs | Democratic | Yea |
| Tina M. Davis | Democratic | Yea |
| Aaron Bernstine | Republican | Nay |
| Abby Major | Republican | Yea |
| Alec J. Ryncavage | Republican | Yea |
| Andrew Kuzma | Republican | Yea |
| Ann Flood | Republican | Yea |
| Barbara Gleim | Republican | Nay |
| Brad Roae | Republican | Yea |
| Brenda M. Pugh | Republican | Yea |
| Brett R. Miller | Republican | Yea |
| Brian C. Rasel | Republican | Yea |
| Brian Smith | Republican | Yea |
| Bryan Cutler | Republican | Yea |
| Bud Cook | Republican | Yea |
| Carl Walker Metzgar | Republican | Yea |
| Chad G. Reichard | Republican | Yea |
| Charity Grimm Krupa | Republican | Nay |
| Clint Owlett | Republican | Yea |
| Craig T. Staats | Republican | Yea |
| Craig Williams | Republican | Yea |
| Dallas Kephart | Republican | Nay |
| Dan Moul | Republican | Yea |
| Dane Watro | Republican | Yea |
| David H. Rowe | Republican | Yea |
| David H. Zimmerman | Republican | Yea |
| David M. Maloney | Republican | Nay |
| Donna Scheuren | Republican | Yea |
| Doyle Heffley | Republican | Yea |
| Eric Davanzo | Republican | Yea |
| Eric J. Weaknecht | Republican | Yea |
| Eric R. Nelson | Republican | Yea |
| Gary W. Day | Republican | Yea |
| Jack Rader | Republican | Yea |
| Jacob D. Banta | Republican | Nay |
| James B. Struzzi | Republican | Yea |
| Jamie Barton | Republican | Yea |
| Jamie L. Flick | Republican | Yea |
| Jamie Walsh | Republican | Nay |
| Jason Ortitay | Republican | Yea |
| Jeff Olsommer | Republican | Yea |
| Jeremy Shaffer | Republican | Yea |
| Jesse Topper | Republican | Yea |
| Jill N. Cooper | Republican | Yea |
| Jim Rigby | Republican | Yea |
| Joanne Stehr | Republican | Yea |
| Joe Emrick | Republican | Yea |
| Joe Hamm | Republican | Nay |
| Joe Hogan | Republican | Yea |
| Joe Kerwin | Republican | Yea |
| John A. Lawrence | Republican | Nay |
| John A. Schlegel | Republican | Yea |
| Jonathan Fritz | Republican | Yea |
| Joseph D'Orsie | Republican | Nay |
| Josh Bashline | Republican | Nay |
| Joshua D. Kail | Republican | Yea |
| Kate A. Klunk | Republican | Yea |
| Kathleen C. Tomlinson | Republican | Yea |
| Kathy L. Rapp | Republican | Yea |
| Keith J. Greiner | Republican | Yea |
| Kerry A. Benninghoff | Republican | Yea |
| Kristin Marcell | Republican | Yea |
| Leslie Rossi | Republican | Yea |
| Marc S. Anderson | Republican | Nay |
| Marci Mustello | Republican | Yea |
| Mark M. Gillen | Republican | Yea |
| Marla Brown | Republican | Yea |
| Martin T. Causer | Republican | Yea |
| Martina A. White | Republican | Yea |
| Michael Stender | Republican | Yea |
| Mike Armanini | Republican | Yea |
| Mike Jones | Republican | Nay |
| Milou Mackenzie | Republican | Yea |
| Mindy Fee | Republican | Yea |
| Natalie Mihalek | Republican | Yea |
| Parke Wentling | Republican | Yea |
| Perry A. Stambaugh | Republican | Yea |
| R. Lee James | Republican | Yea |
| Rich Irvin | Republican | Yea |
| Rob W. Kauffman | Republican | Yea |
| Robert Leadbeter | Republican | Yea |
| Roman Kozak | Republican | Yea |
| Russ Diamond | Republican | Yea |
| Ryan Warner | Republican | Nay |
| Scott Barger | Republican | Nay |
| Shelby Labs | Republican | Yea |
| Sheryl M. Delozier | Republican | Yea |
| Stephanie Borowicz | Republican | Nay |
| Steven C. Mentzer | Republican | Yea |
| Thomas H. Kutz | Republican | Yea |
| Thomas L. Mehaffie | Republican | Yea |
| Tim Twardzik | Republican | Yea |
| Timothy J. O'Neal | Republican | Yea |
| Timothy R. Bonner | Republican | Nay |
| Tina Pickett | Republican | Yea |
| Tom Jones | Republican | Yea |
| Valerie S. Gaydos | Republican | Yea |
| Wendy Fink | Republican | Nay |
| Zachary Mako | Republican | Yea |
Subjects
Frequently asked questions
- Who sponsors HB 1331?
- HB 1331 is sponsored by Jordan A. Harris (Democratic).
- What is the current status of HB 1331?
- This bill has passed the House. Introduced May 06, 2025. It now moves to the second chamber.
- Where can I track HB 1331?
- Track HB 1331 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB 1331
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB 1331
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →