SB 234 — Energy utility matters.
Last action — First reading: referred to Committee on Utilities
-
✓Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill is in committee in the Senate. Introduced January 08, 2026. It must pass committee before a floor vote.
Next likely step: a committee vote, then a floor vote in the Senate.
Odds of enactment
Low chanceBased on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
-
In Committee
Current position in the legislative process.
-
1 sponsor
1 primary, 0 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (1 R).
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
Summary
Provides that any standard tariff offered by an energy utility after March 14, 2026, to a large load customer of the energy utility must include a provision that requires reimbursement by the large load customer of all project costs reasonably allocable to the large load customer, regardless of whether the large load customer ultimately takes service in any anticipated amount and within any anticipated time frame. Makes a conforming amendment to the existing statute that allows an energy utility to petition the Indiana utility regulatory commission (IURC) for approval of a project to serve a large load customer. Provides that in a proceeding that is filed with or pending before the IURC after December 31, 2025, for a change in an energy utility's basic rates and charges, the IURC may not issue an order in the proceeding that would result, upon full implementation, in an increase in the energy utility's basic rates and charges, for any customer class, that exceeds the average monthly percentage increase in seasonally adjusted electricity prices for the United States over the course of a specified period that ends with the last month of the energy utility's 12 month test period used in the proceeding. Provides that the IURC may not authorize a public utility that: (1) provides retail electric or natural gas service; and (2) is under the IURC's jurisdiction for the approval of rates and charges; (utility) to recover through the utility's retail rates and charges any direct or indirect costs associated with specified expenses and activities related to lobbying, legislative action, political activities, charitable giving, litigation, investor relations, and other specified activities and expenses. Beginning in 2026, requires a utility to file with the IURC an annual report that includes specified information concerning costs to: (1) the utility; or (2) an affiliate of the utility; that are related to these expenses or activities and that are directly billed or allocated to the utility. Requires the IURC to make available on the IURC's website a direct link to the annual reports provided by all utilities under these provisions. Urges the legislative council to assign to the interim study committee on energy, utilities, and telecommunications the task of studying, during the 2026 legislative interim, the use of trackers by public utilities providing electric or natural gas service.
Bill Text
- Introduced Introduced Senate Bill (S) Current pdf
Action History
-
First reading: referred to Committee on Utilities
-
Authored by Senator Becker
Sponsors
- Vaneta Becker · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 149 not signed on
Sponsors (1)
- Vaneta Becker Republican
Co-sponsors (0)
None.
Not signed on (149)
149 members have not signed on to this bill.
Show all 149 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does SB 234 do?
- Provides that any standard tariff offered by an energy utility after March 14, 2026, to a large load customer of the energy utility must include a provision that requires reimbursement by the large load customer of all project costs reasonably allocable to the large load customer, regardless of whether the large load customer ultimately takes service in any anticipated amount and within any anticipated time frame. Makes a conforming amendment to the existing statute that allows an energy utility to petition the Indiana utility regulatory commission (IURC) for approval of a project to serve a large load customer. Provides that in a proceeding that is filed with or pending before the IURC after December 31, 2025, for a change in an energy utility's basic rates and charges, the IURC may not issue an order in the proceeding that would result, upon full implementation, in an increase in the energy utility's basic rates and charges, for any customer class, that exceeds the average monthly percentage increase in seasonally adjusted electricity prices for the United States over the course of a specified period that ends with the last month of the energy utility's 12 month test period used in the proceeding. Provides that the IURC may not authorize a public utility that: (1) provides retail electric or natural gas service; and (2) is under the IURC's jurisdiction for the approval of rates and charges; (utility) to recover through the utility's retail rates and charges any direct or indirect costs associated with specified expenses and activities related to lobbying, legislative action, political activities, charitable giving, litigation, investor relations, and other specified activities and expenses. Beginning in 2026, requires a utility to file with the IURC an annual report that includes specified information concerning costs to: (1) the utility; or (2) an affiliate of the utility; that are related to these expenses or activities and that are directly billed or allocated to the utility. Requires the IURC to make available on the IURC's website a direct link to the annual reports provided by all utilities under these provisions. Urges the legislative council to assign to the interim study committee on energy, utilities, and telecommunications the task of studying, during the 2026 legislative interim, the use of trackers by public utilities providing electric or natural gas service.
- Who sponsors SB 234?
- SB 234 is sponsored by Vaneta Becker (Republican).
- What is the current status of SB 234?
- This bill is in committee in the Senate. Introduced January 08, 2026. It must pass committee before a floor vote.
- Where can I track SB 234?
- Track SB 234 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 234
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 234
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →