HB 3609 — THERMAL ENERGY NETWORKS

Last action — Rule 19(a) / Re-referred to Rules Committee

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the House. Introduced February 07, 2025. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the House.

Prognosis

Advancing 46% · moderate confidence

Where this bill stands today.

Odds of enactment

Low

How often bills like it became law.

  • In Committee

    Current position in the legislative process.

  • 7 sponsors

    1 primary, 6 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (7 D).

  • Cleared a recorded vote

    Passed 1 recorded vote so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

198 added · 206 removed

Plain-language change summary

The updated version of HB 3609 introduces new language that emphasizes the environmental and market benefits of reducing electricity and natural gas usage, which can help the public understand the broader implications of energy-saving initiatives. It also requires the Illinois Commerce Commission to launch a process for developing pilot thermal energy networks within six months, aiming to explore new energy solutions that can serve multiple parties. These changes are important because they signal a shift towards more sustainable energy practices and promote innovation in how energy is delivered and consumed in the state.

→
Previous
Latest
*LRB10412086AAS22184b* HB3609 104TH GENERAL ASSEMBLY State of Illinois and 2026 HB3609 Introduced 2/18/2025, by Rep.
HB3609 Engrossed LRB104 12086 AAS 22184 b AN ACT concerning regulation.
Ann M.
Williams SYNOPSIS AS INTRODUCED:
ILCS 5/3-101 from Ch.
111 2/3, par.
3-101 ILCS 5/3-128 new ILCS 5/3-129 new ILCS 5/8-513 new Provides that the amendatory Act may be referred to as the Thermal Energy Network and Jobs Acts.
Sets forth a statement of legislative findings and intent.
Amends the Public Utilities Act.
Defines "thermal energy" and "thermal energy network".
Requires the Illinois Commerce Commission to initiate a proceeding within 6 months after the effective date of the amendatory Act to support the development of pilot thermal energy networks.
Provides that within 10 months after the effective date of the amendatory Act, every gas public utility, electric public utility, or combination public utility serving over 100,000 customers shall file with the Commission a petition seeking Commission-approval of at least one and no more than 3 proposed pilot thermal energy network projects.
Requires every gas public utility, electric public utility, or combination public utility constructing or operating a Commission-approved pilot thermal energy network project to report to the Commission, on a quarterly basis and until completion of the pilot thermal energy network project, the status of each pilot thermal energy network project.
Requires every gas public utility, electric public utility, or combination public utility constructing or operating a Commission-approved pilot thermal energy network project to demonstrate that it has entered into a labor peace agreement with a bona fide labor organization that is actively engaged in representing its employees.
Requires the Commission to adopt specified rules within 4 years after the completion of the construction of all thermal energy network projects.
Provides that a gas public utility, electric public utility, or combination public utility required to develop a pilot thermal energy network project shall be permitted to recover all reasonable and prudently incurred costs associated with the development, construction, and operation of one or more pilot thermal energy network projects through general rates or through rates set in a Multi-Year Rate Plan.
Effective immediately.
LRB104 12086 AAS 22184 b A BILL FOR HB3609 LRB104 12086 AAS 22184 b AN ACT concerning regulation.
(4) Thermal energy networks consist of pipe loops between multiple buildings and energy sources, which carry HB3609 - 2 - LRB104 12086 AAS 22184 b water and can be connected to by building owners to support heating and cooling and hot water services.
(4) Thermal energy networks consist of pipe loops between multiple buildings and energy sources, which carry HB3609 Engrossed - 2 - LRB104 12086 AAS 22184 b water and can be connected to by building owners to support heating and cooling and hot water services.
(8) Thermal loop technology provides benefits to participants and non-participants alike including societal benefits to the environment and the market benefits associated with the reduction of both the volume and peak demand of electricity and natural gas.
(8) Thermal loop technology provides benefits to participants and non-participants alike, including societal benefits to the environment and the market benefits associated with the reduction of both the volume and peak demand of electricity and natural gas.
(9) A utility's access to capital, the utility's experience with networked infrastructure in public HB3609 - 3 - LRB104 12086 AAS 22184 b rights-of-way, and the requirement that the utility serve all customers positions the utility well to develop and scale thermal energy networks that are accessible to all customers and to coordinate the development of thermal energy networks with any orderly rightsizing of the utility gas system.
(9) A utility's access to capital, the utility's experience with networked infrastructure in public HB3609 Engrossed - 3 - LRB104 12086 AAS 22184 b rights-of-way, and the requirement that the utility serve all customers positions the utility well to develop and scale thermal energy networks that are accessible to all customers and to coordinate the development of thermal energy networks with any orderly rightsizing of the utility gas system.
(12) Finally, these findings are especially vital now because the construction industry is experiencing HB3609 - 4 - LRB104 12086 AAS 22184 b widespread skill shortages across the country, which are crippling existing capital projects and threatening projects planned for the future.
(12) Finally, these findings are especially vital now because the construction industry is experiencing HB3609 Engrossed - 4 - LRB104 12086 AAS 22184 b widespread skill shortages across the country, which are crippling existing capital projects and threatening projects planned for the future.
(3) to promote the successful planning and delivery of thermal energy networks and protect critical investments in such projects by requiring the use of appropriate quality craft labor policies that ensure the development of and access to an adequate supply of well trained, HB3609 - 5 - LRB104 12086 AAS 22184 b highly skilled craft persons needed to support timely, reliable, high-quality projects;
(3) to promote the successful planning and delivery of thermal energy networks and protect critical investments in such projects by requiring the use of appropriate quality craft labor policies that ensure the development of and access to an adequate supply of well trained, HB3609 Engrossed - 5 - LRB104 12086 AAS 22184 b highly skilled craft persons needed to support timely, reliable, high-quality projects;
The Public Utilities Act is amended by changing Section 3-101 and by adding Sections 3-128, 3-129, HB3609 - 6 - LRB104 12086 AAS 22184 b and 8-513 as follows:
The Public Utilities Act is amended by changing Section 3-101 and by adding Sections 3-128, 3-129, HB3609 Engrossed - 6 - LRB104 12086 AAS 22184 b and 8-513 as follows:
"Thermal energy network" means all real estate, fixtures, and personal property operated, owned, used, or to be used for, in connection with, or to facilitate a utility-scale distribution infrastructure project that supplies thermal energy.
"Thermal energy network" means all real estate, fixtures, and personal property operated, owned, used, or to be used for, in connection with, or to facilitate a utility-scale distribution infrastructure project that supplies non-combusting thermal energy.
(220 ILCS 5/8-513 new) Sec.
"Thermal energy network" includes real estate, fixtures, and personal property that is operated, owned, or used by multiple parties.
HB3609 Engrossed - 7 - LRB104 12086 AAS 22184 b (220 ILCS 5/8-513 new) Sec.
HB3609 - 7 - LRB104 12086 AAS 22184 b (a) The Illinois Commerce Commission shall initiate a proceeding within 6 months after the effective date of this amendatory Act of the 104th General Assembly to support the development of pilot thermal energy networks.
(a) The Illinois Commerce Commission shall initiate a proceeding within 6 months after the effective date of this amendatory Act of the 104th General Assembly to support the development of pilot thermal energy networks.
No later than 18 months after the effective date of this amendatory Act of the 104th General Assembly, the Commission shall enter an order approving, approving with modification, or rejecting each proposed pilot thermal energy network project and shall direct the public utility to implement the pilot thermal energy network projects as approved or approved as modified.
No later than 18 months after the effective date of this amendatory Act of the 104th General Assembly, the Commission shall enter an order approving, approving with modification, or rejecting each proposed pilot thermal energy network project and shall direct HB3609 Engrossed - 8 - LRB104 12086 AAS 22184 b the public utility to implement the pilot thermal energy network projects as approved or approved as modified.
In considering whether to approve or approve as modified each HB3609 - 8 - LRB104 12086 AAS 22184 b pilot thermal energy network project, the Commission shall consider whether the pilot thermal energy network project is in the public interest, whether the pilot thermal energy network project will develop information useful for the Commission in adopting rules governing thermal energy networks, whether the pilot thermal energy network project furthers climate justice and emissions reduction, whether the pilot thermal energy network project advances financial and technical approaches to equitable and affordable building electrification, and whether the pilot thermal energy network project creates benefits to customers and society at large, including, but not limited to, public health benefits in areas with disproportionate environmental or public health burdens, job retention and creation, reliability, and increased affordability of renewable thermal energy options.
In considering whether to approve or approve as modified each pilot thermal energy network project, the Commission shall consider whether the pilot thermal energy network project is in the public interest, whether the pilot thermal energy network project will develop information useful for the Commission in adopting rules governing thermal energy networks, whether the pilot thermal energy network project furthers climate justice and emissions reduction, whether the pilot thermal energy network project advances financial and technical approaches to equitable and affordable building electrification, and whether the pilot thermal energy network project creates benefits to customers and society at large, including, but not limited to, public health benefits in areas with disproportionate environmental or public health burdens, job retention and creation, reliability, and increased affordability of renewable thermal energy options.
(c) If a utility proposes 3 pilot thermal energy network projects, at least one project shall be proposed in economically disadvantaged communities as defined in Section 5-35 of the Energy Transition Act and at least one shall be focused on existing electric heat customers.
(c) If a utility proposes 3 pilot thermal energy network projects, at least one project shall be proposed in economically disadvantaged communities as defined in Section HB3609 Engrossed - 9 - LRB104 12086 AAS 22184 b 5-35 of the Energy Transition Act and at least one shall include an industrial heat application that may additionally include residential and commercial applications.
Each public utility shall coordinate with other public utilities and HB3609 - 9 - LRB104 12086 AAS 22184 b consultants with expertise on successful pilot projects to ensure that the pilot projects are diverse and designed to inform the Commission's decisions in the proceeding on the various ownership, market, and rate structures for thermal energy networks.
Priority shall be given to pilot proposals that replace leak-prone natural gas distribution infrastructure with distribution infrastructure that supplies non-combusting thermal energy or that replaces thermal energy for buildings currently heated with electric resistance heat.
Each public utility shall coordinate with other public utilities and consultants with expertise on successful pilot projects to ensure that the pilot projects are diverse and designed to inform the Commission's decisions in the proceeding on the various ownership, market, and rate structures for thermal energy networks.
(c-5) Each public utility shall hold at least one pre-filing public meeting to receive public comment concerning HB3609 Engrossed - 10 - LRB104 12086 AAS 22184 b the proposed thermal energy network in the municipality where the thermal energy network is to be located.
Notice of the public meeting shall be published in a newspaper of general circulation for 3 consecutive weeks, beginning no earlier than one month before the first public meeting.
Notice of the public meeting, including a description of the thermal energy network, must be provided in writing to the clerk of the county where the project is to be located and to the Chief Clerk of the Commission.
A representative of the Commission shall be invited to each pre-filing public meeting.
HB3609 - 10 - LRB104 12086 AAS 22184 b (3) the number of customers served;
(3) the number of customers served;
and (6) other information the Commission deems to be in the public interest or considers likely to prove useful or relevant to the rulemaking described in subsection (h).
and (6) other information the Commission deems to be in HB3609 Engrossed - 11 - LRB104 12086 AAS 22184 b the public interest or considers likely to prove useful or relevant to the rulemaking described in subsection (h).
(d-5) The Commission shall require projects submitted to the utility-scale renewable thermal energy network program for approval to include a proposed rate structure for thermal energy services supplied to network end users and consumer protection plans for end users.
The Commission may approve the proposed rate structure if the projected heating and cooling costs for end users is not greater than the heating and cooling costs the end users would have incurred if the end users had not participated in the program.
Show all 46 changed rows (6 more)
Previous
Latest
(f) Any contractor or subcontractor that performs work on a pilot thermal energy network under this Section shall be a responsible bidder as described in Section 30-22 of the Illinois Procurement Code and shall certify that not less than prevailing wage, as determined under the Prevailing Wage Act, was or will be paid to employees who are engaged in construction activities associated with the pilot thermal energy network project.
(f) Any contractor or subcontractor that performs work on a pilot thermal energy network under this Section shall be a responsible bidder as described in Section 30-22 of the Illinois Procurement Code and shall certify that not less than HB3609 Engrossed - 12 - LRB104 12086 AAS 22184 b prevailing wage, as determined under the Prevailing Wage Act, was or will be paid to employees who are engaged in construction activities associated with the pilot thermal energy network project.
The contractor or subcontractor shall HB3609 - 11 - LRB104 12086 AAS 22184 b submit evidence to the Commission that it complied with the requirements of this subsection.
The contractor or subcontractor shall submit evidence to the Commission that it complied with the requirements of this subsection.
(h) Within 4 years after the completion of the construction of all thermal energy network projects under this Section, the Commission shall adopt rules to, at a minimum:
(h) Within 4 years after the effective date of this amendatory Act of the 104th General Assembly, the Commission shall adopt rules to, at a minimum:
and (4) encourage third-party participation and competition where it will maximize benefits to customers.
and (4) encourage third-party participation and HB3609 Engrossed - 13 - LRB104 12086 AAS 22184 b competition where it will maximize benefits to customers.
(i) A gas public utility, electric public utility, or combination public utility required to develop any pilot thermal energy network project under this Section shall be HB3609 - 12 - LRB104 12086 AAS 22184 b permitted to recover all reasonable and prudently incurred costs associated with the development, construction, and operation of one or more pilot thermal energy network projects through general rates set pursuant to Section 9-201 or through rates set in a Multi-Year Rate Plan pursuant to Section 16-108.18.
(i) A gas public utility, electric public utility, or combination public utility required to develop any pilot thermal energy network project under this Section shall be permitted to recover all reasonable and prudently incurred costs associated with the development, construction, and operation of one or more pilot thermal energy network projects through general rates set pursuant to Section 9-201 or through rates set in a Multi-Year Rate Plan pursuant to Section 16-108.18.
A gas public utility, electric public utility, or combination public utility developing a thermal energy network project that includes an industrial heat application may recover rates proportionally from each class of customer.
View plain text versions (2)

Amendments

2 amendments

Click Show changes on an amendment above to see how it modifies the bill.

Action History

  1. Rule 19(a) / Re-referred to Rules Committee

  2. Added Co-Sponsor Rep. Lilian Jiménez

  3. Added Co-Sponsor Rep. Camille Y. Lilly

  4. House Floor Amendment No. 2 Referred to Rules Committee

  5. House Floor Amendment No. 2 Filed with Clerk by Rep. Ann M. Williams

  6. Added Co-Sponsor Rep. Kelly M. Cassidy

  7. Placed on Calendar Order of 3rd Reading - Short Debate

  8. Second Reading - Short Debate

  9. Placed on Calendar 2nd Reading - Short Debate

  10. Do Pass as Amended / Short Debate Energy & Environment Committee; 015-008-000

  11. House Committee Amendment No. 1 Adopted in Energy & Environment Committee; by Voice Vote

  12. House Committee Amendment No. 1 Rules Refers to Energy & Environment Committee

  13. House Committee Amendment No. 1 Referred to Rules Committee

  14. House Committee Amendment No. 1 Filed with Clerk by Rep. Ann M. Williams

  15. Assigned to Energy & Environment Committee

  16. Added Co-Sponsor Rep. Anne Stava

  17. Added Chief Co-Sponsor Rep. Jay Hoffman

  18. Added Chief Co-Sponsor Rep. Marcus C. Evans, Jr.

  19. Referred to Rules Committee

  20. First Reading

  21. Filed with the Clerk by Rep. Ann M. Williams

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 6 co-sponsors · 176 not signed on · 8 voted No

Sponsors (1)

Co-sponsors (6)

Not signed on (176)

176 members have not signed on to this bill.

Show all 176 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Energy & Environment

Passed 15 Yea · 8 Nay · 6 Other
Party YeaNayPresentNot Voting
Democrat 15004
Republican 0802
Total 15806
% of votes cast 52%28%0%21%
How each member voted (29)
Member Party Vote
Aarón M. Ortíz Democrat Yea
Abdelnasser Rashid Democrat Not Voting
Amy Briel Democrat Yea
Ann M. Williams Democrat Yea
Anna Moeller Democrat Yea
Anne Stava Democrat Yea
Curtis J. Tarver, II Democrat Not Voting
Diane Blair-Sherlock Democrat Yea
Jawaharial Williams Democrat Yea
Joyce Mason Democrat Yea
Kimberly Du Buclet Democrat Yea
Laura Faver Dias Democrat Yea
Lawrence "Larry" Walsh, Jr. Democrat Yea
Lilian Jiménez Democrat Yea
Michelle Mussman Democrat Not Voting
Norma Hernandez Democrat Yea
Sonya M. Harper Democrat Not Voting
Suzanne M. Ness Democrat Yea
William "Will" Davis Democrat Yea
Adam M. Niemerg Republican Not Voting
Blaine Wilhour Republican Nay
Brad Halbrook Republican Nay
Bradley Fritts Republican Not Voting
Charles Meier Republican Nay
Chris Miller Republican Nay
Dave Severin Republican Nay
Jason R. Bunting Republican Nay
Jed Davis Republican Nay
Regan Deering Republican Nay

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors HB 3609?
HB 3609 is sponsored by Ann M. Williams (Democrat), Marcus C. Evans, Jr. (Democrat), Jay Hoffman (Democrat), Anne Stava (Democrat), Kelly M. Cassidy (Democrat), Camille Y. Lilly (Democrat), and Lilian Jiménez (Democrat).
What is the current status of HB 3609?
This bill is in committee in the House. Introduced February 07, 2025. It must pass committee before a floor vote.
Where can I track HB 3609?
Track HB 3609 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 3609

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 3609

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →