THERMAL ENERGY NETWORKS
Do you support it?
Want to know if it passes?
We'll email you when HB 3609 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on HB 3609.
You're tracking HB 3609
We'll email you the moment it moves.
HB 3609 — THERMAL ENERGY NETWORKS
Last action — Rule 19(a) / Re-referred to Rules Committee
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
2In Committee
-
3Passed House
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill is in committee in the House. Introduced February 07, 2025. It must pass committee before a floor vote.
Next likely step: a committee vote, then a floor vote in the House.
Prognosis
Where this bill stands today.
Odds of enactment
LowHow often bills like it became law.
-
In Committee
Current position in the legislative process.
-
7 sponsors
1 primary, 6 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (7 D).
-
Cleared a recorded vote
Passed 1 recorded vote so far.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
Bill Text
What changed in the latest version
198 added · 206 removedPlain-language change summary
The updated version of HB 3609 introduces new language that emphasizes the environmental and market benefits of reducing electricity and natural gas usage, which can help the public understand the broader implications of energy-saving initiatives. It also requires the Illinois Commerce Commission to launch a process for developing pilot thermal energy networks within six months, aiming to explore new energy solutions that can serve multiple parties. These changes are important because they signal a shift towards more sustainable energy practices and promote innovation in how energy is delivered and consumed in the state.
*LRB10412086AAS22184b* HB3609 104THEngrossed GENERALLRB104 ASSEMBLY12086 StateAAS of22184 Illinoisb andAN 2026ACT HB3609concerning Introducedregulation. 2/18/2025, by Rep.
Ann M.
Williams SYNOPSIS AS INTRODUCED:
ILCS 5/3-101 from Ch.
111 2/3, par.
3-101 ILCS 5/3-128 new ILCS 5/3-129 new ILCS 5/8-513 new Provides that the amendatory Act may be referred to as the Thermal Energy Network and Jobs Acts.
Sets forth a statement of legislative findings and intent.
Amends the Public Utilities Act.
Defines "thermal energy" and "thermal energy network".
Requires the Illinois Commerce Commission to initiate a proceeding within 6 months after the effective date of the amendatory Act to support the development of pilot thermal energy networks.
Provides that within 10 months after the effective date of the amendatory Act, every gas public utility, electric public utility, or combination public utility serving over 100,000 customers shall file with the Commission a petition seeking Commission-approval of at least one and no more than 3 proposed pilot thermal energy network projects.
Requires every gas public utility, electric public utility, or combination public utility constructing or operating a Commission-approved pilot thermal energy network project to report to the Commission, on a quarterly basis and until completion of the pilot thermal energy network project, the status of each pilot thermal energy network project.
Requires every gas public utility, electric public utility, or combination public utility constructing or operating a Commission-approved pilot thermal energy network project to demonstrate that it has entered into a labor peace agreement with a bona fide labor organization that is actively engaged in representing its employees.
Requires the Commission to adopt specified rules within 4 years after the completion of the construction of all thermal energy network projects.
Provides that a gas public utility, electric public utility, or combination public utility required to develop a pilot thermal energy network project shall be permitted to recover all reasonable and prudently incurred costs associated with the development, construction, and operation of one or more pilot thermal energy network projects through general rates or through rates set in a Multi-Year Rate Plan.
Effective immediately.
LRB104 12086 AAS 22184 b A BILL FOR HB3609 LRB104 12086 AAS 22184 b AN ACT concerning regulation.
(4) Thermal energy networks consist of pipe loops between multiple buildings and energy sources, which carry HB3609 Engrossed - 2 - LRB104 12086 AAS 22184 b water and can be connected to by building owners to support heating and cooling and hot water services.
(8) Thermal loop technology provides benefits to participants and non-participants alikealike, including societal benefits to the environment and the market benefits associated with the reduction of both the volume and peak demand of electricity and natural gas.
(9) A utility's access to capital, the utility's experience with networked infrastructure in public HB3609 Engrossed - 3 - LRB104 12086 AAS 22184 b rights-of-way, and the requirement that the utility serve all customers positions the utility well to develop and scale thermal energy networks that are accessible to all customers and to coordinate the development of thermal energy networks with any orderly rightsizing of the utility gas system.
(12) Finally, these findings are especially vital now because the construction industry is experiencing HB3609 Engrossed - 4 - LRB104 12086 AAS 22184 b widespread skill shortages across the country, which are crippling existing capital projects and threatening projects planned for the future.
(3) to promote the successful planning and delivery of thermal energy networks and protect critical investments in such projects by requiring the use of appropriate quality craft labor policies that ensure the development of and access to an adequate supply of well trained, HB3609 Engrossed - 5 - LRB104 12086 AAS 22184 b highly skilled craft persons needed to support timely, reliable, high-quality projects;
The Public Utilities Act is amended by changing Section 3-101 and by adding Sections 3-128, 3-129, HB3609 Engrossed - 6 - LRB104 12086 AAS 22184 b and 8-513 as follows:
"Thermal energy network" means all real estate, fixtures, and personal property operated, owned, used, or to be used for, in connection with, or to facilitate a utility-scale distribution infrastructure project that supplies non-combusting thermal energy.
(220"Thermal ILCSenergy 5/8-513network" new)includes Sec.real estate, fixtures, and personal property that is operated, owned, or used by multiple parties.
HB3609 Engrossed - 7 - LRB104 12086 AAS 22184 b (220 ILCS 5/8-513 new) Sec.
HB3609 - 7 - LRB104 12086 AAS 22184 b (a) The Illinois Commerce Commission shall initiate a proceeding within 6 months after the effective date of this amendatory Act of the 104th General Assembly to support the development of pilot thermal energy networks.
No later than 18 months after the effective date of this amendatory Act of the 104th General Assembly, the Commission shall enter an order approving, approving with modification, or rejecting each proposed pilot thermal energy network project and shall direct HB3609 Engrossed - 8 - LRB104 12086 AAS 22184 b the public utility to implement the pilot thermal energy network projects as approved or approved as modified.
In considering whether to approve or approve as modified each HB3609 - 8 - LRB104 12086 AAS 22184 b pilot thermal energy network project, the Commission shall consider whether the pilot thermal energy network project is in the public interest, whether the pilot thermal energy network project will develop information useful for the Commission in adopting rules governing thermal energy networks, whether the pilot thermal energy network project furthers climate justice and emissions reduction, whether the pilot thermal energy network project advances financial and technical approaches to equitable and affordable building electrification, and whether the pilot thermal energy network project creates benefits to customers and society at large, including, but not limited to, public health benefits in areas with disproportionate environmental or public health burdens, job retention and creation, reliability, and increased affordability of renewable thermal energy options.
(c) If a utility proposes 3 pilot thermal energy network projects, at least one project shall be proposed in economically disadvantaged communities as defined in Section HB3609 Engrossed - 9 - LRB104 12086 AAS 22184 b 5-35 of the Energy Transition Act and at least one shall beinclude focusedan onindustrial existingheat electricapplication heatthat customers.may additionally include residential and commercial applications.
EachPriority public utility shall coordinatebe withgiven otherto publicpilot utilitiesproposals andthat HB3609replace -leak-prone 9natural -gas LRB104distribution 12086infrastructure AAS 22184 b consultants with expertisedistribution oninfrastructure successful pilot projects to ensure that thesupplies pilotnon-combusting projectsthermal areenergy diverseor andthat designedreplaces tothermal informenergy thefor Commission'sbuildings decisionscurrently inheated thewith proceedingelectric onresistance theheat. various ownership, market, and rate structures for thermal energy networks.
Each public utility shall coordinate with other public utilities and consultants with expertise on successful pilot projects to ensure that the pilot projects are diverse and designed to inform the Commission's decisions in the proceeding on the various ownership, market, and rate structures for thermal energy networks.
(c-5) Each public utility shall hold at least one pre-filing public meeting to receive public comment concerning HB3609 Engrossed - 10 - LRB104 12086 AAS 22184 b the proposed thermal energy network in the municipality where the thermal energy network is to be located.
Notice of the public meeting shall be published in a newspaper of general circulation for 3 consecutive weeks, beginning no earlier than one month before the first public meeting.
Notice of the public meeting, including a description of the thermal energy network, must be provided in writing to the clerk of the county where the project is to be located and to the Chief Clerk of the Commission.
A representative of the Commission shall be invited to each pre-filing public meeting.
HB3609 - 10 - LRB104 12086 AAS 22184 b (3) the number of customers served;
and (6) other information the Commission deems to be in HB3609 Engrossed - 11 - LRB104 12086 AAS 22184 b the public interest or considers likely to prove useful or relevant to the rulemaking described in subsection (h).
(d-5) The Commission shall require projects submitted to the utility-scale renewable thermal energy network program for approval to include a proposed rate structure for thermal energy services supplied to network end users and consumer protection plans for end users.
The Commission may approve the proposed rate structure if the projected heating and cooling costs for end users is not greater than the heating and cooling costs the end users would have incurred if the end users had not participated in the program.
Show all 46 changed lines (6 more)
(f) Any contractor or subcontractor that performs work on a pilot thermal energy network under this Section shall be a responsible bidder as described in Section 30-22 of the Illinois Procurement Code and shall certify that not less than HB3609 Engrossed - 12 - LRB104 12086 AAS 22184 b prevailing wage, as determined under the Prevailing Wage Act, was or will be paid to employees who are engaged in construction activities associated with the pilot thermal energy network project.
The contractor or subcontractor shall HB3609 - 11 - LRB104 12086 AAS 22184 b submit evidence to the Commission that it complied with the requirements of this subsection.
(h) Within 4 years after the completioneffective ofdate the construction of allthis thermalamendatory energyAct networkof projectsthe under104th thisGeneral Section,Assembly, the Commission shall adopt rules to, at a minimum:
and (4) encourage third-party participation and HB3609 Engrossed - 13 - LRB104 12086 AAS 22184 b competition where it will maximize benefits to customers.
(i) A gas public utility, electric public utility, or combination public utility required to develop any pilot thermal energy network project under this Section shall be HB3609 - 12 - LRB104 12086 AAS 22184 b permitted to recover all reasonable and prudently incurred costs associated with the development, construction, and operation of one or more pilot thermal energy network projects through general rates set pursuant to Section 9-201 or through rates set in a Multi-Year Rate Plan pursuant to Section 16-108.18.
A gas public utility, electric public utility, or combination public utility developing a thermal energy network project that includes an industrial heat application may recover rates proportionally from each class of customer.
Show all 46 changed rows (6 more)
Amendments
2 amendmentsClick Show changes on an amendment above to see how it modifies the bill.
Action History
-
Rule 19(a) / Re-referred to Rules Committee
-
Added Co-Sponsor Rep. Lilian Jiménez
-
Added Co-Sponsor Rep. Camille Y. Lilly
-
House Floor Amendment No. 2 Referred to Rules Committee
-
House Floor Amendment No. 2 Filed with Clerk by Rep. Ann M. Williams
-
Added Co-Sponsor Rep. Kelly M. Cassidy
-
Placed on Calendar Order of 3rd Reading - Short Debate
-
Second Reading - Short Debate
-
Placed on Calendar 2nd Reading - Short Debate
-
Do Pass as Amended / Short Debate Energy & Environment Committee; 015-008-000
-
House Committee Amendment No. 1 Adopted in Energy & Environment Committee; by Voice Vote
-
House Committee Amendment No. 1 Rules Refers to Energy & Environment Committee
-
House Committee Amendment No. 1 Referred to Rules Committee
-
House Committee Amendment No. 1 Filed with Clerk by Rep. Ann M. Williams
-
Assigned to Energy & Environment Committee
-
Added Co-Sponsor Rep. Anne Stava
-
Added Chief Co-Sponsor Rep. Jay Hoffman
-
Added Chief Co-Sponsor Rep. Marcus C. Evans, Jr.
-
Referred to Rules Committee
-
First Reading
-
Filed with the Clerk by Rep. Ann M. Williams
Sponsors
- Ann M. Williams · Primary
- Jr. Marcus C. Evans · Cosponsor
- Jay Hoffman · Cosponsor
- Anne Stava · Cosponsor
- Kelly M. Cassidy · Cosponsor
- Camille Y. Lilly · Cosponsor
- Lilian Jiménez · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 6 co-sponsors · 176 not signed on · 8 voted No
Sponsors (1)
- Ann M. Williams Democrat
Co-sponsors (6)
- Marcus C. Evans, Jr. Democrat
- Jay Hoffman Democrat
- Anne Stava Democrat
- Kelly M. Cassidy Democrat
- Camille Y. Lilly Democrat
- Lilian Jiménez Democrat
Not signed on (176)
176 members have not signed on to this bill.
Show all 176 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 15 | 0 | 0 | 4 |
| Republican | 0 | 8 | 0 | 2 |
| Total | 15 | 8 | 0 | 6 |
| % of votes cast | 52% | 28% | 0% | 21% |
How each member voted (29)
| Member | Party | Vote |
|---|---|---|
| Aarón M. Ortíz | Democrat | Yea |
| Abdelnasser Rashid | Democrat | Not Voting |
| Amy Briel | Democrat | Yea |
| Ann M. Williams | Democrat | Yea |
| Anna Moeller | Democrat | Yea |
| Anne Stava | Democrat | Yea |
| Curtis J. Tarver, II | Democrat | Not Voting |
| Diane Blair-Sherlock | Democrat | Yea |
| Jawaharial Williams | Democrat | Yea |
| Joyce Mason | Democrat | Yea |
| Kimberly Du Buclet | Democrat | Yea |
| Laura Faver Dias | Democrat | Yea |
| Lawrence "Larry" Walsh, Jr. | Democrat | Yea |
| Lilian Jiménez | Democrat | Yea |
| Michelle Mussman | Democrat | Not Voting |
| Norma Hernandez | Democrat | Yea |
| Sonya M. Harper | Democrat | Not Voting |
| Suzanne M. Ness | Democrat | Yea |
| William "Will" Davis | Democrat | Yea |
| Adam M. Niemerg | Republican | Not Voting |
| Blaine Wilhour | Republican | Nay |
| Brad Halbrook | Republican | Nay |
| Bradley Fritts | Republican | Not Voting |
| Charles Meier | Republican | Nay |
| Chris Miller | Republican | Nay |
| Dave Severin | Republican | Nay |
| Jason R. Bunting | Republican | Nay |
| Jed Davis | Republican | Nay |
| Regan Deering | Republican | Nay |
Subjects
Frequently asked questions
- Who sponsors HB 3609?
- HB 3609 is sponsored by Ann M. Williams (Democrat), Marcus C. Evans, Jr. (Democrat), Jay Hoffman (Democrat), Anne Stava (Democrat), Kelly M. Cassidy (Democrat), Camille Y. Lilly (Democrat), and Lilian Jiménez (Democrat).
- What is the current status of HB 3609?
- This bill is in committee in the House. Introduced February 07, 2025. It must pass committee before a floor vote.
- Where can I track HB 3609?
- Track HB 3609 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB 3609
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB 3609
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →