AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO THE LOAD FORECAST ACCOUNTABILITY ACT.
This means consumers may benefit from more accurate energy supply forecasts, potentially reducing unnecessary costs.
Do you support it?
Want to know if it passes?
We'll email you when SB 308 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on SB 308.
You're tracking SB 308
We'll email you the moment it moves.
SB 308 — AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO THE LOAD FORECAST ACCOUNTABILITY ACT.
Last action — Signed by Governor
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill has passed the Senate. Introduced May 07, 2026. It now moves to the second chamber.
Next likely step: consideration and a floor vote in the House.
Prognosis
Where this bill stands today.
Odds of enactment
HighHow often bills like it became law.
-
Passed Senate
Current position in the legislative process.
-
10 sponsors
10 primary, 0 co-sponsors signed on.
-
Bipartisan support
Sponsored across 2 parties (8 D · 2 R) — cross-party backing.
-
Cleared a recorded vote
Passed 2 recorded votes so far.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
In plain language
The bill enhances the Delaware Public Service Commission's authority over electricity load forecasting.
This legislation allows the Delaware Public Service Commission to oversee load forecasts from electric distribution companies. It aims to ensure accurate forecasting to maintain electric supply reliability and protect consumers from excessive costs.
What this means for you
- Consumers: This means consumers may benefit from more accurate energy supply forecasts, potentially reducing unnecessary costs.
Summary
This legislation shall be known and may be cited as the “Load Forecast Accountability Act.” Recent reports by PJM Interconnection, L.L.C. (PJM), have highlighted that electricity demand across the PJM footprint, including Delaware, is projected to grow due to data centers, electrification of vehicles and buildings, and other large load additions. PJM recently projected that, by 2030, PJM expects to add 32 GW of load to the grid – 30 GW of which is attributable to data centers. PJM relies upon load forecasts submitted by Commission-regulated electric distribution companies in Delaware to establish system planning needs and capacity requirements which ultimately have costs associated with both. Accurate, transparent, load forecasting is essential to ensure the adequacy of electric supply, maintain system reliability, and protect Delaware consumers from unnecessary costs caused by overbuilding or underbuilding system resources. There is a critical need for the Delaware Public Service Commission to provide oversight of load forecasting inputs from Commission-regulated electric distribution companies, to ensure accuracy and transparency, and to coordinate with PJM and neighboring state regulators to prevent duplicative counting of projects and customer contracts. The purpose of this Act is to provide the Commission with authority and responsibility to: (1) Review and evaluate load forecasts submitted by Delaware Commission-regulated electric distribution companies to PJM; (2) Coordinate with PJM and other states to ensure accurate system-wide planning; and (3) Access all relevant materials, including confidential agreements, necessary to carry out this oversight. Under this Act, the Commission is required to submit a written report to the Governor, the General Assembly, and the Director and the Librarian of the Division of Legislative Services no later than May 1 of each year on its progress in implementing this Act. This report must also be posted on the Commission’s website.
Bill Text
What changed in the latest version
98 added · 18 removedPlain-language change summary
The amendment to SB 308 adds specific criteria for the Delaware Public Service Commission to consider when evaluating load forecasts from electric distribution companies. These criteria include the project's development stage, expected timelines, any duplicative interconnection requests, and customer financial commitments. This change aims to enhance the transparency and accuracy of load forecasting methodologies used by these companies.
Hansen DELAWARE& STATERep. SENATE 153rd GENERAL ASSEMBLY SENATE AMENDMENT NO.
1Burns TOSens. SENATE BILL NO.
308Paradee, AMENDRichardson, SenateSeigfried, BillWalsh; No.
308Reps. by deleting line 39 in its entirety and inserting in lieu thereof the following:
“consider:Griffith, Lambert, Minor-Brown, S.
1.Moore, Morrison, Phillips DELAWARE STATE SENATE 153rd GENERAL ASSEMBLY SENATE BILL NO.
The308 stageAN ofACT developmentTO andAMEND projectTITLE development26 status,OF includingTHE whetherDELAWARE theCODE customerRELATING hasTO executedTHE relevantLOAD serviceFORECAST agreements,ACCOUNTABILITY demonstratedACT. site control, and met permitting milestones.
2.BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF DELAWARE:
ExpectedSection ramping1. schedules, including the anticipated in-service date, interim load levels, and full build-out timing.
3.Amend Title 26 of the Delaware Code by making deletions as shown by strike through and insertions as shown by underline as follows:
WhetherSubchapter theVII-B. customer has filed duplicative interconnection requests within or outside of PJM, and the number and associated megawatts of such requests.
4.Load Forecast Accountability Act §715.
TheShort statusTitle. and amount of customer financial commitments, including deposits, construction obligations, or other sureties.”.
SYNOPSIS This amendmentact addsand specificthis matterssubchapter thatshall thebe Delawareknown Publicand Servicemay Commissionbe shouldcited consideras when the Commission“Load investigatesForecast theAccountability methodologies,Act.” data,§716. and assumptions used by Commission-regulated electric distribution companies in developing load forecasts submitted to PJM.
Legislative Findings and Purpose.
(a) The General Assembly finds and declares as follows:
(1) Recent reports by PJM Interconnection, L.L.C.
(PJM), have highlighted that electricity demand across the PJM footprint, including Delaware, is projected to grow due to data centers, electrification of vehicles and buildings, and other large load additions.
PJM recently projected that by 2030, PJM expects to add 32 GW of load to the grid – 30 GW of which is attributable to data centers.
(2) PJM relies upon load forecasts submitted by electric distribution companies in Delaware to establish system planning needs and capacity requirements which ultimately have costs associated with both.
(3) Accurate load forecasting is essential to ensure the adequacy of electric supply, maintain system reliability, and protect Delaware consumers from unnecessary costs caused by overbuilding or underbuilding system resources.
(4) Currently, the process by which utilities and load-serving entities submit information to PJM is very opaque, requires revision to ensure confidence and transparency so that policymakers, regulators, and stakeholders can rely upon the results.
(5) There is a critical need for the Delaware Public Service Commission (Commission) to provide oversight of load forecasting inputs from Commission-regulated electric distribution companies, to ensure SD :
FJM :
ALW Page 1 of 3 Released:
05/07/2026 05:42 PM accuracy and transparency, and to coordinate with PJM and neighboring state regulators to prevent duplicative counting of projects and customer contracts.
(b) The purpose of this Act is to provide the Commission with authority and responsibility to:
(1) Review and evaluate load forecasts submitted by Commission-regulated electric distribution companies to PJM.
(2) Coordinate with PJM and other states to support system-wide planning.
(3) Access all relevant materials, including confidential agreements, necessary to review and evaluate load forecasts.
§717.
Oversight of Load Forecasting.
(a) The Commission shall initiate a proceeding to investigate the methodologies, data, and assumptions used by Commission-regulated electric distribution companies in developing load forecasts submitted to PJM.
(b) As part of this investigation, the Commission shall:
(1) Review all materials, data sets, and filings provided by Commission-regulated electric distribution companies to PJM related to load forecasting.
(2) Review the accuracy, consistency, and transparency of forecasting methods and assumptions.
(3) Review specific load interconnection requests to ensure that only those projects that have a high likelihood of being developed are included in the load forecast.
As part of this evaluation, the Commission should consider financial commitments provided by the interconnecting customer to the development of its project.
(4) Coordinate directly with Commission-regulated electric distribution companies and PJM to ensure that Delaware’s electric utility forecasts are incorporated into PJM’s regional planning on a fair, accurate, and non- duplicative basis.
(5) Work jointly with PJM and other state utility commissions within the PJM footprint to ensure that new large loads and customer contracts are not double counted across jurisdictions and to evaluate whether other state load forecasting policies can improve Delaware’s efforts.
Show all 74 changed lines (34 more)
(c) The Commission shall have the authority to promulgate regulations to more fully define the requirements necessary for the implementation of this section.
§718.
Access to Confidential Contracts.
(a) In carrying out its responsibilities under this Act, the Commission shall have authority to review and access any contracts, agreements, or commitments between interconnecting customers and Commission-regulated electric distribution companies within the State of Delaware that impact load forecasting assumptions.
SD :
FJM :
ALW Page 2 of 3 Released:
05/07/2026 05:42 PM (b) Commission-regulated electric distribution companies shall provide such contracts to the Commission upon request, subject to the confidentiality provisions of Title 29 of the Delaware Code, § 10002(o)(2) and (6) and any other provisions of Delaware law.
The Commission shall put in place appropriate safeguards to protect against disclosure of confidential information.
§719.
Annual Reporting.
(a) The Commission shall submit a written report to the General Assembly no later than May 1 of each year on its progress in implementing this Act.
This report shall be posted on the Commission’s website.
(b) The report shall describe:
(1) The Commission’s efforts to implement this Act during the prior year.
(2) Findings from its review of load forecasting processes and materials submitted by Commission- regulated electric distribution companies to PJM.
(3) Any coordination undertaken with PJM and other states to prevent duplicative counting of projects and customer contracts.
(4) Recommendations for legislative or regulatory changes to further improve load forecasting oversight and reliability.
Section 2.
This Act shall sunset on December 31, 2035, unless otherwise renewed by the General Assembly.
SYNOPSIS This legislation shall be known and may be cited as the “Load Forecast Accountability Act.” Recent reports by PJM Interconnection, L.L.C.
(PJM), have highlighted that electricity demand across the PJM footprint, including Delaware, is projected to grow due to data centers, electrification of vehicles and buildings, and other large load additions.
PJM recently projected that, by 2030, PJM expects to add 32 GW of load to the grid – 30 GW of which is attributable to data centers.
PJM relies upon load forecasts submitted by Commission-regulated electric distribution companies in Delaware to establish system planning needs and capacity requirements which ultimately have costs associated with both.
Accurate, transparent, load forecasting is essential to ensure the adequacy of electric supply, maintain system reliability, and protect Delaware consumers from unnecessary costs caused by overbuilding or underbuilding system resources.
There is a critical need for the Delaware Public Service Commission to provide oversight of load forecasting inputs from Commission-regulated electric distribution companies, to ensure accuracy and transparency, and to coordinate with PJM and neighboring state regulators to prevent duplicative counting of projects and customer contracts.
The purpose of this Act is to provide the Commission with authority and responsibility to:
(1) Review and evaluate load forecasts submitted by Delaware Commission-regulated electric distribution companies to PJM;
(2) Coordinate with PJM and other states to ensure accurate system-wide planning;
and (3) Access all relevant materials, including confidential agreements, necessary to carry out this oversight.
Under this Act, the Commission is required to submit a written report to the Governor, the General Assembly, and the Director and the Librarian of the Division of Legislative Services no later than May 1 of each year on its progress in implementing this Act.
This report must also be posted on the Commission’s website.
ALW Page 13 of 13 Released:
05/14/202605/07/2026 09:1805:42 AMPM 27115302632711530192
Show all 74 changed rows (34 more)
Action History
-
Passed By House. Votes: 39 YES 1 NO 1 ABSENT
-
Reported Out of Committee (Natural Resources & Energy) in House with 4 Favorable, 6 On Its Merits
-
Assigned to Natural Resources & Energy Committee in House
-
Passed By Senate. Votes: 20 YES 1 ABSENT
-
Amendment SA 1 to SB 308 - Passed By Senate. Votes: 20 YES 1 ABSENT
-
Amendment SA 1 to SB 308 - Introduced and Placed With Bill
-
Reported Out of Committee (Environment, Energy & Transportation) in Senate with 7 Favorable
-
Introduced and Assigned to Environment, Energy & Transportation Committee in Senate
Sponsors
- David L. Wilson · Primary
- Eric Morrison · Primary
- David P. Sokola · Primary
- Spiros Mantzavinos · Primary
- Nicole Poore · Primary
- John "Jack" Walsh · Primary
- Ray Seigfried · Primary
- Trey Paradee · Primary
- Bryant L. Richardson · Primary
- Stephanie L. Hansen · Primary
Sponsorship breakdown
Export CSV (upgrade) →10 sponsors · 0 co-sponsors · 52 not signed on · 1 voted No
Sponsors (10)
- David L. Wilson Republican
- Eric Morrison Democratic
- David P. Sokola Democratic
- Spiros Mantzavinos Democratic
- Nicole Poore Democratic
- John "Jack" Walsh Democratic
- Ray Seigfried Democratic
- Trey Paradee Democratic
- Bryant L. Richardson Republican
- Stephanie L. Hansen Democratic
Co-sponsors (0)
None.
Not signed on (52)
52 members have not signed on to this bill.
Show all 52 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democratic | 27 | 0 | 0 | 0 |
| Republican | 12 | 1 | 0 | 1 |
| Total | 39 | 1 | 0 | 1 |
| % of votes cast | 95% | 2% | 0% | 2% |
How each member voted (41)
| Member | Party | Vote |
|---|---|---|
| Alonna Berry | Democratic | Yea |
| Claire Snyder-Hall | Democratic | Yea |
| Cyndie Romer | Democratic | Yea |
| DeShanna U Neal | Democratic | Yea |
| Debra Heffernan | Democratic | Yea |
| Edward S. Osienski | Democratic | Yea |
| Eric Morrison | Democratic | Yea |
| Frank Burns | Democratic | Yea |
| Franklin D. Cooke | Democratic | Yea |
| Josue O Ortega | Democratic | Yea |
| Kamela T Smith | Democratic | Yea |
| Kendra Johnson | Democratic | Yea |
| Kerri Evelyn Harris | Democratic | Yea |
| Kimberly Williams | Democratic | Yea |
| Krista Griffith | Democratic | Yea |
| Larry Lambert | Democratic | Yea |
| Madinah Wilson-Anton | Democratic | Yea |
| Mara Gorman | Democratic | Yea |
| Melanie Ross Levin | Democratic | Yea |
| Melissa Minor-Brown | Democratic | Yea |
| Nnamdi O. Chukwuocha | Democratic | Yea |
| Sean M. Lynn | Democratic | Yea |
| Sherae'a Moore | Democratic | Yea |
| Sophie Phillips | Democratic | Yea |
| Stephanie T. Bolden | Democratic | Yea |
| William Bush | Democratic | Yea |
| William J. Carson | Democratic | Yea |
| Bryan W. Shupe | Republican | Yea |
| Charles S Postles Jr. | Republican | Yea |
| Daniel B. Short | Republican | Yea |
| Jeff Hilovsky | Republican | Nay |
| Jeffrey N. Spiegelman | Republican | Yea |
| Jesse R. Vanderwende | Republican | Not Voting |
| Kevin S Hensley | Republican | Yea |
| Lyndon D. Yearick | Republican | Yea |
| Michael F. Smith | Republican | Yea |
| Richard G. Collins | Republican | Yea |
| Ronald E. Gray | Republican | Yea |
| Shannon Morris | Republican | Yea |
| Timothy D. Dukes | Republican | Yea |
| Valerie Jones Giltner | Republican | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democratic | 15 | 0 | 0 | 0 |
| Republican | 5 | 0 | 0 | 1 |
| Total | 20 | 0 | 0 | 1 |
| % of votes cast | 95% | 0% | 0% | 5% |
How each member voted (21)
| Member | Party | Vote |
|---|---|---|
| Bryan Townsend | Democratic | Yea |
| Daniel Cruce | Democratic | Yea |
| Darius J. Brown | Democratic | Yea |
| David P. Sokola | Democratic | Yea |
| John "Jack" Walsh | Democratic | Yea |
| Kyra L. Hoffner | Democratic | Yea |
| Laura V. Sturgeon | Democratic | Yea |
| Marie Pinkney | Democratic | Yea |
| Nicole Poore | Democratic | Yea |
| Ray Seigfried | Democratic | Yea |
| Russell Huxtable | Democratic | Yea |
| S. Elizabeth Lockman | Democratic | Yea |
| Spiros Mantzavinos | Democratic | Yea |
| Stephanie L. Hansen | Democratic | Yea |
| Trey Paradee | Democratic | Yea |
| Brian Pettyjohn | Republican | Yea |
| Bryant L. Richardson | Republican | Yea |
| Dave G. Lawson | Republican | Yea |
| David L. Wilson | Republican | Yea |
| Eric Buckson | Republican | Yea |
| Gerald W. Hocker | Republican | Not Voting |
Subjects
Frequently asked questions
- What does SB 308 do?
- This legislation shall be known and may be cited as the “Load Forecast Accountability Act.” Recent reports by PJM Interconnection, L.L.C. (PJM), have highlighted that electricity demand across the PJM footprint, including Delaware, is projected to grow due to data centers, electrification of vehicles and buildings, and other large load additions. PJM recently projected that, by 2030, PJM expects to add 32 GW of load to the grid – 30 GW of which is attributable to data centers. PJM relies upon load forecasts submitted by Commission-regulated electric distribution companies in Delaware to establish system planning needs and capacity requirements which ultimately have costs associated with both. Accurate, transparent, load forecasting is essential to ensure the adequacy of electric supply, maintain system reliability, and protect Delaware consumers from unnecessary costs caused by overbuilding or underbuilding system resources. There is a critical need for the Delaware Public Service Commission to provide oversight of load forecasting inputs from Commission-regulated electric distribution companies, to ensure accuracy and transparency, and to coordinate with PJM and neighboring state regulators to prevent duplicative counting of projects and customer contracts. The purpose of this Act is to provide the Commission with authority and responsibility to: (1) Review and evaluate load forecasts submitted by Delaware Commission-regulated electric distribution companies to PJM; (2) Coordinate with PJM and other states to ensure accurate system-wide planning; and (3) Access all relevant materials, including confidential agreements, necessary to carry out this oversight. Under this Act, the Commission is required to submit a written report to the Governor, the General Assembly, and the Director and the Librarian of the Division of Legislative Services no later than May 1 of each year on its progress in implementing this Act. This report must also be posted on the Commission’s website.
- Who sponsors SB 308?
- SB 308 is sponsored by David L. Wilson (Republican), Eric Morrison (Democratic), David P. Sokola (Democratic), Spiros Mantzavinos (Democratic), Nicole Poore (Democratic), John "Jack" Walsh (Democratic), Ray Seigfried (Democratic), Trey Paradee (Democratic), Bryant L. Richardson (Republican), and Stephanie L. Hansen (Democratic).
- What is the current status of SB 308?
- This bill has passed the Senate. Introduced May 07, 2026. It now moves to the second chamber.
- Where can I track SB 308?
- Track SB 308 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 308
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 308
Last checked for changes about 2 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →