Connecticut 2026 Session Status: In Committee

HB 5469 — AN ACT CONCERNING COLOCATED ELECTRIC SUPPLIERS AND LARGE ELECTRIC LOAD CUSTOMERS.

Last action — FILE NO. 421

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the House. Introduced March 05, 2026. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the House.

Prognosis

Not enough signal yet

Where this bill stands today.

Odds of enactment

Low

How often bills like it became law.

Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

325 added · 56 removed

Plain-language change summary

The recent amendments to HB 5469 include the addition of new lines that officially document the committee's support for the bill, clarifying its progress through the legislative process. At the same time, several initial technical references and identifiers were removed, likely to streamline the bill and improve its readability. These changes are important because they ensure the bill is properly documented and acknowledged by the House, which can facilitate easier understanding and tracking of its legislative journey.

→
Previous
Latest
General Assembly Raised Bill No.
House of Representatives General Assembly File No.
5469 February Session, 2026 LCO No.
421 February Session, 2026 House Bill No.
2300 Referred to Committee on ENERGY AND TECHNOLOGY Introduced by:
5469 House of Representatives, April 7, 2026 The Committee on Energy and Technology reported through REP.
(ET) AN ACT CONCERNING COLOCATED ELECTRIC SUPPLIERS AND LARGE ELECTRIC LOAD CUSTOMERS.
STEINBERG of the 136th Dist., Chairperson of the Committee on the part of the House, that the bill ought to pass.
AN ACT CONCERNING COLOCATED ELECTRIC SUPPLIERS AND LARGE ELECTRIC LOAD CUSTOMERS.
(3) "Public service company" includes electric distribution, gas, telephone, pipeline, sewage, water and community antenna television LCO 2300 1 of 26 Raised Bill No.
(3) "Public service company" includes electric distribution, gas, HB5469 / File No.
5469 companies and holders of a certificate of cable franchise authority, owning,leasing, maintaining,operating,managingorcontrollingplants or parts of plants or equipment, but shall not include towns, cities, boroughs, any municipal corporation or department thereof, whether separately incorporated or not, a private power producer, as defined in section 16-243b, or an exempt wholesale generator, as defined in 15 USC 79z-5a;
421 1 HB5469 File No.
421 telephone, pipeline, sewage, water and community antenna television companies and holders of a certificate of cable franchise authority, owning,leasing, maintaining,operating,managingorcontrollingplants or parts of plants or equipment, but shall not include towns, cities, boroughs, any municipal corporation or department thereof, whether separately incorporated or not, a private power producer, as defined in section 16-243b, or an exempt wholesale generator, as defined in 15 USC 79z-5a;
A water company does not include homeowners, condominium associations providing water only to their members, homeowners associations providing water to customers at least eighty per cent of whom are members of such associations, a municipal waterworks system established under chapter 102, a district, metropolitan district, municipal district or special services district established under chapter LCO 2300 2 of 26 Raised Bill No.
A water company does not include homeowners, condominium associations providing water only to their members, homeowners associations providing water to customers at least eighty per cent of whom are members of such associations, a municipal waterworks system established under chapter 102, a district, metropolitan district, HB5469 / File No.
5469 105, chapter 105a or any other general statute or any public or special act which is authorized to supply water, or any other waterworks system owned, leased, maintained, operated, managed or controlled by any unit of local government under any general statute or any public or special act;
421 2 HB5469 File No.
421 municipal district or special services district established under chapter 105, chapter 105a or any other general statute or any public or special act which is authorized to supply water, or any other waterworks system owned, leased, maintained, operated, managed or controlled by any unit of local government under any general statute or any public or special act;
LCO 2300 3 of 26 Raised Bill No.
HB5469 / File No.
5469 (11) "Community antenna television service" means (A) the one-way transmission to subscribers of video programming or information that a community antenna television company makes available to all subscribers generally, and subscriber interaction, if any, which is required for the selection of such video programming or information, and (B) noncable communications service.
421 3 HB5469 File No.
421 (11) "Community antenna television service" means (A) the one-way transmission to subscribers of video programming or information that a community antenna television company makes available to all subscribers generally, and subscriber interaction, if any, which is required for the selection of such video programming or information, and (B) noncable communications service.
(14) "Noncable communications service" means any LCO 2300 4 of 26 Raised Bill No.
(14) "Noncable communications service" means any HB5469 / File No.
5469 telecommunications service, as defined in section 16-247a, and which is not included in the definition of "cable service" in the Communications Act of 1934, 47 USC 522, as amended.
421 4 HB5469 File No.
421 telecommunications service, as defined in section 16-247a, and which is not included in the definition of "cable service" in the Communications Act of 1934, 47 USC 522, as amended.
(19) "Telecommunications company" means a person that provides telecommunications service, as defined in section 16-247a, within the state, but shall not mean a person that provides only (A) private telecommunications service, as defined in section 16-247a, (B) the one- way transmission of video programming or other programming services to subscribers, (C) subscriber interaction, if any, which is required for the selection of such video programming or other programming services, (D) the two-way transmission of educational or instructional programming to a public or private elementary or secondary school, or a public or independent institution of higher education, as required by the authority pursuant to a community antenna television company franchise agreement, or provided pursuant LCO 2300 5 of 26 Raised Bill No.
(19) "Telecommunications company" means a person that provides telecommunications service, as defined in section 16-247a, within the state, but shall not mean a person that provides only (A) private telecommunications service, as defined in section 16-247a, (B) the one- way transmission of video programming or other programming services to subscribers, (C) subscriber interaction, if any, which is required for the selection of such video programming or other programming services, (D) the two-way transmission of educational or instructional programming to a public or private elementary or secondary school, or a public or independent institution of higher education, as required by the authority pursuant to a community antenna television company franchise agreement, or provided pursuant HB5469 / File No.
5469 to a contract with such a school or institution which contract has been filed with the authority, or (E) a combination of the services set forth in subparagraphs (B) to (D), inclusive, of this subdivision;
421 5 HB5469 File No.
(20) "Class I renewable energy source" means (A) electricity derived from (i) solar power, (ii) wind power, (iii) a fuel cell, (iv) geothermal, (v) anaerobic digestion or other biogas derived from biological sources, (vi) thermal electric direct energy conversion from a certified Class I renewable energy source, (vii) ocean thermal power, (viii) wave or tidal power, (ix) low emission advanced renewable energy conversion technologies, including, but not limitedto,zero emissionlowgrade heat power generation systems based on organic oil free rankine, kalina or other similar nonsteam cycles that use waste heat from an industrial or commercial process that does not generate electricity, (x) (I) a run-of- the-river hydropower facility that began operation after July 1, 2003,has a generating capacity of not more than sixty megawatts, is not based on a new dam or a dam identified by the Commissioner of Energy and Environmental Protection as a candidate for removal, and meets applicable state and federal requirements, including state dam safety requirements and applicable site-specific standards for water quality and fish passage, or (II) a run-of-the-river hydropower facility that received a new license after January 1, 2018, under the Federal Energy Regulatory Commission rules pursuant to 18 CFR 16, as amended from time to time, is not based on a new dam or a dam identified by the Commissioner of Energy and Environmental Protection as a candidate for removal, and meets applicable state and federal requirements, including state dam safety requirements and applicable site-specific standards for water quality and fish passage, (xi) a biomass facility, provided such facility has executed an agreement to provide energy to an electric distribution company prior to October 1, 2025, that (I) uses sustainable biomass fuel and has an average emission rate of equal to or less than .075 pounds of nitrogen oxides per million BTU of heat input for the previous calendar quarter, or (II) has a capacity of less than five hundred kilowatts that began construction before July 1, 2003, may be considered a Class I renewable energy source for the duration of such LCO 2300 6 of 26 Raised Bill No.
421 to a contract with such a school or institution which contract has been filed with the authority, or (E) a combination of the services set forth in subparagraphs (B) to (D), inclusive, of this subdivision;
5469 agreement, or (xii) a nuclear power generating facility constructed on or after October 1, 2023, or (B) any electrical generation, including distributed generation, generated from a Class I renewable energy source, provided, on and after January 1, 2014, any megawatt hours of electricity from a renewable energy source described under this subparagraph that are claimed or counted by a load-serving entity, province or state toward compliance with renewable portfolio standards or renewable energy policy goals in another province or state, other than the state of Connecticut, shall not be eligible for compliance with the renewable portfolio standards established pursuant to section 16-245a;
(20) "Class I renewable energy source" means (A) electricity derived from (i) solar power, (ii) wind power, (iii) a fuel cell, (iv) geothermal, (v) anaerobic digestion or other biogas derived from biological sources, (vi) thermal electric direct energy conversion from a certified Class I renewable energy source, (vii) ocean thermal power, (viii) wave or tidal power, (ix) low emission advanced renewable energy conversion technologies, including, but not limitedto,zero emissionlowgrade heat power generation systems based on organic oil free rankine, kalina or other similar nonsteam cycles that use waste heat from an industrial or commercial process that does not generate electricity, (x) (I) a run-of- the-river hydropower facility that began operation after July 1, 2003,has a generating capacity of not more than sixty megawatts, is not based on a new dam or a dam identified by the Commissioner of Energy and Environmental Protection as a candidate for removal, and meets applicable state and federal requirements, including state dam safety requirements and applicable site-specific standards for water quality and fish passage, or (II) a run-of-the-river hydropower facility that received a new license after January 1, 2018, under the Federal Energy Regulatory Commission rules pursuant to 18 CFR 16, as amended from time to time, is not based on a new dam or a dam identified by the Commissioner of Energy and Environmental Protection as a candidate for removal, and meets applicable state and federal requirements, including state dam safety requirements and applicable site-specific standards for water quality and fish passage, (xi) a biomass facility, provided such facility has executed an agreement to provide energy to an electric distribution company prior to October 1, 2025, that (I) uses sustainable biomass fuel and has an average emission rate of equal to or less than .075 pounds of nitrogen oxides per million BTU of heat input for the previous calendar quarter, or (II) has a capacity of less than five hundred kilowatts that began construction before July 1, 2003, may be considered a Class I renewable energy source for the duration of such agreement, or (xii) a nuclear power generating facility constructed on or HB5469 / File No.
421 6 HB5469 File No.
421 after October 1, 2023, or (B) any electrical generation, including distributed generation, generated from a Class I renewable energy source, provided, on and after January 1, 2014, any megawatt hours of electricity from a renewable energy source described under this subparagraph that are claimed or counted by a load-serving entity, province or state toward compliance with renewable portfolio standards or renewable energy policy goals in another province or state, other than the state of Connecticut, shall not be eligible for compliance with the renewable portfolio standards established pursuant to section 16-245a;
LCO 2300 7 of 26 Raised Bill No.
(24) "Electric supplier" means any person, including an electric aggregator or participating municipal electric utility that is licensed by HB5469 / File No.
5469 (24) "Electric supplier" means any person, including an electric aggregator or participating municipal electric utility that is licensed by the Public Utilities Regulatory Authority in accordance with section 16- 245, as amended by this act, that provides electric generation services to end use customers in the state using the transmission or distribution facilities of an electric distribution company, regardless of whether or not such person takes title to such generation services, but does not include:
421 7 HB5469 File No.
421 the Public Utilities Regulatory Authority in accordance with section 16- 245, as amended by this act, that provides electric generation services to end use customers in the state using the transmission or distribution facilities of an electric distribution company, regardless of whether or not such person takes title to such generation services, but does not include:
LCO 2300 8 of 26 Raised Bill No.
(29) "Participating municipal electric utility" means a municipal electric utility established under chapter 101 or any other electric utility HB5469 / File No.
5469 (29) "Participating municipal electric utility" means a municipal electric utility established under chapter 101 or any other electric utility owned, leased, maintained, operated, managed or controlled by any unit of local government under any general statute or any public or specialact,thatisauthorizedbytheauthorityinaccordancewithsection 16-245c to provide electric generation services to end use customers outside its service area, as defined in section 16-245c;
421 8 HB5469 File No.
421 owned, leased, maintained, operated, managed or controlled by any unit of local government under any general statute or any public or specialact,thatisauthorizedbytheauthorityinaccordancewithsection 16-245c to provide electric generation services to end use customers outside its service area, as defined in section 16-245c;
(35) "Federally mandated congestion charges" means any cost approvedbytheFederalEnergyRegulatoryCommissionaspartofNew England Standard Market Design including, but not limited to, LCO 2300 9 of 26 Raised Bill No.
(35) "Federally mandated congestion charges" means any cost approvedbytheFederalEnergyRegulatoryCommissionaspartofNew England Standard Market Design including, but not limited to, locational marginal pricing, locational installed capacity payments, any cost approved by the Public Utilities Regulatory Authority to reduce HB5469 / File No.
5469 locational marginal pricing, locational installed capacity payments, any cost approved by the Public Utilities Regulatory Authority to reduce federally mandated congestion charges in accordance with section 7- 233y, this section, sections 16-32f, 16-50i, 16-50k, 16-50x, 16-243i to 16- 243q, inclusive, 16-244c, 16-245m, 16-245n and 16-245z, section 21 of public act 05-1 of the June special session, subsection (f) of section 16a- 3j and reliability must run contracts;
421 9 HB5469 File No.
421 federally mandated congestion charges in accordance with section 7- 233y, this section, sections 16-32f, 16-50i, 16-50k, 16-50x, 16-243i to 16- 243q, inclusive, 16-244c, 16-245m, 16-245n and 16-245z, section 21 of public act 05-1 of the June special session, subsection (f) of section 16a- 3j and reliability must run contracts;
LCO 2300 10 of 26 Raised Bill No.
(39) "Sustainable biomass fuel" means biomass that is cultivated and harvested in a sustainable manner.
5469 (39) "Sustainable biomass fuel" means biomass that is cultivated and harvested in a sustainable manner.
"Sustainable biomass fuel" does not meanconstructionand demolitionwaste, asdefinedin section22a-208x, HB5469 / File No.
"Sustainable biomass fuel" does not meanconstructionand demolitionwaste, asdefinedin section22a-208x, finished biomass products from sawmills, paper mills or stud mills, organic refuse fuel derived separately from municipal solid waste, or biomass from old growth timber stands, except where (A) such biomass is used in a biomass gasification plant that received funding prior to May 1, 2006, from the Clean Energy Fund established pursuant to section 16-245n, or (B) the energy derived from such biomass is subject to a long-term power purchase contract pursuant to subdivision (2) of subsection (j) of section 16-244c entered into prior to May 1, 2006;
421 10 HB5469 File No.
421 finished biomass products from sawmills, paper mills or stud mills, organic refuse fuel derived separately from municipal solid waste, or biomass from old growth timber stands, except where (A) such biomass is used in a biomass gasification plant that received funding prior to May 1, 2006, from the Clean Energy Fund established pursuant to section 16-245n, or (B) the energy derived from such biomass is subject to a long-term power purchase contract pursuant to subdivision (2) of subsection (j) of section 16-244c entered into prior to May 1, 2006;
(42) "Certificate of video franchise authority" means an authorization issued by the Public Utilities Regulatory Authority conferring the right to an entity or person to own, lease, maintain, operate, manage or LCO 2300 11 of 26 Raised Bill No.
(42) "Certificate of video franchise authority" means an authorization issued by the Public Utilities Regulatory Authority conferring the right to an entity or person to own, lease, maintain, operate, manage or control facilities in, under or over any public highway to offer video service to any subscribers in the state;
5469 control facilities in, under or over any public highway to offer video service to any subscribers in the state;
(43) "Certificate of cable franchise authority" means an authorization HB5469 / File No.
(43) "Certificate of cable franchise authority" means an authorization issued by the Public Utilities Regulatory Authority pursuant to section 16-331q conferring the right to a community antenna television company to own, lease, maintain, operate, manage or control a community antenna television system in, under or over any public highway to (A) offer community antenna television service in a community antenna television company's designated franchise area, or (B) use the public rights-of-way to offer video service in a designated franchise area.
421 11 HB5469 File No.
421 issued by the Public Utilities Regulatory Authority pursuant to section 16-331q conferring the right to a community antenna television company to own, lease, maintain, operate, manage or control a community antenna television system in, under or over any public highway to (A) offer community antenna television service in a community antenna television company's designated franchise area, or (B) use the public rights-of-way to offer video service in a designated franchise area.
Show all 230 changed rows (190 more)
Previous
Latest
(47) "Large-scale hydropower" means any hydropower facility that (A) began operation onor after January 1, 2003, (B) is located in the New LCO 2300 12 of 26 Raised Bill No.
(47) "Large-scale hydropower" means any hydropower facility that (A) began operation onor after January 1, 2003, (B) is located in the New England Power Pool Generation Information System geographic eligibility area in accordance with Rule 2.3 of said system or an area abutting the northern boundary of the New England Power Pool Generation Information System geographic eligibility area that is not HB5469 / File No.
5469 England Power Pool Generation Information System geographic eligibility area in accordance with Rule 2.3 of said system or an area abutting the northern boundary of the New England Power Pool Generation Information System geographic eligibility area that is not interconnected with any other control area that is not a part of the New England Power Pool Generation Information System geographic eligibility area, (C) delivers power into such geographic eligibility area, and (D) has a generating capacity of more than thirty megawatts;
421 12 HB5469 File No.
421 interconnected with any other control area that is not a part of the New England Power Pool Generation Information System geographic eligibility area, (C) delivers power into such geographic eligibility area, and (D) has a generating capacity of more than thirty megawatts;
[and] (50) "Grid-side system enhancement" means an investment in distribution system infrastructure, technology and systems designed to enable the deployment of distributed energy resources and allow for grid management and system balancing, including, but not limited to, energy storage systems, distribution system automation and controls, intelligent field systems, advanced distribution system metering, and LCO 2300 13 of 26 Raised Bill No.
[and] (50) "Grid-side system enhancement" means an investment in distribution system infrastructure, technology and systems designed to enable the deployment of distributed energy resources and allow for grid management and system balancing, including, but not limited to, energy storage systems, distribution system automation and controls, intelligent field systems, advanced distribution system metering, and communication and systems that enable two-way power flow;
5469 communication and systems that enable two-way power flow;
(51) "Colocated electric supplier" means any person that provides, or plans to provide, electric generation services to a large electric load customer (A) through a physical connection behind such customer's HB5469 / File No.
(51) "Colocated electric supplier" means any person that provides, or plans to provide, electric generation services to a large electric load customer (A) through a physical connection behind such customer's point of interconnection with the electric distribution or transmission system, or (B) if both such supplier and such customer have no connection to the electric distribution or transmission system;
421 13 HB5469 File No.
421 point of interconnection with the electric distribution or transmission system, or (B) if both such supplier and such customer have no connection to the electric distribution or transmission system;
On and after April 30, 2002, the MIRA Dissolution Authority LCO 2300 14 of 26 Raised Bill No.
On and after April 30, 2002, the MIRA Dissolution Authority shall not sell or attempt to sell electric generation services to end use customers located in the state using the transmission or distribution facilities of an electric distribution company unless the authority has been issued a license by the Public Utilities Regulatory Authority in accordance with the provisions of this section.
5469 shall not sell or attempt to sell electric generation services to end use customers located in the state using the transmission or distribution facilities of an electric distribution company unless the authority has been issued a license by the Public Utilities Regulatory Authority in accordance with the provisions of this section.
Not later than January 1, HB5469 / File No.
Not later than January 1, 1999, the authority shall, by regulations adopted pursuant to chapter 54, developlicensing procedures.The licensing processshall begin not later than April 1, 1999.
421 14 HB5469 File No.
421 1999, the authority shall, by regulations adopted pursuant to chapter 54, developlicensing procedures.The licensing processshall begin not later than April 1, 1999.
(2) the address of the applicant's principal office in the state, if any, or the address of the applicant's agent for LCO 2300 15 of 26 Raised Bill No.
(2) the address of the applicant's principal office in the state, if any, or the address of the applicant's agent for service in the state;
5469 service in the state;
(5) a disclosure of whether the applicant or any of the applicant's corporate affiliates or officers have been or are currently under investigation for the violation of any consumer protection law or regulation, [to which it is subject, either] whether in this state or in another state;
(5) a disclosure of whether the applicant or any of the applicant's corporate affiliates or officers have been or are HB5469 / File No.
421 15 HB5469 File No.
421 currently under investigation for the violation of any consumer protection law or regulation, [to which it is subject, either] whether in this state or in another state;
(3) operate each [generating] generation facility [operated by or under long-term contract to the licensee shall comply] in compliance with chapter 277a, and any state environmental laws and regulations adopted by the Commissioner of Energy and Environmental Protection, pursuant to section 22a-174j, or ensure that any generation facility with which the LCO 2300 16 of 26 Raised Bill No.
(3) operate each [generating] generation facility [operated by or under long-term contract to the licensee shall comply] in compliance with chapter 277a, and any state environmental laws and regulations adopted by the Commissioner of Energy and Environmental Protection, pursuant to section 22a-174j, or ensure that any generation facility with which the licensee enters into a long-term contract complies with said chapter and any such laws and regulations;
5469 licensee enters into a long-term contract complies with said chapter and any such laws and regulations;
(5) [the licensee shall] be a member of the New England Power Pool or its successor or have a contractual relationship with one or more entities who are members of the New England Power Pool or its successor, and [the licensee shall] comply with the rules of the regional independent system operator and standards and any other reliability guidelines of the regional independent systems operator;
(5) [the licensee shall] be a member of the New England Power Pool or its successor or have a contractual relationship with one or more HB5469 / File No.
421 16 HB5469 File No.
421 entities who are members of the New England Power Pool or its successor, and [the licensee shall] comply with the rules of the regional independent system operator and standards and any other reliability guidelines of the regional independent systems operator;
(12) [the licensee shall] make available to the authority for posting on the authority's Internet web site and [shall] list on the licensee's own Internet web site, on a monthly basis, the highest and lowest electric generation service rate charged by the licensee as part of a variable rate offer in each of the preceding twelve months to any LCO 2300 17 of 26 Raised Bill No.
(12) [the licensee shall] make available to the authority for posting on the authority's Internet web site and [shall] list on the licensee's own Internet web site, on a monthly basis, the highest and lowest electric generation service rate charged by the licensee as part of a variable rate offer in each of the preceding twelve months to any customer with a peak demand of less than fifty kilowatts, cumulated of all such customer's meters, during a twelve-month period;
5469 customer with a peak demand of less than fifty kilowatts, cumulated of all such customer's meters, during a twelve-month period;
and (13) provide, in any contract between [a] the licensee and a residential customer eligible for standard service entered into on and after July 1, 2014, [shall provide] for the same electric generation service rate that HB5469 / File No.
and (13) provide, in any contract between [a] the licensee and a residential customer eligible for standard service entered into on and after July 1, 2014, [shall provide] for the same electric generation service rate that may not be exceeded for at least the first three billing cycles of the contract, providedthelicensee may decrease suchrate at any time.
421 17 HB5469 File No.
421 may not be exceeded for at least the first three billing cycles of the contract, providedthelicensee may decrease suchrate at any time.
LCO 2300 18 of 26 Raised Bill No.
[(j)] (k) No license may be transferred, and no customer may be assigned or transferred, without the prior approval of the authority.
5469 [(j)] (k) No license may be transferred, and no customer may be assigned or transferred, without the prior approval of the authority.
[Notice of] An electric supplier or a colocated electric supplier shall provide notice of any such assignment or transfer [shall be provided to the Public Utilities Regulatory Authority at least] to the authority not lessthanthirty days [prior to]before theeffective date oftheassignment HB5469 / File No.
[Notice of] An electric supplier or a colocated electric supplier shall provide notice of any such assignment or transfer [shall be provided to the Public Utilities Regulatory Authority at least] to the authority not lessthanthirty days [prior to]before theeffective date oftheassignment or transfer of a customer from one electric supplier to another electric supplier or from one colocated electric supplier to another colocated electric supplier.
421 18 HB5469 File No.
421 or transfer of a customer from one electric supplier to another electric supplier or from one colocated electric supplier to another colocated electric supplier.
(1) For LCO 2300 19 of 26 Raised Bill No.
(1) For calendar years up to and including calendar year 2017, five and one-half cents per kilowatt hour, (2) for calendar years commencing on January 1, 2018, and up to and including the calendar year commencing on January 1, 2020, five and one-half cents per kilowatt hour if the licensee fails to comply with the renewable portfolio standards during the subject annualperiodfor ClassI renewableenergy sources,andtwo and one-half cents per kilowatt hour if the licensee fails to comply with the HB5469 / File No.
5469 calendar years up to and including calendar year 2017, five and one-half cents per kilowatt hour, (2) for calendar years commencing on January 1, 2018, and up to and including the calendar year commencing on January 1, 2020, five and one-half cents per kilowatt hour if the licensee fails to comply with the renewable portfolio standards during the subject annualperiodfor ClassI renewableenergy sources,andtwo and one-half cents per kilowatt hour if the licensee fails to comply with the renewable portfolio standards during the subject annual period for Class II renewable energy sources, and (3) for calendar years commencing on and after January 1, 2021, four cents per kilowatt hour if the licensee fails to comply with the renewable portfolio standards during the subject annual period for Class I renewable energy sources, and two and one-half cents per kilowatt hour if the licensee fails to comply with the renewable portfolio standards during the subject annual period for Class II renewable energy sources.
421 19 HB5469 File No.
421 renewable portfolio standards during the subject annual period for Class II renewable energy sources, and (3) for calendar years commencing on and after January 1, 2021, four cents per kilowatt hour if the licensee fails to comply with the renewable portfolio standards during the subject annual period for Class I renewable energy sources, and two and one-half cents per kilowatt hour if the licensee fails to comply with the renewable portfolio standards during the subject annual period for Class II renewable energy sources.
The authority shall allocate such payment to the Clean Energy Fund for the development of Class I renewable energy sources, provided, on and after June 5, 2013, any such payment shall be refunded to ratepayers by using such payment to offset the costs to all customers of electric distribution companies of the costs of contracts and tariffs entered into pursuant to sections 16-244r, 16-244t and section 16-244z, except that, on and after January 1, 2023, any such payment that is attributable to a failure to comply with the Class II renewable portfolio standards shall be deposited in the sustainable materials management account LCO 2300 20 of 26 Raised Bill No.
The authority shall allocate such payment to the Clean Energy Fund for the development of Class I renewable energy sources, provided, on and after June 5, 2013, any such payment shall be refunded to ratepayers by using such payment to offset the costs to all customers of electric distribution companies of the costs of contracts and tariffs entered into pursuant to sections 16-244r, 16-244t and section 16-244z, except that, on and after January 1, 2023, any such payment that is attributable to a failure to comply with the Class II renewable portfolio standards shall be deposited in the sustainable materials management account established pursuant to section 16-244bb.
5469 established pursuant to section 16-244bb.
For any licensee that is a colocated electric supplier, the authority may, in the authority's discretion, waive or modify any of the requirements of this subsection.
For any licensee that is a colocated electric supplier, the authority may, HB5469 / File No.
421 20 HB5469 File No.
421 in the authority's discretion, waive or modify any of the requirements of this subsection.
and (E) disclosure of whether the applicant or any of the applicant's corporate affiliates or officers, if LCO 2300 21 of 26 Raised Bill No.
and (E) disclosure of whether the applicant or any of the applicant's corporate affiliates or officers, if applicable, have been or are currently under investigation for violation of any consumer protection law or regulation to which it is subject, either in this state or in another state.
5469 applicable, have been or are currently under investigation for violation of any consumer protection law or regulation to which it is subject, either in this state or in another state.
(4) Not more than thirty days after receiving an application for a certificate of registration, the authority shall notify the applicant whether the application is complete or whether the applicant must submit additional information.
(4) Not more than thirty days after receiving an application for a certificate of registration, the authority shall notify the applicant HB5469 / File No.
421 21 HB5469 File No.
421 whether the application is complete or whether the applicant must submit additional information.
To receive and maintain a license under this section, the authority shall LCO 2300 22 of 26 Raised Bill No.
To receive and maintain a license under this section, the authority shall require that a colocated electric supplier shall:
5469 require that a colocated electric supplier shall:
Notwithstanding the provisions of this subdivision, the authority may waive the requirement that a colocated electric supplier supply the entire anticipatedelectricloadofsuchcustomer,or for areserve margin, if the authority deems that such waiver is (A) in the best interest of all ratepayers in the state, (B) consistent with the integrated resources plan developed pursuant to section 16a-3a, if applicable, and (C) consistent with the comprehensive energy strategy developed pursuant to section 16a-3d, if applicable;
HB5469 / File No.
421 22 HB5469 File No.
421 Notwithstanding the provisions of this subdivision, the authority may waive the requirement that a colocated electric supplier supply the entire anticipatedelectricloadofsuchcustomer,or for areserve margin, if the authority deems that such waiver is (A) in the best interest of all ratepayers in the state, (B) consistent with the integrated resources plan developed pursuant to section 16a-3a, if applicable, and (C) consistent with the comprehensive energy strategy developed pursuant to section 16a-3d, if applicable;
(o) Any person, municipality or regional water authority may seek a declaratory ruling from the authority to determine whether any existing project or any project plannedor proposedbysuchperson,municipality LCO 2300 23 of 26 Raised Bill No.
(o) Any person, municipality or regional water authority may seek a declaratory ruling from the authority to determine whether any existing project or any project plannedor proposedbysuchperson,municipality orauthoritywillbedeemedacolocatedelectricsupplierpursuanttothis section.
5469 orauthoritywillbedeemedacolocatedelectricsupplierpursuanttothis section.
(p) (1) Not later than April 1, 2027, each electric distribution company and municipal utility shall file with the authority a proposal for a tariff concerning the provision of electricity to large load electric customers that interconnect to the distribution or transmission system in the state after October 1, 2026.
(p) (1) Not later than April 1, 2027, each electric distribution company and municipal utility shall file with the authority a proposal for a tariff HB5469 / File No.
421 23 HB5469 File No.
421 concerning the provision of electricity to large load electric customers that interconnect to the distribution or transmission system in the state after October 1, 2026.
(B) In carrying out the provisions of this section, the authority shall LCO 2300 24 of 26 Raised Bill No.
(B) In carrying out the provisions of this section, the authority shall require each electric distribution company or municipal utility to:
5469 require each electric distribution company or municipal utility to:
(iii) in addition to any other security required by the authority, provide for the posting of deposits or financial security, in a form approved by the authority, sufficient to protect ratepayers against a material increase in rates should the large electric load customer project cease operations or require less electric service than anticipated over the ten-year period beginning when service commences;
(iii) in HB5469 / File No.
421 24 HB5469 File No.
421 addition to any other security required by the authority, provide for the posting of deposits or financial security, in a form approved by the authority, sufficient to protect ratepayers against a material increase in rates should the large electric load customer project cease operations or require less electric service than anticipated over the ten-year period beginning when service commences;
LCO 2300 25 of 26 Raised Bill No.
(r) Nothing in this section shall be construed to limit the authority of the Connecticut Siting Council to act with respect to the siting of any facility.
5469 (r) Nothing in this section shall be construed to limit the authority of the Connecticut Siting Council to act with respect to the siting of any facility.
(a) As used in this section, "self-generation facility" means a facility that (1) generates electricity, (2) is owned or operated by an entity other than an electric distribution company, [as defined in section 16-1, or] an electric supplier, or a colocated electric supplier, as those terms are defined in [said] section 16-1, as amended by this act, and (3) operates inparallelwithother generationonthedistributionsystemofanelectric distribution company and which reduces or eliminates the purchase of electricity through the distribution network.
(a) As used in this section, "self-generation facility" means a facility that (1) generates electricity, (2) is owned or operated by an entity other HB5469 / File No.
421 25 HB5469 File No.
421 than an electric distribution company, [as defined in section 16-1, or] an electric supplier, or a colocated electric supplier, as those terms are defined in [said] section 16-1, as amended by this act, and (3) operates inparallelwithother generationonthedistributionsystemofanelectric distribution company and which reduces or eliminates the purchase of electricity through the distribution network.
3 July 1, 2026 16-245w(a) ET Joint Favorable LCO 2300 26 of 26
3 July 1, 2026 16-245w(a) ET Joint Favorable HB5469 / File No.
421 26 HB5469 File No.
421 The following Fiscal Impact Statement and Bill Analysis are prepared for the benefit of the members of the General Assembly, solely for purposes of information, summarization and explanation and do not represent the intent of the General Assembly or either chamber thereof for any purpose.
In general, fiscal impacts are based upon a variety of informational sources, including the analyst’s professional knowledge.
Whenever applicable, agency data is consulted as part of the analysis, however final products do not necessarily reflect an assessment from any specific department.
OFA Fiscal Note State Impact:
None Municipal Impact:
None Explanation The bill requires the Public Utilities Regulatory Authority (PURA), by January 1, 2027, to open a proceeding on co-located supplier licenses and tariffs for grid-connected large load electric customers.
This is not expected to result in a fiscal impact as PURA has the staff and expertise necessary to do so.
The bill makes other changes to electric distribution companies and co-located electric suppliers, which has no fiscal impact on the state.
Rate Payer Impact The bill subjects co-located suppliers to the same licensing procedures and provisions as retail electric suppliers and establishes new tariffs for grid-connected large load electric customers that interconnect to the state’s distribution or transmission system after October 1, 2026 (grid-connected large load customers).
The changes implementedwithinthebillensurethatexistingutilitycustomersdonot pay the total costs related to interconnecting new large electric load customers, which could result in savings to rate payers.
Additionally, by controlling load growth rate payers are less likely to incur additional costs.
The net impact, which is anticipated to yield lower costs to rate payers, is indeterminate and would be dependent upon various decisions that are outside the immediate scope of the bill.
HB5469 / File No.
421 27 HB5469 File No.
421 The Out Years State Impact:
None Municipal Impact:
None HB5469 / File No.
421 28 HB5469 File No.
421 OLR Bill Analysis HB 5469 AN ACT CONCERNING COLOCATED ELECTRIC SUPPLIERS AND LARGE ELECTRIC LOAD CUSTOMERS.
SUMMARY This bill generally establishes a framework for regulating the electric supply of certain large electric load customers (for example, large data centers).
Primarily, the bill (1) sets licensure requirements for co-located electricsupplierswho provideelectricity to large loadcustomersand (2) requires the electric distribution companies (EDCs;
Eversource and United Illuminating) to create new tariffs (rate schedules and related requirements) for providing electricity to other large electric load customers that interconnect to the state’s distribution or transmission system after October 1, 2026 (grid-connected large load customers).
Under the bill, a “large electric load customer” is any electric customer whose peak demand is at least 50 megawatts.
A “co-located electric supplier” is any person (including entities) that provides, or plans to provide, electric generation services to a large electric load customer (1) through a physical connection behind the customer’s point of interconnection with the electric distribution or transmission system (for example, behind-the-meter on-site generation) or (2) if both the supplierandthecustomerhavenoconnectiontotheelectricdistribution or transmission system (generation that connects only with the customer and not the grid).
The bill generally subjects co-located suppliers to the same licensing procedures and provisions as retail electric suppliers, including provisions that require licensees to annually submit certain information to the Public Utilities Regulatory Authority (PURA) and prohibit transferring a license without PURA’s approval.
However, the bill also allows PURA to waive certain provisions.
It also sets certain licensing HB5469 / File No.
421 29 HB5469 File No.
421 criteria specific to co-located suppliers, such as a requirement for them to supply all of their large electric load customer’s anticipated electric load, plus an additional amount to cover a specified reserve margin, with energy from new generation (that entered service after July 1, 2026), subject to certain exceptions.
Through the new tariffs for grid-connected large electric load customers, the bill generally requires, among other things:
1.
the customer to contract with new generation for all of the customer’s anticipated electric load, plus an additional amount to cover a specified reserve margin;
2.
PURA to consider, when deciding whether to approve the tariff, whether it reasonably protects other ratepayers against increased retail rates due to new or increased transmission, distribution, capacity, energy, or other costs;
and 3.
the EDCs to ensure that a new large electric load customer has adequate financial guarantees to pay for at least 85% of its requested electric service for at least 10 years.
The bill requires PURA, by January 1, 2027, to open a proceeding to implement the bill’s provisions on co-located supplier licenses and tariffs for grid-connected large electric load customers.
It also makes numerous minor, technical, and conforming changes.
EFFECTIVE DATE:
July 1, 2026 CO-LOCATED ELECTRIC SUPPLIERS The bill requires any person, municipality, or regional water authority that wants to sell, attempt to sell, or otherwise provide electric generation services to a large electric load customer in a co-located or behind-the-meter arrangement to first obtain a co-located electric supplier license from PURA.
Licensing Provisions Specific to Co-Located Suppliers The bill generally requires a co-located electric supplier licensee to HB5469 / File No.
421 30 HB5469 File No.
421 meet the same licensing process and requirements as a licensed retail electricsupplier,althoughitalsoallowsPURAtowaiveormodifymany of them (see below).
However, it also adds additional requirements specific to co-located electric supplier licenses.
More specifically, to qualify for a license a co-located electric supplier must file an application with PURA.
The bill sets licensure requirements on new generation, annual reporting, and renewable portfolio standard (RFS) compliance, as described below.
Supply From New Generation.
The co-locatedsupplier must supply at least 100% of its large electric load customer’s anticipated electric load, plus an additional amount to cover a specified reserve margin determined by PURA, from a generation source that enters service on or after July 1, 2026, or from an incremental increase to an existing generation resource’s nameplate capacity that PURA determines to be adequate.
However, PURA may waive this requirement if it is (1) in the best interest of all ratepayers in the state;
(2) consistent with the state’s Integrated Resources Plan (IRP), if applicable;
and (3) consistent with the state’s Comprehensive Energy Strategy, if applicable.
Annual Report.
The co-located supplier must file an annual report with PURA that describes the generation and load characteristics of the co-located supplier and large electric load customer to show PURA that the co-located supplier complies with the supply requirements described above.
Renewable Portfolio Standard.
The co-located supplier must comply with the state’s RFS requirements for retail electric suppliers.
However, for any generation source used by a co-located supplier that enters service on or after December 31, 2030, PURA may require the co- located supplier to retire a greater number of regional renewable energy certificates than the RPS requires if PURA finds that the IRP supports such a requirement.
Generally, the RPS law requires EDCs and retail suppliers to procure an increasing portion of their power from certain renewable and other HB5469 / File No.
421 31 HB5469 File No.
421 clean energy resources.
Applicable Retail Supplier Licensing Provisions As mentioned above, the bill also generally requires a co-located electric supplier to meet the same licensing process and requirements as a licensed retail electric supplier.
Among other things, these provisions generally:
1.
allow PURA to condition a license on proof that the applicant’s products are not overpriced or harmful to residential customers;
2.
require a license applicant to show that it has the technical, managerial, and financial capability to provide electric generation services and maintain a bond or other security to ensure its financial responsibility;
3.
specify the license application and approval process;
4.
require a licensed supplier to notify PURA at least 10 days in advance of a change in its corporate structure or scope of service;
5.
require PURA’s approval before a license or customer may be assigned or transferred;
and 6.
allow PURA to issue civil penalties for noncompliance with the supplier licensing laws.
Retail Supplier Requirements That PURA May Waive for Co- Located Suppliers The bill allows PURA, in its discretion, to waive or modify for a co- located electric supplier certain provisions that currently apply to licensed retail electric suppliers.
Among other things, these provisions generally require licensed suppliers to:
1.
comply with the National Labor Relations Act, if applicable, and the Connecticut Unfair Trade Practices Act;
2.
have their generating facilities comply with state laws on siting electric generation facilities and emissions;
HB5469 / File No.
421 32 HB5469 File No.
421 3.
comply with the state’s RPS law;
4.
join the New England Power Pool and comply with the regional independent system operator’s (ISO-NE) rules and guidelines;
5.
agree to cooperate with PURA if there is an emergency condition that may jeopardize the safety and reliability of electric service;
6.
comply with the code of conduct for EDCs;
7.
comply with the Federal Energy Regulatory Commission’s applicable licensing requirements;
8.
offer a time-of-use price option to customers;
and 9.
acknowledge that it is subject to certain state taxes and pay all state taxes it is subject to.
The bill also allows PURA, in its discretion, to waive or modify for a co-located electric supplier current provisions that generally (1) subject licensed suppliersto PURA-imposedcivilpenaltiesfor failingto comply with their licensing conditions or violating the supplier licensing law and (2) require certain payments by and procedures for suppliers who fail to meet certain RPS requirements.
Declaratory Rulings The bill allows any person, municipality, or regional water authority to seek a declaratory ruling from PURA to determine whether any existing project or any project they planned or proposed will be deemed a co-located electric supplier.
The bill also allows PURA, on its own motion, to open a proceeding to investigate any person supplying electricity to a large electric load customer or a potential large electric load customer to determine whether the person is acting as an unlicensed co-located electric supplier.
GRID-CONNECTED LARGE ELECTRIC LOAD CUSTOMERS The bill requires each EDC and municipal utility, by April 1, 2027, to file with PURA a proposal for a tariff on providing electricity to large HB5469 / File No.
421 33 HB5469 File No.
421 electric load customers that interconnect to the distribution or transmission system in the state after October 1, 2026.
(The bill does not define “municipal utility,” but presumably, this would only include municipal electric companies.) Except for largeelectricloadcustomersservedby aco-located electric supplier, the tariff must at least require the large load customer to contract with or otherwise provide for a generation source that supplies at least 100% of the customer’s anticipated electric load, plus an additional amount to cover a specified reserve margin determined by PURA, from a generation source that enters service on or after July 1, 2026, and that has not previously cleared an ISO-NE capacity market auction.
The tariff must also account for any potential transmission or distribution impacts of any large electric load customer on all other ratepayers in the state, including any large electric load customers served by a co-located electric supplier.
Once an EDC or municipal utility files the tariff, the bill requires PURA to open a proceeding to review and seek public comment on the proposal.
In determining whether to approve or modify the proposal, PURA must consider whether it reasonably protects ratepayers who are not large electric load customers against increased retail rates due to new or increased transmission, distribution, capacity, energy, or other costs resulting solely or primarily from serving large electric load customers.
The bill requires PURA, in carrying out the bill’s provisions, to require each EDC or municipal utility to:
1.
ensure that any new large electric load customer has adequate financial guarantees that it will pay for at least 85% of the electric service it requests for at least 10 years after its electric service begins;
2.
require any new large electric load customer to (a) show, to PURA’s reasonable satisfaction, that its proposed project is unique and not duplicative of any other large electric load HB5469 / File No.
421 34 HB5469 File No.
421 customer project, whether located in the state or elsewhere, and (b) identify the project’s interdependencies;
3.
provide for the posting of deposits or financial security, in a PURA-approved form (and in addition to any other PURA- required security), sufficient to protect ratepayers against a material rate increase if the large electric load customer project ceases operations or requires less electric service than anticipated over the 10-year period after service begins;
and 4.
implement any other provisions that PURA deems necessary to protect ratepayers in the state.
The bill allows PURA, regardless of the bill’s tariff provisions, to waive the new generation requirement for a large electric load customer that does not have a co-located electric supplier (the requirement to be served by a generation source that enters service on or after July 1, 2026, andthat hasnot previously clearedanISO-NEcapacity market auction).
To do so, the customer must show PURA that it has sufficient electric demand flexibility to eliminate the need for the generation.
The bill gives PURA discretion to determine what constitutes an appropriate level of electric demand flexibility.
But in exercising this discretion, PURA must consider how ISO-NE treats electric demand or operational flexibility in transmission and resource adequacy planning.
OTHER PROVISIONS The bill specifies that it does not limit the Connecticut Siting Council’s authority to act on siting any facility.
It also specifies that a co- located electric supplier is not a “self-generation facility.” Generally, the law requires customers who have installed self-generation facilities to pay a PURA-determined fee to offset any revenue loss or potential loss to the competitive transition assessment, the systems benefits charge, the conservation adjustment mechanisms, and the Clean Energy Fund assessment charged on ratepayers’ electric bills.
HB5469 / File No.
421 35 HB5469 File No.
421 COMMITTEE ACTION Energy and Technology Committee Joint Favorable Yea 26 Nay 0 (03/19/2026) HB5469 / File No.
421 36
View plain text versions (3)

Action History

  1. FILE NO. 421

  2. HOUSE CALENDAR NUMBER 305

  3. FAV. RPT., TABLED FOR HOUSE CALENDAR

  4. RPTD. OUT OF LCO

  5. REFERRED TO Office of Legislative Research AND Office of Fiscal Analysis 04/07/26

  6. FILED WITH LCO

  7. Joint Favorable

  8. PUBLIC HEARING 0312

  9. REF. TO JOINT COMM. ON Energy and Technology

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 0 co-sponsors · 187 not signed on

Sponsors (0)

None.

Co-sponsors (0)

None.

Not signed on (187)

187 members have not signed on to this bill.

Show all 187 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What is the current status of HB 5469?
This bill is in committee in the House. Introduced March 05, 2026. It must pass committee before a floor vote.
Where can I track HB 5469?
Track HB 5469 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 5469

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 5469

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →