Clean Energy Permitting Processes
Do you support it?
Want to know if it passes?
We'll email you when SB 33 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on SB 33.
You're tracking SB 33
We'll email you the moment it moves.
SB 33 — Clean Energy Permitting Processes
Last action — Senate Committee on State, Veterans, & Military Affairs Postpone Indefinitely
No card. One bill, free forever — alerts when it moves.
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced January 26, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Prognosis
Where this bill stands today.
Odds of enactment
LowHow often bills like it became law.
-
Introduced
Current position in the legislative process.
-
2 sponsors
2 primary, 0 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (1 R).
-
Mixed recorded votes
1 passed, 1 failed in recorded votes so far.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
Summary
The bill creates the Colorado clean energy permitting coordination office (office) in the Colorado energy office to provide coordination and technical assistance to owners or operators, local governments, and state permitting authorities regarding permitting for the construction, expansion, repowering, or material modification of a clean energy resource facility project (covered clean energy project).At the request of the owner or operator of a covered clean energy project (owner or operator) or a local government with jurisdiction over the covered clean energy project or that the owner or operator determines is likely to experience direct and significant impacts from the covered clean energy project (host community), the office must convene a meeting (application coordination meeting) to coordinate the filing of permit applications for the covered clean energy project that includes certain interested parties. Following an application coordination meeting, the office must prepare a coordinated permitting schedule for the covered clean energy project that identifies the permits and approvals likely to be required for the covered clean energy project and certain other information (coordinated permitting schedule).The office is required to develop and maintain a public dashboard (public dashboard) on the office's website for an owner or operator that receives a coordinated permitting schedule or that receives state technical assistance from the office.Effective July 1, 2027, at least 90 days before the owner or operator submits the first state permit application for a covered clean energy project, the owner or operator must submit a community engagement plan to the office and relevant state permitting authorities. A community engagement plan must identify host communities for the project and describe certain other community engagement efforts regarding the project.Effective July 1, 2027, an owner or operator must prepare a community benefit agreement and submit the community benefit agreement to the office and the parties participating in the covered clean energy project's application coordination meeting. The office is required to develop model community benefit agreement terms for a covered clean energy project and post the terms on the covered clean energy project's public dashboard or the office's website.The office is required to prioritize technical assistance and permitting readiness support for covered clean energy projects that repower or reuse retired or retiring fossil fuel generation sites, are located in coal transition communities, or are located on brownfield sites. On or before December 1, 2027, the office shall publish and update annually an inventory identifying coal plant and industrial sites and brownfield sites suitable for redevelopment for clean energy resource facilities and other key infrastructure considerations.Effective July 1, 2027, an owner or operator must develop and submit to the office a safety and emergency preparedness plan and coordinate with relevant local emergency management agencies and the Colorado division of homeland security and emergency management in implementing the safety and emergency preparedness plan. The office shall post a safety and emergency preparedness plan on the covered clean energy project's public dashboard or the office's website.Effective November 1, 2027, an owner or operator of a covered clean energy project must submit to the office a grid reliability and security statement. The office must coordinate with the public utilities commission and utilities as appropriate to align permitting readiness with grid reliability needs.On or before December 1, 2027, and on or before each December 1 thereafter, the office must submit a report to certain committees of the general assembly summarizing certain information about the functions of the office.(Note: This summary applies to this bill as introduced.)
Bill Text
- Introduced View text Current pdf January 26, 2026
Action History
-
Senate Committee on State, Veterans, & Military Affairs Postpone Indefinitely
-
Introduced In Senate - Assigned to State, Veterans, & Military Affairs
Sponsors
- T. Winter · Primary
- Larry Liston · Primary
Sponsorship breakdown
Export CSV (upgrade) →2 sponsors · 0 co-sponsors · 99 not signed on · 5 voted No
Sponsors (2)
- T. Winter
- Larry Liston Republican
Co-sponsors (0)
None.
Not signed on (99)
99 members have not signed on to this bill.
Show all 99 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 3 | 0 | 0 | 0 |
| Republican | 2 | 0 | 0 | 0 |
| Total | 5 | 0 | 0 | 0 |
| % of votes cast | 100% | 0% | 0% | 0% |
How each member voted (5)
| Member | Party | Vote |
|---|---|---|
| Katie Wallace | Democrat | Yea |
| Tom Sullivan | Democrat | Yea |
| William Lindstedt | Democrat | Yea |
| Lynda Zamora Wilson | Republican | Yea |
| Rod Pelton | Republican | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 0 | 3 | 0 | 0 |
| Republican | 0 | 2 | 0 | 0 |
| Total | 0 | 5 | 0 | 0 |
| % of votes cast | 0% | 100% | 0% | 0% |
How each member voted (5)
| Member | Party | Vote |
|---|---|---|
| Katie Wallace | Democrat | Nay |
| Tom Sullivan | Democrat | Nay |
| William Lindstedt | Democrat | Nay |
| Lynda Zamora Wilson | Republican | Nay |
| Rod Pelton | Republican | Nay |
Subjects
Frequently asked questions
- What does SB 33 do?
- The bill creates the Colorado clean energy permitting coordination office (office) in the Colorado energy office to provide coordination and technical assistance to owners or operators, local governments, and state permitting authorities regarding permitting for the construction, expansion, repowering, or material modification of a clean energy resource facility project (covered clean energy project).At the request of the owner or operator of a covered clean energy project (owner or operator) or a local government with jurisdiction over the covered clean energy project or that the owner or operator determines is likely to experience direct and significant impacts from the covered clean energy project (host community), the office must convene a meeting (application coordination meeting) to coordinate the filing of permit applications for the covered clean energy project that includes certain interested parties. Following an application coordination meeting, the office must prepare a coordinated permitting schedule for the covered clean energy project that identifies the permits and approvals likely to be required for the covered clean energy project and certain other information (coordinated permitting schedule).The office is required to develop and maintain a public dashboard (public dashboard) on the office's website for an owner or operator that receives a coordinated permitting schedule or that receives state technical assistance from the office.Effective July 1, 2027, at least 90 days before the owner or operator submits the first state permit application for a covered clean energy project, the owner or operator must submit a community engagement plan to the office and relevant state permitting authorities. A community engagement plan must identify host communities for the project and describe certain other community engagement efforts regarding the project.Effective July 1, 2027, an owner or operator must prepare a community benefit agreement and submit the community benefit agreement to the office and the parties participating in the covered clean energy project's application coordination meeting. The office is required to develop model community benefit agreement terms for a covered clean energy project and post the terms on the covered clean energy project's public dashboard or the office's website.The office is required to prioritize technical assistance and permitting readiness support for covered clean energy projects that repower or reuse retired or retiring fossil fuel generation sites, are located in coal transition communities, or are located on brownfield sites. On or before December 1, 2027, the office shall publish and update annually an inventory identifying coal plant and industrial sites and brownfield sites suitable for redevelopment for clean energy resource facilities and other key infrastructure considerations.Effective July 1, 2027, an owner or operator must develop and submit to the office a safety and emergency preparedness plan and coordinate with relevant local emergency management agencies and the Colorado division of homeland security and emergency management in implementing the safety and emergency preparedness plan. The office shall post a safety and emergency preparedness plan on the covered clean energy project's public dashboard or the office's website.Effective November 1, 2027, an owner or operator of a covered clean energy project must submit to the office a grid reliability and security statement. The office must coordinate with the public utilities commission and utilities as appropriate to align permitting readiness with grid reliability needs.On or before December 1, 2027, and on or before each December 1 thereafter, the office must submit a report to certain committees of the general assembly summarizing certain information about the functions of the office.(Note: This summary applies to this bill as introduced.)
- Who sponsors SB 33?
- SB 33 is sponsored by T. Winter and Larry Liston (Republican).
- What is the current status of SB 33?
- This bill has been introduced in the Senate. Introduced January 26, 2026. It must pass committee before a floor vote.
- Where can I track SB 33?
- Track SB 33 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 33
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 33
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →