Requires each electric company to develop a distributed power plant program for the procurement of grid ser...
Do you support it?
Want to know if it passes?
We'll email you when HB 3609 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on HB 3609.
You're tracking HB 3609
We'll email you the moment it moves.
HB 3609 — Requires each electric company to develop a distributed power plant program for the procurement of grid services to be provided by distributed energy resources.
Last action — In House Committee
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
2In Committee
-
3Passed House
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill is in committee in the House. Introduced April 14, 2025. It must pass committee before a floor vote.
Next likely step: a committee vote, then a floor vote in the House.
Prognosis
Where this bill stands today.
Odds of enactment
LowHow often bills like it became law.
-
In Committee
Current position in the legislative process.
-
2 sponsors
1 primary, 1 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (2 D).
-
Cleared a recorded vote
Passed 1 recorded vote so far.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
Summary
Digest: Makes each power company create a program for buying grid services. (Flesch Readability Score: 64.9). Requires each electric company to develop a distributed power plant program for the procurement of grid services to be provided by distributed energy resources. Specifies the grid services that may be eligible for compensation and the classes of distributed energy resources technologies that must be eligible to provide the grid services. Allows a customer to enroll directly or through a third party in an electric company's distributed power plant program. Requires an electric company to use a standard offer, open access tariff. Allows an electric company to recover in rates prudently incurred costs associated with the program. Directs the Public Utility Commission to develop and adopt annual procurement targets and performance incentives. Allows an electric company to earn performance incentives for meeting program targets. Requires each electric company to file an annual report with the commission on the status of the electric company's distributed power plant program, including the capacity enrolled in the program. Provides for initial requirements and an implementing timeline. Requires an initial distributed power plant program to provide compensation for system-wide peak load reduction that is provided by an energy storage device that is a battery. Takes effect on the 91st day following adjournment sine die.
Bill Text
We don't have the full text on file for this bill yet.
Read HB 3609 on the official Oregon source →Action History
-
In House Committee
Sponsors
- Mark Gamba · Primary
- Ken Helm · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 1 co-sponsors · 88 not signed on · 5 voted No
Sponsors (1)
- Mark Gamba Democrat
Co-sponsors (1)
- Ken Helm Democrat
Not signed on (88)
88 members have not signed on to this bill.
Show all 88 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 6 | 0 | 0 | 0 |
| Republican | 0 | 5 | 0 | 0 |
| Unaffiliated | 1 | 0 | 0 | 0 |
| Total | 7 | 5 | 0 | 0 |
| % of votes cast | 58% | 42% | 0% | 0% |
How each member voted (12)
| Member | Party | Vote |
|---|---|---|
| Courtney Neron | — | Yea |
| Emerson Levy | Democrat | Yea |
| John Lively | Democrat | Yea |
| Ken Helm | Democrat | Yea |
| Mark Gamba | Democrat | Yea |
| Pam Marsh | Democrat | Yea |
| Tom Andersen | Democrat | Yea |
| Bobby Levy | Republican | Nay |
| Darcey Edwards | Republican | Nay |
| Kim Wallan | Republican | Nay |
| Mark Owens | Republican | Nay |
| Virgle Osborne | Republican | Nay |
Subjects
Frequently asked questions
- What does HB 3609 do?
- Digest: Makes each power company create a program for buying grid services. (Flesch Readability Score: 64.9). Requires each electric company to develop a distributed power plant program for the procurement of grid services to be provided by distributed energy resources. Specifies the grid services that may be eligible for compensation and the classes of distributed energy resources technologies that must be eligible to provide the grid services. Allows a customer to enroll directly or through a third party in an electric company's distributed power plant program. Requires an electric company to use a standard offer, open access tariff. Allows an electric company to recover in rates prudently incurred costs associated with the program. Directs the Public Utility Commission to develop and adopt annual procurement targets and performance incentives. Allows an electric company to earn performance incentives for meeting program targets. Requires each electric company to file an annual report with the commission on the status of the electric company's distributed power plant program, including the capacity enrolled in the program. Provides for initial requirements and an implementing timeline. Requires an initial distributed power plant program to provide compensation for system-wide peak load reduction that is provided by an energy storage device that is a battery. Takes effect on the 91st day following adjournment sine die.
- Who sponsors HB 3609?
- HB 3609 is sponsored by Mark Gamba (Democrat) and Ken Helm (Democrat).
- What is the current status of HB 3609?
- This bill is in committee in the House. Introduced April 14, 2025. It must pass committee before a floor vote.
- Where can I track HB 3609?
- Track HB 3609 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB 3609
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB 3609
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →