Oregon 2025R1 Session Status: In Committee

SB 92 — Allows a community solar project with a nameplate capacity of five megawatts or less to participate in the community solar program.

Last action — In Senate Committee

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the Senate. Introduced April 17, 2025. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the Senate.

Odds of enactment

Low chance

Based on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Not enough signal yet

Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Summary

Digest: Allows a project to partake in the community solar program that is five megawatts or less. Allows a project and its subscribers to be in different service areas of the state. Sets a cap on the total capacity of the program and raises the cap over time. (Flesch Readability Score: 61.3). Allows a community solar project with a nameplate capacity of five megawatts or less to participate in the community solar program. Allows a community solar project and its subscribers to be located in different electric company service territories. Establishes, beginning in 2026, an initial cap on the total generating capacity of the community solar projects participating in the program at no less than 4.5 percent of an electric company's system peak in the calendar year 2016. Increases the cap by an additional 2 percent each year up to 14.5 percent beginning in 2031 and each subsequent year. Directs the Public Utility Commission to adopt a schedule establishing penalties that may be imposed on an electric company for unreasonably delaying the interconnection process for a community solar project.

Bill Text

We don't have the full text on file for this bill yet.

Read SB 92 on the official Oregon source →

Action History

  1. In Senate Committee

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 0 co-sponsors · 90 not signed on

Sponsors (0)

None.

Co-sponsors (0)

None.

Not signed on (90)

90 members have not signed on to this bill.

Show all 90 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 92 do?
Digest: Allows a project to partake in the community solar program that is five megawatts or less. Allows a project and its subscribers to be in different service areas of the state. Sets a cap on the total capacity of the program and raises the cap over time. (Flesch Readability Score: 61.3). Allows a community solar project with a nameplate capacity of five megawatts or less to participate in the community solar program. Allows a community solar project and its subscribers to be located in different electric company service territories. Establishes, beginning in 2026, an initial cap on the total generating capacity of the community solar projects participating in the program at no less than 4.5 percent of an electric company's system peak in the calendar year 2016. Increases the cap by an additional 2 percent each year up to 14.5 percent beginning in 2031 and each subsequent year. Directs the Public Utility Commission to adopt a schedule establishing penalties that may be imposed on an electric company for unreasonably delaying the interconnection process for a community solar project.
What is the current status of SB 92?
This bill is in committee in the Senate. Introduced April 17, 2025. It must pass committee before a floor vote.
Where can I track SB 92?
Track SB 92 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 92

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 92

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →