HB 2618 — decommissioning; solar and wind; standards
Last action — Vetoed by Governor
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
✓Passed House
-
✓Passed Senate
-
✓To Executive
-
Died in session
This bill died with 56th Legislature - First Regular Session. It reached “To Executive” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Vetoed by Governor Katie Hobbs (Democratic) on June 19, 2023.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Bill Text
What changed in the latest version
304 added · 694 removedPlain-language change summary
The recent amendments to HB 2618 introduce new standards regarding the maintenance and decommissioning of solar energy power plants in Arizona. Now, the owners or operators are required to keep their facilities in good repair and operational until they are officially decommissioned. This change ensures that solar plants function reliably and do not become neglected, aligning with efforts to promote sustainable energy practices. Additionally, the bill clarifies the responsibilities when ownership of these plants changes hands.
Senate Engrossed House BillEngrossed decommissioning;
standards;
conditions;
AN OWNERAPPLICANT ORFOR OPERATOR OF A SOLAR ENERGY POWER PLANT SHALL COMPLY WITH THE APPLICABLE STANDARDS, CONDITIONS, REQUIREMENTS ANDOR PROCEDURES FOR A SOLAR ENERGY POWER PLANT THAT ARE ADOPTED BY THE CITY, TOWN OR COUNTY IN WHICH THE SOLAR ENERGY POWER PLANT IS TO BE LOCATED.
THE TRANSFER OF A SOLAR ENERGY POWER PLANT OR SPECIAL USE PERMIT OR THE SALE OF THE ENTITY OWNING THE SOLAR ENERGY POWER PLANT MAY NOT OCCUR WITHOUT WRITTEN ACCEPTANCE BY THE TRANSFEREE OF THE TRANSFEROR'S OBLIGATIONS UNDER THIS CHAPTER,CHAPTER. INCLUDING THE OBLIGATION TO MAINTAIN AND IMPLEMENT A DECOMMISSIONING AND SITE RESTORATION PLAN PURSUANT TO SECTION 30-904, TO MAINTAIN THE FINANCIAL ASSURANCE PRESCRIBED BY SECTION 30-905 AND TO MAINTAIN THE LIABILITY INSURANCE PRESCRIBED BY SECTION 30-906.
A TRANSFER OR SALE DOES NOT ELIMINATE THE LIABILITY OR RESPONSIBILITY OF AAN TRANSFERORAPPLICANT OR OF ANY OTHER PARTY UNDER THIS CHAPTER FOR ACTS OR OMISSIONS OF THE TRANSFEROR OR OTHER PARTY OCCURRING BEFORE THE TRANSFER OR SALE,SALE. EXCEPT WHEN THE TRANSFEREE AND TRANSFEROR PROVIDE FOR THE TRANSFER OF LIABILITY OR RESPONSIBILITY BY AGREEMENT.
FOR A TRANSFER OF UNIT OWNERSHIP, THE CITY, TOWN OR COUNTY MAY REASSESS THE AMOUNT OF ANY FINANCIAL ASSURANCE REQUIRED UNDER SECTION 30-905 AND THE SOLAR ENERGY POWER PLANT PROJECT OWNER OR OPERATOR SHALL REIMBURSE ANY REASONABLE COSTS INCURRED BY THE CITY, TOWN OR COUNTY TO OBTAIN THE REASSESSMENT.
C.
A CITY, TOWN OR COUNTY MAY ESTABLISH A PROCEDURE FOR:
1.
RECEIVING NOTICE OF A SALE AND TRANSFER OF OBLIGATIONS UNDER THIS SECTION.
2.
APPROVING A SALE AND TRANSFER OF OBLIGATIONS UNDER THIS SECTION.
D.
IF A SOLAR ENERGY POWER PLANT OWNER SELLS A SOLAR ENERGY POWER PLANT TO AN ENTITY DESCRIBED IN SECTION 30-905, SUBSECTION E OR F, THE SOLAR ENERGY POWER PLANT OWNER SHALL PROVIDE WRITTEN NOTICE OF THE SALE TO THE CITY, TOWN OR COUNTY.
WITHIN FIFTEEN DAYS AFTER RECEIVING THE NOTICE, THE CITY, TOWN OR COUNTY SHALL WAIVE THE REQUIREMENTS OF SECTION 30-905 AND RETURN OR RELEASE TO THE SOLAR ENERGY POWER PLANT OWNER ANY FINANCIAL ASSURANCE PROVIDED TO THE CITY, TOWN OR COUNTY UNLESS OTHERWISE PROVIDED BY AGREEMENT.
- 1 - H.B.
2618 E.
BEFORE OR IN CONJUNCTION WITH APPROVING A LAND USE OR ZONING PERMIT APPLICATION FOR A SOLAR ENERGY POWER PLANT, A CITY, TOWN OR COUNTY MAY ADOPT A PROCEDURE FOR WAIVING THE FINANCIAL ASSURANCE PRESCRIBED BY SECTION 30-905 IF THE OWNER OR OPERATOR OF THE PLANNED SOLAR ENERGY POWER PLANT SUBMITS THE FOLLOWING DOCUMENTATION IN CONJUNCTION WITH ITS APPLICATION:
1.
EVIDENCE THAT THE SOLAR ENERGY POWER PLANT IS BEING CONSTRUCTED PURSUANT TO A BUILD-TRANSFER AGREEMENT WITH AN ENTITY DESCRIBED IN SECTION 30-905, SUBSECTION E OR F AND THE TRANSFER OF OWNERSHIP WILL OCCUR WITHIN A REASONABLE TIME PERIOD, AS DETERMINED BY THE CITY, TOWN OR COUNTY, AFTER THE DATE OF CONSTRUCTION OR OPERATION.
2.
THE DOCUMENTATION PRESCRIBED BY SECTION 30-905, SUBSECTION E OR F, AS APPLICABLE TO THE RELEVANT ENTITY.
DutyCessation toof maintain;use;
cessation of use;
notificationapplicability requirements A.
THEIF OWNERA PART OF A SOLAR ENERGY POWER PLANT IS DAMAGED OR OPERATORIF OFA SOLAR ENERGY POWER PLANT VIOLATES A PERMIT CONDITION IMPOSED BY A CITY, TOWN OR COUNTY, THE SOLAR ENERGY POWER PLANT SHALL:OWNER OR OPERATOR SHALL CURE ANY DAMAGE OR DEFICIENCY WITHIN NINETY DAYS AFTER WRITTEN NOTICE FROM THE CITY, TOWN OR COUNTY.
1.IF IT IS NOT REASONABLY POSSIBLE FOR THE SOLAR ENERGY POWER PLANT OWNER OR OPERATOR TO CURE THE DAMAGE OR DEFICIENCY WITHIN NINETY DAYS AFTER RECEIVING THE WRITTEN NOTICE, THE SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL PROVIDE THE CITY, TOWN OR COUNTY WITH A PLAN TO CURE THE DAMAGE OR DEFICIENCY AS SOON AS REASONABLY POSSIBLE.
MAINTAIN THE PLANT IN GOOD CONDITION AND REPAIR.
2.
EXCEPT DURING PERIODS OF REGULAR MAINTENANCE AND PLANNED CURTAILMENTS, ENSURE THAT THE PLANT REMAINS FUNCTIONAL AND OPERATIONAL UNTIL DECOMMISSIONING OF THE PLANT IS INITIATED PURSUANT TO THIS CHAPTER.
IF A CITY,SOLAR TOWNENERGY ORPOWER COUNTYPLANT MAYREMAINS ADOPTNONFUNCTIONAL REASONABLEOR TIMELINESINOPERATIVE AND REQUIREMENTS FOR THEA CURECONTINUOUS ANDPERIOD REPAIR OF VISIBLEAT DAMAGELEAST ORONE DEFECTSYEAR, TOTHE AAPPLICANT VISIBLEOR COMPONENTITS OFSUCCESSORS AOR SOLARASSIGNS, ENERGYWITHOUT POWERANY PLANTFURTHER ANDACTION FORBY THE RESTORATIONCITY, ANDTOWN REPAIR,OR REPLACEMENTCOUNTY, ORSHALL REMOVALREMOVE OFTHE ANYSYSTEM COMPONENTAND OFRESTORE ATHE SOLARSITE ENERGYAT POWERITS PLANTOWN THATEXPENSE ISAS NONFUNCTIONALPRESCRIBED ORIN INOPERABLE.SECTION 30-904.
IF IT IS NOT REASONABLY POSSIBLE FOR A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR TO RESTORE THE SOLAR ENERGY POWER PLANT TO BE FUNCTIONAL OR OPERATIONAL WITHIN ONE YEAR, THE SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL PROVIDE THE CITY, TOWN OR - 1 - H.B.
2618 COUNTY WITH A PLAN TO RESTORE THE SOLAR ENERGY POWER PLANT TO BE FUNCTIONAL OR OPERATIONAL AS SOON AS REASONABLY POSSIBLE.
ATHIS CITY,SECTION TOWNAPPLIES ORTO COUNTYA MAYSOLAR ADOPTENERGY ANDPOWER ENFORCEPLANT REASONABLE PENALTIES AND PROCEDURES FOR THE VIOLATION OF OR NONCOMPLIANCE WITH ANY TIMELINE OR REQUIREMENT THAT ISBEGINS AUTHORIZEDCOMMERCIAL PURSUANTOPERATIONS TOBEFORE, THISON SECTION,AND INCLUDINGAFTER INITIATING OR COMPLETING DECOMMISSIONING OR SITE RESTORATION AT THE OWNER'SEFFECTIVE ORDATE OPERATOR'SOF EXPENSETHIS PURSUANTSECTION. TO SECTION 30-904 IF THE OWNER OR OPERATOR FAILS TO COMPLY WITH THE CITY'S, TOWN'S OR COUNTY'S REASONABLE TIMELINES OR REQUIREMENTS.
D.
A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL NOT ABANDON A SOLAR ENERGY POWER PLANT FOR ANY REASON, INCLUDING BANKRUPTCY OR FINANCIAL INSOLVENCY.
IF A SOLAR ENERGY POWER PLANT OWNER FILES FOR BANKRUPTCY OR OTHERWISE BECOMES INSOLVENT, THE OWNER SHALL IMMEDIATELY PROVIDE WRITTEN NOTICE OF THE BANKRUPTCY OR INSOLVENCY TO THE CITY, TOWN OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED.
E.
A CITY, TOWN OR COUNTY MAY ADOPT REASONABLE PROCEDURES FOR DETERMINING WHEN A SOLAR ENERGY POWER PLANT HAS BEEN ABANDONED AND MAY ADOPT REASONABLE TIMELINES AND PROCEDURES FOR INITIATING AND COMPLETING THE DECOMMISSIONING AND SITE RESTORATION FOR A SOLAR ENERGY POWER PLANT THAT HAS BEEN ABANDONED OR WHOSE OWNER HAS FILED FOR BANKRUPTCY OR OTHERWISE BECOME INSOLVENT.
Show all 311 changed lines (271 more)
- 2 - H.B.
2618 F.
NOTWITHSTANDING ANY TIMELINE OR PROCEDURE THAT A CITY, TOWN OR COUNTY ADOPTS PURSUANT TO THIS SECTION, A CITY, TOWN OR COUNTY SHALL NOT INITIATE DECOMMISSIONING OR SITE RESTORATION UNDER SUBSECTION E OF THIS SECTION UNLESS THE CITY, TOWN OR COUNTY PROVIDES NOTICE AND AN OPPORTUNITY FOR A HEARING TO THE FOLLOWING:
1.
THE LANDOWNER WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED.
2.
ALL APPLICABLE CREDITORS AND PARTIES TO THE RELEVANT BANKRUPTCY PROCEEDING.
Decommissioning and site restorationrestoration; plan;
requirements;applicability A.
certificationA A.SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL PROVIDE A CITY, TOWN OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED WITH A DECOMMISSIONING AND SITE RESTORATION PLAN AS PRESCRIBED IN THIS SECTION.
BEFORE A CITY, TOWN OR COUNTY MAY APPROVE A LAND USE OR ZONING PERMIT APPLICATION FOR A SOLAR ENERGY POWER PLANT, THE SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL PROVIDE THE CITY, TOWN OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED WITH A DECOMMISSIONING AND SITE RESTORATION PLAN AS PRESCRIBED IN THIS SECTION.
ATHE CITY, TOWN OR COUNTY MAY ADOPT PROCEDURES FOR REVIEWING AND APPROVING A DECOMMISSIONING AND SITE RESTORATION PLAN THATSHALL ASTATE HOW THE SOLAR ENERGY POWER PLANT OWNERWILL ORBE OPERATORDECOMMISSIONED SUBMITSAND TO THE CITY,SITE TOWNWILL ORBE COUNTY.RESTORED AND SHALL INCLUDE ALL OF THE FOLLOWING:
THE PROCEDURES MAY INCLUDE REQUIREMENTS FOR RECEIVING OR REVIEWING PUBLIC COMMENTS OR CONDUCTING ONE OR MORE PUBLIC MEETINGS OR HEARINGS.
C.
A CITY, TOWN OR COUNTY MAY ESTABLISH THE MINIMUM COMPONENTS OF A DECOMMISSIONING AND SITE RESTORATION PLAN.
THE MINIMUM COMPONENTS SHALL INCLUDE ALL OF THE FOLLOWING:
AAN BRIEFESTIMATE NARRATIVEOF THAT DESCRIBES HOW THE SOLARCOST ENERGYOF POWER PLANT WILL BE DECOMMISSIONED AND HOW THE SITE WILL BE RESTORED AND THAT IS CONSISTENT WITH THE MINIMUM DECOMMISSIONING AND SITERESTORATION, RESTORATIONNET STANDARDS AND PROCEDURES ADOPTED BY THE CITY, TOWN OR COUNTY PURSUANT TO SUBSECTIONS F AND G OF THISSALVAGE SECTION.VALUE.
THE ESTIMATE SHALL BE MADE BY A PERSON WHO IS QUALIFIED TO ESTIMATE DECOMMISSIONING AND SITE RESTORATION COSTS AND SALVAGE VALUE FOR THE SOLAR ENERGY POWER PLANT.
AN ESTIMATE OF THE COSTFINANCIAL OFRESOURCES DECOMMISSIONINGTHAT THE SOLAR ENERGY POWER PLANT ANDWILL RESTORINGUSE THETO SOLARACCOMPLISH ENERGYDECOMMISSIONING POWERAND PLANTRESTORATION. SITE.
THE ESTIMATE SHALL BE MADE BY A PERSON WHOM THE CITY, TOWN OR COUNTY DEEMS QUALIFIED TO ESTIMATE DECOMMISSIONING AND SITE RESTORATION COSTS FOR THE SOLAR ENERGY POWER PLANT.
A DESCRIPTION OF THE FINANCIAL RESOURCESASSURANCES THAT THE SOLAR ENERGY POWER PLANT OWNER OR OPERATOR WILL USE TO ACCOMPLISH DECOMMISSIONING AND RESTORATION AND THAT COMPLY WITH SECTION 30-905.
C.
A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL REMOVE A SOLAR ENERGY POWER PLANT AND RESTORE A SOLAR ENERGY POWER PLANT SITE AS PRESCRIBED IN THIS SECTION UNLESS A CITY, TOWN OR COUNTY DETERMINES THAT A PROVISION OF THIS SECTION RELATING TO RESTORATION IS NOT NECESSARY.
ATHE SOLARREMOVAL ENERGYOF POWER PLANT OWNER OR OPERATOR SHALL DECOMMISSION A SOLAR ENERGY POWER PLANT ANDSHALL: RESTORE A SOLAR ENERGY POWER PLANT SITE AS DESCRIBED IN THE DECOMMISSIONING AND SITE RESTORATION PLAN THAT IS APPROVED BY THE CITY, TOWN OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED UNLESS THE CITY, TOWN OR COUNTY DETERMINES IN WRITING THAT A PROVISION OF THE PLAN IS NOT NECESSARY.
E.
A CITY, TOWN OR COUNTY MAY ADOPT AND ENFORCE MINIMUM STANDARDS AND PROCEDURES FOR THE DECOMMISSIONING OF A SOLAR ENERGY POWER PLANT THAT IS SUBJECT TO A LAND USE OR ZONING PERMIT AUTHORIZED PURSUANT TO THIS - 3 - H.B.
2618 CHAPTER.
THE MINIMUM STANDARDS AND PROCEDURES SHALL COVER ALL OF THE FOLLOWING:
THEINCLUDE REMOVAL OF ALL ABOVEGROUNDABOVE GROUND COMPONENTS, INCLUDING SOLAR ARRAYS, TRANSFORMERS, BATTERY ENERGY STORAGE SYSTEMS, ABOVEGROUNDABOVE GROUND COLLECTION CABLES AND POLES.POLES AND FENCING.
THECOMPLY REMOVAL OF ALL FOUNDATIONS, BURIED PROJECT COMPONENTS AND COLLECTION LINES TO A DEPTH DETERMINED BY THE CITY, TOWN OR COUNTY, UNLESS THE CITY, TOWN OR COUNTY AUTHORIZES A LESSER DEPTH IN WRITING OR, IF THE SOLAR ENERGY POWER PLANT IS LOCATED ON PRIVATE LAND, THE LANDOWNER AGREES TO A LESSER DEPTH AND THE EXISTENCE OF THE REMAINING FOUNDATIONS OR BURIED PROJECT COMPONENTS ARE DISCLOSED IN WRITING AND RECORDED WITH THE COUNTYFOLLOWING: RECORDER IN THE COUNTY WHERE THE LAND IS LOCATED.
3.(a) FOUNDATIONS AND BURIED PROJECT COMPONENTS, OTHER THAN BURIED COLLECTION LINES, MUST BE REMOVED TO A DEPTH OF AT LEAST THIRTY-SIX INCHES OR AS PRESCRIBED BY A CITY, TOWN OR COUNTY.
THE(b) COMPLETIONBURIED OFCOLLECTION ALLLINES REMOVALMUST ACTIVITIESBE AFTERREMOVED DECOMMISSIONINGTO INITIATION WITHIN A TIMEDEPTH PERIODOF THATAT ISLEAST DESIGNATEDTHIRTY-SIX BYINCHES. THE CITY, TOWN OR COUNTY, UNLESS THE CITY, TOWN OR COUNTY AUTHORIZES A LONGER TIME PERIOD IN WRITING.
F.COLLECTION LINES BELOW A DEPTH OF THIRTY-SIX INCHES MAY REMAIN IN PLACE UNLESS OTHERWISE PRESCRIBED BY A CITY, TOWN OR COUNTY.
A(c) CITY,REMOVAL TOWNACTIVITIES ORMUST COUNTYBE MAYCOMPLETED ADOPTWITHIN ANDEIGHTEEN ENFORCEMONTHS MINIMUMAFTER STANDARDSDECOMMISSIONING ANDINITIATION PROCEDURESUNLESS FOROTHERWISE THEAPPROVED RESTORATIONBY OFTHE ACITY, SOLARTOWN ENERGY POWER PLANT SITE THAT IS SUBJECT TO A LAND USE OR ZONINGCOUNTY. PERMIT AUTHORIZED PURSUANT TO THIS CHAPTER.
THEE. MINIMUM STANDARDS AND PROCEDURES SHALL COVER ALL OF THE FOLLOWING:
THE RESTORATION OF EACH SITE SHALL INCLUDE:
THEMINIMIZING REASONABLE MINIMIZATION OR FILLING OF ANY GROUND DISTURBANCESDISTURBANCE AND RESTORATIONRESTORING OF THE SITE'SSITE GROUND CONTOURS AND GRADING TO ITS ORIGINAL GROUND CONTOURSCONTOURS, ANDIF GRADING,POSSIBLE, ASOR DETERMINEDCOORDINATING BYWITH THE CITY,LANDOWNER TOWNTO ORRESTORE COUNTY WHERE THE SITESITE. IS LOCATED.
THEREASONABLY REASONABLERESTORING RESTORATION AND REESTABLISHMENTREESTABLISHING OF DISTURBED ON-SITE SOILS,SOILS VEGETATION AND GROUNDVEGETATION COVERSBY TOUSING ANATIVE CONDITIONSEED THATMIX ISAND CONSISTENTPROPER WITHSOIL ORNUTRIENTS, SUPPORTSINCLUDING THEFERTILIZER RETURNAND OFLIME, THEIF SITENECESSARY, OVER TIME TO ITSPROVIDE NATURALAND UNDEVELOPEDSUSTAIN CONDITION,GROWTH AS DETERMINED BY THE CITY, TOWN OR COUNTYIN WHERECOORDINATION WITH THE SITELANDOWNER ISTO LOCATED,ALLOW WHICHDESIRED MAYVEGETATION INCLUDETO PLANTINGBE ONE- OR2 MORE- SITE-SPECIFICH.B. NATIVE PLANTS OR SPECIES OF ONE OR MORE SIZES, VARIETIES OR MATURITIES PER SQUARE AREA.
IRRIGATION2618 ISPLANTED NOTOR REQUIRED.RETURNING THE ON-SITE SOILS AND VEGETATION TO THEIR ORIGINAL CONDITIONS.
THEADEQUATELY ADEQUATERESTORING RESTORATION, RETENTION OR REMOVAL OF OTHER IMPROVEMENTS, INCLUDING PAVED ROADS,ROADS ACCESSTO ROADS,THEIR FENCING,ORIGINAL DRAINAGECONDITION IMPROVEMENTS,FOLLOWING WELLSDECOMMISSIONING ANDACTIVITIES OTHEROR RESIDUALLEAVING MINORIMPROVEMENTS IMPROVEMENTS,IN ASPLACE DETERMINEDWITH BY THE CITY,LANDOWNER'S TOWNCONSENT. OR COUNTY WHERE THE SITE IS LOCATED.
THEALLOWING REMOVALACCESS ANDROADS, REMEDIATIONFENCING, OFASSOCIATED DRAINAGE IMPROVEMENTS AND ANY HAZARDOUSOTHER MATERIALSRESIDUAL ANDMINOR WASTE.IMPROVEMENTS TO REMAIN WITH THE LANDOWNER'S WRITTEN CONSENT.
THEREMOVING COMPLETIONAND OFREMEDIATING ALLANY SITEHAZARDOUS RESTORATIONMATERIALS ACTIVITIESAND AFTERWASTE. DECOMMISSIONING COMPLETION WITHIN A TIME PERIOD THAT IS DESIGNATED BY THE CITY, TOWN OR COUNTY UNLESS THE CITY, TOWN OR COUNTY AUTHORIZES IN WRITING A LONGER TIME PERIOD.
F.
AFTER PROVIDING REASONABLE NOTICE TO THE PROPERTY OWNER, THE CITY, TOWN OR COUNTY MAY ENTER THE SITE TO EFFECT OR COMPLETE DECOMMISSIONING PURSUANT TO THE DECOMMISSIONING PLAN.
IFAFTER ATHE SOLAR ENERGY POWER PLANT OWNER OR OPERATOR FAILSCOMPLETES TOTHE COMPLETE DECOMMISSIONING ANDOF SITEA RESTORATIONSOLAR WITHINENERGY THEPOWER TIMEPLANT PERIODAND PRESCRIBEDRESTORATION BYOF THE CITY,SOLAR TOWNENERGY ORPOWER COUNTYPLANT PURSUANTSITE TOAS THISPRESCRIBED SECTION,IN AFTERTHIS -SECTION: 4 - H.B.
26181. PROVIDING REASONABLE NOTICE TO THE LANDOWNER, THE CITY, TOWN OR COUNTY MAY ENTER THE SITE TO INITIATE OR COMPLETE DECOMMISSIONING OR SITE RESTORATION PURSUANT TO THE DECOMMISSIONING AND SITE RESTORATION PLAN.
THE SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL NOTIFY THE CITY, TOWN OR COUNTY WITHIN THIRTY DAYS AFTER THE DATE ON WHICH THE OWNER OR OPERATOR COMPLETES DECOMMISSIONING AND RESTORATION.
2.
THE CITY, TOWN OR COUNTY SHALL CERTIFY TO THE SOLAR ENERGY POWER PLANT OWNER OR OPERATOR THAT DECOMMISSIONING AND RESTORATION IS COMPLETE WITHIN THIRTY DAYS AFTER THE DATE ON WHICH THE CITY, TOWN OR COUNTY RECEIVES NOTICE FROM THE SOLAR ENERGY POWER PLANT OWNER OR OPERATOR.
AAFTER THE CITY, TOWN OR COUNTY SHALLCERTIFIES ADOPTTHAT A PROCEDURE FOR CERTIFYING WHEN DECOMMISSIONING AND SITE RESTORATION ACTIVITIESIS HAVECOMPLETE: BEEN COMPLETED, FOR RECEIVING NOTIFICATION RELATED TO THE COMPLETION AND FOR RELEASING A SOLAR ENERGY POWER PLANT OWNER'S OR OPERATOR'S FINANCIAL ASSURANCE DESCRIBED IN SECTION 30-905.
I.
NOTWITHSTANDING SUBSECTION H OF THIS SECTION, IF A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR COMPLETES ALL DECOMMISSIONING AND SITE RESTORATION ACTIVITIES PURSUANT TO THIS SECTION AND NOTIFIES THE CITY, TOWN OR COUNTY IN WRITING THAT ALL DECOMMISSIONING AND SITE RESTORATION ACTIVITIES HAVE BEEN COMPLETED, WITHIN NINETY DAYS AFTER THE DATE OF THE NOTICE:
THE SOLAR ENERGY POWER PLANT OWNER OR OPERATOR IS RELEASED FROM ANY OBLIGATION PRESCRIBED IN THIS CHAPTER.
THE CITY, TOWN OR COUNTY SHALL RETURN OR RELEASE ANY REMAINING OWNER'S OR OPERATOR'S FINANCIAL ASSURANCE DESCRIBEDREQUIRED INUNDER SECTION 30-905.
J.I.
THETHIS OWNERSECTION ORAPPLIES OPERATORTO OF A SOLAR ENERGY POWER PLANT SHALLTHAT PROVIDEBEGINS ACOMMERCIAL COPYOPERATIONS OFBEFORE, THEON DECOMMISSIONING AND SITEAFTER RESTORATION PLAN TO THE CORPORATIONEFFECTIVE COMMISSION,DATE STATE LAND DEPARTMENT AND DEPARTMENT OF ENVIRONMENTALTHIS QUALITYSECTION. ON REQUEST.
costapplicability estimateA. update;
estimatedBEGINNING salvageON value;A DATE DETERMINED BY THE CITY, TOWN OR COUNTY WHERE A SOLAR ENERGY POWER PLANT IS LOCATED, A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL CONTINUOUSLY MAINTAIN FINANCIAL ASSURANCE, INCLUDING IN THE FORM OF A BOND OR PARENT GUARANTEE, IN AN AMOUNT EQUAL TO THE COST TO DECOMMISSION THE SOLAR ENERGY POWER PLANT AND RESTORE THE SOLAR ENERGY POWER PLANT SITE AS PRESCRIBED IN SECTION 30-904, NET SALVAGE VALUE, AS DETERMINED BY THE CITY, TOWN OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED.
waiverTHE A.SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL UPDATE THE COST ESTIMATE EVERY TEN YEARS TO ENSURE AN ACCURATE ESTIMATION OF COSTS ASSOCIATED WITH DECOMMISSIONING, EQUIPMENT VALUE AND SITE RESTORATION, ADJUSTED FOR INFLATION.
BEGINNING ON A DATE DETERMINED BY THE CITY, TOWN OR COUNTY WHERE A SOLAR ENERGY POWER PLANT IS LOCATED, A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL CONTINUOUSLY MAINTAIN FINANCIAL ASSURANCE, IN A FORM DETERMINED BY THE CITY, TOWN OR COUNTY, WHICH MAY INCLUDE A BOND IN AN AMOUNT THAT IS NOT LESS THAN THE TOTAL ESTIMATED COST TO DECOMMISSION THE SOLAR ENERGY POWER PLANT AND RESTORE THE SOLAR ENERGY POWER PLANT SITE AS PRESCRIBED IN SECTION 30-904, AS DETERMINED BY THE CITY, TOWN OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED AND THAT IS REASONABLY BASED ON THE ESTIMATE PROVIDED PURSUANT TO SECTION 30-904.
ATHE CITY, TOWN OR COUNTY MAY REQUIREUSE A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR TO UPDATE THE COSTFINANCIAL ESTIMATEASSURANCE PROVIDED PURSUANT TO SECTION 30-904, SUBSECTION C, PARAGRAPH 2 OR ADOPT PROCEDURES FOR THE OWNERCOSTS OR OPERATOR OF ACORRECTING SOLARANY ENERGYOTHER POWERACTS PLANTOF TONONCOMPLIANCE SUBMITWITH UPDATEDTHIS COSTCHAPTER. ESTIMATES TO THE CITY, TOWN OR COUNTY BASED ON A SCHEDULE OR TIMELINE THAT IS ESTABLISHED BY THE CITY, TOWN OR COUNTY.
A- CITY,3 TOWN- ORH.B. COUNTY THAT ADOPTS REQUIREMENTS OR PROCEDURES MAY REASSESS THE AMOUNT OF ANY FINANCIAL ASSURANCE REQUIRED UNDER SUBSECTION A OF THIS SECTION AND, BASED ON THE MOST RECENT COST ESTIMATE RECEIVED BY THE CITY, TOWN OR COUNTY, MAY MODIFY OR ADJUST THE AMOUNT REQUIRED PURSUANT TO THIS SECTION.
2618 C.
IF A CITY,SOLAR TOWNENERGY ORPOWER COUNTYPLANT MAYOWNER ADOPTSELLS PROCEDURESTHE FORSOLAR ANENERGY OWNERPOWER ORPLANT OPERATORTO OF A PUBLIC SERVICE CORPORATION REGULATED BY THE CORPORATION COMMISSION, THE SOLAR ENERGY POWER PLANT TOOWNER SUBMITSHALL WITHPROVIDE A NOTICE OF THE COSTSALE ESTIMATETO -THE 5CITY, -TOWN H.B.OR COUNTY.
2618WITHIN PROVIDEDFIFTEEN PURSUANTDAYS TOAFTER SECTIONRECEIVING 30-904,THE SUBSECTIONNOTICE, C,THE PARAGRAPHCITY, 2TOWN OR ANCOUNTY UPDATEDSHALL COSTWAIVE ESTIMATETHE DESCRIBEDREQUIREMENTS IN SUBSECTION B OF THIS SECTION,SECTION AND FORRETURN THE CITY, TOWN OR COUNTYRELEASE TOANY CONSIDER DURING THE CALCULATION OF THE AMOUNT OF FINANCIAL ASSURANCE REQUIREDPROVIDED PURSUANT TO SUBSECTION A OF THIS SECTION, THE ESTIMATEDCITY, SALVAGETOWN VALUEOR OFCOUNTY TO THE SOLAR ENERGY POWER PLANT EQUIPMENTOWNER. AT THE TIME OF DECOMMISSIONING.
IF THE CITY, TOWN OR COUNTY ADOPTS THE PROCEDURES, THE CITY, TOWN OR COUNTY MAY ESTABLISH MINIMUM REQUIREMENTS FOR DETERMINING HOW THE SALVAGE VALUE SHOULD BE ESTIMATED AND WHO SHOULD BE DEEMED QUALIFIED TO MAKE THE ESTIMATES.
A CITY, TOWN OR COUNTY THAT HAS ADOPTED THE PROCEDURES MAY ALLOW A FINANCIAL ASSURANCE REQUIRED PURSUANT TO THIS SECTION TO BE NOT LESS THAN THE TOTAL ESTIMATED COST OF DECOMMISSIONING THE SOLAR ENERGY POWER PLANT AND RESTORING THE SOLAR ENERGY POWER PLANT SITE, NET OF THE ESTIMATED SALVAGE VALUE AT THE TIME OF DECOMMISSIONING.
A CITY, TOWN OR COUNTY THAT HAS ADOPTED THE PROCEDURES AUTHORIZED IN SUBSECTION C OF THIS SECTION MAYAPPLIES WAIVE THE FINANCIAL ASSURANCE REQUIRED PURSUANT TO THISA SECTION IF THE CITY, TOWN OR COUNTY DETERMINES, BASED ON THE MOST RECENT COST ESTIMATE SUBMITTED TO AND APPROVED BY THE CITY, TOWN OR COUNTY PURSUANT TO THIS SECTION, THAT THE ESTIMATED SALVAGE VALUE OF THE SOLAR ENERGY POWER PLANT ATTHAT THEBEGINS TIMECOMMERCIAL OFOPERATIONS DECOMMISSIONINGBEFORE, ISON SUFFICIENTAND TOAFTER COVER THE ESTIMATEDEFFECTIVE COSTDATE OF DECOMMISSIONINGTHIS THESECTION. SOLAR ENERGY POWER PLANT AND RESTORING THE SOLAR ENERGY POWER PLANT SITE.
A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR THAT SUBMITS AN ESTIMATED SALVAGE VALUE TO A CITY, TOWN OR COUNTY PURSUANT TO THIS SECTION IS NOT GUARANTEED A WAIVER OF FINANCIAL ASSURANCE BUT THE CITY, TOWN OR COUNTY THAT HAS ADOPTED THE PROCEDURES SHALL CONSIDER THE ESTIMATED SALVAGE VALUE WHEN DETERMINING THE AMOUNT OF FINANCIAL ASSURANCE TO BE REQUIRED PURSUANT TO THIS SECTION.
E.
IN LIEU OF MAINTAINING THE FINANCIAL ASSURANCE REQUIRED UNDER THIS SECTION, A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR THAT IS A CITY, TOWN, COUNTY OR OTHER LOCAL GOVERNMENTAL ENTITY OR POLITICAL SUBDIVISION OF THIS STATE MAY DEMONSTRATE FINANCIAL CAPABILITY OF MEETING THE COSTS OF DECOMMISSIONING THE SOLAR ENERGY POWER PLANT AND RESTORING THE SITE AS PRESCRIBED IN SECTION 30-904 BY SUBMITTING BOTH OF THE FOLLOWING:
1.
A LETTER THAT IS SIGNED BY THE CHIEF FINANCIAL OFFICER OF THE CITY, TOWN, COUNTY OR OTHER LOCAL GOVERNMENTAL ENTITY OR POLITICAL SUBDIVISION OF THIS STATE STATING THAT THE CITY, TOWN, COUNTY OR OTHER LOCAL GOVERNMENTAL ENTITY OR POLITICAL SUBDIVISION IS FINANCIALLY CAPABLE OF MEETING THE COSTS OF DECOMMISSIONING THE SOLAR ENERGY POWER PLANT AND RESTORING THE SITE AS PRESCRIBED IN SECTION 30-904.
2.
A STATEMENT SPECIFYING THE DETAILS OF THE FINANCIAL ARRANGEMENTS THAT THE CITY, TOWN, COUNTY OR OTHER LOCAL GOVERNMENTAL ENTITY OR POLITICAL SUBDIVISION OF THIS STATE WILL USE TO MEET THE ESTIMATED DECOMMISSIONING AND SITE RESTORATION COSTS.
- 6 - H.B.
2618 F.
IN LIEU OF MAINTAINING THE FINANCIAL ASSURANCE REQUIRED UNDER THIS SECTION, A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR THAT IS A PUBLIC SERVICE CORPORATION REGULATED BY THE CORPORATION COMMISSION MAY DEMONSTRATE FINANCIAL CAPABILITY OF MEETING THE COSTS OF DECOMMISSIONING THE SOLAR ENERGY POWER PLANT AND RESTORING THE SITE AS PRESCRIBED IN SECTION 30-904 BY SUBMITTING BOTH OF THE FOLLOWING:
1.
AN ORDER ISSUED BY THE CORPORATION COMMISSION STATING THAT THE CORPORATION COMMISSION HAS ADOPTED A FINANCIAL ASSURANCE REQUIREMENT FOR THE PUBLIC SERVICE CORPORATION THAT IS SUBSTANTIALLY SIMILAR TO THE REQUIREMENT ESTABLISHED IN SUBSECTION A OF THIS SECTION AND APPROVING A PROCESS OR MECHANISM FOR COVERING THE ESTIMATED COST OF DECOMMISSIONING THE SOLAR ENERGY POWER PLANT AND RESTORING THE SITE AS PRESCRIBED IN SECTION 30-904.
2.
A STATEMENT SPECIFYING THE DETAILS OF THE FINANCIAL ARRANGEMENTS OR MECHANISMS THAT THE CORPORATION COMMISSION HAS APPROVED TO ENSURE THAT THE PUBLIC SERVICE CORPORATION MEETS THE ESTIMATED DECOMMISSIONING AND SITE RESTORATION COSTS.
G.
A CITY, TOWN OR COUNTY MAY USE THE FINANCIAL ASSURANCE REQUIRED BY THIS SECTION TO COVER THE COST OF INITIATING OR COMPLETING DECOMMISSIONING OR SITE RESTORATION AS DESCRIBED IN THE DECOMMISSIONING AND SITE RESTORATION PLAN AS AUTHORIZED PURSUANT TO PROCEDURES ADOPTED BY THE CITY, TOWN OR COUNTY PURSUANT TO SECTION 30-903, SUBSECTION B OR E OR IF THE SOLAR ENERGY POWER PLANT OWNER OR OPERATOR FAILS TO COMPLETE DECOMMISSIONING AND SITE RESTORATION AS DESCRIBED IN SECTION 30-904, SUBSECTION G.
noticeapplicability ofA. cancellation;
certificateA ofSOLAR insuranceENERGY A.POWER PLANT OWNER OR OPERATOR SHALL MAINTAIN AN INSURANCE POLICY THAT INCLUDES COVERAGE OF ANY REASONABLE LIABILITY OF THE CITY, TOWN OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED RELATED TO THE CONSTRUCTION AND OPERATION OF THE SOLAR ENERGY POWER PLANT.
A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL MAINTAIN A COMMERCIAL GENERAL LIABILITY INSURANCE POLICY THAT RESULTS IN COVERAGE OF ANY REASONABLE LIABILITY TO THIRD PARTIES FOR REAL OR PERSONAL INJURIES OR DAMAGES ARISING FROM THE SOLAR ENERGY POWER PLANT OWNER'S OR OPERATOR'S ACTIONS OR NEGLIGENCE RELATED TO THE CONSTRUCTION, OPERATION, MAINTENANCE OR DECOMMISSIONING OF THE SOLAR ENERGY POWER PLANT OR THE RESTORATION OF THE SOLAR ENERGY POWER PLANT SITE.
A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL IMMEDIATELY PROVIDE WRITTEN NOTICE OF ANY CANCELLATIONCHANGE OFIN THE INSURANCE POLICY DESCRIBED IN SUBSECTION A OF THIS SECTION TO THE CITY, TOWN OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED.
TOTHIS THESECTION EXTENTAPPLIES THATTO AAN CONTRACTUAL RELATIONSHIP EXISTS BETWEEN A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR ANDOF THEA CITY, TOWN, OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT ISTHAT LOCATED,BEGINS THE CITY, TOWN OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED MAY REQUIRE THE SOLAR ENERGY POWER PLANT OWNER OR OPERATOR TO MAINTAIN, WHEN REQUIRED BY THE CONTRACT, COMMERCIAL GENERALOPERATIONS LIABILITYBEFORE, INSURANCEON COVERAGEAND WITHAFTER RESPECT TO THE SOLAREFFECTIVE ENERGYDATE POWEROF PLANTTHIS THATSECTION. NAMES THE CITY, TOWN OR COUNTY AS AN ADDITIONAL - 7 - H.B.
2618 INSURED.
WHEN A CITY, TOWN OR COUNTY IS NAMED AS AN ADDITIONAL INSURED, THE SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL PROVIDE A CERTIFICATE OF INSURANCE DEMONSTRATING COVERAGE ON WRITTEN REQUEST FROM THE CITY, TOWN OR COUNTY.
D.
A CITY, TOWN OR COUNTY THAT APPROVES A PERMIT, STANDARD, CONDITION, REQUIREMENT OR DECOMMISSIONING AND SITE RESTORATION PLAN FOR A SOLAR ENERGY POWER PLANT PURSUANT TO THIS CHAPTER IS NOT LIABLE OR RESPONSIBLE FOR ANY DAMAGES, ANY REAL OR PERSONAL INJURIES OR ANY ACTS OR OMISSIONS RELATED TO OR RESULTING FROM THE CONSTRUCTION, OPERATION, MAINTENANCE OR DECOMMISSIONING OF THE SOLAR ENERGY POWER PLANT OR THE RESTORATION OF THE SOLAR ENERGY POWER PLANT SITE BASED SOLELY ON THE FACT THAT THE CITY, TOWN OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED ISSUED THE APPROVAL.
THE CITY, TOWN OR COUNTY SHALL NOT BE NAMED AS AN ADDITIONAL PARTY OR DEFENDANT IN ANY CAUSE OF ACTION THAT IS BASED SOLELY ON ANY APPROVAL DESCRIBED IN THIS SUBSECTION.
30-907.
Applicability of chapter A.
THIS CHAPTER APPLIES TO ANY SOLAR ENERGY POWER PLANT THAT IS THE SUBJECT OF AN INITIAL LAND USE OR ZONING PERMIT APPLICATION IF THE APPLICATION IS BOTH:
1.
SUBMITTED TO A CITY, TOWN OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED.
2.
SUBMITTED FOR THE FIRST TIME FOR THE SOLAR ENERGY POWER PLANT ON OR AFTER THE EFFECTIVE DATE OF THIS SECTION.
B.
THIS CHAPTER DOES NOT APPLY TO A SOLAR ENERGY POWER PLANT THAT IS THE SUBJECT OF AN INITIAL LAND USE OR ZONING PERMIT APPLICATION IF THE APPLICATION IS BOTH:
1.
SUBMITTED TO A CITY, TOWN OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED.
2.
SUBMITTED FOR THE FIRST TIME FOR THE SOLAR ENERGY POWER PLANT BEFORE THE EFFECTIVE DATE OF THIS CHAPTER.
C.
THIS CHAPTER APPLIES ONLY TO A GROUND-MOUNTED SOLAR ENERGY SYSTEM THAT IS FIFTY-ONE KILOWATTS OR MORE AND THAT IS LOCATED OR PROPOSED TO BE LOCATED ON VACANT OR AGRICULTURAL LAND.
THIS CHAPTER DOES NOT APPLY TO A SOLAR ENERGY SYSTEM THAT IS MOUNTED ON A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL ROOF OR STRUCTURE THAT HAS A PRIMARY PURPOSE TO PROVIDE SHADE OR SHELTER OVER LANDS THAT HAVE BEEN DEDICATED, IMPROVED OR ZONED FOR A PURPOSE OTHER THAN TO GENERATE SOLAR ELECTRIC ENERGY.
standards;
conditions;
-B. 8 - H.B.
2618AN B.APPLICANT FOR A WIND ENERGY POWER PLANT SHALL COMPLY WITH THE REQUIREMENTS OR PROCEDURES FOR A WIND ENERGY POWER PLANT THAT ARE ADOPTED BY THE CITY, TOWN OR COUNTY IN WHICH THE WIND ENERGY POWER PLANT IS TO BE LOCATED.
AN APPLICANT FOR A WIND ENERGY POWER PLANT SHALL COMPLY WITH THE REQUIREMENTS AND PROCEDURES FOR A WIND ENERGY POWER PLANT THAT ARE ADOPTED BY THE CITY, TOWN OR COUNTY IN WHICH THE WIND ENERGY POWER PLANT IS TO BE LOCATED.
THE TRANSFER OF A WIND ENERGY POWER PLANT OR SPECIAL USE PERMIT OR THE SALE OF THE ENTITY OWNING THE WIND ENERGY POWER PLANT MAY NOT OCCUR WITHOUT WRITTEN ACCEPTANCE BY THE TRANSFEREE OF THE TRANSFEROR'S OBLIGATIONS UNDER THIS CHAPTER,CHAPTER. INCLUDING THE OBLIGATION TO MAINTAIN AND IMPLEMENT A DECOMMISSIONING AND SITE RESTORATION PLAN PURSUANT TO SECTION 30-1004, TO DEMONSTRATE AND MAINTAIN THE FINANCIAL ASSURANCE PRESCRIBED BY SECTION 30-1005 AND TO MAINTAIN THE LIABILITY INSURANCE AS PRESCRIBED BY SECTION 30-1006.
A TRANSFER OR SALE MAY NOT ELIMINATE THE LIABILITY OR RESPONSIBILITY OF AAN TRANSFERORAPPLICANT OR OF ANY OTHER PARTY UNDER THIS CHAPTER FOR ACTS OR OMISSIONS OF THE TRANSFEROR OR OTHER PARTY OCCURRING BEFORE THE TRANSFER OR SALE,SALE. EXCEPT WHEN THE TRANSFEREE AND TRANSFEROR PROVIDE FOR THE TRANSFER OF LIABILITY OR RESPONSIBILITY BY AGREEMENT.
C.- 4 - H.B.
A2618 CITY,30-1003. TOWN OR COUNTY MAY ESTABLISH A PROCEDURE FOR:
1.Cessation of use;
RECEIVING NOTICE OF A SALE AND TRANSFER OF OBLIGATIONS UNDER THIS SECTION.
2.
APPROVING A SALE AND TRANSFER OF OBLIGATIONS UNDER THIS SECTION.
D.
IF A WIND ENERGY POWER PLANT OWNER SELLS A WIND ENERGY POWER PLANT TO AN ENTITY DESCRIBED IN SECTION 30-1005, SUBSECTION E OR F, THE WIND ENERGY POWER PLANT OWNER SHALL PROVIDE WRITTEN NOTICE OF THE SALE TO THE CITY, TOWN OR COUNTY.
WITHIN FIFTEEN DAYS AFTER RECEIVING THE NOTICE, THE CITY, TOWN OR COUNTY SHALL WAIVE THE REQUIREMENTS OF SECTION 30-1005 AND RETURN OR RELEASE TO THE WIND ENERGY POWER PLANT OWNER ANY FINANCIAL ASSURANCE PROVIDED TO THE CITY, TOWN OR COUNTY UNLESS OTHERWISE PROVIDED BY AGREEMENT.
E.
BEFORE OR IN CONJUNCTION WITH APPROVING A LAND USE OR ZONING PERMIT APPLICATION FOR A WIND ENERGY POWER PLANT, A CITY, TOWN OR COUNTY MAY ADOPT A PROCEDURE FOR WAIVING THE FINANCIAL ASSURANCE PRESCRIBED BY SECTION 30-1005 IF THE OWNER OR OPERATOR OF THE PLANNED WIND ENERGY POWER PLANT SUBMITS THE FOLLOWING DOCUMENTATION IN CONJUNCTION WITH ITS APPLICATION:
1.
EVIDENCE THAT THE WIND ENERGY POWER PLANT IS BEING CONSTRUCTED PURSUANT TO A BUILD-TRANSFER AGREEMENT WITH AN ENTITY DESCRIBED IN SECTION 30-1005, SUBSECTION E OR F AND THE TRANSFER OF OWNERSHIP WILL OCCUR WITHIN A REASONABLE TIME PERIOD, AS DETERMINED BY THE CITY, TOWN OR COUNTY, AFTER THE DATE OF CONSTRUCTION OR OPERATION.
- 9 - H.B.
2618 2.
THE DOCUMENTATION PRESCRIBED BY SECTION 30-1005, SUBSECTION E OR F, AS APPLICABLE TO THE RELEVANT ENTITY.
30-1003.
Duty to maintain;
cessation of use;
notificationapplicability requirements A.
THEIF OWNERA PART OF A WIND ENERGY POWER PLANT IS DAMAGED OR OPERATORIF OFA WIND ENERGY POWER PLANT VIOLATES A PERMIT CONDITION IMPOSED BY A CITY, TOWN OR COUNTY, THE WIND ENERGY POWER PLANT SHALL:OWNER OR OPERATOR SHALL CURE ANY DAMAGE OR DEFICIENCY WITHIN NINETY DAYS AFTER WRITTEN NOTICE FROM THE CITY, TOWN OR COUNTY.
1.IF IT IS NOT REASONABLY POSSIBLE FOR THE WIND ENERGY POWER PLANT OWNER OR OPERATOR TO CURE THE DAMAGE OR DEFICIENCY WITHIN NINETY DAYS AFTER RECEIVING THE WRITTEN NOTICE, THE WIND ENERGY POWER PLANT OWNER OR OPERATOR SHALL PROVIDE THE CITY, TOWN OR COUNTY WITH A PLAN TO CURE THE DAMAGE OR DEFICIENCY AS SOON AS REASONABLY POSSIBLE.
MAINTAIN THE PLANT IN GOOD CONDITION AND REPAIR.
2.
EXCEPT DURING PERIODS OF REGULAR MAINTENANCE AND PLANNED CURTAILMENTS, ENSURE THAT THE PLANT REMAINS FUNCTIONAL AND OPERATIONAL UNTIL DECOMMISSIONING OF THE PLANT IS INITIATED PURSUANT TO THIS CHAPTER.
IF A CITY,WIND TOWNENERGY ORPOWER COUNTYPLANT MAYREMAINS ADOPTNONFUNCTIONAL REASONABLEOR TIMELINESINOPERATIVE AND REQUIREMENTS FOR THEA CURECONTINUOUS ANDPERIOD REPAIR OF VISIBLEAT DAMAGELEAST ORONE DEFECTSYEAR, TOTHE AAPPLICANT VISIBLEOR COMPONENTITS OFSUCCESSORS AOR WINDASSIGNS, ENERGYWITHOUT POWERANY PLANTFURTHER ANDACTION FORBY THE RESTORATIONCITY, ANDTOWN REPAIR, REPLACEMENT OR REMOVALCOUNTY, OFSHALL ANYREMOVE COMPONENTTHE OF A WIND ENERGY POWER PLANT THATAND ISRESTORE NONFUNCTIONALTHE ORSITE INOPERABLE.AT ITS OWN EXPENSE AS PRESCRIBED IN SECTION 30-1004.
IF IT IS NOT REASONABLY POSSIBLE FOR A WIND ENERGY POWER PLANT OWNER OR OPERATOR TO RESTORE THE WIND ENERGY POWER PLANT TO BE FUNCTIONAL OR OPERATIONAL WITHIN ONE YEAR, THE WIND ENERGY POWER PLANT OWNER OR OPERATOR SHALL PROVIDE THE CITY, TOWN OR COUNTY WITH A PLAN TO RESTORE THE WIND ENERGY POWER PLANT TO BE FUNCTIONAL OR OPERATIONAL AS SOON AS REASONABLY POSSIBLE.
ATHIS CITY,SECTION TOWNAPPLIES OR COUNTY MAY ADOPT AND ENFORCE REASONABLE PENALTIES AND PROCEDURES FOR THE VIOLATION OF OR NONCOMPLIANCE WITH ANY TIMELINE OR REQUIREMENT THAT IS AUTHORIZED PURSUANT TO SUBSECTION A ORWIND BENERGY OFPOWER THISPLANT SECTION,THAT INCLUDINGBEGINS INITIATINGCOMMERCIAL OROPERATIONS COMPLETINGBEFORE, DECOMMISSIONINGON ORAND SITEAFTER RESTORATION AT THE OWNER'SEFFECTIVE ORDATE OPERATOR'SOF EXPENSETHIS PURSUANTSECTION. TO SECTION 30-1004 IF THE OWNER OR OPERATOR FAILS TO COMPLY WITH THE CITY'S, TOWN'S OR COUNTY'S REASONABLE TIMELINES OR REQUIREMENTS.
D.
A WIND ENERGY POWER PLANT OWNER OR OPERATOR SHALL NOT ABANDON A WIND ENERGY POWER PLANT FOR ANY REASON, INCLUDING BANKRUPTCY OR FINANCIAL INSOLVENCY.
IF A WIND ENERGY POWER PLANT OWNER FILES FOR BANKRUPTCY OR OTHERWISE BECOMES INSOLVENT, THE OWNER SHALL IMMEDIATELY PROVIDE WRITTEN NOTICE OF THE BANKRUPTCY OR INSOLVENCY TO THE CITY, TOWN OR COUNTY WHERE THE WIND ENERGY POWER PLANT IS LOCATED.
E.
A CITY, TOWN OR COUNTY MAY ADOPT REASONABLE PROCEDURES FOR DETERMINING WHEN A WIND ENERGY POWER PLANT HAS BEEN ABANDONED AND MAY ADOPT REASONABLE TIMELINES AND PROCEDURES FOR INITIATING AND COMPLETING THE DECOMMISSIONING AND SITE RESTORATION FOR A WIND ENERGY POWER PLANT THAT HAS BEEN ABANDONED OR WHOSE OWNER HAS FILED FOR BANKRUPTCY OR OTHERWISE BECOME INSOLVENT.
F.
NOTWITHSTANDING ANY TIMELINE OR PROCEDURE THAT A CITY, TOWN OR COUNTY ADOPTS PURSUANT TO THIS SECTION, A CITY, TOWN OR COUNTY SHALL NOT INITIATE DECOMMISSIONING OR SITE RESTORATION UNDER SUBSECTION E OF THIS SECTION UNLESS THE CITY, TOWN OR COUNTY PROVIDES NOTICE AND AN OPPORTUNITY FOR A HEARING TO THE FOLLOWING:
1.
THE LANDOWNER WHERE THE WIND ENERGY POWER PLANT IS LOCATED.
2.
ALL APPLICABLE CREDITORS AND PARTIES TO THE RELEVANT BANKRUPTCY PROCEEDING.
Decommissioning and site restorationrestoration; plan;
requirements;applicability A.
certificationA A.WIND ENERGY POWER PLANT OWNER OR OPERATOR SHALL PROVIDE A CITY, TOWN OR COUNTY WHERE THE WIND ENERGY POWER PLANT IS LOCATED WITH A DECOMMISSIONING AND SITE RESTORATION PLAN AS PRESCRIBED IN THIS SECTION.
BEFORE A CITY, TOWN OR COUNTY MAY APPROVE A LAND USE OR ZONING PERMIT APPLICATION FOR A WIND ENERGY POWER PLANT, THE WIND ENERGY POWER - 10 - H.B.
2618 PLANT OWNER OR OPERATOR SHALL PROVIDE THE CITY, TOWN OR COUNTY WHERE THE WIND ENERGY POWER PLANT IS LOCATED WITH A DECOMMISSIONING AND SITE RESTORATION PLAN AS PRESCRIBED IN THIS SECTION.
ATHE CITY, TOWN OR COUNTY MAY ADOPT PROCEDURES FOR REVIEWING AND APPROVING A DECOMMISSIONING AND SITE RESTORATION PLAN THATSHALL ASTATE HOW THE WIND ENERGY POWER PLANT OWNERWILL ORBE OPERATORDECOMMISSIONED SUBMITSAND TO THE CITY,SITE TOWNWILL ORBE COUNTY.RESTORED AND SHALL INCLUDE ALL OF THE FOLLOWING:
THE PROCEDURES MAY INCLUDE REQUIREMENTS FOR RECEIVING OR REVIEWING PUBLIC COMMENTS OR CONDUCTING ONE OR MORE PUBLIC MEETINGS OR HEARINGS.
C.
A CITY, TOWN OR COUNTY MAY ESTABLISH THE MINIMUM COMPONENTS OF A DECOMMISSIONING AND SITE RESTORATION PLAN.
THE MINIMUM COMPONENTS SHALL INCLUDE ALL OF THE FOLLOWING:
AAN BRIEFESTIMATE NARRATIVEOF THAT DESCRIBES HOW THE WINDCOST ENERGYOF POWER PLANT WILL BE DECOMMISSIONED AND HOW THE SITE WILL BE RESTORED AND THAT IS CONSISTENT WITH THE MINIMUM DECOMMISSIONING AND SITERESTORATION, RESTORATIONNET STANDARDS AND PROCEDURES ADOPTED BY THE CITY, TOWN OR COUNTY PURSUANT TO SUBSECTIONS F AND G OF THISSALVAGE SECTION.VALUE.
THE ESTIMATE SHALL BE MADE BY A PERSON WHO IS QUALIFIED TO ESTIMATE DECOMMISSIONING AND SITE RESTORATION COSTS AND SALVAGE VALUE FOR THE WIND ENERGY POWER PLANT.
AN ESTIMATE OF THE COSTFINANCIAL OFRESOURCES DECOMMISSIONINGTHAT THE WIND ENERGY POWER PLANT ANDWILL RESTORINGUSE THETO WINDACCOMPLISH ENERGYDECOMMISSIONING POWERAND PLANTRESTORATION. SITE.
THE ESTIMATE SHALL BE MADE BY A PERSON WHOM THE CITY, TOWN OR COUNTY DEEMS QUALIFIED TO ESTIMATE DECOMMISSIONING AND SITE RESTORATION COSTS FOR THE WIND ENERGY POWER PLANT.
A DESCRIPTION OF THE FINANCIAL RESOURCESASSURANCES THAT THE WIND ENERGY POWER PLANT OWNER OR OPERATOR WILL USE TO ACCOMPLISH DECOMMISSIONING AND RESTORATION AND THAT COMPLY WITH SECTION 30-1005.
C.
A WIND ENERGY POWER PLANT OWNER OR OPERATOR SHALL REMOVE A WIND ENERGY POWER PLANT AND RESTORE A WIND ENERGY POWER PLANT SITE AS PRESCRIBED IN THIS SECTION UNLESS A CITY, TOWN OR COUNTY DETERMINES THAT A PROVISION OF THIS SECTION RELATING TO RESTORATION IS NOT NECESSARY.
ATHE WINDREMOVAL ENERGYOF POWER PLANT OWNER OR OPERATOR SHALL DECOMMISSION A WIND ENERGY POWER PLANT ANDSHALL: RESTORE A WIND ENERGY POWER PLANT SITE AS DESCRIBED IN THE DECOMMISSIONING AND SITE RESTORATION PLAN THAT IS APPROVED BY THE CITY, TOWN OR COUNTY WHERE THE WIND ENERGY POWER PLANT IS LOCATED UNLESS THE CITY, TOWN OR COUNTY DETERMINES IN WRITING THAT A PROVISION OF THE PLAN IS NOT NECESSARY.
1.
INCLUDE ALL ABOVE GROUND COMPONENTS, INCLUDING TURBINES, BLADES, NACELLES, TOWERS, TRANSFORMERS, ABOVE GROUND COLLECTION CABLES AND POLES AND FENCING.
- 5 - H.B.
2618 2.
COMPLY WITH THE FOLLOWING:
(a) FOUNDATIONS AND BURIED PROJECT COMPONENTS, OTHER THAN BURIED COLLECTION LINES, MUST BE REMOVED TO A DEPTH OF AT LEAST THIRTY-SIX INCHES OR AS PRESCRIBED BY A CITY, TOWN OR COUNTY.
(b) BURIED COLLECTION LINES MUST BE REMOVED TO A DEPTH OF AT LEAST THIRTY-SIX INCHES.
COLLECTION LINES BELOW A DEPTH OF THIRTY-SIX INCHES MAY REMAIN IN PLACE UNLESS OTHERWISE PRESCRIBED BY A CITY, TOWN OR COUNTY.
(c) REMOVAL ACTIVITIES MUST BE COMPLETED WITHIN EIGHTEEN MONTHS AFTER DECOMMISSIONING INITIATION UNLESS OTHERWISE APPROVED BY THE CITY, TOWN OR COUNTY.
A CITY, TOWN OR COUNTY MAY ADOPT AND ENFORCE MINIMUM STANDARDS AND PROCEDURES FOR THE DECOMMISSIONINGRESTORATION OF AEACH WINDSITE ENERGYSHALL POWERINCLUDE: PLANT THAT IS SUBJECT TO A LAND USE OR ZONING PERMIT AUTHORIZED PURSUANT TO THIS CHAPTER.
THE MINIMUM STANDARDS AND PROCEDURES SHALL COVER ALL OF THE FOLLOWING:
THEMINIMIZING REMOVALGROUND OFDISTURBANCE ALLAND ABOVEGROUNDRESTORING COMPONENTS,THE INCLUDINGSITE TURBINES,TO BLADES,ITS NACELLES,ORIGINAL TOWERS,GROUND TRANSFORMERS,CONTOURS, BATTERYIF ENERGYPOSSIBLE, STORAGEOR SYSTEMS,COORDINATING ABOVEGROUNDWITH COLLECTIONTHE CABLESLANDOWNER ANDTO POLES.RESTORE THE SITE.
THEREASONABLY REMOVALRESTORING OFAND ALLREESTABLISHING FOUNDATIONS,ON-SITE BURIEDSOILS PROJECT COMPONENTS AND COLLECTIONVEGETATION LINES TO A DEPTH DETERMINED BY THEUSING CITY,NATIVE TOWNSEED ORMIX COUNTY,AND UNLESSPROPER THESOIL CITY,NUTRIENTS, TOWNINCLUDING ORFERTILIZER COUNTYAND AUTHORIZESLIME, A LESSER DEPTH IN WRITING OR, IF THENECESSARY, WINDTO ENERGYPROVIDE POWERAND PLANTSUSTAIN ISGROWTH LOCATEDOR ONIN PRIVATECOORDINATION LAND,WITH THE LANDOWNER AGREES TO AALLOW LESSERDESIRED DEPTHVEGETATION ANDTO THEBE EXISTENCEPLANTED OF THE REMAINING FOUNDATIONS OR BURIEDRETURNING PROJECTTHE COMPONENTSON-SITE ARESOILS DISCLOSED IN WRITING AND RECORDEDVEGETATION WITHTO THETHEIR COUNTYORIGINAL RECORDERCONDITIONS. IN THE COUNTY WHERE THE LAND IS LOCATED.
- 11 - H.B.
2618 3.
THE COMPLETION OF ALL REMOVAL ACTIVITIES AFTER DECOMMISSIONING INITIATION WITHIN A TIME PERIOD THAT IS DESIGNATED BY THE CITY, TOWN OR COUNTY, UNLESS THE CITY, TOWN OR COUNTY AUTHORIZES A LONGER TIME PERIOD IN WRITING.
F.
A CITY, TOWN OR COUNTY MAY ADOPT AND ENFORCE MINIMUM STANDARDS AND PROCEDURES FOR THE RESTORATION OF A WIND ENERGY POWER PLANT SITE THAT IS SUBJECT TO A LAND USE OR ZONING PERMIT AUTHORIZED PURSUANT TO THIS CHAPTER.
THE MINIMUM STANDARDS AND PROCEDURES SHALL COVER ALL OF THE FOLLOWING:
1.
THE REASONABLE MINIMIZATION OR FILLING OF ANY GROUND DISTURBANCES AND RESTORATION OF THE SITE'S GROUND CONTOURS AND GRADING TO ITS ORIGINAL GROUND CONTOURS AND GRADING, AS DETERMINED BY THE CITY, TOWN OR COUNTY WHERE THE SITE IS LOCATED.
2.
THE REASONABLE RESTORATION AND REESTABLISHMENT OF DISTURBED ON-SITE SOILS, VEGETATION AND GROUND COVERS TO A CONDITION THAT IS CONSISTENT WITH OR SUPPORTS THE RETURN OF THE SITE OVER TIME TO ITS NATURAL UNDEVELOPED CONDITION, AS DETERMINED BY THE CITY, TOWN OR COUNTY WHERE THE SITE IS LOCATED, WHICH MAY INCLUDE PLANTING ONE OR MORE SITE-SPECIFIC NATIVE PLANTS OR SPECIES OF ONE OR MORE SIZES, VARIETIES OR MATURITIES PER SQUARE AREA.
IRRIGATION IS NOT REQUIRED.
THEADEQUATELY ADEQUATERESTORING RESTORATION, RETENTION OR REMOVAL OF OTHER IMPROVEMENTS, INCLUDING PAVED ROADS,ROADS ACCESSTO ROADS,THEIR FENCING,ORIGINAL DRAINAGECONDITION IMPROVEMENTS,FOLLOWING WELLSDECOMMISSIONING ANDACTIVITIES OTHEROR RESIDUALLEAVING MINORIMPROVEMENTS IMPROVEMENTS,IN ASPLACE DETERMINEDWITH BY THE CITY,LANDOWNER'S TOWNCONSENT. OR COUNTY WHERE THE SITE IS LOCATED.
THEALLOWING REMOVALACCESS ANDROADS, REMEDIATIONFENCING, OFASSOCIATED DRAINAGE IMPROVEMENTS AND ANY HAZARDOUSOTHER MATERIALSRESIDUAL ANDMINOR WASTE.IMPROVEMENTS TO REMAIN WITH THE LANDOWNER'S WRITTEN CONSENT.
THEREMOVING COMPLETIONAND OFREMEDIATING ALLANY SITEHAZARDOUS RESTORATIONMATERIALS ACTIVITIESAND AFTERWASTE. DECOMMISSIONING COMPLETION WITHIN A TIME PERIOD THAT IS DESIGNATED BY THE CITY, TOWN OR COUNTY UNLESS THE CITY, TOWN OR COUNTY AUTHORIZES IN WRITING A LONGER TIME PERIOD.
F.
AFTER PROVIDING REASONABLE NOTICE TO THE PROPERTY OWNER, THE CITY, TOWN OR COUNTY MAY ENTER THE SITE TO EFFECT OR COMPLETE DECOMMISSIONING PURSUANT TO THE DECOMMISSIONING PLAN.
IFAFTER ATHE WIND ENERGY POWER PLANT OWNER OR OPERATOR FAILSCOMPLETES TOTHE COMPLETE DECOMMISSIONING ANDOF SITEA RESTORATIONWIND WITHINENERGY THEPOWER TIMEPLANT PERIODAND PRESCRIBEDRESTORATION BYOF THE CITY,WIND TOWNENERGY ORPOWER COUNTYPLANT PURSUANT TO THIS SECTION, THE CITY, TOWN OR COUNTY, AFTER PROVIDING REASONABLE NOTICE TO THE LANDOWNER, THE CITY, TOWN OR COUNTY MAY ENTER THE SITE TOAS INITIATEPRESCRIBED ORIN COMPLETETHIS DECOMMISSIONINGSECTION: AND SITE RESTORATION PURSUANT TO THE DECOMMISSIONING PLAN.
H.
A CITY, TOWN OR COUNTY SHALL ADOPT A PROCEDURE FOR CERTIFYING WHEN DECOMMISSIONING AND SITE RESTORATION ACTIVITIES HAVE BEEN COMPLETED, FOR RECEIVING NOTIFICATION RELATED TO THE COMPLETION AND FOR RELEASING A WIND ENERGY POWER PLANT OWNER'S OR OPERATOR'S FINANCIAL ASSURANCE DESCRIBED IN SECTION 30-1005.
I.
NOTWITHSTANDING SUBSECTION H OF THIS SECTION, IF A WIND ENERGY POWER PLANT OWNER OR OPERATOR COMPLETES ALL DECOMMISSIONING AND SITE RESTORATION ACTIVITIES PURSUANT TO THIS SECTION AND NOTIFIES THE CITY, TOWN OR COUNTY IN WRITING THAT ALL DECOMMISSIONING AND SITE RESTORATION - 12 - H.B.
2618 ACTIVITIES HAVE BEEN COMPLETED, WITHIN NINETY DAYS AFTER THE DATE OF THE NOTICE:
THE WIND ENERGY POWER PLANT OWNER OR OPERATOR ISSHALL RELEASEDNOTIFY FROMTHE ANYCITY, OBLIGATIONTOWN PRESCRIBEDOR INCOUNTY THISWITHIN CHAPTER.THIRTY DAYS AFTER THE DATE ON WHICH THE OWNER OR OPERATOR COMPLETES DECOMMISSIONING AND RESTORATION.
THE CITY, TOWN OR COUNTY SHALL RETURNCERTIFY TO THE WIND ENERGY POWER PLANT OWNER OR RELEASEOPERATOR ANYTHAT REMAININGDECOMMISSIONING OWNER'SAND RESTORATION IS COMPLETE WITHIN THIRTY DAYS AFTER THE DATE ON WHICH THE CITY, TOWN OR OPERATOR'SCOUNTY FINANCIALRECEIVES ASSURANCENOTICE DESCRIBEDFROM INTHE SECTIONWIND 30-1005.ENERGY POWER PLANT OWNER OR OPERATOR.
J.H.
AFTER THE OWNERCITY, TOWN OR OPERATORCOUNTY OFCERTIFIES ATHAT WIND ENERGY POWER PLANT SHALL PROVIDE A COPY OF THE DECOMMISSIONING AND SITE RESTORATION PLANIS TOCOMPLETE: THE CORPORATION COMMISSION, STATE LAND DEPARTMENT AND DEPARTMENT OF ENVIRONMENTAL QUALITY ON REQUEST.
1.
THE WIND ENERGY POWER PLANT OWNER OR OPERATOR IS RELEASED FROM ANY OBLIGATION PRESCRIBED IN THIS CHAPTER.
- 6 - H.B.
2618 2.
THE CITY, TOWN OR COUNTY SHALL RETURN OR RELEASE ANY REMAINING FINANCIAL ASSURANCE REQUIRED UNDER SECTION 30-1005.
I.
THIS SECTION APPLIES TO A WIND ENERGY POWER PLANT THAT BEGINS COMMERCIAL OPERATIONS BEFORE, ON AND AFTER THE EFFECTIVE DATE OF THIS SECTION.
costapplicability estimateA. update;
estimatedBEGINNING salvageON value;A DATE DETERMINED BY THE CITY, TOWN OR COUNTY WHERE A WIND ENERGY POWER PLANT IS LOCATED, A WIND ENERGY POWER PLANT OWNER OR OPERATOR SHALL CONTINUOUSLY MAINTAIN FINANCIAL ASSURANCE, INCLUDING IN THE FORM OF A BOND OR PARENT GUARANTEE, IN AN AMOUNT EQUAL TO THE COST TO DECOMMISSION THE WIND ENERGY POWER PLANT AND RESTORE THE WIND ENERGY POWER PLANT SITE AS PRESCRIBED IN SECTION 30-1004, NET SALVAGE VALUE, AS DETERMINED BY THE CITY, TOWN OR COUNTY WHERE THE WIND ENERGY POWER PLANT IS LOCATED.
waiverTHE A.WIND ENERGY POWER PLANT OWNER OR OPERATOR SHALL UPDATE THE COST ESTIMATE EVERY FIVE YEARS TO ENSURE AN ACCURATE ESTIMATION OF COSTS ASSOCIATED WITH DECOMMISSIONING, EQUIPMENT VALUE AND SITE RESTORATION, ADJUSTED FOR INFLATION.
BEGINNING ON A DATE DETERMINED BY THE CITY, TOWN OR COUNTY WHERE A WIND ENERGY POWER PLANT IS LOCATED, A WIND ENERGY POWER PLANT OWNER OR OPERATOR SHALL CONTINUOUSLY MAINTAIN FINANCIAL ASSURANCE, IN A FORM DETERMINED BY THE CITY, TOWN OR COUNTY, WHICH MAY INCLUDE A BOND IN AN AMOUNT THAT IS NOT LESS THAN THE TOTAL ESTIMATED COST TO DECOMMISSION THE WIND ENERGY POWER PLANT AND RESTORE THE WIND ENERGY POWER PLANT SITE AS PRESCRIBED IN SECTION 30-1004, AS DETERMINED BY THE CITY, TOWN OR COUNTY WHERE THE WIND ENERGY POWER PLANT IS LOCATED AND THAT IS REASONABLY BASED ON THE ESTIMATE PROVIDED PURSUANT TO SECTION 30-1004.
ATHE CITY, TOWN OR COUNTY MAY REQUIREUSE A WIND ENERGY POWER PLANT OWNER OR OPERATOR TO UPDATE THE COSTFINANCIAL ESTIMATEASSURANCE PROVIDED PURSUANT TO SECTION 30-1004, SUBSECTION C, PARAGRAPH 2 OR ADOPT PROCEDURES FOR THE OWNERCOSTS OR OPERATOR OF ACORRECTING WINDANY ENERGYOTHER POWERACTS PLANTOF TONONCOMPLIANCE SUBMITWITH UPDATEDTHIS COSTCHAPTER. ESTIMATES TO THE CITY, TOWN OR COUNTY BASED ON A SCHEDULE OR TIMELINE THAT IS ESTABLISHED BY THE CITY, TOWN OR COUNTY.
A CITY, TOWN OR COUNTY THAT ADOPTS REQUIREMENTS OR PROCEDURES MAY REASSESS THE AMOUNT OF ANY FINANCIAL ASSURANCE REQUIRED UNDER SUBSECTION A OF THIS SECTION AND, BASED ON THE MOST RECENT COST ESTIMATE RECEIVED BY THE CITY, TOWN OR COUNTY, MAY MODIFY OR ADJUST THE AMOUNT REQUIRED PURSUANT TO THIS SECTION.
AIF CITY, TOWN OR COUNTY MAY ADOPT PROCEDURES FOR AN OWNER OR OPERATOR OF A WIND ENERGY POWER PLANT TOOWNER SUBMITSELLS WITH THE COSTWIND ESTIMATEENERGY PROVIDEDPOWER PURSUANTPLANT TO SECTIONA 30-904,PUBLIC SUBSECTIONSERVICE C,CORPORATION PARAGRAPHREGULATED 2BY OR AN UPDATED COST ESTIMATE DESCRIBED IN SUBSECTION B OF THIS SECTION, AND FOR THE CITY,CORPORATION TOWNCOMMISSION, OR COUNTY TO CONSIDER DURING THE CALCULATIONWIND OFENERGY THEPOWER AMOUNTPLANT OFOWNER FINANCIALSHALL ASSURANCEPROVIDE REQUIRED PURSUANT TO SUBSECTION A OFNOTICE THIS SECTION, THE ESTIMATED SALVAGE VALUE OF THE WINDSALE ENERGYTO POWER PLANT EQUIPMENT AT THE TIMECITY, OFTOWN DECOMMISSIONING.OR COUNTY.
IFWITHIN THEFIFTEEN CITY,DAYS TOWNAFTER ORRECEIVING COUNTY ADOPTS THE PROCEDURES,NOTICE, THE CITY, TOWN OR COUNTY MAYSHALL ESTABLISHWAIVE MINIMUMTHE REQUIREMENTS FOROF DETERMININGTHIS HOWSECTION THEAND SALVAGERETURN VALUEOR SHOULDRELEASE BEANY ESTIMATEDFINANCIAL ANDASSURANCE WHOPROVIDED SHOULDTO BETHE DEEMEDCITY, QUALIFIEDTOWN TOOR MAKECOUNTY TO THE ESTIMATES.WIND ENERGY POWER PLANT OWNER.
A CITY, TOWN OR COUNTY THAT HAS ADOPTED THE PROCEDURES MAY ALLOW A FINANCIAL ASSURANCE REQUIRED PURSUANT TO THIS SECTION TO BE NOT LESS THAN THE TOTAL ESTIMATED COST OF DECOMMISSIONING THE WIND ENERGY POWER PLANT AND RESTORING THE WIND ENERGY - 13 - H.B.
2618 POWER PLANT SITE, NET OF THE ESTIMATED SALVAGE VALUE AT THE TIME OF DECOMMISSIONING.
A CITY, TOWN OR COUNTY THAT HAS ADOPTED THE PROCEDURES AUTHORIZED IN SUBSECTION C OF THIS SECTION MAYAPPLIES WAIVE THE FINANCIAL ASSURANCE REQUIRED PURSUANT TO THISA SECTION IF THE CITY, TOWN OR COUNTY DETERMINES, BASED ON THE MOST RECENT COST ESTIMATE SUBMITTED TO AND APPROVED BY THE CITY, TOWN OR COUNTY PURSUANT TO THIS SECTION, THAT THE ESTIMATED SALVAGE VALUE OF THE WIND ENERGY POWER PLANT ATTHAT THEBEGINS TIMECOMMERCIAL OFOPERATIONS DECOMMISSIONINGBEFORE, ISON SUFFICIENTAND TOAFTER COVER THE ESTIMATEDEFFECTIVE COSTDATE OF DECOMMISSIONINGTHIS THESECTION. WIND ENERGY POWER PLANT AND RESTORING THE WIND ENERGY POWER PLANT SITE.
A WIND ENERGY POWER PLANT OWNER OR OPERATOR THAT SUBMITS AN ESTIMATED SALVAGE VALUE TO A CITY, TOWN OR COUNTY PURSUANT TO THIS SECTION IS NOT GUARANTEED A WAIVER OF FINANCIAL ASSURANCE BUT THE CITY, TOWN OR COUNTY THAT HAS ADOPTED THE PROCEDURES SHALL CONSIDER THE ESTIMATED SALVAGE VALUE WHEN DETERMINING THE AMOUNT OF FINANCIAL ASSURANCE TO BE REQUIRED PURSUANT TO THIS SECTION.
E.
IN LIEU OF MAINTAINING THE FINANCIAL ASSURANCE REQUIRED UNDER THIS SECTION, A WIND ENERGY POWER PLANT OWNER OR OPERATOR THAT IS A CITY, TOWN, COUNTY OR OTHER LOCAL GOVERNMENTAL ENTITY OR POLITICAL SUBDIVISION OF THIS STATE MAY DEMONSTRATE FINANCIAL CAPABILITY OF MEETING THE COSTS OF DECOMMISSIONING THE WIND ENERGY POWER PLANT AND RESTORING THE SITE AS PRESCRIBED IN SECTION 30-1004 BY SUBMITTING BOTH OF THE FOLLOWING:
1.
A LETTER THAT IS SIGNED BY THE CHIEF FINANCIAL OFFICER OF THE CITY, TOWN, COUNTY OR OTHER LOCAL GOVERNMENTAL ENTITY OR POLITICAL SUBDIVISION OF THIS STATE STATING THAT THE CITY, TOWN, COUNTY OR OTHER LOCAL GOVERNMENTAL ENTITY OR POLITICAL SUBDIVISION IS FINANCIALLY CAPABLE OF MEETING THE COSTS OF DECOMMISSIONING THE WIND ENERGY POWER PLANT AND RESTORING THE SITE AS PRESCRIBED IN SECTION 30-1004.
2.
A STATEMENT SPECIFYING THE DETAILS OF THE FINANCIAL ARRANGEMENTS THAT THE CITY, TOWN, COUNTY OR OTHER LOCAL GOVERNMENTAL ENTITY OR POLITICAL SUBDIVISION OF THIS STATE WILL USE TO MEET THE ESTIMATED DECOMMISSIONING AND SITE RESTORATION COSTS.
F.
IN LIEU OF MAINTAINING THE FINANCIAL ASSURANCE REQUIRED UNDER THIS SECTION, A WIND ENERGY POWER PLANT OWNER OR OPERATOR THAT IS A PUBLIC SERVICE CORPORATION REGULATED BY THE CORPORATION COMMISSION MAY DEMONSTRATE FINANCIAL CAPABILITY OF MEETING THE COSTS OF DECOMMISSIONING THE WIND ENERGY POWER PLANT AND RESTORING THE SITE AS PRESCRIBED IN SECTION 30-1004 BY SUBMITTING BOTH OF THE FOLLOWING:
1.
AN ORDER ISSUED BY THE CORPORATION COMMISSION STATING THAT THE CORPORATION COMMISSION HAS ADOPTED A FINANCIAL ASSURANCE REQUIREMENT FOR THE PUBLIC SERVICE CORPORATION THAT IS SUBSTANTIALLY SIMILAR TO THE REQUIREMENT ESTABLISHED IN SUBSECTION A OF THIS SECTION AND APPROVING A PROCESS OR MECHANISM FOR COVERING THE ESTIMATED COST OF DECOMMISSIONING THE WIND ENERGY POWER PLANT AND RESTORING THE SITE AS PRESCRIBED IN SECTION 30-1004.
- 14 - H.B.
2618 2.
A STATEMENT SPECIFYING THE DETAILS OF THE FINANCIAL ARRANGEMENTS OR MECHANISMS THAT THE CORPORATION COMMISSION HAS APPROVED TO ENSURE THAT THE PUBLIC SERVICE CORPORATION MEETS THE ESTIMATED DECOMMISSIONING AND SITE RESTORATION COSTS.
G.
A CITY, TOWN OR COUNTY MAY USE THE FINANCIAL ASSURANCE REQUIRED BY THIS SECTION TO COVER THE COST OF INITIATING OR COMPLETING DECOMMISSIONING OR SITE RESTORATION AS DESCRIBED IN THE DECOMMISSIONING AND SITE RESTORATION PLAN AS AUTHORIZED PURSUANT TO PROCEDURES ADOPTED BY THE CITY, TOWN OR COUNTY PURSUANT TO SECTION 30-1003, SUBSECTION B OR E OR IF THE WIND ENERGY POWER PLANT OWNER OR OPERATOR FAILS TO COMPLETE DECOMMISSIONING AND SITE RESTORATION AS DESCRIBED IN SECTION 30-1004, SUBSECTION G.
noticeapplicability ofA. cancellation;
certificateA ofWIND insuranceENERGY A.POWER PLANT OWNER OR OPERATOR SHALL MAINTAIN AN INSURANCE POLICY THAT INCLUDES COVERAGE FOR ANY WIND ENERGY POWER PLANT RELATED LIABILITY OF THE CITY, TOWN OR COUNTY WHERE THE WIND ENERGY POWER PLANT IS LOCATED.
A WIND ENERGY POWER PLANT OWNER OR OPERATOR SHALL MAINTAIN A COMMERCIAL GENERAL LIABILITY INSURANCE POLICY THAT RESULTS IN COVERAGE OF ANY REASONABLE LIABILITY TO THIRD PARTIES FOR REAL OR PERSONAL INJURIES OR DAMAGES ARISING FROM THE WIND ENERGY POWER PLANT OWNER'S OR OPERATOR'S ACTION OR NEGLIGENCE RELATED TO THE CONSTRUCTION, OPERATION, MAINTENANCE OR DECOMMISSIONING OF THE WIND ENERGY POWER PLANT OR THE RESTORATION OF THE WIND ENERGY POWER PLANT SITE.
A WIND ENERGY POWER PLANT OWNER OR OPERATOR SHALL IMMEDIATELY PROVIDE WRITTEN NOTICE OF ANY CANCELLATIONCHANGE OFIN THE INSURANCE POLICY DESCRIBED IN SUBSECTION A OF THIS SECTION TO THE CITY, TOWN OR COUNTY WHERE THE WIND ENERGY POWER PLANT IS LOCATED.
TOTHIS THESECTION EXTENTAPPLIES THATTO AAN CONTRACTUAL RELATIONSHIP EXISTS BETWEEN A WIND ENERGY POWER PLANT OWNER OR OPERATOR ANDOF THEA CITY, TOWN OR COUNTY WHERE THE WIND ENERGY POWER PLANT ISTHAT LOCATED,BEGINS THE CITY, TOWN OR COUNTY WHERE THE WIND ENERGY POWER PLANT IS LOCATED MAY REQUIRE THE WIND ENERGY POWER PLANT OWNER OR OPERATOR TO MAINTAIN, WHEN REQUIRED BY THE CONTRACT, COMMERCIAL GENERALOPERATIONS LIABILITYBEFORE, INSURANCEON COVERAGEAND WITHAFTER RESPECT TO THE WINDEFFECTIVE ENERGYDATE POWEROF PLANTTHIS THATSECTION. NAMES THE CITY, TOWN OR COUNTY AS AN ADDITIONAL INSURED.
WHEN- A7 CITY,- TOWN OR COUNTY IS NAMED AS AN ADDITIONAL INSURED, THE WIND ENERGY POWER PLANT OWNER OR OPERATOR SHALL PROVIDE A CERTIFICATE OF INSURANCE DEMONSTRATING COVERAGE ON WRITTEN REQUEST FROM THE CITY, TOWN OR COUNTY.
D.
A CITY, TOWN OR COUNTY THAT APPROVES A PERMIT, STANDARD, CONDITION, REQUIREMENT OR DECOMMISSIONING AND SITE RESTORATION PLAN FOR A WIND ENERGY POWER PLANT PURSUANT TO THIS CHAPTER IS NOT LIABLE OR RESPONSIBLE FOR ANY DAMAGES, ANY REAL OR PERSONAL INJURIES OR ANY ACTS OR OMISSIONS RELATED TO OR RESULTING FROM THE CONSTRUCTION, OPERATION, MAINTENANCE OR DECOMMISSIONING OF THE WIND ENERGY POWER PLANT OR THE RESTORATION OF THE WIND ENERGY POWER PLANT SITE BASED SOLELY ON THE FACT THAT THE CITY, TOWN OR COUNTY WHERE THE WIND ENERGY POWER PLANT IS LOCATED ISSUED THE APPROVAL.
THE CITY, TOWN OR COUNTY SHALL NOT BE NAMED AS AN - 15 - H.B.
2618 ADDITIONAL PARTY OR DEFENDANT IN ANY CAUSE OF ACTION THAT IS BASED SOLELY ON ANY APPROVAL DESCRIBED IN THIS SUBSECTION.
30-1007.
Applicability of chapter A.
THIS CHAPTER APPLIES TO ANY WIND ENERGY POWER PLANT THAT IS THE SUBJECT OF AN INITIAL LAND USE OR ZONING PERMIT APPLICATION IF THE APPLICATION IS BOTH:
1.
SUBMITTED TO A CITY, TOWN OR COUNTY WHERE THE POWER PLANT IS LOCATED.
2.
SUBMITTED FOR THE FIRST TIME FOR THE WIND ENERGY POWER PLANT ON OR AFTER THE EFFECTIVE DATE OF THIS SECTION.
B.
THIS CHAPTER DOES NOT APPLY TO ANY WIND ENERGY POWER PLANT THAT IS THE SUBJECT OF AN INITIAL LAND USE OR ZONING PERMIT APPLICATION IF THE APPLICATION IS BOTH:
1.
SUBMITTED TO A CITY, TOWN OR COUNTY WHERE THE WIND ENERGY POWER PLANT IS LOCATED.
2.
SUBMITTED FOR THE FIRST TIME FOR THE WIND ENERGY POWER PLANT BEFORE THE EFFECTIVE DATE OF THIS CHAPTER.
- 16 -
Show all 311 changed rows (271 more)
View plain text versions (8)
- Engrossed House Engrossed Version pdf
- Engrossed Senate Engrossed Version Current pdf
- SENATE - Natural Resources, Energy and Water View text pdf
- SENATE - Rules View text pdf
- Amended HOUSE - Floor Amend to Bill - passed pdf
- Amended SENATE - Kerr flr amend (ref Bill) (sub NREW) adopted pdf
- Amended SENATE - Sundareshan flr amend (ref Bill) failed pdf
- Introduced Introduced Version pdf
AI-generated reading aid from the bill's amendatory text — verify against the official bill.
The bill adds new regulations for solar energy power plants in Arizona, establishing standards for zoning, decommissioning, and site restoration.
-
Title 30, Arizona Revised Statutes
CHAPTER 7 SOLAR ENERGY POWER PLANTS ARTICLE 1. GENERAL PROVISIONS
Adds a new chapter for solar energy power plants, outlining general provisions.
-
30-901
A CITY, TOWN OR COUNTY MAY ADOPT ZONING STANDARDS, SITE SPECIFIC CONDITIONS AND PERMITTING REQUIREMENTS OR PROCEDURES FOR A SOLAR ENERGY POWER PLANT THAT IS LOCATED IN THE CITY, TOWN OR COUNTY.
Allows local governments to adopt zoning standards and permitting requirements for solar energy power plants.
-
30-902
THE TRANSFER OF A SOLAR ENERGY POWER PLANT OR SPECIAL USE PERMIT OR THE SALE OF THE ENTITY OWNING THE SOLAR ENERGY POWER PLANT MAY NOT OCCUR WITHOUT WRITTEN ACCEPTANCE BY THE TRANSFEREE OF THE TRANSFEROR'S OBLIGATIONS UNDER THIS CHAPTER...
Establishes requirements for the transfer or sale of solar energy power plants, ensuring obligations related to decommissioning are upheld.
-
30-903
THE OWNER OR OPERATOR OF A SOLAR ENERGY POWER PLANT SHALL: 1. MAINTAIN THE PLANT IN GOOD CONDITION AND REPAIR. 2. EXCEPT DURING PERIODS OF REGULAR MAINTENANCE AND PLANNED CURTAILMENTS, ENSURE THAT THE PLANT REMAINS FUNCTIONAL AND OPERATIONAL UNTIL DECOMMISSIONING OF THE PLANT IS INITIATED PURSUANT TO THIS CHAPTER.
Imposes maintenance requirements on owners/operators of solar energy power plants to ensure operational standards until decommissioning.
-
30-904
A CITY, TOWN OR COUNTY MAY ADOPT AND ENFORCE MINIMUM STANDARDS AND PROCEDURES FOR THE DECOMMISSIONING OF A SOLAR ENERGY POWER PLANT THAT IS SUBJECT TO A LAND USE OR ZONING PERMIT AUTHORIZED PURSUANT TO THIS CHAPTER.
Grants local entities the authority to establish standards and procedures for decommissioning solar energy power plants.
-
30-905
A SOLAR ENERGY POWER PLANT OWNER OR OPERATOR SHALL PROVIDE THE CITY, TOWN OR COUNTY WHERE THE SOLAR ENERGY POWER PLANT IS LOCATED WITH A DECOMMISSIONING AND SITE RESTORATION PLAN.
Requires solar energy power plant owners/operators to submit a decommissioning and site restoration plan to local governments.
-
30-906
THE OWNER OR OPERATOR OF A SOLAR ENERGY POWER PLANT SHALL NOT ABANDON A SOLAR ENERGY POWER PLANT FOR ANY REASON, INCLUDING BANKRUPTCY OR FINANCIAL INSOLVENCY.
Prohibits abandonment of solar energy power plants under any circumstances, including bankruptcy.
-
30-903
A CITY, TOWN OR COUNTY MAY ADOPT AND ENFORCE REASONABLE PENALTIES AND PROCEDURES FOR THE VIOLATION OF OR NONCOMPLIANCE WITH ANY TIMELINE OR REQUIREMENT.
Allows local governments to implement penalties for noncompliance with decommissioning or maintenance requirements.
Action History
-
Vetoed by Governor
-
Transmit to Governor
-
PASSED
-
PASSED
-
Transmit to House
-
PASSED
-
DPA
-
DPA
-
Senate Second Reading
-
Senate First Reading
-
Transmit to Senate
-
PASSED
-
DPA
-
House Placed on Consent Calendar
-
DP
-
House Second Reading
-
House First Reading.
Sponsors
- Gail Griffin · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 92 not signed on · 42 voted No
Sponsors (1)
- Gail Griffin Republican
Co-sponsors (0)
None.
Not signed on (92)
92 members have not signed on to this bill.
Show all 92 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 0 | 16 | 0 | 2 |
| Republican | 23 | 0 | 0 | 0 |
| Unaffiliated | 8 | 11 | 0 | 0 |
| Total | 31 | 27 | 0 | 2 |
| % of votes cast | 52% | 45% | 0% | 3% |
How each member voted (60)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 0 | 10 | 0 | 1 |
| Unaffiliated | 6 | 3 | 0 | 0 |
| Republican | 10 | 0 | 0 | 0 |
| Total | 16 | 13 | 0 | 1 |
| % of votes cast | 53% | 43% | 0% | 3% |
How each member voted (30)
| Member | Party | Vote |
|---|---|---|
| Anna Hernandez | — | Nay |
| Anthony Kern | — | Yea |
| Christine Marsh | — | Nay |
| Juan Mendez | — | Nay |
| Justine Wadsack | — | Yea |
| Ken Bennett | — | Yea |
| Sine Kerr | — | Yea |
| Sonny Borrelli | — | Yea |
| Steve Kaiser | — | Yea |
| Brian Fernandez | Democrat | Not Voting |
| Catherine Miranda | Democrat | Nay |
| Denise “Mitzi” Epstein | Democrat | Nay |
| Eva Burch | Democrat | Nay |
| Eva Diaz | Democrat | Nay |
| Flavio Bravo | Democrat | Nay |
| Lela Alston | Democrat | Nay |
| Priya Sundareshan | Democrat | Nay |
| Rosanna Gabaldón | Democrat | Nay |
| Sally Ann Gonzales | Democrat | Nay |
| Theresa Hatathlie | Democrat | Nay |
| David C. Farnsworth | Republican | Yea |
| David Gowan | Republican | Yea |
| Frank Carroll | Republican | Yea |
| J.D. Mesnard | Republican | Yea |
| Jake Hoffman | Republican | Yea |
| Janae Shamp | Republican | Yea |
| John Kavanagh | Republican | Yea |
| Thomas "T.J." Shope | Republican | Yea |
| Warren Petersen | Republican | Yea |
| Wendy Rogers | Republican | Yea |
Per-member breakdown not published by this state.
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 0 | 18 | 0 | 0 |
| Republican | 22 | 0 | 0 | 0 |
| Unaffiliated | 9 | 10 | 0 | 1 |
| Total | 31 | 28 | 0 | 1 |
| % of votes cast | 52% | 47% | 0% | 2% |
How each member voted (60)
Per-member breakdown not published by this state.
Subjects
Frequently asked questions
- Who sponsors HB 2618?
- HB 2618 is sponsored by Gail Griffin (Republican).
- What is the current status of HB 2618?
- This bill died with 56th Legislature - First Regular Session. It reached “To Executive” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track HB 2618?
- Track HB 2618 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB 2618
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB 2618
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →