Alaska 33rd Legislature (2023-2024) Status: Enacted

HB 307 — An Act relating to the Regulatory Commission of Alaska; relating to regulation of public utilities and pipeline carriers; relating to approval of wholesale power agreements; relating to electric reliability organizations; relating to loans for renewable energy resources projects from the power project fund; relating to the taxation of new electricity generation and storage facilities; relating to the Alaska Energy Authority; relating to the Railbelt Transmission Organization; and providing for an effective date.

Last action — (H) LEG FINANCE APPROPRIATION MESSAGE REVISED 10/15

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed House
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced February 02, 2024. Enacted.

Signed by Governor Mike Dunleavy (Republican) on October 09, 2024.

Prognosis

Advancing 54% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

  • Mixed recorded votes

    8 passed, 8 failed in recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

434 added · 83 removed

Plain-language change summary

The bill HB 307 has been revised to focus on the regulation of public utilities and renewable energy rather than specifically addressing taxation for independent power producers. This change simplifies the bill and emphasizes improvements in transmission efficiency and collaboration among electric reliability organizations. It matters because it aims to enhance the energy infrastructure in Alaska, potentially lowering costs for ratepayers while promoting renewable energy projects.

→
Previous
Latest
33-GH2489\A HOUSE BILL NO.
LAWS OF ALASKA Source Chapter No.
307 IN THE LEGISLATURE OF THE STATE OF ALASKA THIRTY-THIRD LEGISLATURE - SECOND SESSION BY THE HOUSE RULES COMMITTEE BY REQUEST OF THE GOVERNOR Introduced:
SCS CSHB 307(FIN) _______ AN ACT Relating to the Regulatory Commission of Alaska;
2/2/24 Referred:
relating to regulation of public utilities and pipeline carriers;
Finance A BILL FOR AN ACT ENTITLED "An Act relating to the taxation of independent power producers;
relating to approval of wholesale power agreements;
and increasing the efficiency of integrated transmission system charges and use for the benefit of ratepayers." BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF ALASKA:
relating to electric reliability organizations;
* Section 1.
relating to loans for renewable energy resources projects from the power project fund;
relating to the taxation of new electricity generation and storage facilities;
relating to the Alaska Energy Authority;
relating to the Railbelt Transmission Organization;
and providing for an effective date.
_______________ BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF ALASKA:
THE ACT FOLLOWS ON PAGE 1 Enrolled HB 307 AN ACT Relating to the Regulatory Commission of Alaska;
relating to regulation of public utilities and pipeline carriers;
relating to approval of wholesale power agreements;
relating to electric reliability organizations;
relating to loans for renewable energy resources projects from the power project fund;
relating to the taxation of new electricity generation and storage facilities;
relating to the Alaska Energy Authority;
relating to the Railbelt Transmission Organization;
and providing for an effective date.
_______________ * Section 1.
PURPOSE.
LEGISLATIVE INTENT.
The purpose of this Act is to eliminate the charging of inefficient transmission rates for integrated transmission systems that are also subject to the integrated resource planning process of an electric reliability organization.
It is the intent of the legislature that ownership of state- funded new or upgraded backbone transmission assets in the Railbelt be decided when the financing for the new or upgraded transmission assets is approved by the state.
AS 10.25.540(b) is amended to read:
AS 39.25.110(11) is amended to read:
(b) Before March 1 of each year, (1) each telephone cooperative shall pay to the state, instead of state and local ad valorem, income, and excise taxes that may be assessed or levied, a percentage of its gross revenue earned during the preceding calendar year;
(11) the officers and employees of the following boards, commissions, and authorities:
HB0307a -1- HB 307 New Text Underlined [DELETED TEXT BRACKETED] 33-GH2489\A (2) each electric cooperative and independent power producer shall pay to the state, instead of state and local ad valorem, income, and excise taxes that may be assessed or levied, a tax on the number of kilowatt hours of electricity sold at retail by the cooperative or independent power producer during the preceding calendar year;
-1- Enrolled HB 307 (A) [REPEALED] (B) Alaska Permanent Fund Corporation;
for the purposes of this paragraph, "independent power producer" means a utility that only sells wholesale power to cooperative or municipal utilities.
(C) Alaska Industrial Development and Export Authority;
(D) Alaska Commercial Fisheries Entry Commission;
(E) Alaska Commission on Postsecondary Education;
(F) Alaska Aerospace Corporation;
(G) [REPEALED] (H) Alaska Gasline Development Corporation and subsidiaries of the Alaska Gasline Development Corporation;
(I) Alaska Energy Authority;
AS 42.05 is amended by adding new sections to read:
AS 42.04.020(a) is amended to read:
Article 11A.
(a) The commission consists of five commissioners appointed by the governor and confirmed by the legislature in joint session.
Integrated Transmission System Cost Recovery.
To qualify for appointment as a commissioner, a person must (1) be a member in good standing of the Alaska Bar Association with at least five years of actual experience in the practice of law;
(2) be a professional engineer registered under AS 08.48;
or (3) have a degree from an accredited college or university with a major in [ENGINEERING,] finance, economics, accounting, business administration, or public administration and at least five years of actual experience in the field associated with the degree [ACTUAL EXPERIENCE FOR A PERIOD OF FIVE YEARS IN THE PRACTICE OF LAW OR IN THE FIELD OF ENGINEERING, FINANCE, ECONOMICS, ACCOUNTING, BUSINESS ADMINISTRATION, OR PUBLIC ADMINISTRATION IS EQUIVALENT TO A DEGREE].
* Sec.
4.
AS 42.04.020(f) is amended to read:
Show all 264 changed rows (224 more)
Previous
Latest
(f) Members of the commission are in the exempt service and are entitled to a monthly salary equal to a step in Range 29 [RANGE 27] of the salary schedule in AS 39.27.011(a) for Juneau, Alaska.
The chair of the commission is entitled to a monthly salary equal to a step in Range 29 [RANGE 27] of the salary schedule in AS 39.27.011(a) for Juneau, Alaska.
* Sec.
5.
AS 42.05.141(b) is amended to read:
Enrolled HB 307 -2- (b) The commission shall perform the duties assigned to it under AS 42.45.100 - 42.45.190 and AS 44.83.700 - 44.83.720.
* Sec.
6.
AS 42.05.141 is amended by adding a new subsection to read:
(g) Nothing in this chapter limits the authority of the commission under this section or AS 42.05.151 necessary to implement provisions that remain applicable under AS 42.05.321(b) or 42.05.711.
* Sec.
7.
AS 42.05.254(a) is amended to read:
(a) A regulated public utility or a certificated utility that provides telecommunications services operating in the state shall pay to the commission an annual regulatory cost charge in an amount not to exceed the maximum percentage of adjusted gross revenue that applies to the utility sector of which the utility is a part.
The regulatory cost charges that the commission expects to collect from all regulated utilities and certificated utilities providing telecommunications services may not exceed the sum of the following percentages of the total adjusted gross revenue of all regulated public utilities and certificated utilities providing telecommunications services derived from operations in the state:
(1) not more than .98 [.7] percent to fund the operations of the commission, and (2) not more than .22 [.17] percent to fund operations of the public advocacy function under AS 42.04.070(c) and AS 44.23.020(e) within the Department of Law.
An exempt utility that does not provide telecommunications services shall pay the actual cost of services provided to it by the commission.
* Sec.
8.
AS 42.05.381 is amended by adding a new subsection to read:
(p) A determination of whether an electric utility's rate is just and reasonable may consider whether the purpose of the rate is to increase diversity of supply, promote load growth, or enhance energy reliability or energy security.
* Sec.
9.
AS 42.05.431(b) is amended to read:
(b) A wholesale power agreement between public utilities, or between a public utility and an independent power producer, is subject to advance approval of the commission.
A rate set in accordance with a wholesale power agreement must disclose a state or local tax exemption provided to a utility or independent power producer.
After a wholesale power agreement is in effect, the commission -3- Enrolled HB 307 may not invalidate any purchase or sale obligation under the agreement.
However, if the commission finds that rates set in accordance with the agreement violate this subsection or are not just and reasonable, the commission may order the parties to negotiate an amendment to the agreement and if the parties fail to agree, to use the dispute resolution procedures contained in the contract.
In this subsection, "independent power producer" means a legal entity, other than a public utility or a joint action agency established under AS 42.45.310, that owns or operates a facility for the generation of electricity.
* Sec.
10.
AS 42.05.711(b) is amended to read:
(b) Except as otherwise provided in this subsection, [AND IN] (o) of this section, and AS 44.83.700(d), public utilities owned and operated by a political subdivision of the state, or electric operating entities established as the instrumentality of two or more public utilities owned and operated by political subdivisions of the state, are exempt from this chapter, other than AS 42.05.221 - 42.05.281 and 42.05.385.
However, (1) the governing body of a political subdivision may elect to be subject to this chapter;
and (2) a utility or electric operating entity that is owned and operated by a political subdivision and that directly competes with another utility or electric operating entity is subject to this chapter and any other utility or electric operating entity owned and operated by the political subdivision is also subject to this chapter;
this paragraph does not apply to a utility or electric operating entity owned and operated by a political subdivision that competes with a telecommunications utility.
* Sec.
11.
AS 42.05.760(a) is amended to read:
(a) An electric utility must participate in an electric reliability organization if the utility operates in an interconnected electric energy transmission network served by an electric reliability organization certificated by the commission.
The commission may not require an electric reliability organization for an interconnected bulk-electric system if (1) all of the load-serving entities operating in the interconnected bulk- electric system are exempt under AS 42.05.711(b);
or Enrolled HB 307 -4- (2) the sum of annual electric energy sales made by load-serving entities operating in the interconnected bulk-electric system is less than 3,000,000 megawatt-hours.
* Sec.
12.
AS 42.05.762 is amended to read:
42.05.900.
42.05.762.
Findings.
Duties of an electric reliability organization.
The legislature finds that, for an integrated transmission system that is subject to the integrated resources planning process of an electric reliability organization, (1) the elimination of per-unit wholesale transmission charges will increase the efficiency by which electricity service is provided;
An electric reliability organization shall (1) develop reliability standards that provide for an adequate level of reliability of an interconnected electric energy transmission network;
(2) the elimination of multiple pancaked rates is essential to the people of the state;
(2) develop integrated resource plans under AS 42.05.780(a);
and (3) the actual, reasonable costs to own and operate an integrated transmission system should be fairly recovered from the load-serving entities connected to the integrated transmission system.
(3) establish rules to (A) ensure that the directors of the electric reliability organization and the electric reliability organization act independently from users, owners, and operators of the interconnected electric energy transmission network;
(B) equitably allocate reasonable dues, fees, and other charges among all load-serving entities connected to the interconnected electric energy transmission network for all activities under AS 42.05.760 - 42.05.790;
(C) provide fair and impartial procedures for the enforcement of reliability standards;
(D) provide for reasonable notice and opportunity for public comment, due process, openness, and balancing of interests in exercising its duties;
[AND] (4) be governed by a board that (A) includes as nonvoting members the chair of the commission or the chair's designee and the attorney general or the attorney general's designee;
and (B) is formed as (i) an independent board;
(ii) a balanced stakeholder board;
or (iii) a combination independent and balanced stakeholder board;
and -5- Enrolled HB 307 (5) prioritize the reliability, stability, and cost to consumers of the interconnected bulk-electric system served by the electric reliability organization.
* Sec.
13.
AS 42.05.770 is amended to read:
42.05.905.
42.05.770.
Integrated transmission system cost recovery.
Regulations.
(a) The commission shall establish a transmission cost recovery mechanism to ensure that the actual, reasonable costs of owning and operating an integrated transmission system are recovered to achieve the findings stated in AS 42.05.900.
The commission shall adopt regulations governing electric reliability organizations, reliability standards, and modifications to reliability standards consistent with this section.
The transmission cost recovery mechanism must take into account each load-serving entity's load in comparison to the total load on the integrated transmission system.
Regulations under AS 42.05.760 - 42.05.790 must (1) require that an electric reliability organization's tariff include [(A) STANDARDS FOR] nondiscriminatory standards for [OPEN ACCESS TRANSMISSION AND] interconnection;
(b) The commission shall develop a process to gradually transition the collection of transmission costs recovered through a load-serving entity's base rates and wheeling charges to tariffs that reflect the transmission cost recovery mechanism.
[(B) STANDARDS FOR TRANSMISSION SYSTEM COST RECOVERY;] (2) provide a process to ideny and resolve conflicts between a reliability standard and a function, rule, tariff, rate schedule, or agreement that has been accepted, approved, adopted, or ordered by the commission;
(3) allow an electric reliability organization to recover its costs through surcharges added to the rate for each participating load-serving entity.
* Sec.
14.
AS 42.06.286(a) is amended to read:
(a) A pipeline carrier operating in the state shall pay to the commission an annual regulatory cost charge in an amount not to exceed the sum of the following percentages of gross revenue derived from operations in the state:
(1) not more than .98 [.7] percent to fund the operations of the commission, and (2) not more than .22 [.17] percent to fund operations of the public advocacy function under AS 42.04.070(c) and AS 44.23.020(e) within the Department of Law.
A regulatory cost charge may not be assessed on pipeline carrier operations unless the operations are within the jurisdiction of the commission.
* Sec.
15.
AS 42.45.010 is amended by adding new subsections to read:
(m) A loan for a renewable energy resources project in which the cumulative state monetary involvement, through loans, grants, and bonds, is at least $5,000,000 may not be granted for a term that exceeds 50 years and may, notwithstanding (f)(2) of this section, be granted at an interest rate that is the lesser of Enrolled HB 307 -6- (1) three percent lower than the rate determined under (f)(2)(A) of this section, but not less than one percent;
or (2) a rate equivalent to the rate determined under (f)(2)(B) of this section.
(n) In (m) of this section, "renewable energy resources" has the meaning given in AS 42.45.045(l).
* Sec.
16.
AS 43.98 is amended by adding a new section to read:
Article 2A.
Taxation of New Electricity Generation and Storage Facilities.
42.05.910.
43.98.100.
Integrated transmission system association.
Taxation of new electricity generation and storage facilities.
(a) The commission shall require all utilities that own or operate a portion of an integrated transmission system and are subject to an electric reliability organization to form an HB 307 -2- HB0307a New Text Underlined [DELETED TEXT BRACKETED] 33-GH2489\A integrated transmission system association to assist in administering the system of transmission cost recovery.
(a) An electricity generation facility or electricity storage facility that is constructed and placed into service on or after July 1, 2024, is not subject to state and local ad valorem, income, and excise taxes if the electricity generation facility is (1) operated by a public utility or joint action agency established under AS 42.45.310;
The commission shall require the association to file tariffs to achieve the purposes of AS 42.05.900 - 42.05.915.
or (2) operated by an entity other than a public utility and provides power only to a public utility.
(b) The integrated transmission system association may not own assets of the integrated transmission system.
(b) In this section, "public utility" has the meaning given in AS 42.05.990.
(c) Notwithstanding (b) of this section, the integrated transmission system association is a public utility.
* Sec.
17.
AS 44.83.030 is amended to read:
42.05.915.
44.83.030.
Membership of the authority.
The members of the board of directors of the authority [ALASKA ENERGY AUTHORITY] are (1) the commissioner of revenue;
(2) the commissioner of commerce, community, and economic development;
and (3) six public members appointed by the governor as follows:
(A) one member with expertise or experience in managing or operating an electric utility that is not connected to an interconnected electric energy transmission network as defined in AS 42.05.790;
(B) one member with expertise or experience in developing energy projects in rural communities;
(C) one member with expertise or experience in managing or operating an electric utility connected to an interconnected electric -7- Enrolled HB 307 energy transmission network as defined in AS 42.05.790;
(D) one member with expertise or experience in managing a municipally owned utility located off the interconnected road system or joint action agency established under AS 42.45.310 located off the interconnected road system;
(E) one member with financial expertise in large power generation project development;
and (F) one member with expertise or experience in finance, energy policy, energy technology, engineering, law, or economics [THE MEMBERS OF THE ALASKA INDUSTRIAL DEVELOPMENT AND EXPORT AUTHORITY].
* Sec.
18.
AS 44.83.030 is amended by adding new subsections to read:
(b) If the commissioner described in (a)(1) or (a)(2) of this section is unable to attend a meeting of the authority, the commissioner may, by an instrument in writing filed with the authority, designate a deputy or director to act in the commissioner's place as a member of the board at the meeting.
For all purposes of this chapter, the designee is a member of the board at the meeting.
(c) Public board members described in (a)(3) of this section serve for three- year terms.
(d) If a vacancy occurs in the membership of the board, the governor shall immediately appoint a member for the unexpired portion of the term.
* Sec.
19.
AS 44.83.040(a) is amended to read:
(a) The board of directors of the authority shall elect a chair and vice-chair every two years from among its members [OF THE ALASKA INDUSTRIAL DEVELOPMENT AND EXPORT AUTHORITY SHALL SERVE AS OFFICERS OF THE ALASKA ENERGY AUTHORITY].
The powers of the authority [ALASKA ENERGY AUTHORITY] are vested in the board of directors, and five board members [FOUR DIRECTORS OF THE AUTHORITY] constitute a quorum.
Action may be taken and motions and resolutions adopted by the authority [ALASKA ENERGY AUTHORITY] at a meeting by the affirmative vote of at least five board members [A MAJORITY OF THE DIRECTORS].
The members of the Enrolled HB 307 -8- board of directors of the authority [ALASKA ENERGY AUTHORITY] serve without compensation, but they shall receive the same travel pay and per diem as provided by law for board members under AS 39.20.180.
* Sec.
20.
AS 44.83.040 is amended by adding a new subsection to read:
(e) The authority may, as the authority considers advisable, appoint persons as officers, including an executive director, and employ professional advisors, counsel, technical experts, agents, and other employees.
The executive director and employees of the authority are in the exempt service under AS 39.25.
* Sec.
21.
AS 44.83.080 is amended to read:
Sec.
44.83.080.
Powers of the authority.
In furtherance of its corporate purposes, the authority has the following powers in addition to its other powers:
(1) to sue and be sued;
(2) to have a seal and alter it at pleasure;
(3) to make and alter bylaws for its organization and internal management;
(4) to adopt regulations governing the exercise of its corporate powers;
(5) to improve, equip, operate, and maintain power projects and bulk fuel, waste energy, energy conservation, energy efficiency, and alternative energy facilities and equipment;
(6) to issue bonds to carry out any of its corporate purposes and powers, including the establishment or increase of reserves to secure or to pay the bonds or interest on them, and the payment of all other costs or expenses of the authority incident to and necessary or convenient to carry out its corporate purposes and powers;
(7) to sell, lease as lessor or lessee, exchange, donate, convey, or encumber in any manner by mortgage or by creation of any other security interest, real or personal property owned by it, or in which it has an interest, when, in the judgment of the authority, the action is in furtherance of its corporate purposes;
(8) to accept gifts, grants, or loans from, and enter into contracts or other transactions regarding them, with any person;
(9) to deposit or invest its funds, subject to agreements with -9- Enrolled HB 307 bondholders;
(10) to enter into contracts with the United States or any person and, subject to the laws of the United States and subject to concurrence of the legislature, with a foreign country or its agencies, for the construction, financing, operation, and maintenance of all or any part of a power project or bulk fuel, waste energy, energy conservation, energy efficiency, or alternative energy facilities or equipment, either inside or outside the state, and for the sale or transmission of power from a project or any right to the capacity of it or for the security of any bonds of the authority issued or to be issued for the project;
(11) to enter into contracts with any person and with the United States and, subject to the laws of the United States and subject to the concurrence of the legislature, with a foreign country or its agencies for the purchase, sale, exchange, transmission, or use of power from a project, or any right to the capacity of it;
(12) to apply to the appropriate agencies of the state, the United States, and a foreign country and any other proper agency for the permits, licenses, or approvals as may be necessary, to acquire, construct, maintain, and operate power projects in accordance with the licenses or permits, and to obtain, hold, and use the licenses and permits in the same manner as any other person or operating unit;
(13) to enter into contracts or agreements with respect to the exercise of any of its powers, and do all things necessary or convenient to carry out its corporate purposes and exercise the powers granted in this chapter;
(14) to recommend to the legislature (A) the pledge of the credit of the state to guarantee repayment of all or any portion of revenue bonds issued to assist in construction of power projects;
(B) an appropriation from the general fund (i) for debt service on bonds or other project purposes;
or (ii) to reduce the amount of debt financing for the project;
(15) to carry out the powers and duties assigned to it under AS 42.45 Enrolled HB 307 -10- and AS 44.83.700 - 44.83.720;
(16) to make grants or loans to any person and enter into contracts or other transactions regarding the grants or loans;
(17) to promote energy conservation, energy efficiency, and alternative energy through training and public education;
(18) to acquire a Susitna River power project, whether by construction, purchase, gift, or lease, including the acquisition of property rights and interests by eminent domain under AS 09;
(19) to perform feasibility studies and engineering and design with respect to power projects;
(20) to acquire battery and other energy storage systems, whether by direct ownership, purchase, grant, gift, or lease.
* Sec.
22.
AS 44.83.090(b) is amended to read:
(b) The authority is not subject to the jurisdiction of the Regulatory Commission of Alaska, except as provided in AS 44.83.700(d).
Nothing in this chapter, except as provided in AS 44.83.700 - 44.83.720, grants the authority jurisdiction over the services or rates of a public utility or diminishes or otherwise alters the jurisdiction of the Regulatory Commission of Alaska with respect to a public utility, including any right the commission may have to review and approve or disapprove contracts for the purchase of electricity by a public utility other than wholesale agreements and contracts described in AS 42.05.431(c)(1).
* Sec.
23.
AS 44.83 is amended by adding new sections to read:
Article 5A.
Railbelt Transmission Organization.
Sec.
44.83.700.
Railbelt Transmission Organization.
(a) The Railbelt Transmission Organization is created for the purpose of establishing an open access transmission tariff that (1) provides for recovery of transmission costs and related ancillary services;
and (2) replaces wholesale charges assessed by unit by each utility in the Railbelt with a new mechanism that fairly recovers and equitably allocates the costs of operating the backbone transmission system.
-11- Enrolled HB 307 (b) For administrative purposes, the transmission organization is a division of the Alaska Energy Authority.
(c) To assist in administering the open access transmission tariff, the governance structure for the transmission organization must be made up of a representative from the authority, a representative from each Railbelt utility, and, as an ex officio nonvoting representative, the chief executive officer of the applicable electric reliability organization or the chief executive officer's designee.
(d) Notwithstanding AS 42.05.711(b) and AS 44.83.090(b), the transmission organization is subject to the jurisdiction of the commission for the purposes of AS 44.83.700 - 44.83.720.
The commission shall require the transmission organization to apply for a certificate under AS 42.05.221 and file tariffs to achieve the purposes of AS 44.83.700 - 44.83.720.
Sec.
44.83.710.
Revenue mechanism.
(a) The transmission organization shall hold and administer a commission-approved nondiscriminatory open access transmission tariff for the backbone transmission system.
(b) The transmission organization shall file with the commission a nondiscriminatory open access transmission tariff consistent with Federal Energy Regulatory Commission standards to remove impediments to competition in the wholesale bulk power marketplace in the state.
If the transmission organization does not file a nondiscriminatory open access transmission tariff with the commission on or before July 1, 2025, the commission shall, after notice and opportunity for public comment, establish a nondiscriminatory open access transmission tariff consistent with this section.
(c) The nondiscriminatory open access transmission tariff must, as approved by the commission, (1) pool backbone transmission system costs and allocate those costs through certificated load-serving entities on a coincident peak or load ratio share basis, or a combination of both;
and (2) account for (A) required backbone transmission system ancillary services;
(B) backbone transmission system congestion;
Enrolled HB 307 -12- (C) disruptions to the backbone transmission system that result in the isolation of one geographical area of the backbone transmission system from another for more than 24 hours;
and (D) costs to own and operate the backbone transmission system, as established by the commission or by contract, including transmission costs associated with the Bradley Lake hydroelectric project.
(d) A Railbelt utility shall pass the commission-approved transmission costs directly and transparently to the utility's customers.
Sec.
44.83.720.
In AS 42.05.900 - 42.05.915, (1) "electric reliability organization" has the meaning given in AS 42.05.790;
In AS 44.83.700 - 44.83.720, (1) "backbone transmission system" means the transmission assets in the Railbelt that facilitate the transmission of electrical power under the standards established by the Federal Energy Regulatory Commission;
(2) "integrated transmission system" means the non-generation assets of an interconnected electric energy transmission network;
(2) "commission" means the Regulatory Commission of Alaska;
a radial transmission line constructed after the effective date of AS 42.05.900 - 42.05.915 for the purpose of connecting a single generation asset to the interconnected electric energy transmission network to effectuate contractual sales of energy to load serving entities is part of the integrated transmission system only if the commission determines that the line is economically necessary to enable the establishment of multiple new generation assets;
(3) "Railbelt" means the geographic region from the Kenai Peninsula to Interior Alaska that is connected to a common electric transmission backbone;
(3) "load-serving entity" has the meaning given in AS 42.05.790;
(4) "Railbelt utility" means a public electric utility certificated to operate in the Railbelt that operates backbone transmission system assets;
(4) "transmission costs" include the costs to own and operate the integrated transmission system, as established by the commission or by contract, including costs associated with the Bradley Lake hydroelectric project.
(5) "transmission organization" means the Railbelt Transmission Organization established by AS 44.83.700.
HB0307a -3- HB 307 New Text Underlined [DELETED TEXT BRACKETED]
* Sec.
24.
The uncodified law of the State of Alaska is amended by adding a new section to read:
TRANSITION:
REGULATORY COMMISSION OF ALASKA MEMBERS.
An individual who is a member of the Regulatory Commission of Alaska on the day before the effective date of sec.
3 of this Act continues to serve on the Regulatory Commission of Alaska until the member's term expires and a successor is appointed and qualified.
The governor shall make appointments for vacancies that occur on or after the effective date of sec.
3 of this Act in accordance with AS 42.04.020(a), as amended by sec.
3 of this Act.
* Sec.
25.
The uncodified law of the State of Alaska is amended by adding a new section to read:
TRANSITION:
ALASKA ENERGY AUTHORITY BOARD MEMBERS.
Notwithstanding AS 44.83.030(c), added by sec.
18 of this Act, the governor shall appoint -13- Enrolled HB 307 two public members of the initial Alaska Energy Authority board of directors to one-year terms, two public members to two-year terms, and two public members to three-year terms.
* Sec.
26.
The uncodified law of the State of Alaska is amended by adding a new section to read:
TRANSITION:
RAILBELT TRANSMISSION ORGANIZATION.
To facilitate the development and management of the Railbelt backbone transmission system open access transmission tariff, the Alaska Energy Authority and the Railbelt utilities, as defined in AS 44.83.720, added by sec.
23 of this Act, shall form the Railbelt Transmission Organization under AS 44.83.700, added by sec.
23 of this Act, on or before January 1, 2025, modeled after the governance structure of the Bradley Lake Hydroelectric Project, as outlined in the Bradley Lake Power Sales Agreement, including the creation, duties, and methods of the Bradley Lake Project Management Committee, with any adjustments the parties to the agreement determine are necessary.
On or before January 1, 2025, the Railbelt Transmission Organization shall apply to the Regulatory Commission of Alaska for a certificate under AS 42.05.221 to achieve the purposes of AS 44.83.700 - 44.83.720, added by sec.
23 of this Act.
* Sec.
27.
Section 8 of this Act takes effect immediately under AS 01.10.070(c).
* Sec.
28.
Except as provided in sec.
27 of this Act, this Act takes effect July 1, 2024.
Enrolled HB 307 -14-
View plain text versions (5)

Action History

  1. (H) LEG FINANCE APPROPRIATION MESSAGE REVISED 10/15

  2. (H) FN5: (CED)

  3. (H) FN4: (CED)

  4. (H) FN3: (CED)

  5. (H) FN(S) ATTACHED TO APPROP. BILL HB 268

  6. (H) LEG FINANCE APPROPRIATION MESSAGE 8/30/24

  7. (H) EFFECTIVE DATE(S) OF LAW 8/1/24

  8. (H) Signed into law 7/31 CHAPTER 24 SLA 24

  9. (H) MANIFEST ERROR(S)

  10. (H) 9:00 A.M. 7/16/24 Transmitted to Governor

  11. (S) Minutes (SFIN)

  12. (S) Moved SCS CSHB 307(FIN) Out of Committee -- Meeting Postponed until 12:30 PM --

  13. (S) FINANCE at 09:00 AM SENATE FINANCE 532

  14. (H) EFFECTIVE DATE(S) SAME AS PASSAGE

  15. (H) CONCURRED AM OF (S) Y36 N4

  16. (H) TITLE CHANGE: SCR 44

  17. (H) CONCUR TAKEN UP

  18. (S) VERSION: SCS CSHB 307(FIN)

  19. (S) TRANSMITTED TO (H) AS AMENDED

  20. (S) EFFECTIVE DATE(S) SAME AS PASSAGE

  21. (S) PASSED Y18 N2

  22. (S) READ THE THIRD TIME SCS CSHB 307(FIN)

  23. (S) ADVANCED TO THIRD READING UC

  24. (S) AM NO 3 OFFERED AND WITHDRAWN

  25. (S) AM NO 2 FAILED Y9 N11

  26. (S) AM NO 1 NOT OFFERED

  27. (S) FIN SCS ADOPTED UC

  28. (S) READ THE SECOND TIME

  29. (S) MOVED TO BOTTOM OF CALENDAR

  30. (S) RULES TO FIRST SUP CALENDAR 5/15/2024

  31. (S) FN5: (CED)

  32. (S) FN4: (CED)

  33. (S) FN3: (CED)

  34. (S) FN1: ZERO(CED)

  35. (S) NR: STEDMAN, WILSON, MERRICK

  36. (S) DP: HOFFMAN, OLSON, KIEHL, BISHOP

  37. (S) TITLE CHANGE: SCR 44

  38. (S) FIN RPT SCS 4DP 3NR NEW TITLE

  39. (S) FIN

  40. (S) READ THE FIRST TIME - REFERRALS

  41. (H) VERSION: CSHB 307(FIN) AM

  42. (H) TRANSMITTED TO (S)

  43. (H) EFFECTIVE DATE(S) SAME AS PASSAGE

  44. (H) PASSED ON RECONSIDERATION Y36 N4

  45. (H) RECON SAME DAY UC - IN THIRD READING

  46. (H) STAPP NOTICE OF RECONSIDERATION

  47. (H) EFFECTIVE DATE(S) SAME AS PASSAGE

  48. (H) PASSED Y36 N4

  49. (H) READ THE THIRD TIME CSHB 307(FIN) AM

  50. (H) ADVANCED TO THIRD READING 5/14 CALENDAR

  51. (H) ...CHANGES TITLE OF LEGISLATION

  52. (H) AM NO 14 ADOPTED Y38 N1 E1

  53. (H) AM NO 13 FAILED Y6 N33 E1

  54. (H) AM NO 12 FAILED Y8 N30 E1 A1

  55. (H) AM NOS 10 AND 11 NOT OFFERED

  56. (H) AM NO 9 FAILED Y2 N34 E1 A3

  57. (H) ...CHANGES TITLE OF LEGISLATION

  58. (H) AM NO 8 ADOPTED Y28 N11 E1

  59. (H) AM NO 7 FAILED Y7 N32 E1

  60. (H) AM NO 6 FAILED Y10 N27 E1 A2

  61. (H) AM NO 5 FAILED Y12 N25 E1 A2

  62. (H) AM NO 4 NOT OFFERED

  63. (H) AM NO 3 FAILED Y19 N20 E1

  64. (H) AM NO 2 AS AMD ADOPTED UC

  65. (H) AM 1 TO AM 2 ADOPTED UC

  66. (H) AM NO 2 OFFERED

  67. (H) AM NO 1 ADOPTED Y32 N5 E1 A2

  68. (H) FIN CS ADOPTED Y32 N4 E1 A3

  69. (H) BEFORE HOUSE IN SECOND READING

  70. (H) HELD IN SECOND READING TO 5/13 CALENDAR

  71. (H) READ THE SECOND TIME

  72. (H) MOVED TO BOTTOM OF CALENDAR

  73. (H) RULES TO CALENDAR 5/12/2024

  74. (H) FN2: (CED)

  75. (H) FN1: ZERO(CED)

  76. (H) AM: TOMASZEWSKI

  77. (H) NR: CRONK, COULOMBE, JOSEPHSON, ORTIZ

  78. (H) DP: STAPP, HANNAN, EDGMON, D.JOHNSON, FOSTER

  79. (H) FIN RPT CS(FIN) NEW TITLE 5DP 4NR 1AM

  80. (H) Minutes (HFIN)

  81. (H) Moved CSHB 307(FIN) Out of Committee

  82. (H) FINANCE at 01:30 PM ADAMS 519

  83. (H) Minutes (HFIN)

  84. (H) Heard & Held -- Delayed to 5:30 PM --

  85. (H) FINANCE at 01:30 PM ADAMS 519

  86. (S) Minutes (SFIN)

  87. (S) <Pending Referral> -- Please Note Time Change --

  88. (S) FINANCE at 01:30 PM SENATE FINANCE 532

  89. (H) Heard & Held -- Recessed from 4/29/24 1:30 pm --

  90. (H) FINANCE at 09:00 AM ADAMS 519

  91. (H) Minutes (HFIN)

  92. (H) Scheduled but Not Heard -- Recessed to 4/30/24 at 9:00 am --

  93. (H) FINANCE at 01:30 PM ADAMS 519

  94. (H) Heard & Held -- Recessed to 08:00 am 4/26/24 --

  95. (H) FINANCE at 01:30 PM ADAMS 519

  96. (H) Minutes (HFIN)

  97. (H) Heard & Held -- Please Note Time Change --

  98. (H) FINANCE at 10:00 AM ADAMS 519

  99. (H) Minutes (HFIN)

  100. (H) Heard & Held

  101. (H) FINANCE at 01:30 PM ADAMS 519

  102. (H) -- Delayed to a Call of the Chair --

  103. (H) FINANCE at 01:30 PM ADAMS 519

  104. (H) Minutes (HFIN)

  105. (H) -- MEETING CANCELED --

  106. (H) FINANCE at 01:30 PM ADAMS 519

  107. (H) GOVERNOR'S TRANSMITTAL LETTER

  108. (H) FN2: (CED)

  109. (H) FN1: ZERO(CED)

  110. (H) FIN

  111. (H) READ THE FIRST TIME - REFERRALS

Sponsors

  • House Rules · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 64 not signed on

Sponsors (1)

  • House Rules

Co-sponsors (0)

None.

Not signed on (64)

64 members have not signed on to this bill.

Show all 64 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors HB 307?
HB 307 is sponsored by House Rules.
What is the current status of HB 307?
This bill has been enacted into law. Introduced February 02, 2024. Enacted.
Where can I track HB 307?
Track HB 307 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 307

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 307

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →