Alaska 33rd Legislature (2023-2024) Status: Enacted

HB 50 — An Act relating to carbon storage on state land; relating to the powers and duties of the Alaska Oil and Gas Conservation Commission; relating to deposits into the permanent fund; establishing the carbon storage closure trust fund and carbon dioxide storage facility administrative fund; relating to geothermal resources; relating to carbon storage exploration licenses; relating to carbon storage leases; relating to carbon storage operator permits; relating to enhanced oil or gas recovery; relating to long-term monitoring and maintenance of storage facilities; relating to carbon oxide sequestration tax credits; relating to the Regulatory Commission of Alaska and regulation of the service of natural gas storage; relating to the regulation of liquefied natural gas import facilities; relating to the oil and gas production tax; relating to the duties of the Department of Natural Resources; relating to carbon dioxide pipelines; relating to reserve-based state loans for oil and gas development projects in the Cook Inlet sedimentary basin; relating to the Alaska Industrial Development and Export Authority; requiring the Alaska Industrial Development and Export Authority to report to the legislature on oil and gas projects with potential to increase oil and gas production from the Cook Inlet sedimentary basin; relating to an audit of carbon storage leases conducted by the legislative audit division; and providing for an effective date.

Last action — (H) APPROPRIATION MESSAGE REVISED 10/15, HB 50 AND HB 257 NO LONGER ATTACHED

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed House
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced January 27, 2023. Enacted.

Signed by Governor Mike Dunleavy (Republican) on October 09, 2024.

Prognosis

Advancing 54% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

  • Mixed recorded votes

    7 passed, 10 failed in recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

1548 added · 1000 removed

Plain-language change summary

Recent amendments to HB 50 have expanded its scope significantly, now covering various aspects of carbon storage and management on state land. Key changes include the establishment of a carbon storage closure trust fund and a new administrative fund for carbon dioxide storage facilities. These additions aim to enhance oversight and funding for carbon storage projects, which is important for regulating and encouraging environmentally responsible practices in Alaska’s oil and gas sectors, ultimately supporting the state’s efforts to reduce carbon emissions.

→
Previous
Latest
33-GH1567\A HOUSE BILL NO.
LAWS OF ALASKA Source Chapter No.
50 IN THE LEGISLATURE OF THE STATE OF ALASKA THIRTY-THIRD LEGISLATURE - FIRST SESSION BY THE HOUSE RULES COMMITTEE BY REQUEST OF THE GOVERNOR Introduced:
SCS CSHB 50(FIN) am S _______ AN ACT Relating to carbon storage on state land;
1/27/23 Referred:
relating to the powers and duties of the Alaska Oil and Gas Conservation Commission;
Resources, Finance A BILL FOR AN ACT ENTITLED "An Act relating to the geologic storage of carbon dioxide;
relating to deposits into the permanent fund;
and providing for an effective date." BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF ALASKA:
establishing the carbon storage closure trust fund and carbon dioxide storage facility administrative fund;
* Section 1.
relating to geothermal resources;
relating to carbon storage exploration licenses;
relating to carbon storage leases;
relating to carbon storage operator permits;
relating to enhanced oil or gas recovery;
relating to long-term monitoring and maintenance of storage facilities;
relating to carbon oxide sequestration tax credits;
relating to the Regulatory Commission of Alaska and regulation of the service of natural gas storage;
relating to the regulation of liquefied natural gas import facilities;
relating to the oil and gas production tax;
relating to the duties of the Department of Natural Resources;
relating to carbon dioxide pipelines;
relating to reserve- based state loans for oil and gas development projects in the Cook Inlet sedimentary basin;
relating to the Alaska Industrial Development and Export Authority;
requiring the Alaska Industrial Development and Export Authority to report to the legislature on oil and gas projects with potential to increase oil and gas production from the Cook Inlet sedimentary basin;
relating to an audit of carbon storage leases conducted by the legislative audit division;
and providing for an effective date.
_______________ BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF ALASKA:
THE ACT FOLLOWS ON PAGE 1 Enrolled HB 50 AN ACT Relating to carbon storage on state land;
relating to the powers and duties of the Alaska Oil and Gas Conservation Commission;
relating to deposits into the permanent fund;
establishing the carbon storage closure trust fund and carbon dioxide storage facility administrative fund;
relating to geothermal resources;
relating to carbon storage exploration licenses;
relating to carbon storage leases;
relating to carbon storage operator permits;
relating to enhanced oil or gas recovery;
relating to long-term monitoring and maintenance of storage facilities;
relating to carbon oxide sequestration tax credits;
relating to the Regulatory Commission of Alaska and regulation of the service of natural gas storage;
relating to the regulation of liquefied natural gas import facilities;
relating to the oil and gas production tax;
relating to the duties of the Department of Natural Resources;
relating to carbon dioxide pipelines;
relating to reserve- based state loans for oil and gas development projects in the Cook Inlet sedimentary basin;
Show all 500 changed rows (460 more)
Previous
Latest
relating to the Alaska Industrial Development and Export Authority;
requiring the Alaska -1- Enrolled HB 50 Industrial Development and Export Authority to report to the legislature on oil and gas projects with potential to increase oil and gas production from the Cook Inlet sedimentary basin;
relating to an audit of carbon storage leases conducted by the legislative audit division;
and providing for an effective date.
_______________ * Section 1.
The uncodified law of the State of Alaska is amended by adding a new section to read:
The authority of the commission further applies to all land included in a voluntary cooperative or unit plan of development or operation entered into in accordance with AS 38.05.180(p) or 38.05.730.
The authority of the commission further applies to all land included in a voluntary cooperative or unit plan of development or operation entered into in accordance with AS 38.05.180(p) or 38.05.725.
AS 31.05.030(h) is amended to read:
AS 31.05.030(m) is amended to read:
(h) The commission may take all actions necessary to allow the state to HB0050a -1- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A acquire primary enforcement responsibility under 42 U.S.C.
(m) The commission has jurisdiction and authority over all persons and property, public and private, necessary to carry out the purposes and intent of AS 41.06, except for provisions in AS 41.06.005 - 41.06.060 and 41.06.305 [AS 41.06] for which the Department of Natural Resources has jurisdiction.
300h-1 and 42 U.S.C.
300h-4 (Safe Drinking Water Act of 1974, as amended, 42 U.S.C.
300f - 300j-26), for the control of underground injection related to the recovery and production of oil and natural gas and the control of underground injection in Class I wells, as defined in 40 C.F.R.
144.6, as amended, and the control of underground injection in Class VI wells, as defined in 40 C.F.R.
144.6, as amended.
AS 37.05.146(c) is amended by adding new paragraphs to read:
(86) carbon dioxide storage facility administrative fund (AS 41.06.160);
(87) carbon storage closure trust fund (AS 37.14.850).
* Sec.
5.
AS 37.13.010(a) is amended to read:
(a) Under art.
IX, sec.
15, of the state constitution, there is established as a separate fund the Alaska permanent fund.
The Alaska permanent fund consists of (1) 25 percent of all mineral lease rentals, royalties, royalty sale Enrolled HB 50 -2- proceeds, net profit shares under AS 38.05.180(f) and (g), and federal mineral revenue sharing payments received by the state from mineral leases issued on or before December 1, 1979, and 25 percent of all bonuses received by the state from mineral leases issued on or before February 15, 1980;
(2) 50 percent of all mineral lease rentals, royalties, royalty sale proceeds, net profit shares under AS 38.05.180(f) and (g), carbon storage injection royalties required under AS 38.05.705(c)(3)(B), and federal mineral revenue sharing payments received by the state from mineral leases issued after December 1, 1979, and 50 percent of all bonuses received by the state from mineral leases issued after February 15, 1980;
and (3) any other money appropriated to or otherwise allocated by law or former law to the Alaska permanent fund.
* Sec.
6.
(a) The carbon storage closure trust fund is established as a separate trust fund of the state.
(a) The carbon storage closure trust fund is established as a separate trust fund of the state outside and separate from the general fund.
The principal and earnings of the fund shall be held by the state for the purpose of protecting the public interest in maintenance and closure of carbon storage facilities in the state.
The legislature may appropriate the principal and earnings of the fund for the purpose of protecting the public interest in maintaining and closing carbon storage facilities in the state.
The fund is composed of the carbon storage closure trust fund income account and the carbon storage closure trust fund operating account.
Money in the fund does not lapse.
(b) The carbon storage closure trust fund income account consists of payments received under (c) of this section, AS 41.06.180, and earnings on the income account.
(b) The carbon storage closure trust fund consists of payments received under AS 41.06.175 and earnings on the fund.
The carbon storage closure trust fund operating account consists of appropriations by the legislature of the annual balance of the carbon storage closure trust fund income account and any earnings on those appropriations while in the operating account.
The payments received for each storage facility shall be separately accounted for under AS 37.05.142.
(c) Before payments are accepted into the carbon storage closure trust fund income account for a particular carbon storage facility, the Alaska Oil and Gas Conservation Commission and the operator may execute a memorandum of understanding that outlines a schedule of expected payments into the fund and the relationship of the payments and accumulated earnings in the fund to the operator's obligations under AS 41.06.155 or 41.06.175.
The commissioner of revenue is a fiduciary of the fund.
If the memorandum of understanding addresses investment of the fund with respect to payments made by the operator, the commissioner of revenue must also sign the memorandum.
The commissioner of revenue shall manage and invest the fund assets as provided in AS 37.10.071.
(d) Nothing in this section creates a dedicated fund.
(c) The commissioner of natural resources may make expenditures from the carbon storage closure trust fund for the purpose of conducting long-term monitoring and maintenance of a storage facility under AS 41.06.305.
(e) In this section, unless the context requires otherwise, (1) "fund" means the carbon storage closure trust fund;
If a storage operator is unable to fulfill the storage operator's duties and the financial assurance provided by the storage operator under AS 41.06.110(c)(2) is exhausted or insufficient, the Alaska Oil and Gas Conservation Commission may make expenditures from the fund for the purposes allowed under AS 41.06.105 - 41.06.210.
(2) "storage facility" has the meaning given in AS 41.06.210.
-3- Enrolled HB 50 (d) Nothing in this section creates a dedicated fund.
HB 50 -2- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A * Sec.
(e) In this section, (1) "fund" means the carbon storage closure trust fund;
5.
(2) "storage facility" and "storage operator" have the meanings given in AS 41.06.210.
* Sec.
7.
6.
8.
(a) Land, including tide, submerged, or shoreland, to which the state holds title or to which it may become entitled, may be leased, except for the extraction of natural resources and carbon storage under AS 38.05.700 - 38.05.795, in the manner provided in AS 38.05.070 - 38.05.105.
(a) Land, including tide, submerged, or shoreland, to which the state holds title or to which the state [IT] may become entitled, may be leased, except for the extraction of natural resources and for carbon storage under AS 38.05.700 - 38.05.795, in the manner provided in AS 38.05.070 - 38.05.105.
7.
9.
Rights may not be exercised by the state, its lessees, successors, or assigns under the reservation as set out in AS 38.05.125 until the state, its lessees, successors, or assigns make provision to pay the owner of the land full payment for all damages sustained by the owner, by reason of entering upon the land.
Rights may not be exercised by the state, its lessees, successors, or assigns under the reservation as set out in AS 38.05.125 until the state, its lessees, successors, or assigns make provision to pay the owner of the land full payment for all damages sustained by the owner, by reason of entering onto [UPON] the land.
If the owner for any cause refuses or neglects to settle the damages, the state, its lessees, successors, assigns, or an applicant for a lease or contract from the state for the purpose of prospecting for valuable minerals, or option, contract, or lease for carbon storage or mining coal, or lease for extracting geothermal resources, petroleum, or natural gas, may enter upon the land in the exercise of the reserved rights after posting a surety bond determined by the director, after notice and an opportunity to be heard, to be sufficient as to form, amount, and security to secure to the owner payment for damages, and may institute legal proceedings in a court where the land is located, as may be necessary to determine the damages which the owner may suffer.
If the owner for any cause refuses or neglects to settle the damages, the state, its lessees, successors, assigns, or an applicant for a lease or contract from the state for the purpose of prospecting for valuable minerals, or option, contract, or lease for carbon storage or mining coal or a lease for extracting geothermal resources, petroleum, or natural gas, may enter onto [UPON] the land in the exercise of the reserved rights after posting a surety bond determined by the director, after notice and an opportunity to be heard, to be sufficient as to form, amount, and security to secure to the owner payment for damages, and may institute legal proceedings in a court where the land is located, as may be necessary to determine the damages that [WHICH] the owner may suffer.
8.
10.
All land, together with tide, submerged, or shoreland, to which the state holds title to or to which the state may become entitled, may be obtained by permit or lease for the purpose of exploration, development, and the extraction of minerals.
Enrolled HB 50 -4- All land, together with tide, submerged, or shoreland, to which the state holds title to or to which the state may become entitled, may be obtained by permit or lease for the purpose of exploration, development, and the extraction of minerals.
Except as specifically limited by AS 38.05.131 - 38.05.181 and 38.05.700 - 38.05.795, land may be withheld from lease application on a first-come, first-served basis, and offered only HB0050a -3- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A on a competitive bid basis when determined by the commissioner to be in the best interests of the state.
Except as specifically limited by AS 38.05.131 - 38.05.181 and 38.05.700 - 38.05.795, land may be withheld from lease application on a first-come, first-served basis, and offered only on a competitive bid basis when determined by the commissioner to be in the best interests of the state.
9.
11.
(c) Payment of a royalty or a net profit share payment to the state under a lease issued under AS 38.05.135 - 38.05.181 or a payment of a rent or charge under AS 38.05.700 - 38.05.795 becomes due on the date and in the manner specified in the lease or in a regulation adopted by the commissioner.
(c) Payment of a royalty or a net profit share payment to the state under a lease issued under AS 38.05.135 - 38.05.181 or an injection charge under AS 38.05.700 - 38.05.795 becomes due on the date and in the manner specified in the lease or in a regulation adopted by the commissioner.
10.
12.
(d) If a royalty or net profit share payment to which the state is entitled under AS 38.05.135 - 38.05.181 or a payment of a rent or charge under AS 38.05.700 - 38.05.795 is not paid or is underpaid when it becomes due under (c) of this section, the unpaid amount of the rent, charge, royalty, or net profit share payment bears interest in a calendar quarter at the rate of five percentage points above the annual rate charged member banks for advances by the 12th Federal Reserve District as of the first day of that calendar quarter, or at the annual rate of 11 percent, whichever is greater, compounded quarterly as of the last day of that quarter.
(d) If a royalty or net profit share payment to which the state is entitled under AS 38.05.135 - 38.05.181 or an injection charge under AS 38.05.700 - 38.05.795 is not paid or is underpaid when it becomes due under (c) of this section, the unpaid amount of the royalty, [OR] net profit share payment, or injection charge bears interest in a calendar quarter at the rate of five percentage points above the annual rate charged member banks for advances by the 12th Federal Reserve District as of the first day of that calendar quarter, or at the annual rate of 11 percent, whichever is greater, compounded quarterly as of the last day of that quarter.
11.
13.
(e) If a royalty or net profit share payment to which the state is entitled under AS 38.05.135 - 38.05.181 or a payment of a rent or charge under AS 38.05.700 - 38.05.795 is overpaid, interest at the rate and compounded in the manner provided in (d) of this section shall be allowed and paid on the overpayment.
(e) If a royalty or net profit share payment to which the state is entitled under AS 38.05.135 - 38.05.181 or an injection charge under AS 38.05.700 - 38.05.795 is overpaid, interest at the rate and compounded in the manner provided in (d) of this section shall be allowed and paid on the overpayment.
(1) if the state grants a credit against future payments for the overpayment, the state shall pay interest on the overpayment (A) from the date that is the later of the date the overpayment was (i) due;
(1) if the state grants a credit against future payments for the overpayment, the state shall pay interest on the overpayment (A) from the date that is the later of the date the overpayment was -5- Enrolled HB 50 (i) due;
HB 50 -4- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A (2) if the state refunds the overpayment, the state shall pay interest on the overpayment (A) from the date that is the later of the date the overpayment was (i) due;
(2) if the state refunds the overpayment, the state shall pay interest on the overpayment (A) from the date that is the later of the date the overpayment was (i) due;
12.
14.
The additional area applied for shall be in multiples of 40 acres, and the application shall contain a statement that the granting of a lease for additional land is necessary for the person to arry on business economically and is in the public interest.
The additional area applied for shall be in multiples of 40 acres, and the application shall contain a statement that the granting of a lease for additional land is necessary for the person to c arry on business economically and is in the public interest.
13.
15.
AS 38.05.184(b) is amended to read:
AS 38.05.181(a) is amended to read:
(b) No carbon storage licenses or leases or additional oil or gas leases may be issued by the department or any other state agency for the exploration for or the development or production of oil and gas on state-owned land and waters seaward of the mean higher high water line, beginning at Anchor Point;
(a) The commissioner may, under regulations adopted by the commissioner, grant prospecting licenses [PERMITS] and leases to a qualified person to explore for, develop, or use geothermal resources.
When title to the surface parcel is held by a person other than the state, that person shall have a preferential right to a geothermal prospecting license [PERMIT] or lease for the area underlying the surface parcel.
The surface owner must exercise the preference right within 30 days after receiving notice of the application for a license [PERMIT], or by agreeing to meet the terms of a bid Enrolled HB 50 -6- within 60 days after receiving notice of the acceptance of the bid for a lease.
* Sec.
16.
AS 38.05.181(c) is amended to read:
(c) On state land that has not been declared a competitive geothermal area or withdrawn from geothermal prospecting, the commissioner may issue a prospecting license [PERMIT] to the first qualified applicant.
The license [PERMIT] conveys an exclusive right, for a period of five [TWO] years, to prospect for geothermal resources on state land included under the license [PERMIT].
The commissioner has discretion to renew the license [PERMIT] for an additional one-year term.
A holder of a prospecting license [PERMIT] has the right, after completion of an agreed-on work commitment [UPON THE SHOWING OF A DISCOVERY OF GEOTHERMAL RESOURCES IN COMMERCIAL QUANTITIES] and the submission of an exploration [A DEVELOPMENT] plan acceptable to the commissioner, to convert the license [PERMIT] to a noncompetitive lease at a royalty rate under (g) of this section.
The conversion privilege must be exercised not later than 30 days after the expiration of the license [PERMIT].
If the land included within the license [PERMIT] is designated a competitive geothermal area during the license [PERMIT] term, the licensee [PERMITTEE] must apply for a noncompetitive lease within 30 days after notification of the designation or forfeit the conversion privileges and the exclusive right to prospect.
* Sec.
17.
AS 38.05.181(d) is amended to read:
(d) On state land that is designated a competitive geothermal area and is not subject to an existing prospecting license [PERMIT], the commissioner may issue geothermal leases to the highest bidder by competitive bidding procedures established by regulations adopted by the commissioner.
At the discretion of the commissioner, competitive lease sales may be by oral or sealed bid, on the basis of a cash bonus, profit share, or royalty share.
* Sec.
18.
AS 38.05.181(e) is amended to read:
(e) Prospecting licenses [PERMITS] and geothermal leases granted under this section must [, EXCEPT IN THE CASE OF PARCELS SUBJECT TO A PREFERENCE RIGHT UNDER (b) OF THIS SECTION,] be issued for at least 40 acres but not more than 2,560 acres.
A person may not own, or hold an interest in, -7- Enrolled HB 50 geothermal leases covering more than 100,000 [51,200] acres.
However, geothermal leases in commercial production, individually or under a unit operation or well spacing or pooling arrangement, do not count against the acreage limitation.
All prospecting licenses [PERMITS] and geothermal leases are subject to an annual rental fee established by the department in regulation and [,] payable in advance [, OF $3 PER ACRE].
The rental for a year shall be credited against royalties accruing for that year.
* Sec.
19.
AS 38.05.181(f) is amended to read:
(f) A geothermal lease shall be issued for a primary term of 10 years and may be renewed for an additional term of five years if the lessee is actively engaged in drilling operations.
A geothermal lease is valid for the duration of commercial production.
[BEGINNING 20 YEARS AFTER THE INITIATION OF COMMERCIAL PRODUCTION AND AT 10-YEAR INTERVALS THEREAFTER, THE COMMISSIONER MAY RENEGOTIATE THE RENTALS AND ROYALTIES DUE ON A GEOTHERMAL LEASE.] * Sec.
20.
AS 38.05.184 is amended by adding a new subsection to read:
(h) A department or other state agency may not issue a carbon storage license or lease on state-owned land and water seaward of the mean higher high water line, beginning at Anchor Point;
then west to the three mile limit of state land and waters;
then west to the three mile limit of state land and water;
14.
21.
Policy on carbon dioxide storage.
Applicability;regulations.
It is in the public interest to promote the geologic storage of carbon dioxide.
(a) The provisions of AS 38.05.700 - 38.05.795 apply to the licensing of state land for carbon storage exploration and the leasing of state land for carbon storage.
The geologic storage of carbon dioxide benefits the citizens of the state and the environment by reducing greenhouse HB0050a -5- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A gas emissions.
Sec.
38.05.705.
Applicability;
regulations.
(a) The provisions of AS 38.05.700 - 38.05.795 apply to exploration licensing and the leasing of state land for carbon storage.
38.05.710.
38.05.705.
(b) A carbon storage exploration license gives the licensee (1) the exclusive right to explore, for carbon storage purposes, the state land described in the license for a five-year term;
Enrolled HB 50 -8- (b) A carbon storage exploration license gives the licensee (1) the exclusive right to explore, for carbon storage purposes, the state land described in the license for a five-year term;
(2) the option to convert the license for all or part of the state land described in the license into a carbon storage lease after the licensee (A) fulfills the work commitments set out in the license;
and (2) the option to convert the license for all or part of the state land described in the license into a carbon storage lease after the licensee complies with the lease conversion process described in AS 38.05.715.
(B) demonstrates the ability to meet the commercial terms for the lease as set out in the license or in regulation;
(c) A carbon storage exploration license must (1) be conditioned on the posting of a bond or other security acceptable to the department and in favor of the state;
(C) obtains a permit under AS 41.06.125;
(2) be conditioned on an obligation by the licensee to fulfill a specified work commitment as set out in the license;
and (D) complies with the lease conversion process of AS 38.05.720(b).
the work commitment must include mandatory provisions for (A) an annual fee paid by the licensee to the department in an amount that is at least $20 an acre, subject to the license;
(c) A carbon storage exploration license must (1) be conditioned on an obligation by the licensee to fulfill a specified work commitment as set out in the license;
and (B) an annual report describing the licensee's exploration activities in the previous calendar year, which the licensee shall provide to the department;
the work commitment must include mandatory provisions for (A) an annual fee paid by the licensee to the department in an amount of at least $20 per acre subject to the license;
and (3) include proposed commercial terms that apply if the license is converted into a carbon storage lease, which must, at a minimum, provide for (A) an annual rent of at least $20 an acre;
and (B) an annual report describing the licensee's exploration activities in the previous calendar year, which must be provided by the licensee to the department;
and (B) a charge on injected volumes of carbon dioxide of at least $2.50 a ton.
(2) include proposed commercial terms if the license is converted into a carbon storage lease, which must at a minimum provide for (A) an annual rent of at least $20 per acre;
(d) The commissioner may revoke a carbon storage exploration license before the termination of the five-year term of the license if the licensee fails to comply with the requirements of (c) of this section or applicable regulations.
and HB 50 -6- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A (B) a per-ton injection charge on all injected volumes of carbon dioxide of at least $2.50;
(e) The department may renew a carbon storage exploration license for a term sufficient to determine whether the licensee's permit application will be accepted under AS 41.06.105 - 41.06.210 if the licensee (1) before the expiration of the license, applies for a permit under AS 41.06.120;
(C) the posting of a bond or other security acceptable to the department and in favor of the state;
(3) be conditioned on the posting of a bond or other security acceptable to the department and in favor of the state;
and (4) be subject to revocation at the commissioner's discretion under (d) of this section.
(d) The commissioner may revoke a carbon storage exploration license before the termination of the license's five-year term if the licensee fails to comply with the requirements of (c) of this section or applicable regulations.
(e) The department shall renew a carbon storage exploration license if the licensee (1) before the expiration of the license term, applies for a permit under AS 41.06.125;
(3) provides documentation acceptable to the department of the pending permit application;
-9- Enrolled HB 50 (3) provides documentation acceptable to the department of the pending permit application;
and (4) submits an executed renewal form to the department affirming the original terms of the license for the renewed license term.
and (4) submits to the department an executed renewal form affirming the original terms of the license for the term of the renewed license.
(f) In the commissioner's discretion, a carbon storage exploration license may be renewed for a term sufficient to determine whether the licensee's permit application will be accepted under AS 41.06.105 - 41.06.210.
(f) A carbon storage exploration license that has been renewed under (e) of this section terminates immediately if the Alaska Oil and Gas Conservation Commission denies the licensee's permit application under AS 41.06.105 - 41.06.210.
(g) A carbon storage exploration license that has been renewed under (e) of this section terminates upon denial of the licensee's permit application by the Alaska Oil and Gas Conservation Commission under AS 41.06.105 - 41.06.210.
(g) The dollar amounts in (c) of this section shall increase every five years in proportion to the Consumer Price Index for urban consumers for urban Alaska, as determined by the United States Department of Labor, Bureau of Labor Statistics.
(h) The dollar amounts in (c) of this section shall change every five years according to changes in the Consumer Price Index for all urban consumers for the Anchorage Metropolitan Area compiled by the Bureau of Labor Statistics, United States Department of Labor.
The index for January 2024 is the reference base index.
The index for January 2023 is the reference base index.
(h) A charge on injected volumes of carbon dioxide required under (c)(3)(B) of this section or as altered by the commissioner under AS 38.05.715(c) is a royalty for the purposes of the Alaska permanent fund under AS 37.13.010.
38.05.715.
38.05.710.
(a) The procedures in this section apply HB0050a -7- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A to the issuance of a carbon storage exploration license under AS 38.05.710.
(a) To apply for a carbon storage exploration license under AS 38.05.705, an applicant shall submit to the commissioner a proposal that (1) identifies the specific area to be subject to the license;
(b) To initiate the licensing procedure, an applicant shall submit to the commissioner a proposal that (1) identifies a specific area to be subject to the license;
(3) proposes commercial terms applicable to a carbon storage lease under AS 38.05.710(c)(2);
(3) proposes commercial terms applicable to a carbon storage lease that satisfy the requirements of AS 38.05.705(c)(3);
(c) The commissioner shall publish notice of a proposal received under (b) of this section.
(b) The commissioner shall publish notice of a proposal received under (a) of this section.
The notice shall include a solicitation for competing proposals.
The notice must include a solicitation for competing proposals.
A copy of the published notice shall be sent to any lessee under AS 38.05.135 - 38.05.181 in one- half mile of the area proposed for an exploration license.
The commissioner shall send a copy of the published notice to each lessee under AS 38.05.135 - 38.05.181 within one-half mile of the area proposed for the Enrolled HB 50 -10- exploration license.
Any person in the area may submit a competing proposal under the process established by the commissioner in regulation.
Any person may submit a competing proposal, including a proposal for the authorization of subsurface storage of oil or gas under AS 38.05.180(u), under the process established by the commissioner in regulation.
The regulations must require that a competing proposal be submitted not later than 90 days after the commissioner's written notice is published.
The regulations must require that a competing proposal be submitted not later than 90 days after the commissioner's notice is published.
(d) After the deadline for submission of a competing proposal has passed, the commissioner shall issue a written finding determining whether the state's best interests are served through issuing a carbon storage exploration license.
(c) After the period for submission of competing proposals has passed, the commissioner shall issue a written finding determining whether issuance of a carbon storage exploration license is in the best interests of tte.
If the commissioner determines that issuance of a carbon storage exploration license is in the best interests of the state, the finding must (1) describe the limitations, stipulations, conditions, or changes from the initiating proposal or competing proposals that are required to make the issuance of the exploration license conform to the best interests of the state;
If the commissioner determines that issuance of a carbon storage exploration license is in the best interests of the state, the finding must (1) describe the limitations, stipulations, and conditions of the license and any changes to the conditions detailed in the proposal submitted under (a) of this section, or a competing proposal, that are required before issuance of the exploration license;
(3) if there are competing proposals from multiple applicants, identify HB 50 -8- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A which applicants are qualified for the issuance of the exploration license and include information for the competitive bid process as set out in (f) of this section;
(3) if there are competing proposals from multiple applicants, identify which applicants are qualified for the issuance of the exploration license and include information about the competitive bid process as set out in (e) of this section;
and (4) include a copy of the exploration license to be issued and the form of lease that will be used for any portion of the exploration license area subsequently converted to a lease under AS 38.05.720.
and (4) include a copy of the exploration license to be issued and the form of lease that will be used for any portion of the exploration license area that is later converted to a lease under AS 38.05.715.
(e) If the commissioner concludes that issuance of a carbon storage exploration license is in the best interests of the state, and that only one applicant is qualified to be issued the license, the applicant may accept or reject the exploration license, as limited or conditioned by the terms of the finding and in the form attached to the finding, not later than 30 days after the finding's date of publication.
(d) If the commissioner determines that issuance of a carbon storage exploration license is in the best interests of the state and that only one applicant is qualified for a license, the applicant may accept or reject the exploration license, as limited or conditioned by the terms of the finding made under (c) of this section and in the form of lease attached to the finding, not later than 30 days after the date the finding was issued.
The commissioner shall consider an applicant's failure to respond in the 30- day period as a rejection of the license.
If an applicant fails to respond within 30 days after the finding was issued, the commissioner shall consider the applicant's failure to respond as a rejection of the license.
(f) If the commissioner concludes that issuance of the carbon storage exploration license is in the best interests of the state, and that more than one applicant is qualified to be issued the license, the commissioner shall issue a request for competitive sealed bids, under procedures adopted by regulation, to determine which qualified applicants will be issued the license.
-11- Enrolled HB 50 (e) If the commissioner determines that issuance of a carbon storage exploration license is in the best interests of the state and that more than one applicant is qualified for a license, the commissioner shall issue a request for competitive sealed bids, under procedures adopted by regulation, to determine which qualified applicants will receive a license.
If the commissioner determines that a competitive bid process is necessary, the best interest finding must include notice that the commissioner intends to request competitive bids.
If the commissioner determines that a competitive bid process is necessary, the best interest finding made under (c) of this section must include notice that the commissioner intends to request competitive bids.
(g) The commissioner shall establish in regulation the criteria for the assessment of competitive bids under (f) of this section and for the determination of a successful bidder.
(f) The commissioner shall establish in regulation the criteria for the assessment of competitive bids under (e) of this section and for the determination of a successful bidder.
(h) If a lessee under AS 38.05.135 - 38.05.181 in the area covered by a proposed carbon storage exploration license participates in a competitive bid process under (f) of this section and is not the successful bidder, before issuing the license, the commissioner shall provide the lessee an opportunity to match the successful bid.
(g) If a lessee under AS 38.05.135 - 38.05.181 in the area covered by a proposed carbon storage exploration license participates in a competitive bid process under (e) of this section and is not the successful bidder, before issuing the license, the commissioner shall provide the lessee an opportunity to match the successful bid.
(i) A carbon storage exploration license issued under this section and a carbon storage lease under AS 38.05.720 or 38.05.725 must include HB0050a -9- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A (1) a covenant from the licensee not to unreasonably interfere with the rights of a lessee under AS 38.05.135 - 38.05.181;
(h) A carbon storage exploration license issued under this section and a carbon storage lease under AS 38.05.715 or 38.05.720 must include (1) a covenant from the licensee or lessee not to unreasonably interfere with the rights of a lessee under AS 38.05.135 - 38.05.181;
and (2) a clause by which the licensee indemnifies the state for any unreasonable interference the licensee might cause to the rights of a lessee under AS 38.05.135 - 38.05.181.
and (2) a clause by which the licensee or lessee indemnifies the state for any unreasonable interference the licensee or lessee might cause to the rights of a lessee under AS 38.05.135 - 38.05.181.
(j) When notice is required under this section, the department shall follow the requirements for notice under AS 38.05.945(b) and (c).
(i) When notice is required under this section, the department shall follow the requirements for notice under AS 38.05.945(b) and (c).
38.05.720.
38.05.715.
(a) The commissioner may convert a carbon storage exploration license to a carbon storage lease if the licensee satisfies the requirements of AS 38.05.710(b) and complies with (b) of this section.
(a) The commissioner may convert a carbon storage exploration license to a carbon storage lease if the licensee complies with (b) of this section.
(b) To convert a carbon storage exploration license to a carbon storage lease, a licensee shall provide a copy of the permit obtained under AS 41.06.105 - 41.06.210 to the commissioner.
(b) To convert a carbon storage exploration license to a carbon storage lease, a licensee shall provide to the commissioner a copy of the permit obtained under AS 41.06.120.
After receiving a copy of the permit, if the licensee is in compliance with AS 38.05.710(b), the commissioner shall issue a carbon storage lease for those areas of the exploration license approved for carbon storage by the permit.
After receiving a copy of the permit, the commissioner may issue a Enrolled HB 50 -12- carbon storage lease for those areas of the exploration license approved for carbon storage by the permit if the licensee has (1) fulfilled the work commitments set out in the license;
A lease issued under this section must include (1) commercial terms for the lease as set out in the commissioner's finding under AS 38.05.715(d);
(2) demonstrated the ability to meet the commercial terms for the lease as set out in the license.
(2) the agreements required under AS 38.05.715(i);
(c) Notwithstanding (b) of this section, if the commissioner determines that a carbon storage project is in the best interests of the state and would not be economically feasible under the commercial terms set by the license, the commissioner may issue the carbon storage lease under alternative commercial terms.
and (3) any other condition or obligation deemed necessary by the commissioner or required by regulation.
A lease issued under this subsection must be supported by a written finding that contains specific factual details justifying the decision, an explanation of the commissioner's reasons for issuing the lease, and a description of the original terms and the alternative terms of the lease.
The finding must be published on the commissioner's publicly available Internet website.
(d) A lease issued under this section must include (1) commercial terms for the lease;
(2) the agreements required under AS 38.05.710(h);
and (3) any other condition or obligation the commissioner considers necessary or that is required by regulation.
38.05.725.
38.05.720.
Concurrent carbon storage leasing.
Transition from enhanced oil recovery operations to carbon storage operations.
(a) A lessee under AS 38.05.180 injecting under a Class II well permit shall apply for a carbon storage lease from the department before engaging in injection operations that may require a Class VI injection permit from the United States Environmental Protection Agency or a storage facility permit under AS 41.06.125.
(a) A lessee under AS 38.05.180 shall acquire a carbon storage lease before engaging in carbon storage activity that is not associated with enhanced oil or gas recovery.
(b) The issuance of a carbon storage lease under (a) of this section is vested solely in the commissioner's discretion.
(b) At the commissioner's discretion, the commissioner may issue a carbon storage lease to a lessee under AS 38.05.180 if the lessee is in compliance with regulations adopted under AS 41.06.185(b).
HB 50 -10- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A (c) A carbon storage lease issued under this section must include (1) the minimum commercial terms described in AS 38.05.710(c)(2);
(c) A carbon storage lease issued under this section must include (1) commercial terms acceptable to the department that satisfy the -13- Enrolled HB 50 requirements of AS 38.05.705(c)(3);
(2) the agreements required under AS 38.05.715(i);
(2) the agreements required under AS 38.05.710(h);
(3) if the carbon storage lessee is not the same entity as the responsible party under the existing lease, an assumption by the carbon storage lessee of any dismantlement, removal, and restoration obligations set out in the oil and gas lease;
(3) any other condition or obligation the commissioner considers necessary or that is required by regulation.
and (4) any other conditions and obligations deemed necessary by the commissioner or required by regulation.
(d) Before a carbon storage lease issued under this section may be transferred or assigned to an entity that is not the responsible party under the existing oil and gas lease under AS 38.05.180, the assuming party must provide financial assurance acceptable to the department that the obligations of the lease can be met.
(e) The department may adopt regulations that allow all or part of a lease issued under AS 38.05.180 to be transitioned to a lease under this section upon the receipt of a permit issued under AS 41.06.185.
38.05.730.
38.05.725.
(b) To prevent or assist in preventing waste, and to protect the correlative rights of persons owning interests in the tracts of lands affected, with the approval of the commissioner, lessees may validly integrate their interests to provide for the unitized management, development, and operation of the tracts of land as a unit.
(b) To prevent or assist in preventing waste, and to protect the correlative rights of persons owning interest in the tracts of land affected, with the approval of the commissioner, a group of lessees may validly integrate the lessees' interests to provide for the unitized management, development, and operation of the tracts of land as a unit.
(c) A lease operated under a plan approved or prescribed by the commissioner is excepted from determining holdings or control under AS 38.05.140.
In this subsection, "unit agreement" means an agreement by lessees with an interest in the unit, the state, and any other carbon storage lessor with an interest in the unit.
(c) A lease operated under a plan approved or prescribed by the commissioner under this section is excepted from determining holdings or control under AS 38.05.140.
38.05.735.
38.05.730.
Except as otherwise provided under art.
Except as otherwise provided in AS 38.05.705(h) or under art.
38.05.735.
Annual report to the legislature.
The commissioner shall Enrolled HB 50 -14- prepare an annual report that includes an accounting of the carbon storage closure trust fund established under AS 37.14.850 and information on carbon storage licensing applications and decisions and the issuance of carbon storage leases.
The commissioner shall submit the report to the senate secretary and the chief clerk of the house of representatives on or before February 1 of each year and notify the legislature that the report is available.
Sec.
38.05.740.
Removal and restoration after termination.
Upon termination of a license under AS 38.05.705 or a lease under AS 38.05.715 or 38.05.720, a licensee or lessee shall promptly remove all improvements and equipment, except as otherwise approved in writing by the commissioner, and shall restore the land to a condition that is approved by the commissioner.
Sec.
In AS 38.05.700 - 38.05.795, unless the context requires otherwise, (1) "carbon dioxide" means carbon dioxide of a quality that (A) will not compromise the safety of geologic storage;
In AS 38.05.700 - 38.05.795, unless the context requires otherwise, (1) "carbon storage" means the underground storage of carbon dioxide in a carbon storage reservoir;
and (B) will not compromise the properties of a storage reservoir HB0050a -11- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A that allow the reservoir to effectively enclose and contain a stored gas or stored supercritical fluid;
(2) "enhanced oil or gas recovry" has the meaning given in AS 41.06.210;
(2) "carbon storage" means the permanent or short-term underground storage of carbon dioxide in a geologic storage reservoir;
(3) "reservoir" has the meaning given in AS 41.06.210.
(3) "geologic storage" has the meaning given in AS 41.06.210;
(4) "pore space" means a geologic storage reservoir, cavity, or void in a subsurface sedimentary stratum;
(5) "reservoir" has the meaning given in AS 41.06.210;
(6) "supercritical fluid" means a substance at or above its critical temperature and critical pressure that is neither a liquid nor a gas but that has properties of both.
15.
22.
AS 38.05.965(6) is amended to read:
(6) "geothermal resources" means the natural heat of the earth at temperatures greater than 80 [120] degrees Celsius, measured at the point where the highest-temperature resources encountered enter or contact a well or other resource extraction device, and includes (A) the energy, including pressure, in whatever form present in, resulting from, created by, or that may be extracted from that natural heat;
(B) the material medium, including the geothermal fluid naturally present, as well as substances artificially introduced to serve as a heat transfer medium;
and (C) all dissolved or entrained minerals and gases that may be obtained from the material medium, but excluding hydrocarbon substances and helium;
-15- Enrolled HB 50 * Sec.
23.
(a) Rights-of-way on state land including rights-of-way over, under, along, across, or upon the right-of-way of a public road or highway or the right-of-way of a railroad or other public utility, or across, upon, over, or under a river or other body of water or land belonging to or administered by the state may be granted by noncompetitive lease by the commissioner for pipeline purposes for the transportation of oil, products, carbon dioxide, or natural gas under those conditions prescribed by law or by administrative regulation.
(a) Rights-of-way on state land, including rights-of-way over, under, along, across, or on [UPON] the right-of-way of a public road or highway or the right-of-way of a railroad or other public utility, or across, on [UPON], over, or under a river or other body of water or land belonging to or administered by the state may be granted by noncompetitive lease by the commissioner for pipeline purposes for the transportation of oil, products, carbon dioxide, or natural gas under those conditions prescribed by law or by administrative regulation.
Except to the extent authorized by an oil and gas lease, a gas only lease, carbon storage lease, or an oil and gas or gas only or carbon storage unit agreement approved by the state, no person may engage in any construction or operation of any part of an oil, products, carbon dioxide, or natural gas pipeline, which in whole or in part is or is proposed to be on state land unless that person has obtained from the commissioner a right-of-way lease of the land under this chapter.
Except to the extent authorized by an oil and gas lease, a gas only lease, or a carbon storage lease, or an oil and gas, [OR] gas only, or carbon storage unit agreement approved by the state, no person may engage in any construction or operation of any part of an oil, products, carbon dioxide, or natural gas pipeline that is or is proposed to be, [WHICH] in whole or in part, [IS OR IS PROPOSED TO BE] on state land unless that person has obtained from the commissioner a right-of-way lease of the land under this chapter.
16.
24.
(b) The commissioner may by regulation exempt the construction or operation (1) of field gathering lines or any reasonable classification of them from the requirement of a right-of-way lease under this chapter;
(b) The commissioner may by regulation exempt from the requirement of a right-of-way lease under this chapter the construction or operation of (1) field gathering lines or any reasonable classification of field gathering lines;
and (2) of a pipeline transporting carbon dioxide within a field for the purpose of an enhanced oil recovery project or field pressurization measures HB 50 -12- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A within that same field from the requirement of a right-of-way lease under this chapter.
and (2) a pipeline transporting carbon dioxide within a field for the purpose of an enhanced oil or gas recovery project under AS 41.06.185 or field pressurization measures within that same field [THEM FROM THE REQUIREMENT OF A RIGHT-OF-WAY LEASE UNDER THIS CHAPTER].
17.
25.
18.
26.
(3) "lease" means the instrument or extension of an instrument issued under this chapter granting a leasehold interest in state land for pipeline right-of-way purposes to a person and authorizing the construction or operation of, or transportation, service or sale by a pipeline for crude oil, natural gas, carbon dioxide, or products;
(3) "lease" means the instrument or extension of an instrument issued under this chapter granting a leasehold interest in state land for pipeline right-of-way Enrolled HB 50 -16- purposes to a person and authorizing the construction or operation of, or the transportation, service, or sale by, a pipeline for crude oil, natural gas, carbon dioxide, or products;
19.
27.
(7) "pipeline" or "pipeline facility" means all the facilities of a total system of pipe, whether owned or operated under a contract, agreement, or lease, used by a carrier for transportation of crude oil, natural gas, carbon dioxide, or products for delivery, for storage, or for further transportation, and including all pipe, pump or compressor stations, station equipment, tanks, valves, access roads, bridges, airfields, terminals and terminal facilities, including docks and tanker loading facilities, operations control center for both the upstream part of the pipeline and the terminal, tanker ballast treatment facilities, and fire protection system, communication system, and all other facilities used or necessary for an integral line of pipe, taken as a whole, to effectuate transportation, including an extension or enlargement of the line;
(7) "pipeline" or "pipeline facility" means all the facilities of a total system of pipe, whether owned or operated under a contract, agreement, or lease, used by a carrier for transportation of crude oil, natural gas, carbon dioxide, or products for delivery, for storage, or for further transportation, and including all pipe, pump or compressor stations, station equipment, tanks, valves, access roads, bridges, airfields, terminals and terminal facilities, including docks and tanker loading facilities, operations control center for both the upstream part of the pipeline and the terminal, tanker ballast treatment facilities, and fire protection system, communication system, and all other facilities used or necessary for an integral line of pipe, taken as a whole, to carry out [EFFECTUATE] transportation, including an extension or enlargement of the line;
20.
28.
(10) "transportation" means the shipment or carriage by a pipeline of crude oil, natural gas, carbon dioxide, or products from an upstream terminus in one or more fields or points of production or supply of the minerals to a downstream terminus in one or more points for delivery of the minerals to a purchaser or consignee, for storage, or for further carriage or shipment, including shipment or carriage within the state that may be classified as interstate or foreign transportation to HB0050a -13- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A the extent that the transportation may constitutionally be subjected to the provisions of this chapter, as well as all services necessary to effectuate shipment or carriage, including, among other things, the receipt, storage, processing, handling, transfer in transit, forwarding, and delivery of the minerals.
(10) "transportation" means the shipment or carriage by a pipeline of crude oil, natural gas, carbon dioxide, or products from an upstream terminus in one or more fields or points of production or supply of the minerals to a downstream terminus in one or more points for delivery of the minerals to a purchaser or consignee, for storage, or for further carriage or shipment, including shipment or carriage within the state that may be classified as interstate or foreign transportation to the extent that the transportation may constitutionally be subjected to the provisions of this chapter, as well as all services necessary to carry out [EFFECTUATE] shipment or carriage, including [, AMONG OTHER THINGS,] the receipt, storage, processing, handling, transfer in transit, forwarding, and delivery of the minerals.
21.
29.
(11) "carbon dioxide" has the meaning given in AS 38.05.795.
(11) "carbon dioxide" has the meaning given in AS 41.06.210.
22.
30.
(a) The commission has jurisdiction under AS 41.06.005 - 41.06.060 [THIS CHAPTER] over geothermal wells to prevent waste, to protect correlative rights, and to ensure public safety.
(a) The commission has jurisdiction under AS 41.06.005 - 41.06.060 [THIS CHAPTER] over geothermal -17- Enrolled HB 50 wells to prevent waste, to protect correlative rights, and to ensure public safety.
23.
31.
(c) The provisions of AS 41.06.005 - 41.06.060 apply [THIS CHAPTER APPLIES] (1) to wells drilled in search of, in support of, or for the recovery or HB 50 -14- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A production of geothermal resources;
(c) The provisions of AS 41.06.005 - 41.06.060 apply [THIS CHAPTER APPLIES] (1) to wells drilled in search of, in support of, or for the recovery or production of geothermal resources;
(d) To the extent the provisions of AS 31.05 do not conflict with the provisions of AS 41.06.005 - 41.06.060 [THIS CHAPTER], the provisions of AS 31.05 are applicable to wells drilled in search of, in support of, or for the recovery or production of geothermal resources.
Enrolled HB 50 -18- (d) To the extent the provisions of AS 31.05 do not conflict with the provisions of AS 41.06.005 - 41.06.060 [THIS CHAPTER], the provisions of AS 31.05 are applicable to wells drilled in search of, in support of, or for the recovery or production of geothermal resources.
24.
32.
(e) The commissioner may adopt regulations under AS 44.62 to carry out the purposes and intent of AS 41.06.005 - 41.06.060 [THIS CHAPTER] for duties assigned to the department, including the promotion of maximum economic recovery.
(e) The commissioner may adopt regulations under AS 44.62 (Administrative Procedure Act) to carry out the purposes and intent of AS 41.06.005 - 41.06.060 [THIS CHAPTER] for duties assigned to the department, including the promotion of maximum economic recovery.
25.
33.
(b) The commission may adopt regulations under AS 44.62 and issue orders appropriate to carry out the purposes and intent of AS 41.06.005 - 41.06.060 [THIS CHAPTER] for duties assigned to the commission, including orders regarding the establishment of drilling units for pools as set out in AS 31.05.100 and orders regarding unitized operation and integration of interests as set out in AS 31.05.110.
(b) The commission may adopt regulations under AS 44.62 (Administrative Procedure Act) and issue orders appropriate to carry out the purposes and intent of AS 41.06.005 - 41.06.060 [THIS CHAPTER] for duties assigned to the commission, including orders regarding the establishment of drilling units for pools as set out in AS 31.05.100 and orders regarding unitized operation and integration of interests as set out in AS 31.05.110.
26.
34.
(a) The commission shall adopt regulations under AS 44.62 (Administrative Procedure Act), issue orders, and take other appropriate action to carry out the HB0050a -15- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A purposes and intent of AS 41.06.005 - 41.06.060 [THIS CHAPTER], including adopting regulations to prevent (1) geothermal resources, water or other fluids, and gases from escaping into strata other than that in which they are found, unless in accordance with an approved reinjection program;
(a) The commission shall adopt regulations under AS 44.62 (Administrative Procedure Act), issue orders, and take other appropriate action to carry out the purposes and intent of AS 41.06.005 - 41.06.060 [THIS CHAPTER], including adopting regulations to prevent (1) geothermal resources, water or other fluids, and gases from escaping into strata other than that in which they are found, unless in accordance with an approved reinjection program;
(3) premature degradation of a geothermal system by water encroachment or otherwise;
(3) premature degradation of a geothermal system by water -19- Enrolled HB 50 encroachment or otherwise;
27.
35.
28.
36.
29.
37.
The Department of Administration shall identify the amount of HB 50 -16- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A appropriations made for the operating costs of the commission under AS 41.06.005 - 41.06.060 [THIS CHAPTER] that lapse into the general fund each year.
The Department of Administration shall identify the amount of appropriations made for the operating costs of the commission under AS 41.06.005 - 41.06.060 [THIS CHAPTER] that lapse into the general fund each year.
If the legislature makes an appropriation to the commission under this subsection that is equal to or greater than the lapsed amount, the commission shall reduce the total regulatory cost charge collected for that fiscal year by a comparable amount.
If the legislature makes an appropriation to the commission under this subsection that is equal to or greater than the lapsed amount, the commission shall reduce the total regulatory cost charge collected for that fiscal Enrolled HB 50 -20- year by a comparable amount.
30.
38.
(5) "geothermal resources" (A) means the natural heat of the earth at temperatures greater than 120 degrees Celsius, or any use of that heat for commercial purposes, measured at the point where the highest-temperature resources encountered enter or contact a well or otherresource extraction device or any commercial use of the natural heat of the earth;
(5) "geothermal resources" (A) means the natural heat of the earth at temperatures greater than 120 degrees Celsius, or any use of that heat for commercial purposes, measured at the point at which [WHERE] the highest-temperature resources encountered enter or contact a well or other resource extraction device or any commercial use of the natural heat of the earth;
(B) includes HB0050a -17- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A (i) the energy, including pressure, in whatever form present in, resulting from, created by, or that may be extracted from that natural heat;
(B) includes (i) the energy, including pressure, in whatever form present in, resulting from, created by, or that may be extracted from that natural heat;
and (iii) all dissolved or entrained minerals and gases that may be obtained from the material medium, but excluding hydrocarbon substances and helium;
and -21- Enrolled HB 50 (iii) all dissolved or entrained minerals and gases that may be obtained from the material medium, but excluding hydrocarbon substances and helium;
(6) "geothermal system" means a stratum, pool, reservoir, or toher geologic formation containing geothermal resources;
(6) "geothermal system" means a stratum, pool, reservoir, or to her geologic formation containing geothermal resources;
31.
39.
Carbon Dioxide Injection and Storage.
Carbon Storage;
Injection.
Policy on carbon dioxide storage.
For the purposes of protecting health, safety, and property in the state, it is in the public interest that to the HB 50 -18- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A extent economically and technologically feasible, carbon dioxide be injected into and stored in oil and gas reservoirs and other geologic formations in a manner protective of waters and reservoir integrity.
The state recognizes that geologic storage of carbon dioxide may require the cooperation of mineral interest holders and that, when cooperation is not achieved, regulatory procedures that promote cooperative management for protection and maximization of resources are necessary.
Sec.
41.06.110.
41.06.115.
41.06.110.
(a) The authority of the commission applies to all land in the state lawfully subject to the police power of the state, including private land, municipal land, state land, federal land, and land subject to the jurisdiction of the United States, and to all land included in a voluntary cooperative or unit plan of development or operation entered into in accordance with AS 38.05.730.
(a) The authority of the commission applies to all land (1) in the state lawfully subject to the police power of the state, including private land, municipal land, state land, federal land, and land subject to the jurisdiction of the United States;
and (2) included in a voluntary cooperative or unit plan of development or Enrolled HB 50 -22- operation entered into in accordance with AS 38.05.725.
(c) The commission has the authority to (1) regulate activities related to a storage facility, including construction, operation, and closure;
(c) The commission has the authority to (1) regulate activities related to a storage facility, including the construction, operation, and closure of the facility;
(3) enter, at a reasonable time and manner, a storage facility to (A) inspect equipment and facilities;
(3) enter, at a reasonable time and in a reasonable manner, a storage facility to (A) inspect equipment and facilities;
(4) exercise continuing jurisdiction over storage operators and storage HB0050a -19- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A facilities, including the authority, after notice and hearing, to amend provisions in a permit and to revoke a permit;
(4) exercise continuing jurisdiction over storage operators and storage facilities, including the authority, after notice and hearing, to amend provisions in a permit and to revoke a permit;
(5) dissolve or change the boundaries of any commission-established oil or gas field or unit that is within or near a storage reservoir's boundaries;
and (5) dissolve or change the boundaries of an oil or gas field or unit established by the commission that is within or near the boundaries of a storage reservoir.
and (6) grant, for good cause, exceptions to the requirements and implementing rules of AS 41.06.105 - 41.06.210.
(d) To the extent AS 31.05 does not conflict with AS 41.06.105 - 41.06.210, the provisions of AS 31.05 are applicable to wells drilled in search of, in support of, and for carbon storage.
(d) To the extent AS 31.05 does not conflict with AS 41.06.105 - 41.06.210, the provisions of AS 31.05 are applicable to wells drilled in search of, in support of, and for carbon dioxide storage.
(e) Nothing in AS 41.06.105 - 41.06.210 limits the authority of the Department of Natural Resources under AS 38.05.700 - 38.05.795 or AS 41.06.305.
(e) Nothing in AS 41.06.105 - 41.06.210 limits the authority of the Department of Natural Resources under AS 38.05.700 - 38.05.795.
41.06.120.
41.06.115.
Waste in a storage facility or reservoir in the state is prohibited.
Waste in a storage facility or storage reservoir in the state is prohibited.
The commission may investigate to determine whether waste exists or is imminent, or whether other facts exist that justify or require action by the commission to prohibit waste.
The commission may investigate to determine whether waste exists or is imminent, or whether other facts exist that justify -23- Enrolled HB 50 or require action by the commission to prohibit waste.
41.06.125.
41.06.120.
(a) A prospective storage operator is required to obtain a permit from the commission.
(a) A storage operator is required to obtain a permit from the commission to operate a storage facility.
(c) A person applying for a permit shall (1) request a pre-application meeting with the commission staff;
(c) A person applying for a permit shall (1) request a preapplication meeting with the commission staff;
and (4) pay the commission the cost the commission incurs in reviewing an application, publishing notices for hearings, and holding hearings on permit applications.
and (4) pay the commission the cost the commission incurs in reviewing the person's application, publishing notices for hearings, and holding hearings on the person's permit application.
(e) The amount of the fee in (c)(3) of this section must be based on the HB 50 -20- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A commission's anticipated cost of processing applications, including any preliminary work in advance of receipt of an application.
(e) The commission shall set the amount of the fee in (c)(3) of this section based on the anticipated cost to the commission associated with processing applications, including preliminary work in advance of receiving an application.
The commission may enter into an agreement with a prospective applicant that requires the applicant to reimburse the commission for reasonable costs of work incurred in preparing for activities before receipt of an application.
The commission may enter into an agreement with a prospective applicant that requires the applicant to reimburse the commission for reasonable costs of work incurred in preparing for activities before the commission receives an application.
(f) A fee the commission receives under this section must be deposited into the carbon dioxide storage facility administrative fund established in AS 41.06.165.
(f) The commission shall deposit fees collected under this section in the carbon dioxide storage facility administrative fund established in AS 41.06.160.
41.06.130.
41.06.125.
The notice must be provided in the same manner as a notice under AS 31.05.050(b) and be provided to (1) each mineral lessee, mineral owner, and mineral right owner of record within the storage reservoir and within one-half mile of the storage reservoir's boundaries;
The commission shall provide notice in the same manner as a notice under AS 31.05.050(b) and shall provide notice to (1) each mineral lessee, mineral owner, and mineral right owner of record within the storage reservoir and within one-half mile of the boundaries of the Enrolled HB 50 -24- storage reservoir;
(2) each surface owner of land overlying the storage reservoir and within one-half mile of the reservoir's boundaries;
(2) each surface owner of land overlying the storage reservoir and within one-half mile of the boundaries of the storage reservoir;
and (3) any additional persons that the commission requires.
and (3) any additional persons that the commission considers necessary.
41.06.135.
41.06.130.
(a) The commission shall consult with the Department of Environmental Conservation and the Department of Natural Resources before issuing a permit under AS 41.06.125.
(a) The commission shall consult with the Department of Environmental Conservation and the Department of Natural Resources before issuing a permit under AS 41.06.120.
(b) Before the commission may approve a permit applied for under AS 41.06.125, the commission shall find (1) that the storage operator has complied with all requirements set by the commission;
(b) Before the commission may approve a permit application submitted under AS 41.06.120, the commission must find (1) that the storage operator has complied with all requirements set by the commission;
(2) that the proposed storage facility is suitable and feasible for carbon dioxide injection and storage;
(2) that the proposed storage facility is suitable and feasible for carbon storage;
HB0050a -21- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A (4) that the storage operator has made a good-faith effort to get the consent of all persons with an ownership interest in the reservoir and surface owners of land overlying the proposed storage reservoir;
(4) that the storage operator has made a good faith effort to get the consent of all persons with an ownership interest in the proposed storage reservoir and surface owners of land overlying the proposed storage reservoir;
(6) that the proposed storage facility will not adversely affect surface waters or formations containing fresh water;
(6) that the proposed storage facility will not adversely affect surface water or formations containing fresh water;
(9) that the proposed storage facility will not endanger human health or unduly endanger the environment;
(9) that the proposed storage facility will not endanger human health or -25- Enrolled HB 50 unduly endanger the environment;
(12) that the storage operator will establish monitoring facilities and protocols to assess the location and migration of carbon dioxide injected for storage and to ensure compliance with all permit, statutory, and administrative requirements;
(12) that the storage operator will establish monitoring facilities and protocols to assess the location and migration of carbon dioxide injected for carbon storage and to ensure compliance with all permit, statutory, and administrative requirements;
(13) that all nonconsenting land owners or holders of mineral rights are or will be equitably compensated;
(13) that all nonconsenting landowners or holders of mineral rights are, or will be, equitably compensated;
41.06.140.
41.06.135.
The commission may include in a permit or order any parameters necessary to carry out the objectives of AS 41.06.105 - 41.06.210 and to protect and adjust the respective rights and obligations of persons affected by geologic storage.
The commission may include in a permit or order any parameters necessary to carry out the objectives of AS 41.06.105 - 41.06.210, prevent waste, protect correlative rights, and ensure the health and safety of persons affected by the permit.
41.06.145.
41.06.140.
If a storage operator does HB 50 -22- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A not obtain the consent of all persons with an ownership interest in the storage reservoir, the commission may order that the mineral rights of nonconsenting owners be included in a storage facility and subject to geologic storage.
If a storage operator does not obtain the consent of all persons with an ownership interest in the storage reservoir, the commission may order that the pore space rights of nonconsenting owners be included in a storage facility and subject to carbon storage.
Before the commission may issue an order effectuating an amalgamation under this section, the commission must provide public notice and hold a hearing.
Before the commission may issue an order forming an amalgamation under this section, the commission shall provide public notice and hold a hearing.
41.06.150.
41.06.145.
When the commission issues a permit under AS 41.06.125, the commission shall also issue a certificate that states the permit has been issued, describes the area covered, and contains information the commission deems appropriate.
When the commission issues a permit under AS 41.06.120, the commission shall also issue a certificate that states that the permit has been issued, describes the area covered, and contains other information the commission considers appropriate.
The storage operator may file a copy of the certificate with the office of the recorder in the district the facility is located.
The storage operator may file a copy of the certificate with the office of the recorder in the district in which the storage facility is located.
41.06.155.
41.06.150.
reservoir integrity.
storage reservoir integrity.
(a) The commission shall take action to ensure that (1) substances that compromise the integrity of a storage reservoir do not enter a storage reservoir;
(a) The commission shall take action to ensure that Enrolled HB 50 -26- (1) substances that compromise the integrity of a storage reservoir do not enter a storage reservoir;
(b) For the purposes of this section and in the application of other laws, carbon dioxide that is stored and remains in storage under a permit is not a pollutant and does not constitute a nuisance.
(b) For the purposes of this section, and in the application of other laws, carbon dioxide that is stored and remains in carbon storage under a permit is not considered a pollutant and does not constitute a nuisance.
41.06.160.
41.06.155.
Nothing in AS 41.06.105 - 41.06.210 (1) prejudices the rights of those with property interests within a storage facility to exercise rights that have not been committed to a storage facility;
Nothing in AS 41.06.105 - 41.06.210 (1) prejudices the rights of a person with a property interestin a storage facility to exercise rights that have not been committed to the storage facility;
or (2) prevents a mineral owner or mineral lessee from drilling through or near a storage reservoir to explore for and develop mineralsrovided the drilling, production, and related activities comply with commission requirements that preserve the storage facility's integrity and protect the objectives of AS 41.06.105 - 41.06.210.
or (2) prevents a mineral owner or mineral lessee from drilling through or near a storage reservoir to explore for and develop minerals if the drilling, production, and related activities comply with requirements set by the commission to preserve the integrity of the storage facility and protect the objectives of AS 41.06.105 - 41.06.210.
41.06.165.
41.06.160.
(a) A storage operator shall pay the commission a fee on each ton of carbon dioxide injected for geologic storage.
(a) A storage operator shall pay to the commission a fee on each metric ton of carbon dioxide injected for carbon storage.
The fee must be in the amount set by the commission.
The commission shall set the amount of the fee based on the anticipated expenses the commission will incur in regulating storage facilities during each phase, including the construction, operational, and pre- completion phases.
The amount must be based on the anticipated expenses that the commission will incur HB0050a -23- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A in regulating storage facilities during their construction, operational, and pre-closure phases.
The commission shall deposit a fee collected under this subsection in the carbon dioxide storage facility administrative fund established in (b) of this section.
The fee shall be deposited in the carbon dioxide storage facility administrative fund established in (b) of this section.
(2) fees received under AS 41.06.125 and 41.06.200;
(2) fees received under AS 41.06.120 and 41.06.195;
and (3) interest earned on the fund.
and (3) interest earned on money in the fund.
(c) Expenditure from the fund is subject to appropriation.
(c) Money in the carbon dioxide storage facility administrative fund shall be separately accounted for under AS 37.05.142.
The appropriation may be made by general appropriation of program receipts conditioned on compliance with the program review provisions of AS 37.07.080(h).
The legislature may appropriate the -27- Enrolled HB 50 money in the fund to the commission to carry out the purposes of AS 41.06.105 - 41.06.210.
The commission, however, through a cooperative agreement with another state agency, may use the fund to compensate the cooperating agency for expenses the cooperating agency incurs in carrying out regulatory responsibilities that the agency may have over a storage facility.
41.06.170.
41.06.165.
The storage operator has title to the carbon dioxide injected into and stored in a storage reservoir and holds title until the commission issues a certificate of completion under AS 41.06.175.
The storage operator has title to the carbon dioxide injected into and stored in a storage reservoir and holds title until the commission issues a certificate of completion under AS 41.06.170.
When a certificate of completion is issued under AS 41.06.170, title to carbon dioxide injected into and stored in a storage reservoir is transferred to the owner of the pore space, unless the storage operator and the owner of the pore space have a contrary agreement.
41.06.175.
41.06.170.
Certificate of completion, release, and transfer of title and custody.
Certificate of completion.
(a) After carbon dioxide injections into a reservoir end and upon application by the storage operator, the commission shall consider issuing a certificate of completion.
(a) Once a storage operator discontinues carbon dioxide injections into a storage reservoir, and upon application by the storage operator, the commission may issue a certificate of completion (1) only after public notice and hearing;
The certificate may only be issued after public notice and hearing.
the commission shall establish notice requirements for a hearing under this paragraph;
The commission shall establish notice requirements for the hearing.
(2) only after the commission consults with the Department of Environmental Conservation, the Department of Natural Resources, and all persons with an ownership interest in the storage reservoir;
The certificate may only be issued after the commission has consulted with the Department of Environmental Conservation, the Department of Natural Resources, and all persons with an ownership interest in the storage reservoir.
and (3) after a period of at least 50 years, or another period approved by the commission for the storage reservoir based on requirements established in regulation, has elapsed since the last carbon dioxide injection into the storage reservoir.
The certificate may not be issued until at least 10 years after carbon dioxide injections end.
(b) The commission may issue a certificate of completion only if the storage operator (1) has fully complied with all laws governing the storage facility;
(b) A certificate of completion may only be issued if the storage operator HB 50 -24- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A (1) is in full compliance with all laws governing the storage facility;
(2) shows that the operator has addressed all pending claims regarding the operation of the storage facility;
(2) shows that the operator has addressed all pending claims regarding the storage facility's operation;
(3) shows that the underground place or pore space in which the injected carbon dioxide is stored is not expected to pose a threat to human health, human safety, the environment, or underground sources of drinking water;
(3) shows that the underground place or pore space where the carbon dioxide was injected or stored is expected to no longer expand vertically or horizontally and is expected to pose no threat to human health, human safety, the environment, or underground sources of drinking water;
Enrolled HB 50 -28- (4) shows that the stored or injected carbon dioxide is unlikely to cross an underground or pore space boundary and is not expected to endanger an underground source of drinking water or otherwise endanger human health, human safety, or the environment;
(4) shows that the stored or injected carbon dioxide is unlikely to cross any underground or pore space boundary and is not expected to endanger any underground source of drinking water or otherwise endanger human health, human safety, or the environment;
(5) shows that all wells, equipment, and facilities allowed to remain in place following post-injection site care and site closure are in good condition and retain mechanical integrity;
(5) shows that all wells, equipment, and facilities to be used in the post-closure period are in good condition and retain mechanical integrity;
(6) shows that the operator has plugged wells, removed equipment and facilities, and completed reclamation work as required by the commission and the Department of Natural Resources;
(6) shows that the operator has plugged wells, removed equipment and facilities, and completed reclamation work as required by the commission;
(7) has paid all fees and surcharges owed for the storage facility;
(7) has paid all fees and surcharges for the facility;
(c) Once a certificate of completion is issued, title to the storage facility and to the stored carbon dioxide transfers, without payment of any compensation, to the state under management of the Department of Natural Resources.
(c) Once a certificate of completion is issued, the department assumes primary responsibility for long-term monitoring and maintenance of the storage facility, as provided in AS 41.06.305.
Title acquired by the state includes all rights and interests in, and all responsibilities associated with, the stored carbon dioxide.
The storage operator and all persons who generated injected carbon dioxide are released from liability to the state associated with the storage facility in an amount equal to the amount attributed to the storage facility in the carbon storage closure trust fund established in AS 37.14.850.
The storage operator and all persons who generated any injected carbon dioxide are released from liability to the state associated with the storage facility, provided that the liability to the state shall not result in the payment of any damages in excess of the balance of the carbon storage closure trust fund established in AS 37.14.850.
The state, the department, or the commission is not liable for damages arising out of, or in any manner connected with, long-term monitoring and maintenance of a storage facility if the amount for the storage facility separately accounted for in the carbon storage closure trust fund established in AS 37.14.850 is unavailable or insufficient.
Any bonds posted by the storage operator must be released.
A bond posted by the storage operator under AS 41.06.110(c)(2) must be released.
In this subsection, "long-term monitoring and maintenance" has the meaning given in AS 41.06.305(e).
41.06.180.
41.06.175.
A storage operators shall pay the commission a surcharge on each ton of carbon dioxide injected for storage.
(a) A storage operator injecting carbon dioxide at a storage facility shall pay to the commission a surcharge each year for the first 12 years that carbon dioxide is injected at the storage facility.
The surcharge must be in the amount set by the commission.
The commission shall deposit the surcharge into the general fund.
The amount must be based on anticipated expenses that the state will incur in regulating storage facilities during post-closure phases.
The legislature may appropriate a surcharge collected under this subsection into the carbon storage closure trust fund established in AS 37.14.850.
The surcharge shall be deposited in the carbon HB0050a -25- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A storage closure trust fund established in AS 37.14.850.
-29- Enrolled HB 50 (b) The annual surcharge in this section is determined by the following formula:
S = (7,500,000 x (I/261.78)) / 12, where (1) S is the dollar amount of the annual surcharge for a storage facility;
(2) I is equal to the Consumer Price Index for urban consumers for urban Alaska, as determined by the United States Department of Labor, Bureau of Labor Statistics, without seasonal adjustment, for December of the calendar year immediately preceding the year of issuance of the storage facility permit.
41.06.185.
41.06.180.
(a) In addition to the penalties in (b) - (d) of this section, a person who violates a provision of AS 41.06.105 - 41.06.210 or a commission regulation, order, or term of a permit issued under AS 41.06.105 - 41.06.210, is liable for a civil penalty of not more than $100,000 for the initial violation and not more than $10,000 for each day after that on which the violation continues.
(a) In addition to the penalties in (b) - (d) of this section, a person who violates a provision of AS 41.06.105 - 41.06.210, a regulation adopted under AS 41.06.105 - 41.06.210, or an order or term of a permit issued by the commission under AS 41.06.105 - 41.06.210 is liable for a civil penalty of not more than $100,000 for the initial violation and not more than $10,000 for each day thereafter on which the violation continues.
(b) A person who knowingly commits an act specified in AS 11.46.630(a) for the purpose of evading a provision of this chapter, a regulation adopted under this chapter, or an order, stipulation, or term of a permit issued by the commission is guilty of a class A misdemeanor.
(b) A person who knowingly commits an act specified in AS 11.46.630(a) for the purpose of evading a provision of AS 41.06.105 - 41.06.210, a regulation adopted under AS 41.06.105 - 41.06.210, or an order, stipulation, or term of a permit issued by the commission is guilty of a class A misdemeanor.
(c) A person who knowingly aids or abets another person in the violation of a provision of this chapter, a regulation adopted under this chapter, or an order, stipulation, or term of a permit issued by the commission is subject to the same penalty as that prescribed in this chapter for the violation by the other person.
(c) A person who knowingly violates a provision of AS 41.06.105 - 41.06.210, a regulation adopted under AS 41.06.105 - 41.06.210, or an order, stipulation, or term of a permit issued by the commission is guilty of a class A misdemeanor punishable by a fine of not more than $10,000 a day for each day of violation.
(d) A person who knowingly violates a provision of this chapter, a regulation adopted under this chapter, or an order, stipulation, or term of a permit issued by the commission is guilty of a misdemeanor punishable by a fine of not more than $10,000 a day for each day of violation.
(d) A person who knowingly aids or abets another person in the violation of a provision of AS 41.06.105 - 41.06.210, a regulation adopted under AS 41.06.105 - 41.06.210, or an order, stipulation, or term of a permit issued by the commission is subject to the same penalty as that prescribed in this section for the violation by the other person.
(f) In determining the amount of a penalty assessed under (a) of this section, the commission shall consider (1) the extent to which the person committing the violation was acting in good faith in attempting to comply;
Enrolled HB 50 -30- (f) In determining the amount of a penalty assessed under (a) of this section, the commission shall consider (1) the extent to which the person committing the violation was acting in good faith in attempting to comply;
(3) the extent and seriousness of the violation and the actual or HB 50 -26- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A potential threat to public health or the environment;
(3) the extent and seriousness of the violation and the actual or potential threat to public health or the environment;
(4) the economic or environmental harm, or injury to the public, caused by the violation;
(4) the economic or environmental harm or injury to the public caused by the violation;
(5) the economic value or other benefits derived by the person committing the violation from the violation;
(5) the economic value or other benefits derived by the person committing the violation from the commission of the violation;
41.06.190.
41.06.185.
Enhanced oil recovery.
Enhanced oil or gas recovery.
If adopted, the regulations must require that in considering whether to approve a conversion, and upon conversion, AS 41.06.105 - 41.06.210 and its implementing rules apply.
The regulations must require that, in considering whether to approve a conversion, and upon conversion, the provisions of AS 41.06.105 - 41.06.210 apply.
The regulations may impose additional requirements to, or waive the requirements of, AS 41.06.105 - 41.06.210 for good cause and to ensure that the objectives of AS 41.06.105 - 41.06.210 are met.
The regulations may impose additional requirements to AS 41.06.105 - 41.06.210, or describe specific situations in which the requirements of AS 41.06.105 - 41.06.210 are waived, to ensure that the objectives of AS 41.06.105 - 41.06.210 are met.
41.06.195.
41.06.190.
(a) The commission may enter into agreements with other governments, government entities, and state agencies for the purpose of carrying out the objectives of AS 41.06.105 - 41.06.210.
(a) The commission -31- Enrolled HB 50 may enter into agreements with other governments, government entities, and state agencies for the purpose of carrying out the objectives of AS 41.06.105 - 41.06.210.
41.06.200.
41.06.195.
Determining storage amounts;
Determining capacity of storage reservoir;
(a) The HB0050a -27- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A commission, under procedures and criteria the commission may adopt, may determine the amount of carbon dioxide that may be injected and stored in a reservoir, including for enhanced oil or gas recovery.
(a) The commission may adopt a written policy establishing procedures and criteria that the commission will use to determine the carbon storage capacity of a storage reservoir, including for the purpose of enhanced oil or gas recovery.
(b) The purpose of determining storage amounts is to facilitate using the stored carbon dioxide for matters including carbon credits, allowances, trading, emissions allocations, and offsets.
(b) The purpose of determining the carbon storage capacity of a storage reservoir is to facilitate calculating the amount of stored carbon dioxide for matters including carbon credits, allowances, trading, emissions allocations, and offsets.
The commission may charge a reasonable fee to a person requesting a storage determination.
The commission may charge a reasonable fee to a person requesting a capacity determination.
A fee the commission receives for a storage determination must be deposited into the carbon dioxide storage facility administrative fund established in AS 41.06.165.
The commission shall deposit fees received under this subsection in the carbon dioxide storage facility administrative fund established in AS 41.06.160.
(c) In this section, "carbon storage capacity of a storage reservoir" means the maximum injected volume in a storage reservoir at which the pressure in the reservoir does not pose a risk to the integrity of the reservoir or its ability to maintain carbon storage.
In AS 41.06.105 - 41.06.210, unless the context requires otherwise, (1) "carbon dioxide" means carbon dioxide of a quality that (A) will not compromise the safety of geologic storage;
In AS 41.06.105 - 41.06.210, unless the context requires otherwise, (1) "carbon dioxide" means carbon dioxide of a quality that will not compromise (A) the safety of carbon storage;
and (B) will not compromise the properties of a storage reservoir that allow the reservoir to effectively enclose and contain a stored gas or stored supercritical fluid;
and (B) the properties of a storage reservoir that allow the reservoir to effectively enclose and contain a stored gas or stored supercritical fluid;
(2) "commission" means the Alaska Oil and Gas Conservation Commission created under AS 31.05.005;
(2) "carbon storage" means the underground storage of carbon dioxide in a storage reservoir;
(3) "geologic storage" means the permanent or short-term underground storage of carbon dioxide in a storage reservoir;
(3) "commission" means the Alaska Oil and Gas Conservation Enrolled HB 50 -32- Commission created under AS 31.05.005;
(4) "permit" means a permit issued by the commission allowing a person to operate a storage facility;
(4) "enhanced oil or gas recovery" means the increased recovery of hydrocarbons, including oil and gas, from a common source of supply achieved by artificial means or by the application of energy extrinsic to the common source of supply, including pressuring, cycling, pressure maintenance or injection of a substance or form of energy, including injection of water, gas, carbon dioxide, or both gas and carbon dioxide, including immiscible and miscible floods, as long as the enhanced oil or gas recovery does not include injection of a substance or form of energy for the sole purpose of (A) aiding in the lifting of fluids in the well;
(5) "pore space" means a cavity or void in a subsurface sedimetary stratum;
or (B) stimulation of the reservoir at or near the well by mechanical, chemical, thermal, or explosive means;
(6) "reservoir" means a subsurface sedimentary stratum, formation, aquifer, cavity, or void, including pore space, oil and gas reservoirs, saline formations, and coal seams suitable for or capable of being made suitable for injecting and storing carbon dioxide;
(5) "permit" means a storage facility permit issued under AS 41.06.120;
(7) "storage facility" means the storage reservoir, underground equipment, well, and surface facilities and equipment used or proposed to be used in HB 50 -28- HB0050a New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A accordance with a permit;
(6) "pore space" means a cavity or void in a subsurface sedimnetary stratum;
(7) "reservoir" means a subsurface sedimentary stratum, formation, aquifer, cavity, or void, including pore space, oil and gas reservoirs, saline formations, and coal seams that are suitable, or capable of being made suitable, for injection and carbon storage;
(8) "storage facility" means the storage reservoir, underground equipment, well, and surface facilities and equipment used in accordance with a permit;
(8) "storage operator" means a person holding or applying for a permit;
(9) "storage operator" means a person holding or applying for a permit;
(9) "storage reservoir" means a reservoir proposed, authorized, or used for storing carbon dioxide;
(10) "storage reservoir" means a reservoir proposed, authorized, or used for carbon storage;
(10) "supercritical fluid" means a substance at or above its critical temperature and critical pressure that is neither a liquid nor a gas but that has properties of both;
(11) "supercritical fluid" means a substance at or above its critical temperature and critical pressure that is neither a liquid nor a gas but that has properties of both;
(11) "waste" means, in addition to its ordinary meaning, physical waste, and includes inefficient, excessive, or improper operation of a storage facility or well;
-33- Enrolled HB 50 (12) "waste" means, in addition to its ordinary meaning, physical waste, and includes inefficient, excessive, or improper operation of a storage facility or well;
(12) "well" means a well that is drilled, converted, or reactivated for discovery, testing, or subsurface injection into a reservoir.
(13) "well" means a well that is drilled, converted, or reactivated for discovery, testing, or subsurface injection into a reservoir.
Article 3.
Long-Term Monitoring and Maintenance of Carbon Storage Facilities.
Sec.
41.06.305.
Long-term monitoring and maintenance.
(a) The department shall conduct long-term monitoring and maintenance of a storage facility that has been issued a certificate of completion under AS 41.06.170.
(b) Under this section, the authority of the department applies to all land in the state lawfully subject to the police power of the state, including private land, municipal land, state land, land of the United States, and land subject to the jurisdiction of the United States.
The department may enter, at a reasonable time and in a reasonable manner, the site of a storage facility that has been issued a certificate of completion under AS 41.06.170.
(c) The state, the department, and the commission have no obligation to pay costs associated with long-term monitoring and maintenance of a storage facility in an amount greater than the amount attributable to that storage facility and separately accounted for under AS 37.14.850.
(d) The department may adopt regulations under AS 44.62 (Administrative Procedure Act) to carry out the purposes of this section.
(e) In this section, (1) "commission" means the Alaska Oil and Gas Conservation Commission created under AS 31.05.005;
(2) "long-term monitoring and maintenance" means an activity associated with monitoring and maintenance of a storage facility that has been issued a certificate of completion under AS 41.06.170 and may include (A) operational and long-term inspecting, testing, and monitoring of the storage facility site, wells, and remaining facilities;
(B) remediation measures arising from the storage facility site, including remediation of property and mechanical problems associated with Enrolled HB 50 -34- wells and remaining facilities;
(C) repairing mechanical leaks at the storage facility site;
(D) plugging and abandoning wells;
(E) converting wells for use as observation wells;
(F) purchasing or paying insurance costs for a storage facility, whether commercially or through government funding;
(3) "storage facility" has the meaning given in AS 41.06.210.
32.
40.
(a) The land and water areas described in AS 41.21.161 are not open to mineral entry under AS 38.05.135 - 38.05.275 and 38.05.700 - 38.05.795.
(a) The land and water areas described in AS 41.21.161 are not open to mineral entry under AS 38.05.135 - 38.05.275 or 38.05.700 - 38.05.795.
33.
41.
34.
42.
35.
43.
The state land and water described in AS 41.21.611(b) is closed to mineral entry under AS 38.05.135 - 38.05.275 and HB0050a -29- HB 50 New Text Underlined [DELETED TEXT BRACKETED] 33-GH1567\A 38.05.700 - 38.05.795, to commercial harvest of timber, and to sale under state land disposal laws.
The state land and water described in AS 41.21.611(b) is closed to mineral entry under AS 38.05.135 - 38.05.275 and 38.05.700 - 38.05.795, to commercial harvest of timber, and to sale under state land disposal laws.
36.
44.
AS 42.05.141 is amended by adding new subsections to read:
(g) The commission shall, as required under AS 44.88.850(b), determine -35- Enrolled HB 50 whether the sale price in a gas sales agreement for gas produced through a project partially or fully funded by a loan under AS 44.88.850 constitutes a just and reasonable immediate delivery price for gas.
(h) Except as provided in AS 42.05.711(q) and (s), the commission shall regulate under this chapter the service of natural gas storage and the service of liquefied natural gas storage, including storage furnished by operating a natural gas storage facility that is part of a (1) pipeline facility operated by a pipeline carrier;
or (2) natural gas pipeline facility operated by a natural gas pipeline carrier.
(i) In (h) of this section, "natural gas pipeline carrier," "natural gas pipeline facility," "pipeline carrier," and "pipeline facility" have the meanings given in AS 42.06.630.
* Sec.
45.
AS 42.05.381(k) is amended to read:
(k) The cost to the utility of storing gas in a gas storage facility or storing liquefied natural gas in a liquefied natural gas storage facility that is allowed in determining a just and reasonable rate shall reflect the (1) reduction in cost attributable to any exemption from a payment due under AS 38.05.096 or 38.05.180(u), as applicable, and the value of a tax credit that the owner of the gas storage facility received under AS 43.20.046 or 43.20.047, as applicable;
the [.
THE] commission may request the (A) [(1)] commissioner of natural resources to report the value of the exemption from a payment due under AS 38.05.096 or 38.05.180(u), as applicable, that the gas storage facility received;
and (B) [(2)] commissioner of revenue to report information on the amount of tax credits claimed under AS 43.20.046 and 43.20.047, as applicable, for the gas storage facility or liquefied natural gas storage facility;
(2) fair market value of oil and gas fields, drilling rigs, production platforms, wells, and similar assets used for gas storage or liquefied natural gas storage and a fair return on the fair market value of those assets;
(3) costs related to the dismantlement, removal, and restoration of Enrolled HB 50 -36- a gas storage facility or liquefied natural gas storage facility IN THIS SUBSECTION, "GAS STORAGE FACILITY" HAS THE MEANING GIVEN IN AS 31.05.032].
* Sec.
46.
AS 42.05.381 is amended by adding a new subsection to read:
(p) In (k) of this section, "gas storage facility" has the meaning given in AS 31.05.032(e).
* Sec.
47.
AS 42.05 is amended by adding a new section to article 5 to read:
Sec.
42.05.505.
Records of gas storage facilities.
Records held by the commission related to the finances of a gas storage facility, a liquefied natural gas storage facility, or a public utility providing the service of natural gas storage, including financial statements and financial assurance agreements, are confidential and are not public records under AS 40.25.100 - 40.25.295 (Alaska Public Records Act).
The commission may disclose information from a record subject to this section only to a state or federal agency if the commission determines that disclosure of the information is necessary for the commission to complete its duties.
* Sec.
48.
AS 42.05.711(q) is amended to read:
(q) The service of natural gas storage furnished by operating a natural gas storage facility that is [(1) PART OF A PIPELINE FACILITY OPERATED BY A PIPELINE CARRIER, (2) PART OF A NATURAL GAS PIPELINE FACILITY OPERATED BY A NATURAL GAS PIPELINE CARRIER, OR (3)] part of a North Slope natural gas pipeline facility operated by a North Slope natural gas pipeline carrier is exempt from this chapter.
In this subsection, ["NATURAL GAS PIPELINE CARRIER," "NATURAL GAS PIPELINE FACILITY,"] "North Slope natural gas pipeline carrier [,]" and "North Slope natural gas pipeline facility [,]" ["PIPELINE CARRIER," AND "PIPELINE FACILITY"] have the meanings given in AS 42.06.630.
* Sec.
49.
AS 42.05.711 is amended by adding a new subsection read:
(w) A liquefied natural gas import facility under the jurisdiction of the Federal Energy Regulatory Commission is exempt from this chapter.
* Sec.
50.
AS 42.06.140 is amended by adding new subsections to read:
(c) The commission shall regulate under AS 42.05 the service of natural gas -37- Enrolled HB 50 and liquefied natural gas storage, including storage furnished by operating a natural gas storage facility that is part of a (1) pipeline facility operated by a pipeline carrier;
or (2) natural gas pipeline facility operated by a natural gas pipeline carrier.
(d) In this section, (1) "service of liquefied natural gas storage" means the operation of a liquefied natural gas storage facility;
"service of liquefied natural gas storage" does not include the storage of liquefied natural gas (A) owned by or contractually obligated to the owner, operator, or manager of the liquefied natural gas storage facility;
or (B) for which the price of storage is not separately itemized;
(2) "service of natural gas storage" means the operation of a natural gas storage facility primarily or exclusively for the benefit of third-party customers, and not for the benefit of the owner, operator, or manager of the natural gas storage facility;
"service of natural gas storage" does not include the storage of natural gas (A) owned by or contractually obligated to the owner, operator, or manager of the natural gas storage facility;
or (B) for which the price of storage is not separately itemized.
* Sec.
51.
AS 43.20.036 is amended by adding a new subsection to read:
(k) For purposes of calculating the income tax payable under this chapter, the taxpayer may not apply as a credit against tax liability the carbon oxide sequestration credit allowed as to federal taxes under 26 U.S.C.
45Q (Internal Revenue Code).
* Sec.
52.
AS 43.55.165(e) is amended to read:
(e) For purposes of this section, lease expenditures do not include (1) depreciation, depletion, or amortization;
(2) oil or gas royalty payments, production payments, lease profit shares, or other payments or distributions of a share of oil or gas production, profit, or revenue, except that a producer's lease expenditures applicable to oil and gas produced from a lease issued under AS 38.05.180(f)(3)(B), (D), or (E) include the share of net profit paid to the state under that lease;
Enrolled HB 50 -38- (3) taxes based on or measured by net income;
(4) interest or other financing charges or costs of raising equity or debt capital;
(5) acquisition costs for a lease or property or exploration license;
(6) costs arising from fraud, wilful misconduct, gross negligence, violation of law, or failure to comply with an obligation under a lease, permit, or license issued by the state or federal government;
(7) fines or penalties imposed by law;
(8) costs of arbitration, litigation, or other dispute resolution activities that involve the state or concern the rights or obligations among owners of interests in, or rights to production from, one or more leases or properties or a unit;
(9) costs incurred in organizing a partnership, joint venture, or other business entity or arrangement;
(10) amounts paid to indemnify the state;
the exclusion provided by this paragraph does not apply to the costs of obtaining insurance or a surety bond from a third-party insurer or surety;
(11) surcharges levied under AS 43.55.201 or 43.55.300;
(12) an expenditure otherwise deductible under (b) of this section that is a result of an internal transfer, a transaction with an affiliate, or a transaction between related parties, or is otherwise not an arm's length transaction, unless the producer establishes to the satisfaction of the department that the amount of the expenditure does not exceed the fair market value of the expenditure;
(13) an expenditure incurred to purchase an interest in any corporation, partnership, limited liability company, business trust, or any other business entity, whether or not the transaction is treated as an asset sale forfederal income tax purposes;
View plain text versions (7)

Action History

  1. (H) APPROPRIATION MESSAGE REVISED 10/15, HB 50 AND HB 257 NO LONGER ATTACHED

  2. (H) FN1: (DNR) FROM HB 257

  3. (H) FN(S) ATTACHED TO APPROP. BILL HB 268

  4. (H) LEG FINANCE APPROPRIATION MESSAGE 8/30/24

  5. (H) EFFECTIVE DATE(S) OF LAW SEE CHAPTER

  6. (H) Signed into law 7/31 CHAPTER 23 SLA 24

  7. (H) MANIFEST ERROR(S)

  8. (H) 9:00 A.M. 7/16/24 Transmitted to Governor

  9. (H) EFFECTIVE DATE(S) SAME AS PASSAGE

  10. (H) CONCURRED AM OF (S) Y37 N3

  11. (H) TITLE CHANGE: SCR 17

  12. (H) CONCUR TAKEN UP

  13. (H) CONCUR READ AND HELD

  14. (S) VERSION: SCS CSHB 50(FIN) AM S

  15. (S) TRANSMITTED TO (H) AS AMENDED

  16. (S) EFFECTIVE DATE(S) SAME AS PASSAGE

  17. (S) PASSED Y17 N2 A1

  18. (S) AUTOMATICALLY IN THIRD READING

  19. (S) AM NO 1 ADOPTED UC

  20. (S) RETURN TO SECOND FOR AM 1 UC

  21. (S) RESCIND ACTION ON PASSING SCS CSHB 50(FIN) UC

  22. (H) RETURNED TO SENATE PER REQUEST

  23. (S) VERSION: SCS CSHB 50(FIN)

  24. (S) TRANSMITTED TO (H) AS AMENDED

  25. (S) EFFECTIVE DATE(S) SAME AS PASSAGE

  26. (S) PASSED ON RECONSIDERATION Y18 N2

  27. (S) RECON SAME DAY UC IN 3RD RDG

  28. (S) HOFFMAN NOTICE OF RECONSIDERATION

  29. (S) EFFECTIVE DATE(S) SAME AS PASSAGE

  30. (S) PASSED Y18 N2

  31. (S) BEFORE SENATE IN THIRD READING

  32. (S) HELD IN THIRD READING TO 5/14 CAL

  33. (S) AUTOMATICALLY IN THIRD READING

  34. (S) FIN SCS ADOPTED UC

  35. (S) RETURN TO SECOND FOR AM UC

  36. (S) READ THE THIRD TIME CSHB 50(FIN)

  37. (S) MOVED TO BOTTOM OF CALENDAR

  38. (S) Moved SCS CSHB 50(FIN) Out of Committee

  39. (S) FINANCE at 02:00 PM SENATE FINANCE 532

  40. (S) ADVANCED TO THIRD READING 5/13 CAL

  41. (S) READ THE SECOND TIME

  42. (S) RULES TO FIRST SUP CALENDAR 5/12/2024

  43. (S) FN18: INDETERMINATE(REV)

  44. (S) FN17: ZERO(CED)

  45. (S) FN16: INDETERMINATE(DNR)

  46. (S) FN15: ZERO(CED)

  47. (S) FN14: (CED)

  48. (S) FN13: ZERO(CED)

  49. (S) FN9: ZERO(DEC)

  50. (S) NR: STEDMAN, WILSON, KIEHL, MERRICK, BISHOP

  51. (S) DP: HOFFMAN, OLSON

  52. (S) TITLE CHANGE: SCR 17

  53. (S) FIN RPT SCS 2DP 5NR NEW TITLE

  54. (S) Minutes (SFIN)

  55. (S) Heard & Held -- Recessed to 3 PM --

  56. (S) FINANCE at 10:00 AM SENATE FINANCE 532

  57. (S) Heard & Held

  58. (S) FINANCE at 09:00 AM SENATE FINANCE 532

  59. (S) Minutes (SFIN)

  60. (S) Heard & Held

  61. (S) FINANCE at 09:00 AM SENATE FINANCE 532

  62. (S) -- MEETING CANCELED --

  63. (S) FINANCE at 01:30 PM SENATE FINANCE 532

  64. (S) Minutes (SFIN)

  65. (S) Heard & Held

  66. (S) FINANCE at 09:00 AM SENATE FINANCE 532

  67. (S) Heard & Held -- Please Note Time Change --

  68. (S) FINANCE at 01:30 PM SENATE FINANCE 532

  69. (S) Minutes (SFIN)

  70. (S) Scheduled but Not Heard

  71. (S) FINANCE at 09:00 AM SENATE FINANCE 532

  72. (S) FN13: ZERO(CED)

  73. (S) FN12: (CED)

  74. (S) FN11: (DNR)

  75. (S) FN10: (REV)

  76. (S) FN9: ZERO(DEC)

  77. (S) NR: CLAMAN

  78. (S) AM: BISHOP, KAWASAKI, WIELECHOWSKI, KAUFMAN

  79. (S) DP: GIESSEL, DUNBAR

  80. (S) TITLE CHANGE: SCR 17

  81. (S) RES RPT SCS 2DP 4AM 1NR NEW TITLE

  82. (S) Moved SCS HB 50(RES) Out of Committee **Streamed live on AKL.tv**

  83. (S) RESOURCES at 03:30 PM BUTROVICH 205

  84. (S) Minutes (SFIN)

  85. (S) <Pending Referral>

  86. (S) FINANCE at 09:00 AM SENATE FINANCE 532

  87. (S) Heard & Held

  88. (S) RESOURCES at 03:30 PM BUTROVICH 205

  89. (S) Heard & Held

  90. (S) RESOURCES at 03:30 PM BUTROVICH 205

  91. (S) Heard & Held

  92. (S) RESOURCES at 03:30 PM BUTROVICH 205

  93. (S) RES, FIN

  94. (S) READ THE FIRST TIME - REFERRALS

  95. (H) VERSION: CSHB 50(FIN)

  96. (H) TRANSMITTED TO (S)

  97. (H) EFFECTIVE DATE(S) SAME AS PASSAGE

  98. (H) PASSED ON RECONSIDERATION Y32 N8

  99. (H) RECON SAME DAY PASSED Y38 N2 - IN THIRD READING

  100. (H) SADDLER NOTICE OF RECONSIDERATION

  101. (H) EFFECTIVE DATE(S) SAME AS PASSAGE

  102. (H) PASSED Y32 N8

  103. (H) READ THE THIRD TIME CSHB 50(FIN)

  104. (H) ADVANCED TO THIRD READING 4/17 CALENDAR

  105. (H) AM NO 10 FAILED Y1 N38 E1

  106. (H) AM NO 9 FAILED Y9 N30 E1

  107. (H) AM NO 8 FAILED Y1 N38 E1

  108. (H) AM NO 7 FAILED Y2 N37 E1

  109. (H) AM NO 6 FAILED Y2 N37 E1

  110. (H) AM NO 5 FAILED Y7 N32 E1

  111. (H) AM NO 4 FAILED Y1 N38 E1

  112. (H) AM NO 3 FAILED Y1 N38 E1

  113. (H) AM NO 2 FAILED Y17 N22 E1

  114. (H) AM NO 1 FAILED Y15 N24 E1

  115. (H) FIN CS ADOPTED UC

  116. (H) READ THE SECOND TIME

  117. (H) RULES TO CALENDAR 4/15/2024

  118. (H) FN12: (CED)

  119. (H) FN11: (DNR)

  120. (H) FN10: (REV)

  121. (H) FN9: ZERO(DEC)

  122. (H) AM: STAPP, HANNAN, JOSEPHSON

  123. (H) NR: GALVIN, COULOMBE, ORTIZ, TOMASZEWSKI, EDGMON

  124. (H) DP: CRONK, D.JOHNSON, FOSTER

  125. (H) FIN RPT CS(FIN) NEW TITLE 3DP 5NR 3AM

  126. (H) Moved CSHB 50(FIN) Out of Committee -- Please Note Time Change --

  127. (H) FINANCE at 10:00 AM ADAMS 519

  128. (H) Minutes (HFIN)

  129. (H) Heard & Held -- Delayed to 30 Minutes Following Session --

  130. (H) FINANCE at 01:30 PM ADAMS 519

  131. (H) -- MEETING CANCELED --

  132. (H) FINANCE at 11:00 AM ADAMS 519

  133. (H) Minutes (HFIN)

  134. (H) Heard & Held -- Recessed to a Call of the Chair --

  135. (H) FINANCE at 08:30 AM ADAMS 519

  136. (H) Minutes (HFIN)

  137. (H) Heard & Held

  138. (H) FINANCE at 01:30 PM ADAMS 519

  139. (H) Minutes (HFIN)

  140. (H) -- Recessed to a Call of the Chair --

  141. (H) FINANCE at 01:30 PM ADAMS 519

  142. (H) Minutes (HFIN)

  143. (H) Heard & Held

  144. (H) FINANCE at 01:30 PM ADAMS 519

  145. (H) Minutes (HFIN)

  146. (H) Heard & Held

  147. (H) FINANCE at 01:30 PM ADAMS 519

  148. (H) Minutes (HFIN)

  149. (H) Heard & Held

  150. (H) FINANCE at 01:30 PM ADAMS 519

  151. (H) Minutes (HFIN)

  152. (H) Heard & Held

  153. (H) FINANCE at 01:30 PM ADAMS 519

  154. (H) -- MEETING CANCELED --

  155. (H) FINANCE at 01:30 PM ADAMS 519

  156. (H) Minutes (HW&M)

  157. (H) Minutes (HFIN)

  158. (H) Heard & Held

  159. (H) FINANCE at 01:30 PM ADAMS 519

  160. (H) FN8: (REV)

  161. (H) FN7: (DNR)

  162. (H) FN6: (CED)

  163. (H) FN5: ZERO(DEC)

  164. (H) AM: MEARS

  165. (H) NR: PATKOTAK

  166. (H) DP: ARMSTRONG, DIBERT, MCCABE, SADDLER, WRIGHT, MCKAY

  167. (H) RES RPT CS(RES) NEW TITLE 6DP 1NR 1AM

  168. (H) Minutes (HRES)

  169. (H) Moved CSHB 50(RES) Out of Committee

  170. (H) RESOURCES at 01:00 PM BARNES 124

  171. (H) Minutes (HRES)

  172. (H) Heard & Held -- Delayed to a Call of the Chair --

  173. (H) RESOURCES at 01:00 PM BARNES 124

  174. (H) Minutes (HRES)

  175. (H) Heard & Held

  176. (H) RESOURCES at 01:00 PM BARNES 124

  177. (H) Minutes (HRES)

  178. (H) RESOURCES at 01:00 PM BARNES 124

  179. (H) Minutes (HRES)

  180. (H) Heard & Held -- Delayed to 1:30 --

  181. (H) RESOURCES at 01:00 PM BARNES 124

  182. (H) Minutes (HENE)

  183. (H) Minutes (HRES)

  184. (H) Heard & Held

  185. (H) RESOURCES at 01:00 PM BARNES 124

  186. (H) Minutes (HRES)

  187. (H) Heard & Held

  188. (H) RESOURCES at 01:00 PM BARNES 124

  189. (H) Minutes (HRES)

  190. (H) Heard & Held

  191. (H) RESOURCES at 01:00 PM BARNES 124

  192. (H) Minutes (HRES)

  193. (H) Heard & Held

  194. (H) RESOURCES at 01:00 PM BARNES 124

  195. (H) Minutes (HENE)

  196. (H) Minutes (HRES)

  197. (H) GOVERNOR'S TRANSMITTAL LETTER

  198. (H) FN4: INDETERMINATE(DEC)

  199. (H) FN3: (REV)

  200. (H) FN2: (DNR)

  201. (H) FN1: (CED)

  202. (H) RES, FIN

  203. (H) READ THE FIRST TIME - REFERRALS

Sponsors

  • House Rules · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 64 not signed on

Sponsors (1)

  • House Rules

Co-sponsors (0)

None.

Not signed on (64)

64 members have not signed on to this bill.

Show all 64 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors HB 50?
HB 50 is sponsored by House Rules.
What is the current status of HB 50?
This bill has been enacted into law. Introduced January 27, 2023. Enacted.
Where can I track HB 50?
Track HB 50 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 50

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 50

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →