New Jersey 222nd Legislature Status: Introduced 1 D cosponsors

S 4166 — Requires customer consent to material changes to third-party energy supply contracts under certain circumstances.*

Last action — R/A REF ATU

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed General Assembly
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the Senate. Introduced May 11, 2026. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Prognosis

Stalled 28% · moderate confidence

Where this bill stands today.

Odds of enactment

Low

How often bills like it became law.

  • Introduced

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (1 D).

  • Cleared a recorded vote

    Passed 2 recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

In plain language

The bill requires customer consent for significant changes to third-party energy supply contracts.

This bill mandates that customers must give consent before any material changes are made to their third-party energy supply contracts. It aims to protect consumers by ensuring they are informed and agree to any significant modifications.

What this means for you
  • Consumers: This means you will have a say in any significant changes to your energy supply agreements.

Summary

Energy supply contracts, third party-req customer consent to material changes

Bill Text

What changed in the latest version

62 added · 24 removed

Plain-language change summary

The revised bill now specifies that a "supplier" refers to an electric power supplier or gas supplier, and it clarifies the context for third-party energy supply contracts involving residential customers. It also states that a supplier can renew or extend a contract without needing the explicit consent of the customer if certain conditions are met. This change could affect how customers interact with their energy suppliers during contract renewals.

→
Previous
Latest
S4166 SENATE, No.
S4166 1R [First Reprint] SENATE, No.
Senator  TROY SINGLETON District 7 (Burlington)         SYNOPSIS      Requires customer consent to material changes to third-party energy supply contracts.
Senator  TROY SINGLETON District 7 (Burlington)         SYNOPSIS      Requires customer consent to material changes to third-party energy supply contracts under certain circumstances.
  CURRENT VERSION OF TEXT      As introduced.
  CURRENT VERSION OF TEXT      As reported by the Senate Economic Growth Committee on June 8, 2026, with amendments.
       1.    a.  As used in this section:       “Material change” means a change to the terms or duration of a third-party energy supply contract, including, but not limited to, a change in price or a change to or from fixed or variable pricing.
       1.    a.
     “Third-party energy supply contract” means a contract for electric generation service or gas supply service in the State, as those terms are defined in section 3 of P.L.1999, c.23 (C.48:3-51), entered into by an electric power supplier or a gas supplier, as those terms are defined in section 3 of P.L.1999, c.23 (C.48:3-51), and a residential customer of that supplier.
As used in this section:
     b.    Any material change to a third-party energy supply contract that was entered into or renewed after the effective date of P.L.    , c.    (C.        ) (pending before the Legislature as this bill) shall require the express verbal, electronic, or written consent of the residential customer, which express consent shall be maintained by the electric power supplier or gas supplier in a verifiable format.
     “Material change” means a change to the terms or duration of a third-party energy supply contract, including, but not limited to, a change in price or a change to or from fixed or variable pricing.
     c.     The Board of Public Utilities shall, in accordance with the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), adopt rules and regulations as necessary to implement this section.
     1“Supplier” means an electric power supplier or gas supplier, as those terms are defined in section 3 of P.L.1999, c.23 (C.48:3-51).1      “Third-party energy supply contract” means a contract for electric generation service or gas supply service in the State, as those terms are defined in section 3 of P.L.1999, c.23 (C.48:3-51), entered into by 1[an electric power supplier or a gas supplier, as those terms are defined in section 3 of P.L.1999, c.23 (C.48:3-51),] a supplier1 and a residential customer of that supplier.
     b.    Any material change to a third-party energy supply contract 1[that was]1 entered into or renewed after the effective date of P.L.    , c.    (C.        ) (pending before the Legislature as this bill) shall require the express verbal, electronic, or written consent of the residential customer, which express consent shall be maintained by the 1[electric power supplier or gas]1 supplier in a verifiable format.
     c.     1Notwithstanding the provisions of subsection b.
of this section, a supplier may renew or extend a third-party energy supply contract without obtaining the express consent of the residential customer if the renewal or extension:
     (1)   does not convert a fixed-price product to a variable-price product;
     (2)   does not convert a third-party energy supply contract with a defined term length to a month-to-month or automatically renewing variable-rate contract;
     (3)   does not increase the contract price by more than 20 percent above the price in effect during the final billing cycle of the existing third-party energy supply contract;
and      (4)   permits the residential customer to cancel the renewed or extended third-party energy supply contract and select another product, another supplier, or basic generation service within 60 days following the effective date of the renewal or extension without any cancellation fee, early termination fee, administrative charge, or other financial penalty.
     d.    Prior to renewing or extending a third-party energy supply contract pursuant to subsection c.
of this section, a supplier shall provide two written notices to the residential customer, by mail or electronic notification, in accordance with the preferred method of contact for the residential customer.
 The first notice shall be provided no earlier than 60 days before the effective date of the renewal or extension.  The second notice shall be provided no more than 60 days but no less than 30 days before the effective date of the renewal or extension.  Each notice provided pursuant to this subsection shall clearly disclose:
     (1)   the current price;
     (2)   the proposed renewal or extension price;
     (3)   the percentage difference between the two prices;
     (4)   the residential customer's right to select another product offered by the supplier, enroll with another supplier, or return to basic generation service;
and      (5) the procedure for declining the renewal or extension.
     e.1  The Board of Public Utilities shall, in accordance with the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), adopt rules and regulations as necessary to implement this section.
    STATEMENT        This bill requires the express verbal, electronic, or written consent of a residential customer for any material change to the customer’s third-party energy supply contract for electric generation service or gas supply service in the State with an electric power supplier or a gas supplier, as appropriate.  Under the bill, “material change” means a change to the terms or duration of any third-party energy supply contract, including, but not limited to, a change in price or a change to or from fixed or variable pricing.
View plain text versions (2)

Action History

  1. R/A REF ATU

  2. PS

  3. REP/SCA 2RS

  4. INT 1RS REF SEG

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 119 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (119)

119 members have not signed on to this bill.

Show all 119 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 40 Yea · 0 Nay
Party YeaNayPresentNot Voting
Republican 15000
Democrat 25000
Total 40000
% of votes cast 100%0%0%0%
How each member voted (40)
Member Party Vote
Beach, James Democrat Yea
Burgess, Renee C. Democrat Yea
Burzichelli, John J. Democrat Yea
Cruz-Perez, Nilsa I. Democrat Yea
Cryan, Joseph P. Democrat Yea
Diegnan Jr., Patrick J. Democrat Yea
Gopal, Vin Democrat Yea
Greenstein, Linda R. Democrat Yea
Johnson, Gordon M. Democrat Yea
Lagana, Joseph A. Democrat Yea
McKeon, John F. Democrat Yea
McKnight, Angela V. Democrat Yea
Moriarty, Paul D. Democrat Yea
Mukherji, Raj Democrat Yea
Ruiz, M. Teresa Democrat Yea
Sarlo, Paul A. Democrat Yea
Scutari, Nicholas P. Democrat Yea
Singleton, Troy Democrat Yea
Smith, Bob Democrat Yea
Stack, Brian P. Democrat Yea
Timberlake, Britnee N. Democrat Yea
Turner, Shirley K. Democrat Yea
Vitale, Joseph F. Democrat Yea
Wimberly, Benjie E. Democrat Yea
Zwicker, Andrew Democrat Yea
Amato Jr., Carmen F. Republican Yea
Bramnick, Jon M. Republican Yea
Bucco, Anthony M. Republican Yea
Corrado, Kristin M. Republican Yea
Henry, Owen Republican Yea
Holzapfel, James W. Republican Yea
O'Scanlon Jr., Declan J. Republican Yea
Pennacchio, Joseph Republican Yea
Polistina, Vincent J. Republican Yea
Schepisi, Holly T. Republican Yea
Singer, Robert W. Republican Yea
Space, Parker Republican Yea
Steinhardt, Douglas J. Republican Yea
Testa Jr., Michael L. Republican Yea
Tiver, Latham Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 4166 do?
Energy supply contracts, third party-req customer consent to material changes
Who sponsors S 4166?
S 4166 is sponsored by Singleton, Troy (Democrat).
What is the current status of S 4166?
This bill has been introduced in the Senate. Introduced May 11, 2026. It must pass committee before a floor vote.
Where can I track S 4166?
Track S 4166 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 4166

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 4166

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →