"Construction Containment and Pollution Prevention Act"; requires contractors to use containment devices to...
This legislation mandates that contractors implement containment devices to avoid releasing specific pollutants outside of worksites. It aims to improve environmental protection during construction activities.
Do you support it?
Want to know if it passes?
We'll email you when S 4058 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on S 4058.
You're tracking S 4058
We'll email you the moment it moves.
S 4058 — "Construction Containment and Pollution Prevention Act"; requires contractors to use containment devices to prevent release of certain pollutants outside of worksites.
Last action — REF SBA
No card. One bill, free forever — alerts when it moves.
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed General Assembly
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced March 23, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Prognosis
Where this bill stands today.
Odds of enactment
LowHow often bills like it became law.
-
Introduced
Current position in the legislative process.
-
2 sponsors
2 primary, 0 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (2 D).
-
Cleared a recorded vote
Passed 1 recorded vote so far.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
In plain language
The bill requires contractors to use containment devices to prevent pollutant release at worksites.
This legislation mandates that contractors implement containment devices to avoid releasing specific pollutants outside of worksites. It aims to improve environmental protection during construction activities.
What this means for you
- Environment: This means stricter measures to protect the environment from construction-related pollution.
Summary
Constr. Containment & Pollution Prevention Act-prevent release, cert pollutants
Bill Text
What changed in the latest version
64 added · 68 removedPlain-language change summary
The amendment modifies the definition of "contractor" to refer specifically to persons or business entities performing construction-related activities that involve a "covered activity." It also expands the definition of a "covered activity" to include operations that may generate various pollutants, such as dust and particulate matter, impacting soil, water, or air at and beyond the worksite. Additionally, it removes specific requirements related to ongoing containment measures and filtration standards for stormwater inlets, thereby changing the regulatory framework for managing pollutants during construction projects.
S4058 1R [First Reprint] SENATE, No.
CURRENT VERSION OF TEXT As introduced.reported by the Senate Environment and Energy Committee on June 8, 2026, with amendments.
“Contractor” means any individual,1[individual, firm, partnership, association, or corporation engaged inin] person or business entity performing1 construction, renovation, demolition, or 1permit-required1 maintenance activities1[activities on any commercial or residential property in this State.State] that involves a covered activity1.
1“Covered activity” means any construction, renovation, demolition, or permit-required maintenance operation that generates, or is reasonably likely to generate, dust, debris, sediment, plastic fragments, slurry, or other particulate pollutants capable of depositing into the soil, leaving the worksite, entering storm drains, waterways, or adjoining property, or dispersing into the open air.1 “Worksite” means any location in this State where construction, renovation, demolition, or related contractor activities are being performed.
3. a. A contractor shall employ containment devices in order to prevent the release of dust, debris, microplastics, and other pollutants into the soil or1[or] ,1 water 1, or open air1 at the worksite, as well as beyond the worksite boundaries.
b. At a minimum, the contractor shall ensure that when cutting, drilling, sanding, or performing any 1covered1 activity that1[that generates dust or particulate matter:matter]1:
(2) all such 1covered1 activities are conducted within an enclosure or through the use of containment measures, including tent hoods, vacuums, or other comparable devices, that reasonably prevent the release of airborne or physical debris;
and (5)(5)1[filters filters meeting American Society for Testing and Material specifications D4491, D4751, and D4355 are installed at any stormwater inlet receiving runoff from the worksite.worksite] if a covered activity may result in runoff entering a storm drain, drainage structure, or surface water, the contractor shall install and maintain inlet protection, filtration, sediment controls, or equivalent runoff-control measures in accordance with standards adopted by the department, in consultation with the Department of Environmental Protection1.
1and1 (2) require an on-site briefing before work begins, with a brief checklist to confirm understanding;
4. A contractor shall not discharge, sweep, blow, or otherwise deposit pollutants generated on the worksite into 1the open air, soil,1 public streets, storm drains, waterways, or other drainage infrastructure. All waste shall be collected and disposed of in accordance with the “Solid Waste Management Act” P.L.1970, c.39 (C.13:1E-1 et seq.) and any applicable local ordinances.
b. A1In contractoradministering thatand violatesimplementing the provisions of sectionthis 3act, orthe 4department ofmay thisconsult actwith shallthe beDepartment subjectof toEnvironmental penaltyProtection, as follows:necessary.
c.1 A contractor that violates the provisions of section 3 or 4 of this act shall be subject to penalty as follows:
c. 1[c.] d.1 Each day a violation continues shall constitute a distinct and separate offense.
d.1[d.] e.1 The penalty prescribed by this section shall be collected and enforced by summary proceedings under the "Penalty Enforcement Law of 1999," P.L.1999, c.274 (C.2A:58-10 et seq.).
The penaltySuperior prescribedCourt byshall have jurisdiction to enforce the “Penalty Enforcement Law of 1999” in connection with this sectionact.1[.]1 shall be1[e.] collectedf.1 andNothing enforcedin bythis summaryact proceedingsshall underpreclude the "Penaltydepartment Enforcementfrom Lawseeking ofinjunctive 1999,"relief P.L.1999,to c.274prevent (C.2A:58-10imminent etor seq.).ongoing harm to the environment or public health.
The Superior Court6. shallThe havedepartment jurisdiction1, toin enforceconsultation with the “PenaltyDepartment Enforcementof LawEnvironmental ofProtection,1 1999”shall, in connectionaccordance with the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), adopt rules and regulations as necessary to implement this act..act.
e. Nothing in this act shall preclude the department from seeking injunctive relief to prevent imminent or ongoing harm to the environment or public health.
6. The department shall, in accordance with the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), adopt rules and regulations as necessary to implement this act.
STATEMENT This bill, which would be known as the “Construction Containment and Pollution Prevention Act” requires contractors to take certain steps to mitigate the release and properly dispose of dust, debris, microplastics and other pollutants. The bill requires all contractors to employ physical barriers, vacuum or wet-cutting systems, tarps, enclosures, and inlet filters to prevent dust, debris, microplastics, and other pollutants from escaping a worksite.
This bill requires contractors to employ containment devices, such as vacuum attachments or wet-cutting systems, fully enclosed work areas, tarps or drop cloths, and ASTM-compliant stormwater filters, and to perform daily cleanup of dust, debris, microplastics, and other pollutants. Under the bill, contractors would be required, to prepare, distribute, and periodically update on-site educational materials that explain the bill’s requirements, and illustrate proper device setup, describe health risks and penalties.
Contractors would also be required to inhibit the discharge of any worksite waste into streets, storm drains, waterways, or other drainage infrastructure and dispose of all materials in accordance with the “Solid Waste Management Act” and applicable local ordinances. To ensure compliance with the act, the Department of Community Affairs, or local construction officials, would be authorized to inspect worksites to enforce the bill’s provisions.
The bill also provides penalties for violations of the act.
A contractor that violates the provisions of section 3 or 4 of the act would be subject to:
(1) a warning citation for the first violation;
(2) a fine of up to $1,000 for a second violation;
and (3) a fine of up to $5,000 for each subsequent violation.
Each day a violation continues would constitute a distinct and separate offense.
Action History
-
REF SBA
-
REP/SCA 2RS
-
INT 1RS REF SEN
Sponsors
- Linda R. Greenstein · Primary
- John F. McKeon · Primary
Sponsorship breakdown
Export CSV (upgrade) →2 sponsors · 0 co-sponsors · 118 not signed on · 2 voted No
Sponsors (2)
- Greenstein, Linda R. Democrat
- McKeon, John F. Democrat
Co-sponsors (0)
None.
Not signed on (118)
118 members have not signed on to this bill.
Show all 118 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 3 | 0 | 0 | 0 |
| Republican | 0 | 2 | 0 | 0 |
| Total | 3 | 2 | 0 | 0 |
| % of votes cast | 60% | 40% | 0% | 0% |
How each member voted (5)
| Member | Party | Vote |
|---|---|---|
| Greenstein, Linda R. | Democrat | Yea |
| McKeon, John F. | Democrat | Yea |
| Smith, Bob | Democrat | Yea |
| Space, Parker | Republican | Nay |
| Tiver, Latham | Republican | Nay |
Subjects
Frequently asked questions
- What does S 4058 do?
- Constr. Containment & Pollution Prevention Act-prevent release, cert pollutants
- Who sponsors S 4058?
- S 4058 is sponsored by Greenstein, Linda R. (Democrat) and McKeon, John F. (Democrat).
- What is the current status of S 4058?
- This bill has been introduced in the Senate. Introduced March 23, 2026. It must pass committee before a floor vote.
- Where can I track S 4058?
- Track S 4058 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 4058
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S 4058
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →