S 684 — Establishes thermal energy network pilot program for gas public utilities.*
Last action — REF SBA
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed General Assembly
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced January 13, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Prognosis
Where this bill stands today.
Odds of enactment
LowHow often bills like it became law.
-
Introduced
Current position in the legislative process.
-
2 sponsors
2 primary, 0 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (2 D).
-
Cleared a recorded vote
Passed 1 recorded vote so far.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
Summary
Geothermal energy pilot program-establish for gas public utilities
Bill Text
What changed in the latest version
240 added · 210 removedPlain-language change summary
The bill was amended to establish a thermal energy network pilot program instead of a geothermal energy pilot program. This change broadens the scope to include not just geothermal energy but also other renewable thermal energy sources, such as redistributed thermal waste heat, and outlines that the thermal energy network will supply heating or cooling to multiple buildings. The definition of the involved infrastructure has also been expanded to encompass various types of renewable thermal energy sources, which could lead to a more diverse approach in energy distribution techniques.
S684 1R [First Reprint] SENATE, No.
MCKEON District 27 (Essex and Passaic) SYNOPSIS Establishes geothermalthermal energy network pilot program for gas public utilities.
CURRENT VERSION OF TEXT IntroducedAs Pendingreported Technicalby Reviewthe bySenate LegislativeEnvironment Counsel.and Energy Committee on February 12, 2026, with amendments.
An Act establishing a geothermal1[geothermal] thermal1 energy 1network1 pilot program, supplementing Title 48 of the Revised Statutes, and amending R.S.48:2-13. R.S.48:2-13. Be It Enacted by the Senate and General Assembly of the State of New Jersey:
1. Be (NewIt section)Enacted a. by As used in this section: “Board” means the NewSenate Jersey Board of Public Utilities or its successor. “Gas public utility” or “utility” means a public utility, as that term is defined pursuant to R.S.48:2-13, that distributes gas to end users in the State. “Geothermal energy” means a renewable energy source derived from heat stored within the earth. “Geothermal energy” includes networked geothermal energy and deepGeneral geothermalAssembly energy. of “Geothermal energy infrastructure” means utility-scale distribution infrastructure that supplies heating or cooling from geothermal energy sources. “Geothermal energy project” or “project” means a project undertaken by a gas public utility to replace aging or leaking natural gas pipelines with geothermal energy infrastructure. “Infrastructure plan” means the planState submittedof byNew aJersey: gas public utility to the board pursuant to subsection c.
of 1. (New section) a. As used in this section. section: b. “Board” Themeans the New Jersey Board of Public Utilities shallor establishits successor. “Gas public utility” or “utility” means a three-yearpublic pilotutility, programas that term is defined pursuant to authorizeR.S.48:2-13, athat distributes gas publicto utilityend tousers recoverin the costState. of a“Geothermal geothermalenergy” means 1[a renewable] an1 energy projectsource throughderived from heat stored within the utilityearth. rates“Geothermal chargedenergy” toincludes thenetworked utility’sgeothermal ratepayers. energy Theand purposedeep geothermal energy. “1[Geothermal] Thermal1 energy infrastructure” means 1[utility-scale] thermal extraction and1 distribution infrastructure that supplies 1space1 heating or cooling 1,water heating, or refrigeration1 from geothermal energy sources 1,or other sources of therenewable pilotthermal programenergy, shallsuch beas redistributed thermal waste heat or surface or underground water, wastewater, or other heat sources1. 1“Thermal energy network” means a project that supplies heating or cooling to promotemultiple thebuildings adoptionconnected ofvia underground piping containing fluids that, in concert with heat pumps, exchange geothermal energy, or energy infrastructurefrom amongother gassources publicof utilities. renewable thermal c. energy, Tosuch participateas inredistributed thethermal pilotwaste program,heat or surface or underground water, waste water, or other heat sources.1 “1[Geothermal] Thermal1 energy 1network1 project” or “project” means a project undertaken by a gas public utility shallto submit1[replace] toestablish thethermal boardenergy annetwork infrastructure planin thatlieu shallof includenew anyor informationexisting regardingnatural thegas projectinfrastructure thatfor thenew boardor deemsexisting necessarydevelopments, forparticularly participation in theareas pilotwith1 program. aging or d. leaking Whilenatural reviewinggas apipelines utility’s1[with infrastructuregeothermal plan,energy] theor boardwithout shallexisting consider: natural gas1 (1)infrastructure. “1[Infrastructure] Thermal infrastructure1 plan” means the size,plan scope,submitted andby scalea ofgas public utility to the project;board pursuant to subsection c.
of (2)this section. b. The Board of Public Utilities shall establish a 1[three-year] four-year1 pilot program to authorize 1[a]1 gas public 1[utility] utilities1 to recover the cost of 1[a geothermal] one or more thermal1 energy 1[project] network projects1 through the project;utility rates charged to the utility’s ratepayers. 1The board shall approve a maximum of one project in each of the northern, central, southern, and coastal regions of the State. The board and gas public utilities may establish a new tariff for the sale and delivery of thermal energy to the participating customers.1 The purpose of the pilot program shall be to 1[promote the adoption] demonstrate the benefits and cost of thermal energy networks as a means for supplying space or water conditioning1 of 1[geothermal] thermal1 energy infrastructure among gas public utilities. 1The term of the pilot program may be extended in the board’s discretion if the board so determines pursuant to paragraph (2) of subsection g.
(3) the expected benefits of thethis project,section. whichFor shallpurposes include, but not be limited to, the social value of greenhousethis gassubsection: emissions reductions for the utility’s customers and for residents across the State;
"northern," (4)when thereferring project’sto financialregions impactof onthe State, means the utility’scounties ratepayers;of Bergen, Essex, Hudson, Morris, Passaic, Sussex, and Warren;
"central," (5)when whetherreferring the project’s benefits, identified pursuant to paragraphregions (3) of thisthe subsection,State, justifymeans the costcounties of theHunterdon, project,Mercer, determinedMiddlesex, pursuantSomerset, toand paragraphUnion; (2) of this subsection;
and"southern," when (6)referring any other criteria that the board deems appropriate. e. A gas public utility shall share with the board certain information to beregions determined by the board regarding the operations of the pilotState, program. means f. (1) Within one year of the effectivecounties date of P.L. ,Burlington, c. Camden, (C. )Cumberland, (pendingGloucester, before the Legislature as this bill), and eachSalem; year thereafter until the expiration of the pilot program, the board shall submit to the Governor and, pursuant to section of P.L.1991, c.164 (C.52:14-19.1), to the Legislature, a written report detailing the operations of the pilot program. At a minimum, the report shall summarize the information provided by a gas public utility to the board pursuant to subsection e.
of this section. (2) In its third and final“coastal,” report,when issuedreferring pursuant to paragraphregions (1) of this subsection, the boardState, shallmeans alsothe determinecounties whetherof toAtlantic, expandCape theMay, pilotMonmouth, programand toOcean.1 a permanentc. program. To participate (3) in Thethe boardpilot shallprogram, publish1[a] theeach1 findingsgas ofpublic itsutility reports,shall writtensubmit pursuant to thisthe subsection,board on1[an] its, Internetin website. accordance with g. the Ifminimum thefiling boardrequirements determinesset forth in itsthe thirdorder andissued finalby report,the board pursuant to paragraph (2) of subsection f.i.
of this section, that the pilot program shall become a permanentthermal1 program,infrastructure thenplan thethat board shall adopt,include pursuantany toinformation theregarding “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), rules and regulations to facilitate the pilot1utility’s program’sproposed1 transitionproject to1or aprojects1 permanentthat program. In adopting said rules and regulations, the board shalldeems considernecessary similarfor laws,participation rules, and regulations in otherthe states that have similar pilot programsprogram. or1The permanent programs at the state level. h. (1) Within 60 days after the date of enactment of this act, and notwithstanding the provisions of the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), to the contrary, the board shall,may immediatelyestablish uponone filingor propermore noticeapplication withperiods the Office of Administrative Law, adopt rules and regulations necessary for the implementationsubmission of thisthermal section. infrastructure plans. (2) The rulesboard andmay regulationsapprove, adopteddeny, pursuantrequest tomodifications paragraphto, (1)or ofpartially thisapprove subsectionand shallpartially bedeny in effect for a periodsubmitted notthermal toinfrastructure exceedplan.1 one yeard. afterWhile thereviewing datea ofutility’s filing. 1thermal1 Theseinfrastructure rulesplan, and regulations shall thereafter be adopted, amended, or readopted by the board in accordance with the requirements of the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.). 2. R.S.48:2-13 is amended as follows: 48:2-13. a. The board shall haveconsider: general supervision(1) and the regulationsize, ofscope, and jurisdictionscale and control over all public utilities as defined in this section and their property, property rights, equipment, facilities and franchises so far as may be necessary for the purpose of carrying out the provisions1proposed1 ofproject this1or Title.projects1;
The(2) term the “public1lifecycle1 utility”cost shall include every individual, copartnership, association, corporation or joint stock company, their lessees, trustees or receivers appointed by any court whatsoever, their successors, heirs or assigns, that now or hereafter may own, operate, manage or control within this State any railroad, street railway, traction railway, autobus, charter bus operation, special bus operation, canal, express, subway, pipeline, gas, geothermal energy pursuant to section 1 of P.L. , c. (C. ) (pending before the Legislature1proposed1 asproject this1or bill),projects1; electricity distribution, water, oil, sewer, solid waste collection, solid waste disposal, telephone or telegraph system, plant or equipment for public use, under privileges granted or hereafter to be granted by this State or by any political subdivision thereof.
b. (3) Nothing the containedexpected inbenefits this Title shall extend the powers of the board1proposed1 toproject include1or anyprojects1, supervisionwhich andshall regulationinclude, of,but or jurisdiction and control over any vehicles engaged in ridesharing arrangements with a maximum carrying capacity of not morebe thanlimited 15 passengers, including the driver, where the transportation of passengers is incidental to the1[,] purpose: of the driver or any vehicles engaged in the transportation of passengers for hire in the manner and form commonly called taxicab service unless such service becomes or is held out to be regular service between stated termini;
(a) the information that the project will provide about efficiency of thermal energy networks in New Jersey, the benefits and costs for New Jersey customers of using thermal energy networks as a source of heating and cooling, and the opportunities and challenges related to construction and installation;
(b) the anticipated energy capacity deferment;
(c) the jobs associated with the project, including the extent to which existing natural gas utility workforce will be used for the project;
and (d)1 the social value of greenhouse gas emissions reductions for the utility’s customers and for residents across the State;
(4) the 1proposed1 project’s 1or projects’1 financial impact on the utility’s ratepayers;
(5) whether the 1proposed1 project’s 1or projects’1 benefits, identified pursuant to paragraph (3) of this subsection, justify the cost of the project 1or projects1, determined pursuant to paragraph (2) of this subsection;
1[and]1 (6) 1the extent to which the proposed project or projects serve low- to moderate-income households, residents of overburdened communities, and other vulnerable populations;
(7) the degree to which the proposed project or projects target or mitigate highly inefficient buildings;
(8) the potential opportunities for cost-effective retrofits or the inclusion of future potential for thermal waste heat system tie-ins;
(9) the extent to which the utility has identified non-ratepayer sources of funding to implement the proposed project or projects;
(10) the degree to which the proposed project or projects target or mitigates old or leaking natural gas infrastructure, or presents an alternative to potential natural gas expansion;
and (11)1 any other criteria that the board deems appropriate. e. A gas public utility shall share with the board certain information to be determined by the board regarding the operations of 1projects approved as part of1 the pilot program. f. 1No gas public utility that provides safe, proper, and adequate thermal energy distribution services to customers via a project approved as a part of the pilot program shall be deemed to be in violation of subsection a.
of R.S.48:3-3 because it refuses to also provide natural gas distribution services to such customers.
g.1 (1) 1[Within one year of the effective date of P.L. , c. (C. ) (pending before the Legislature as this bill), and each year thereafter until] No later than six months after1 the expiration of the pilot program, the board shall 1publish on its Internet website and1 submit to the Governor and, pursuant to section 2 of P.L.1991, c.164 (C.52:14-19.1), to the Legislature, a written report detailing the 1[operations] implementation and results1 of the pilot program. At a minimum, the report shall summarize the information provided by 1[a] the1 gas public 1[utility] utilities1 to the board pursuant to subsection e.
of this section. (2) 1[In its third and final report, issued pursuant to paragraph (1) of this subsection,] No later than six months after the expiration of the pilot program,1 the board shall also determine whether 1or not1 to 1[expand] extend1 the pilot program 1, convert the pilot program1 to a permanent program 1,or recommend that New Jersey allow the distribution of geothermal energy as a regulated public utility service. The board’s recommendations shall be included in the report issued pursuant to paragraph (1) of this subsection1. 1[(3) The board shall publish the findings of its reports, written pursuant to this subsection, on its Internet website. g.] h.1 If the board determines 1[in its third and final report]1, pursuant to paragraph (2) of subsection 1[f.] g.1 of this section, that the pilot program shall become a permanent program, then the board shall adopt, pursuant to the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), rules and regulations to facilitate the pilot program’s transition to a permanent program. In adopting said rules and regulations, the board shall consider similar laws, rules, and regulations in other states that have similar pilot programs or permanent programs at the state level. 1[h.] i.1 (1) Within 1[60] 901 days after the date of enactment of 1[this act] P.L. , c. (C. ) (pending before the Legislature as this bill)1, 1[and] the board shall issue an order implementing the provisions of P.L. , c. (C. ) (pending before the Legislature as this bill). If the board determines that rules and regulations are necessary for the implementation of P.L. , c. (C. ) (pending before the Legislature as this bill),1 notwithstanding the provisions of the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), to the contrary, the board 1[shall] may1, immediately upon filing proper notice with the Office of Administrative Law, adopt rules and regulations necessary for the implementation of 1[this section] P.L. , c. (C. ) (pending before the Legislature as this bill)1. (2) The rules and regulations adopted pursuant to paragraph (1) of this subsection shall be in effect for a period not to exceed one year after the date of filing. These rules and regulations shall thereafter be adopted, amended, or readopted by the board in accordance with the requirements of the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.).
2. R.S.48:2-13 is amended to read as follows: 48:2-13. a. The board shall have general supervision and regulation of and jurisdiction and control over all public utilities as defined in this section and their property, property rights, equipment, facilities and franchises so far as may be necessary for the purpose of carrying out the provisions of this Title.
The term “public utility” shall include every individual, copartnership, association, corporation or joint stock company, their lessees, trustees or receivers appointed by any court whatsoever, their successors, heirs or assigns, that now or hereafter may own, operate, manage or control within this State any railroad, street railway, traction railway, autobus, charter bus operation, special bus operation, canal, express, subway, pipeline, gas, 1[geothermal] thermal1 energy 1distribution1 pursuant to section 1 of P.L. , c. (C. ) (pending before the Legislature as this bill), electricity distribution, water, oil, sewer, solid waste collection, solid waste disposal, telephone or telegraph system, plant or equipment for public use, under privileges granted or hereafter to be granted by this State or by any political subdivision thereof.
b. Nothing contained in this Title shall extend the powers of the board to include any supervision and regulation of, or jurisdiction and control over any vehicles engaged in ridesharing arrangements with a maximum carrying capacity of not more than 15 passengers, including the driver, where the transportation of passengers is incidental to the purpose of the driver or any vehicles engaged in the transportation of passengers for hire in the manner and form commonly called taxicab service unless such service becomes or is held out to be regular service between stated termini;
c. c. Except as provided in section 7 of P.L.1995, c.101 (C.58:26-25), the board shall have no regulatory authority over the parties to a contract negotiated between a public entity and a private firm pursuant to P.L.1995, c.101 (C.58:26-19 et al.) in connection with the performance of their respective obligations thereunder.
d. d. Unless otherwise specifically provided pursuant to P.L.1999, c.23 (C.48:3-49 et al.), all services necessary for the transmission and distribution of electricity and gas, including but not limited to safety, reliability, metering, meter reading and billing, shall remain the jurisdiction of the Board of Public Utilities. The board shall also maintain the necessary jurisdiction with regard to the production of electricity and gas to assure the reliability of electricity and gas supply to retail customers in the State as prescribed by the board or any other federal or multi-jurisdictional agency responsible for reliability and capacity in the State.
e. e. Notwithstanding the provisions of subsection a.
and the availability of like or substitute services in the relevant geographic area. Upon such a classification, the board may determine such rates for the thermal energy service for the purpose of providing heating or cooling to a residential dwelling as it finds to be consistent with the prevailing cost of alternative sources of thermal energy in similar situations. The board, however, shall continue to monitor the thermal energy service to such residential dwellings and, whenever the board finds that the thermal energy service has again become sufficiently competitive pursuant to the criteria listed above, the board shall cease to regulate the sale or production of the service. The board shall not have the authority to regulate the sale or production of steam or any other form of thermal energy, including hot and chilled water, to non-residential customers.customers. 1The provisions of this subsection shall not apply to the distribution of thermal energy pursuant to section 1 of P.L. , c. (C. ) (pending before the Legislature as this bill).1 f. Nothing contained in this Title shall extend the powers of the board to include supervision and regulation of, or jurisdiction and control over, an entity engaged in the provision or use of sewage effluent for the purpose of providing a cooling medium to an end user or end users on a single site, which provision results in the conservation of potable water which would otherwise have been used for such purposes. 1The provisions of this subsection shall not apply to the distribution of thermal energy pursuant to section 1 of P.L. , c. (C. ) (pending before the Legislature as this bill).1 g. Except as provided herein, the board shall have no regulatory authority over the parties to a contract entered into between the governing body of a city of the first class and a duly incorporated nonprofit association in connection with the performance of their respective obligations thereunder when the governing body of a city of the first class shall determine by ordinance that it is in the public interest to contract with that duly incorporated nonprofit association for the provision of water supply services as defined in subsection (16) of section 15 of P.L.1971, c.198 (C.40A:11-15), or for the provision of wastewater treatment services as defined in subsection (19) of section 15 of P.L.1971, c.198 (C.40A:11-15), or the designing, financing, construction, operation, or maintenance, or any combination thereof, of a water supply facility as defined in subsection (16) of section 15 of P.L.1971, c.198 (C.40A:11-15) or a wastewater treatment system as defined in subsection (19) of section 15 of P.L.1971, c.198 (C.40A:11-15), or any component part or parts thereof, including a water filtration system as defined in subsection (16) of section 15 of P.L.1971, c.198 (C.40A:11-15), upon approval of the contract pursuant to the provisions of section 6 of P.L.2002, c.47 (C.58:28-7).
f. Notwithstanding Nothingany containedother inprovision thisof TitleP.L.2002, shallc.47 extendwhenever the powersgoverning body of a city of the boardfirst toclass includeenters supervisioninto anda regulationcontract of,with ora jurisdictionduly andincorporated controlnonprofit over,association anfor entitythe engagedprovision of water supply services as defined in subsection (16) of section 15 of P.L.1971, c.198 (C.40A:11-15), or the provisiondesigning, financing, construction, operation, or usemaintenance, or any combination thereof, of sewagea effluentwater forsupply facility as defined in subsection (16) of section 15 of P.L.1971, c.198 (C.40A:11-15), and that governing body operates water supply facilities as authorized pursuant to the purposeprovisions of providingN.J.S.40A:31-4, awhich coolingsupply mediumwater to ancustomers endwithin useranother local unit, the nonprofit association or endgoverning usersbody onshall abe singlesubject site,to whichthe provisionjurisdiction, resultsrate inregulation and control of the conservationBoard of potablePublic waterUtilities whichas wouldprovided otherwisein haveN.J.S.40A:31-23, beento usedthe forextent suchthe purposes.nonprofit association or governing body supplies water to customers within that other local unit.
(cf: g. P.L.2002, Exceptc.47, ass.10) provided herein, the3. boardThis act shall havetake noeffect regulatory1[on authority over the parties to a contract entered into between the governing body of a city of the first classday and a duly incorporated nonprofit association in connection with the performance of their respective obligations thereunder when the governingsixth bodymonth ofafter aenactment, cityexcept of the first class shall determine by ordinance that ita isgas in the public interestutility toand contract with that duly incorporated nonprofit association for the provisionBoard of waterPublic supplyUtilities servicesmay astake defined in subsection (16) of section 15 of P.L.1971, c.198 (C.40A:11-15), or for the provision of wastewater treatment services as defined in subsection (19) of section 15 of P.L.1971, c.198 (C.40A:11-15), or the designing, financing, construction, operation, or maintenance, or any combinationanticipatory thereof,action of a water supply facility as defined in subsectionadvance (16)thereof of section 15 of P.L.1971, c.198 (C.40A:11-15) or a wastewater treatment system as definedmay inbe subsectionnecessary (19)to ofimplement sectionthe 15provisions of P.L.1971,this c.198act. (C.40A:11-15),The oract anyshall componentexpire part30 ordays partsafter thereof,the includingsubmission a water filtration system as defined in subsection (16) of sectionthe 15board’s ofthird P.L.1971,and c.198final (C.40A:11-15),report upon approval of the contract pursuant to thesubsection provisionsf. of section 6 of P.L.2002, c.47 (C.58:28-7).
Notwithstanding any other provision of P.L.2002, c.47 whenever the governing body of a city of the first class enters into a contract with a duly incorporated nonprofit association for the provision of water supply services as defined in subsection (16) of section of P.L.1971, c.198 (C.40A:11-15), or the designing, financing, construction, operation, or maintenance, or any combination thereof, of a water supply facility as defined in subsection (16) of section 15 of P.L.1971, c.198 (C.40A:11-15), and that governing body operates water supply facilities as authorized pursuant to the provisions of N.J.S.40A:31-4, which supply water to customers within another local unit, the nonprofit association or governing body shall be subject to the jurisdiction, rate regulation and control of the Board of Public Utilities as provided in N.J.S.40A:31-23, to the extent the nonprofit association or governing body supplies water to customers within that other local unit.
Show all 47 changed lines (7 more)
(cf: P.L.2002, c.47, s.10) 3. This act shall take effect on the first day of the sixth month after enactment, except that a gas public utility and the Board of Public Utilities may take any anticipatory action in advance thereof as may be necessary to implement the provisions of this act. The act shall expire 30 days after the submission of the board’s third and final report pursuant to subsection f.
of section 1 of P.L. , c. (C. ) (pending before the Legislature as this bill). bill)] immediately1. STATEMENT This bill requires the Board of Public Utilities (board) to establish a three-year pilot program to authorize a gas public utility (utility) to recover the cost of a geothermal energy project (project), which project involves the replacement of aging or leaking natural gas pipelines with geothermal energy infrastructure, through the utility rates charged to its ratepayers. To participate in the pilot program, a utility is to submit an infrastructure plan with any information regarding the project that the board deems necessary. While reviewing a plan, the board is to consider: (1) the size, scope, and scale of the project;
(2) the cost of the project;
(3) the expected benefits of the project;
(4) the project’s financial impact on the utility’s ratepayers;
(5) whether the project’s benefits justify the cost of the project;
and (6) any other criteria that the board deems appropriate. In addition, a utility is required to submit certain information on the operations of the pilot program to the board. The bill requires the board to, at a minimum, summarize this information in an annual report to the Governor and the Legislature until the expiration of the pilot program. In its third and final report, the board is required to also determine whether to expand the pilot program to a permanent program. If the board decides to expand the pilot program, after considering laws, rules, and regulations in other states with similar programs, the board is to adopt rules and regulations to effectuate the transition from a pilot program to a permanent program. The pilot program is to expire 30 days after the board’s submission of its third and final report on the pilot program, provided that the board has not decided to expand the pilot program to become a permanent program. The board is to publish the reports on its Internet website. In addition, the bill amends current law to provide that the term “public utility” is to include an entity that owns, operates, manages, and controls geothermal energy within the State. Under the bill, “geothermal energy” means a renewable energy source derived from heat stored within the earth. “Geothermal energy” includes networked geothermal energy and deep geothermal energy. In addition, the bill defines “geothermal energy infrastructure” to mean utility-scale distribution infrastructure that supplies heating or cooling from geothermal energy sources.
Show all 47 changed rows (7 more)
Action History
-
REF SBA
-
REP/SCA 2RS
-
INT 1RS REF SEN
Sponsors
- John F. McKeon · Primary
- Bob Smith · Primary
Sponsorship breakdown
Export CSV (upgrade) →2 sponsors · 0 co-sponsors · 118 not signed on
Sponsors (2)
- McKeon, John F. Democrat
- Smith, Bob Democrat
Co-sponsors (0)
None.
Not signed on (118)
118 members have not signed on to this bill.
Show all 118 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 3 | 0 | 0 | 0 |
| Republican | 2 | 0 | 0 | 0 |
| Total | 5 | 0 | 0 | 0 |
| % of votes cast | 100% | 0% | 0% | 0% |
How each member voted (5)
| Member | Party | Vote |
|---|---|---|
| Greenstein, Linda R. | Democrat | Yea |
| McKeon, John F. | Democrat | Yea |
| Smith, Bob | Democrat | Yea |
| Space, Parker | Republican | Yea |
| Tiver, Latham | Republican | Yea |
Subjects
Frequently asked questions
- What does S 684 do?
- Geothermal energy pilot program-establish for gas public utilities
- Who sponsors S 684?
- S 684 is sponsored by McKeon, John F. (Democrat) and Smith, Bob (Democrat).
- What is the current status of S 684?
- This bill has been introduced in the Senate. Introduced January 13, 2026. It must pass committee before a floor vote.
- Where can I track S 684?
- Track S 684 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 684
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S 684
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →