Requires BPU to study and implement methods to allow additional distributed energy sources to interconnect ...
Do you support it?
Want to know if it passes?
We'll email you when S 648 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on S 648.
You're tracking S 648
We'll email you the moment it moves.
S 648 — Requires BPU to study and implement methods to allow additional distributed energy sources to interconnect to electrical grid.
Last action — INT 1RS REF SEN
No card. One bill, free forever — alerts when it moves.
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed General Assembly
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced January 13, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Prognosis
Where this bill stands today.
Odds of enactment
LowHow often bills like it became law.
Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
Summary
Distributed energy sources-implement methods to interconnect to electrical grid
Bill Text
- Introduced View text Current html December 18, 2025
Action History
-
INT 1RS REF SEN
Sponsors
- Linda R. Greenstein · Cosponsor
- John F. McKeon · Primary
- Bob Smith · Primary
Sponsorship breakdown
Export CSV (upgrade) →2 sponsors · 1 co-sponsors · 117 not signed on
Sponsors (2)
- McKeon, John F. Democrat
- Smith, Bob Democrat
Co-sponsors (1)
- Greenstein, Linda R. Democrat
Not signed on (117)
117 members have not signed on to this bill.
Show all 117 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does S 648 do?
- Distributed energy sources-implement methods to interconnect to electrical grid
- Who sponsors S 648?
- S 648 is sponsored by Greenstein, Linda R. (Democrat), McKeon, John F. (Democrat), and Smith, Bob (Democrat).
- What is the current status of S 648?
- This bill has been introduced in the Senate. Introduced January 13, 2026. It must pass committee before a floor vote.
- Where can I track S 648?
- Track S 648 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 648
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S 648
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →