Requires BPU to establish distributed energy storage incentive program.*
This bill mandates the Board of Public Utilities (BPU) to set up an incentive program aimed at encouraging the installation of energy storage systems. The goal is to support the development and use of energy storage technology.
Do you support it?
Want to know if it passes?
We'll email you when S 631 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on S 631.
You're tracking S 631
We'll email you the moment it moves.
S 631 — Requires BPU to establish distributed energy storage incentive program.*
Last action — REF SBA
No card. One bill, free forever — alerts when it moves.
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed General Assembly
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced January 13, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Prognosis
Where this bill stands today.
Odds of enactment
LowHow often bills like it became law.
-
Introduced
Current position in the legislative process.
-
3 sponsors
2 primary, 1 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (3 D).
-
Cleared a recorded vote
Passed 1 recorded vote so far.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
In plain language
The bill requires the BPU to create incentives for installing energy storage systems.
This bill mandates the Board of Public Utilities (BPU) to set up an incentive program aimed at encouraging the installation of energy storage systems. The goal is to support the development and use of energy storage technology.
What this means for you
- Environment: This means increased support for clean energy technologies, potentially leading to a reduction in carbon emissions.
Summary
Energy storage systems, new-req. BPU develop program to incentivize installation
Bill Text
What changed in the latest version
206 added · 320 removedPlain-language change summary
The amended version of the bill establishes an incentive program for distributed energy storage, specifically requiring the New Jersey Board of Public Utilities to implement this program. This replaces the previous language that focused on energy storage systems broadly and outlines specific definitions related to the program, such as “accredited capacity” and “critical community facility.” The practical effect of the change is a more targeted approach toward distributing energy storage solutions, which may enhance local energy resilience and security.
S631 SCS SENATE COMMITTEE SUBSTITUTE FOR SENATE, No.
631 STATE OF NEW JERSEY 222nd LEGISLATURE PRE-FILEDADOPTED FORJUNE INTRODUCTION8, IN THE 2026 SESSION Sponsored by:
SenatorSenator BOB SMITH District 17 (Middlesex and Somerset) SenatorSenator LINDA R.
Senator Diegnan SYNOPSIS EstablishesRequires incentiveBPU programto forestablish installationdistributed of energy storage systems.incentive program.
CURRENT VERSION OF TEXT IntroducedSubstitute Pendingas Technicaladopted Review by Legislativethe Counsel.Senate Environment and Energy Committee.
An Act concerning energy storage systems and supplementing Title 48 of the Revised Statutes.
1. TheAs used in P.L. , c. (C. ) (pending before the Legislature findsas andthis declaresbill): that: “Accredited capacity” means the same as that term is defined in section 1 of P.L.2025, c.136 (C.48:3-121.2).
a. “Board” Themeans electricthe gridNew isJersey evolvingBoard from a system that relies on one-way, long-distance transmission of electricityPublic fromUtilities centralizedor powerany plantssuccessor toagency. customers to a system that includes local energy sources located close to customers, who increasingly both produce and consume electricity;
b. “Critical Energycommunity storagefacility” systems,means locatedand throughoutincludes, thebut electricis grid,not canlimited facilitateto, greaterany energyfacility independencethat andhas energybeen securityformally foridentified the State’s electric customers by providingState increasedor stabilitylocal ofoffices the power supply, smoother integration of renewableemergency energymanagement sources,in a reductionhazard inmitigation theplan peakor demandsimilar placeddocument onas centralizeda powercritical plants,community andfacility. cost savings;
c. “Customer-sited Locating energy sourcesstorage andsystem” means energy storage systemsthat operates in highparallel valuewith locations,an oftenelectric neardistribution system, is connected on the pointcustomer side of consumption,the enhancesmeter, gridand stabilityis andowned increasesby efficiency;the customer or another party that is not the electric public utility that provides electric power to the customer.
d. “Electric Empoweringpublic Newutility” Jerseyansmeans tothe takesame aas more active role in the State’sterm electricis griddefined wouldin leveragesection private3 capital,of protectP.L.1999, customersc.23 from(C.48:3-51). rising energy costs, and promote greater understanding and engagement with the challenges associated with updating the State’s electric grid;
e. “Energy Front-of-the-meterstorage” energymeans storage systems that are interconnected with the transmissionsame andas distributionthat systemterm offeris distinctivedefined advantages,pursuant including, but not limited to, lower costs and responsiveness to pricesection signals1 fromof theP.L.2025, wholesalec.136 electricity(C.48:3-121.2). market or electric public utility;
f. “Energy Therestorage arecapacity” currentlymeans significantthe barriersmeasure thatof disincline New Jersey electric customers from obtaining the benefits of energy storagecapacity systems,in includingkilowatt-hours inadequateor valuationmegawatt-hours of energy storage;storage.
and g. “Front-of-the-meter Itenergy isstorage fitting,system” proper,means and in the public interest to encourage the installation of energy storage systemsthat byis providinginterconnected monetarywith incentivesthe todistribution newsystem energyon storagethe systemsutility andside renewableof energythe sourcesmeter. paired“Front-of-the-meter with energy storagestorage” systems,shall andinclude to compensate front-of-the-meter energy storage systemsthat foris theirsubject value to thea grid,tariff untilfrom thesean barrierselectric arepublic removedutility byor marketfrom forces.PJM.
2. “Incentive Asprogram” usedmeans inthe distributed energy storage incentive program established pursuant to section 2 of P.L. , c. (C. ) (pending before the Legislature as this act:bill).
“All-in“Installed systemcapacity” cost” means the totalnameplate costoutput of purchasingan and installing a new energy storage system, includingmeasured thein costskilowatts or megawatts of hardware,alternating siting,current, installation,that permitting,is andavailable interconnection.to the electric grid.
“Board” means the Board of Public Utilities.
“Customer-sited energy storage system” means an energy storage system that operates in parallel with an electric distribution system, is connected on the customer side of the meter, and is owned by the customer or another party that is not the electric public utility that provides electric power to the customer.
“Electric public utility” means a public utility, as that term is defined in R.S.48:2-13, that transmits and distributes electricity to end users within the State.
“Energy storage system” means a commercially available technology that is capable of absorbing energy, storing such energy for a period of time, and redelivering the energy after it has been stored to provide direct or indirect benefits to the broader electricity system, including, but not limited to, a battery system, pumped hydroelectric system, compressed air system, flywheel, or a hydrogen production, storage, or fuel cell system, provided that the hydrogen is produced through electrolysis using electricity from a renewable source.
“Front-of-the-meter energy storage system” means an energy storage system that is interconnected with the transmission and distribution system on the utility side of the meter. “Front-of-the-meter energy storage system” shall include an energy storage system that is subject to a tariff from an electric public utility or from PJM.
“Gap analysis” means an analysis that determines the difference between the average all-in system costs of energy storage systems, considering each energy storage technology and application, and the prevailing revenue stream opportunities to support the economics of the energy storage systems.
“Performance incentive” means a series of recurring monetary payments paid by an electric public utility to an owner of an energy storage system who participates in the pilot program to compensate for the benefits to the transmission and distribution system provided by the system.
“Pilot program” means the pilot program to incentivize the installation of new energy storage systems in the State developed by the board pursuant to section 3 of this act.
“Transmission“Public andutility” distribution system” means the same as thethat term is defined inpursuant sectionto 3R.S.48:2-13. of P.L.1999, c.23 (C.48:3-51).
“Upfront2. incentive”a. means(1) aNo one-timelater monetarythan paymentdays fromafter the boardeffective date of P.L. , c. (C. ) (pending before the Legislature as this bill), the Board of Public Utilities shall establish, by order, a distributed energy storage incentive program to anbe owneradministered by electric public utilities, which incentive program shall provide incentives for the development of anat least 2,000 megawatts of installed capacity of customer-sited energy storage systemsystems whoand participatesfront-of-the-meter inenergy storage systems by 2030. The order establishing the pilotincentive program shall specify minimum filing requirements for the incentive program, including, but not limited to: (a) the incentive levels to mitigatebe established for customer-sited energy storage systems and front-of-the-meter energy storage systems connected to the upfrontdistribution costssystem. However, the board may defer determination of incentive levels for front-of-the-meter energy storage systems until after an electric public utility files the system.tariffs required by section 3 of P.L. , c. (C. ) (pending before the Legislature as this bill);
3. (b) a. a Nomethodology laterfor thandetermining 90 days after the effectiverates datefor of this act, the boardtariffs shallfiled initiateby aan proceedingelectric topublic developutility apursuant pilot program to incentivizesection the3 installation of newP.L. , energyc. storage(C. ) systems(pending inbefore the State. Legislature The pilot program shall include an upfront incentive as set forth in section 4 of this actbill) and a performance incentive as set forth in section 5 of this act for ownersfront-of-the-meter of energy storage systemssystems; that are approved by the board to participate in the program. The provisions of the pilot program shall be based upon the best available data from similarly designed programs in other states.
At(c) thean completionapplication ofprocess thefor proceedingapplicants orseeking 180an daysincentive afterthrough the effectiveincentive dateprogram; of this act, whichever occurs sooner, the board shall issue a board order establishing the pilot program. The order shall include:
the incentive amounts established for customer-sited energy storage systems and front-of-the-meter energy(d) storageeligibility systemsrequirements pursuantfor toapplicants sectionsseeking 4an andincentive 5through ofthe thisincentive act;program.
a methodology(2) forIn determiningthe compensationfirst amountsyear forof tariffsthe filedincentive program, the board shall set goals to provide incentives for front-of-the-meterup to megawatts in customer-sited energy storage systems notand subjectfront-of-the-meter toenergy storage systems, with applicants accepted on a tarifffirst-come, fromfirst-served PJMbasis. pursuantIn general, the incentive program shall be designed to sectionachieve 6or exceed, together with other energy storage programs established by the board through law, rule, regulation, or order, a total of thisincentives act;for new energy storage capacity equal to 3,000 megawatts by 2030.
and an(3) applicationThe processincentives forprovided personsthrough whothe wishincentive toprogram participateshall inbe thestructured pilotas program. an Theadministratively-determined, upfrontfixed incentive amountspaid shallon an annual basis for a period of 15 years, or another period as may be established by the board, based on the nameplateenergy storage capacity of the energy storage system, as measured in kilowattkilowatt-hours. hoursThe amount of alternatingthe currentincentive powershall output. be expressed b. in Stand-alonedollars per rated kilowatt-hour of energy storage systemscapacity orper year. The board shall establish different incentive levels that distinguish between different projects sizes, whether the energy storage systemssystem thatis arecustomer-sited pairedor withfront-of-the-meter, aand renewableother sourcecriteria as established by the board. The total present value of electrican power,incentive including,provided butthrough notthe limitedincentive to,program aover solarthe photovoltaic15-year array,incentive shallterm, or other term as may be eligibleestablished forby the program. board, However,shall not exceed 40 percent of a project’s total cost, based on a seven percent discount rate or other discount rate set by the pilotboard. programThe shallboard bemay availabledevelop onlya system of incentive bonuses to andifferentiate energybetween storageprojects systemby that:attributes, including, but not limited to, those serving overburdened communities and those providing resilient power to critical community facilities.
(1) b. Stand-alone energy storage systems or energy storage systems that are paired with a renewable source of electric power, including, but not limited to, a solar photovoltaic array, shall be eligible for the incentive program. However, the incentive program shall only be available to an energy storage system that becomes operable on or after the date ofon which the pilotincentive program’sprogram establishment;is established pursuant to subsection a.
of this section and is (2) either: a customer-sited energy storage system that is either:owned, hosted, leased, or operated by a residential or non-residential customer of an electric public utility;
or (a) a customer-sitedfront-of-the-meter energy storage system thatlocated isin owned,the leased,service orarea operatedof byan aelectric residentialpublic orutility non-residentialand customerconnected ofto anthe electricdistribution publicsystem. utility;
or (b) c. a The front-of-the-meterboard shall reserve at least one quarter of the incentives provided to customer-sited energy storage systemsystems locatedfor incustomer theclasses serviceor areadeployment ofscenarios anthat electricface publicgreater utility.economic hurdles, including, but not limited to, low-to-moderate income customers and customers located in overburdened communities.
c. d. The boardincentive program shall reservenot atprevent leastor onediscourage thirdcustomer-sited energy storage systems or front-of-the-meter energy storage systems from providing services to, or participating in, the wholesale markets, particularly the PJM capacity market, unless such restrictions are temporarily needed to ensure the peak load reduction value of energy storage systems supported by the upfrontincentive incentivesprogram providedis reflected in PJM load forecasts prior to customer-sitedthe first delivery year in which the energy storage systems forcan customeract classesas capacity suppliers. Any evaluation of costs and benefits of customer-sited energy storage systems or deploymentfront-of-the-meter scenariosenergy storage systems shall include benefits that faceaccrue greaterdirectly economicor hurdles,indirectly including,to butratepayers notdue limitedto to,the low-to-moderateparticipation incomeof customersthe andcustomer-sited customersenergy sitedstorage system or front-of-the-meter energy storage system in overburdenedwholesale communities.markets.
d. e. InAn theapplicant courseseeking ofan developingincentive award through the pilotincentive program,program thefor boarda shallcustomer-sited considerenergy revisingstorage thesystem eligibilityshall requirementcomplete forthe net-meteringproject forby solarno energylater systemsthan that30 requiresmonths thatafter the capacitydate ofon which the solarapplicant’s energyapplication systemis beapproved. noAn greaterapplicant thanseeking thean annualizedincentive electricityaward usagethrough of the facilityincentive toprogram whichfor thea solarfront-of-the-meter energy storage system suppliesshall electricity,complete inthe orderproject toby accommodateno later than 42 months after the inclusiondate ofon energywhich storagethe systemapplicant’s capacity,application asis wellapproved. asHowever, the potentialproject timeline requirements established by this subsection may be waived or extended for futurean electricapplicant vehiclethat capacity. demonstrates Theextenuating boardcircumstances shallthat includecaused itsa recommendationdelay in the reportcompletion requiredof the project, including, but not limited to, delays caused by sectionan 7electric ofpublic thisutility, act.PJM, a permit authority, or supply chain disruption.
e. f. The pilotboard, programwith input from stakeholders, shall beestablish designedminimum toperformance achievestandards orfor exceed,customer-sited togetherenergy storage systems and a method for measuring and ensuring compliance with otherthose programsstandards establishedfor byenergy thestorage board,systems receiving an incentive through the incentive program, which performance standards may include, but shall not be limited to, capability to increase distributed renewable energy storagehosting goalscapacity, establishedcongestion byrelief, subsectioncapacity d.value or peak load reduction, voltage control services such as Volt/Var control systems and Volt/Watt control systems, ramp rate control, and transmission and distribution infrastructure investment deferral or avoidance. The performance standards may be autonomous or respond to signals from the local distribution utility.
of sectionThe 1 board ofmay P.L.2018,include c.17within (C.48:3-87.8).the minimum filing requirements established in subsection a.
of f. this Thesection, programan shalladjustment notto preventthe energyincentive storagepayments systemsaccording fromto providinga servicesproject’s to,degree orof participatingcompliance in,for theprogram wholesaleyears market. after Anythe evaluationinitial ofprogram costsyear. andThe benefitsboard ofmay energyapply storagea systemspreliminary shallversion includeof benefitsthese thatperformance accruestandards directly or indirectly to ratepayersthe duefirst toyear theof participationperformance offor the energyinitial storageprogram systemsyear inincentive wholesalerecipients. markets.
Show all 82 changed lines (42 more)
g. TheAfter pilot program shall be closed immediately upon the adoptionboard ofissues theminimum rulesfiling andrequirements regulations required pursuant to sectionsubsection 8a. of this act.
of this 4. section, a. each Theelectric pilotpublic programutility shall includefile anwith upfront incentive for the ownerboard of a customer-sitedpetition, energy storage system or front-of-the-meterall energyelectric storagepublic system,utilities which shall befile basedwith on the installed capacity of the energy storage system and provided in dollars per kilowatt-hour and shall not exceed 40 percent of the project’s all-in cost. When determining the amount of the upfront incentive offered to an energy storage system, the board shall perform a gapjoint analysispetition toif ensure that the incentive to the owner incorporates consideration of the difference between available revenue streams, including any performance incentive offered under the pilot program, and the all-in system costs of the energy storage system. The board mayso developdirects, aproposing systemhow of incentive bonuses to differentiateimplement between projects by attributes, including, but not limited to, those serving low- and middle-income communities. After the expiration of the pilot program, the board may reduce or eliminate the upfront incentive commensurateprogram. withAny aindividual Statewidepetitions reductionshall inmaximize all-incommon systempublic costsutility forelements energyand storageminimize systemspublic orutility-specific anelements. increase in revenue streams available to owners of energy storage systems.
b. h. The board shall establishreview qualificationseach petition or the joint petition and requirementsmay andirect applicantchanges shallto bethe requiredimplementation plan presented in the submitted petitions or joint petition prior to meetboard action. The board shall approve, approve in orderpart, or deny each submitted petition and shall determine the appropriate level of spending for each electric public utility’s implementation plan and allow each electric public utility to recover its costs through a separate component of the utility’s rate. Each electric public utility’s cost recovery shall be eligiblelimited to the actual cost of implementing the incentive program and administering the incentive payments, inclusive of any carrying costs needed to account for anany upfrontdifference between the timing of incentive pursuantprogram expenditures and cost recovery. Notwithstanding the foregoing, the board may allow an electric public utility to thisearn section,a rate of return, which may be moreless stringent than the requirementsrate of subsectionreturn b.established in the electric public utility’s most recent base rate case, if the electric public utility successfully meets incentive program implementation benchmarks established by the board.
of i. Beginning in 2027 and ending in the first calendar year after cost recovery ends under the incentive program established by this section, the board shall report annually to the Governor, and to the Legislature pursuant to section 32 of thisP.L.1991, act.c.164 (C.52:14-19.1), information pertaining to the incentive program.
c. 3. ForEach energyelectric storagepublic systemsutility within 25the kilowattsState ofshall nameplatefile storagea capacitytariff orwith greater, the board shallno requirelater than 12 months after the applicanteffective fordate anof upfrontP.L. , incentivec. to(C. ) pay(pending tobefore the boardLegislature aas refundablethis deposit,bill), which tariff shall beapply refundedonly onceto thefront-of-the-meter energy storage systemsystems. isThe determinedtariff byshall thebe boardformulated to bemaximize operablecommon andelements inamong use. each Theelectric boardpublic shallutility developand acompensate formulafront-of-the-meter energy storage systems for calculatingtheir value to the depositgrid, amount,as described in whichP.L. , thec. amount(C. ) of(pending before the depositLegislature isas proportionalthis tobill). theThe nameplatetariff capacityshall ofestablish thea new rate design for front-of-the-meter energy storage system.systems that reflects cost causation.
The d. tariff (1) may distinguish between different sizes and types of front-of-the-meter energy storage systems. The boardtariff shall requireexempt anfront-of-the-meter applicantenergy storage systems from charges intended for ancustomers upfrontwho incentiveconsume toelectricity, completeincluding, but not limited to, the energysocietal storagebenefits project:charge imposed pursuant to section 12 of P.L.1999, c.23 (C.48:3-60).
(a) 4. forThe customer-sitedboard energyshall, storagein systems,accordance nowith laterthe than“Administrative 18Procedure monthsAct,” afterP.L.1968, thec.410 date(C.52:14B-1 theet boardseq.), approvesadopt therules applicant’sand application;regulations as necessary to implement this act.
and (b) 5. forThis front-of-the-meteract energyshall storagetake systems,effect noimmediately. later than 40 months after the date the board approves the applicant’s application.
(2) An applicant that does not comply with the project timeline requirements of this subsection shall not be refunded the deposit paid to the board pursuant to subsection c.
of this section. The deposit shall be transferred by the board to the General Fund. The board may waive or extend the project timeline requirements established by this subsection for an applicant that demonstrates extenuating circumstances that caused a delay in the completion of the energy storage project, including any delays caused by an electric public utility or PJM.
e. The board shall limit upfront incentives to one award per electric meter, for customer-sited energy storage systems.
f. The board shall allocate at least $60 million per year, for the duration of the pilot program, from moneys collected from the societal benefits charge imposed pursuant to section 12 of P.L.1999, c.23 (C.48:3-60) to fund upfront incentives pursuant to this section. After the expiration of the pilot program, the board may determine the appropriate amount of funds to allocate to upfront incentives.
5. a. The pilot program shall include a performance incentive to compensate the owner of a customer-sited energy storage system or front-of-the-meter energy storage system. The purpose of the performance payment shall be to:
(1) provide fair compensation for the full value of services provided by the energy storage system, including improving the efficiency of the transmission and distribution system and reducing the peak demand placed on electricity generators;
(2) increase the number of cost-effective energy storage systems that are connected to the transmission and distribution system;
(3) facilitate the integration of distributed sources of electricity generation;
and (4) increase the resilience of the transmission and distribution systems through the deployment of back-up power.
b. The board shall require each electric public utility in the State to offer an appropriate performance incentive, for a period to be determined by the board, to an owner of an energy storage system that participates in the program, which compensates for the operational attributes of the system, including, but not limited to, capacity, demand response, load shifting, generation shifting, locational value, and voltage support. The costs of the performance incentives shall be apportioned to ratepayers using a methodology approved by the board.
c. The board shall establish qualifications and requirements an applicant shall be required to meet in order to be eligible for a performance incentive pursuant to this section, which may be more stringent than the requirements of subsection b.
of section 3 of this act.
6. In addition to the upfront incentive established pursuant to section 4 of this act, and the performance incentive established pursuant to section 5 of this act, each electric public utility in the State shall file a tariff with the board, no later than 12 months after the effective date of this act, that shall apply only to front-of-the-meter energy storage systems that are not subject to a tariff from PJM. The tariff shall be formulated to provide front-of-the-meter energy storage systems with compensation for their value to the grid, as described in section 5 of this act. The tariff shall establish a new rate design for front-of-the-meter energy storage systems that accurately reflects cost causation, based on a cost of service study. The tariff may distinguish between different sizes and types of energy storage systems. The tariff shall exempt front-of-the-meter energy storage systems from charges intended for customers who consume electricity, including, but not limited to, the societal benefits charge imposed pursuant to section 12 of P.L.1999, c.23 (C.48:3-60).
7. No later than one year after the date of the pilot program's establishment, the board shall conduct a review of the program and submit a report, pursuant to section 2 of P.L.1991, c.164 (C.52:14-19.1), to the Legislature that includes, but need not be limited to, details about the recipients of incentive payments, the total costs of upfront incentives provided through the program, an evaluation of the extent of energy storage capacity that has been deployed in the State as a result of the program, an evaluation of the distribution of different energy storage technologies deployed, and an analysis of the maturity of the energy storage market in the State.
8. No later than three years after the effective date of this act, the board, pursuant to the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), shall adopt rules and regulations establishing a permanent energy storage incentive program. The permanent program shall be consistent with the provisions of this act.
9. This act shall take effect immediately.
STATEMENT This bill requires the Board of Public Utilities (BPU) to develop a program to provide monetary incentives to persons who install new energy storage systems in the State.
Specifically, the bill directs the BPU, no later than 180 days after the bill’s effective date, to publish incentive levels and an application process for an energy storage incentive pilot program.
The pilot program will continue until the BPU adopts rules and regulations to establish a permanent program pursuant to the bill.
The program is to meet or exceed the State’s goal of hosting two gigawatts of energy storage capacity by 2030.
The bill establishes certain requirements for the program, including parameters for the types of energy storage projects eligible for the program, as described in the bill.
The program is available to customer-sited energy storage systems, which are smaller energy storage systems owned by a customer of electric utilities and sited in a customer’s residence or business, and to front-of-the-meter energy storage systems, which are larger energy storage systems that are connected directly to the grid.
The bill directs the BPU to reserve a portion of the incentives for energy storage systems owned by low-to-moderate income customers and customers sited in overburdened communities.
The incentives are an upfront incentive and a performance incentive.
The upfront incentive consists of a one-time payment made by the BPU’s Clean Energy Program, which is funded by the societal benefits charge imposed under current law pursuant to N.J.S.A.48:3-60.
The amount of the upfront incentive is calculated using a “gap analysis,” as defined in the bill, to determine the difference between the all-in system cost and the expected lifetime revenue that the customer can expect to gain from the system.
“All-in system cost” is defined as the total cost of purchasing and installing a new energy storage system, including the costs of hardware, siting, installation, permitting, and interconnection.
The bill requires certain applicants for an upfront incentive to pay a deposit and requires applicants to meet certain timeline requirements, as described in the bill.
The bill specifies that the BPU is to allocate at least $60 million per year of funds collected from the societal benefits charge for upfront incentives for the duration of the pilot program.
The performance incentive is a recurring payment, made by an electric public utility, to compensate the owner of the energy storage system for services to the grid made by the system, including reduction of peak demand and supply of power during outages.
The bill directs each electric public utility to file a tariff, a pricing structure that includes rates and other charges, with the BPU for front-of-the-meter energy storage systems that are not subject to a tariff by PJM Interconnection, L.L.C.
The tariff is required to take into account the costs of service and benefits to the grid from front-of-the-meter energy storage systems.
The tariff is required to exempt front-of-themeter energy storage systems from charges intended for customers who consume electricity, including, but not limited to, the societal benefits charge.
Finally, the bill directs the BPU to submit a report to the Legislature on the pilot program no later than one year after the program is established.
Show all 82 changed rows (42 more)
Action History
-
REF SBA
-
REP/SCS 2RS
-
INT 1RS REF SEN
Sponsors
- Patrick J. Diegnan Jr. · Cosponsor
- Linda R. Greenstein · Primary
- Bob Smith · Primary
Sponsorship breakdown
Export CSV (upgrade) →2 sponsors · 1 co-sponsors · 117 not signed on
Sponsors (2)
- Greenstein, Linda R. Democrat
- Smith, Bob Democrat
Co-sponsors (1)
- Diegnan Jr., Patrick J. Democrat
Not signed on (117)
117 members have not signed on to this bill.
Show all 117 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 3 | 0 | 0 | 0 |
| Republican | 2 | 0 | 0 | 0 |
| Total | 5 | 0 | 0 | 0 |
| % of votes cast | 100% | 0% | 0% | 0% |
How each member voted (5)
| Member | Party | Vote |
|---|---|---|
| Greenstein, Linda R. | Democrat | Yea |
| McKeon, John F. | Democrat | Yea |
| Smith, Bob | Democrat | Yea |
| Space, Parker | Republican | Yea |
| Tiver, Latham | Republican | Yea |
Subjects
Frequently asked questions
- What does S 631 do?
- Energy storage systems, new-req. BPU develop program to incentivize installation
- Who sponsors S 631?
- S 631 is sponsored by Diegnan Jr., Patrick J. (Democrat), Greenstein, Linda R. (Democrat), and Smith, Bob (Democrat).
- What is the current status of S 631?
- This bill has been introduced in the Senate. Introduced January 13, 2026. It must pass committee before a floor vote.
- Where can I track S 631?
- Track S 631 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 631
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S 631
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →