New Jersey 222nd Legislature Status: Introduced 3 D cosponsors

S 631 — Requires BPU to establish distributed energy storage incentive program.*

Last action — REF SBA

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed General Assembly
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the Senate. Introduced January 13, 2026. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Prognosis

Stalled 32% · moderate confidence

Where this bill stands today.

Odds of enactment

Low

How often bills like it became law.

  • Introduced

    Current position in the legislative process.

  • 3 sponsors

    2 primary, 1 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (3 D).

  • Cleared a recorded vote

    Passed 1 recorded vote so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

In plain language

The bill requires the BPU to create incentives for installing energy storage systems.

This bill mandates the Board of Public Utilities (BPU) to set up an incentive program aimed at encouraging the installation of energy storage systems. The goal is to support the development and use of energy storage technology.

What this means for you
  • Environment: This means increased support for clean energy technologies, potentially leading to a reduction in carbon emissions.

Summary

Energy storage systems, new-req. BPU develop program to incentivize installation

Bill Text

What changed in the latest version

206 added · 320 removed

Plain-language change summary

The amended version of the bill establishes an incentive program for distributed energy storage, specifically requiring the New Jersey Board of Public Utilities to implement this program. This replaces the previous language that focused on energy storage systems broadly and outlines specific definitions related to the program, such as “accredited capacity” and “critical community facility.” The practical effect of the change is a more targeted approach toward distributing energy storage solutions, which may enhance local energy resilience and security.

→
Previous
Latest
S631 SENATE, No.
S631 SCS SENATE COMMITTEE SUBSTITUTE FOR SENATE, No.
631 STATE OF NEW JERSEY 222nd LEGISLATURE   PRE-FILED FOR INTRODUCTION IN THE 2026 SESSION     Sponsored by:
631 STATE OF NEW JERSEY 222nd LEGISLATURE   ADOPTED JUNE 8, 2026     Sponsored by:
Senator BOB SMITH District 17 (Middlesex and Somerset) Senator LINDA R.
Senator  BOB SMITH District 17 (Middlesex and Somerset) Senator  LINDA R.
Senator Diegnan         SYNOPSIS      Establishes incentive program for installation of energy storage systems.
Senator Diegnan         SYNOPSIS      Requires BPU to establish distributed energy storage incentive program.
  CURRENT VERSION OF TEXT      Introduced Pending Technical Review by Legislative Counsel.
  CURRENT VERSION OF TEXT      Substitute as adopted by the Senate Environment and Energy Committee.
   An Act concerning energy storage systems and supplementing Title 48 of the Revised Statutes.
       An Act concerning energy storage and supplementing Title of the Revised Statutes.
       1.    The Legislature finds and declares that:
       1.    As used in P.L.    , c.    (C.        ) (pending before the Legislature as this bill):       “Accredited capacity” means the same as that term is defined in section 1 of P.L.2025, c.136 (C.48:3-121.2).
     a.     The electric grid is evolving from a system that relies on one-way, long-distance transmission of electricity from centralized power plants to customers  to a system that includes local energy sources located close to customers, who increasingly both produce and consume electricity;
     “Board” means the New Jersey Board of Public Utilities or any successor agency.
     b.    Energy storage systems, located throughout the electric grid, can facilitate greater energy independence and energy security for the State’s electric customers by providing increased stability of the power supply, smoother integration of renewable energy sources, a reduction in the peak demand placed on centralized power plants, and cost savings;
     “Critical community facility” means and includes, but is not limited to, any facility that has been formally identified by State or local offices of emergency management in a hazard mitigation plan or similar document as a critical community facility.
     c.     Locating energy sources and energy storage systems in high value locations, often near the point of consumption, enhances grid stability and increases efficiency;
     “Customer-sited energy storage system” means energy storage that operates in parallel with an electric distribution system, is connected on the customer side of the meter, and is owned by the customer or another party that is not the electric public utility that provides electric power to the customer.
     d.    Empowering New Jerseyans to take a more active role in the State’s electric grid would leverage private capital, protect customers from rising energy costs, and promote greater understanding and engagement with the challenges associated with updating the State’s electric grid;
     “Electric public utility” means the same as the term is defined in section 3 of P.L.1999, c.23 (C.48:3-51).
     e.     Front-of-the-meter energy storage systems that are interconnected with the transmission and distribution system offer distinctive advantages, including, but not limited to, lower costs and responsiveness to price signals from the wholesale electricity market or electric public utility;
     “Energy storage” means the same as that term is defined pursuant to section 1 of P.L.2025, c.136 (C.48:3-121.2).
      f.     There are currently significant barriers that disincline New Jersey electric customers from obtaining the benefits of  energy storage systems, including inadequate valuation of energy storage;
     “Energy storage capacity” means the measure of the energy capacity in kilowatt-hours or megawatt-hours of energy storage.
and      g.    It is fitting, proper, and in the public interest to encourage the installation of energy storage systems by providing monetary incentives to new energy storage systems and  renewable energy sources paired with energy storage systems, and to compensate front-of-the-meter energy storage systems for their value to the grid, until these barriers are removed by market forces.
     “Front-of-the-meter energy storage system” means energy storage that is interconnected with the distribution system on the utility side of the meter.  “Front-of-the-meter energy storage” shall include energy storage that is subject to a tariff from an electric public utility or from PJM.
       2.    As used in this act:
     “Incentive program” means the distributed energy storage incentive program established pursuant to section 2 of P.L.    , c.    (C.        ) (pending before the Legislature as this bill).
     “All-in system cost” means the total cost of purchasing and installing a new energy storage system, including the costs of hardware, siting, installation, permitting, and interconnection.
     “Installed capacity” means the nameplate output of an energy storage system, measured in kilowatts or megawatts of alternating current, that is available to the electric grid.
     “Board” means the Board of Public Utilities.
     “Customer-sited energy storage system” means an energy storage system that operates in parallel with an electric distribution system, is connected on the customer side of the meter, and is owned by the customer or another party that is not the electric public utility that provides electric power to the customer.
     “Electric public utility” means a public utility, as that term is defined in R.S.48:2-13, that transmits and distributes electricity to end users within the State.
     “Energy storage system” means a commercially available technology that is capable of absorbing energy, storing such energy for a period of time, and redelivering the energy after it has been stored to provide direct or indirect benefits to the broader electricity system, including, but not limited to, a battery system, pumped hydroelectric system, compressed air system, flywheel, or a hydrogen production, storage, or fuel cell system, provided that the hydrogen is produced through electrolysis using electricity from a renewable source.
     “Front-of-the-meter energy storage system” means an energy storage system that is interconnected  with the transmission and distribution system on the utility side of the meter.  “Front-of-the-meter energy storage system” shall include an energy storage system that is subject to a tariff from an electric public utility or from PJM.
     “Gap analysis” means an analysis that determines the difference between the average all-in system costs of energy storage systems, considering each energy storage technology and application, and the prevailing revenue stream opportunities to support the economics of the energy storage systems.
     “Performance incentive” means a series of recurring monetary payments paid by an electric public utility to an owner of an energy storage system who participates in the pilot program to compensate for the benefits to the transmission and distribution system provided by the system.
     “Pilot program” means the pilot program to incentivize the installation of new energy storage systems in the State developed by the board pursuant to section 3 of this act.
      “Transmission and distribution system” means the same as the term is defined in section 3 of P.L.1999, c.23 (C.48:3-51).
     “Public utility” means the same as that term is defined pursuant to R.S.48:2-13.
     “Upfront incentive” means a one-time monetary payment from the board to an owner of an energy storage system who participates in the pilot program to mitigate the upfront costs of the system.
       2.    a.  (1) No later than days after the effective date of P.L.    , c.    (C.        ) (pending before the Legislature as this bill), the Board of Public Utilities shall establish, by order, a distributed energy storage incentive program to be administered by electric public utilities, which incentive program shall provide incentives for the development of at least 2,000 megawatts of installed capacity of customer-sited energy storage systems and front-of-the-meter energy storage systems by 2030.  The order establishing the incentive program shall specify minimum filing requirements for the incentive program, including, but not limited to:       (a)   the incentive levels to be established for customer-sited energy storage systems and front-of-the-meter energy storage systems connected to the distribution system.  However, the board may defer determination of incentive levels for front-of-the-meter energy storage systems until after an electric public utility files the tariffs required by section 3 of P.L.    , c.    (C.        ) (pending before the Legislature as this bill);
       3.    a.  No later than 90 days after the effective date of this act, the board shall initiate a proceeding to develop a pilot program to incentivize the installation of new energy storage systems in the State.  The pilot program shall include an upfront incentive as set forth in section 4 of this act and a performance incentive as set forth in section 5 of this act for owners of energy storage systems that are approved by the board to participate in the program.  The provisions of the pilot program shall be based upon the best available data from similarly designed programs in other states.
     (b)   a methodology for determining the rates for the tariffs filed by an electric public utility pursuant to section 3 of P.L.    , c.    (C.        ) (pending before the Legislature as this bill) for front-of-the-meter energy storage systems;
     At the completion of the proceeding or 180 days after the effective date of this act, whichever occurs sooner, the board shall issue a board order establishing the pilot program.  The order shall include:
     (c)   an application process for applicants seeking an incentive through the incentive program;
the incentive amounts established for customer-sited energy storage systems and front-of-the-meter energy storage systems  pursuant to sections 4 and 5 of this act;
and      (d)   eligibility requirements for applicants seeking an incentive through the incentive program.
a methodology for determining compensation amounts for tariffs filed for front-of-the-meter energy storage systems not subject to a tariff from PJM pursuant to section 6 of this act;
     (2)   In the first year of the incentive program, the board shall set goals to provide incentives for up to megawatts in customer-sited energy storage systems and front-of-the-meter energy storage systems, with applicants accepted on a first-come, first-served basis.  In general, the incentive program shall be designed to achieve or exceed, together with other energy storage programs established by the board through law, rule, regulation, or order, a total of incentives for new energy storage capacity equal to 3,000 megawatts by 2030.
and an application process for persons who wish to participate in the pilot program.  The upfront incentive amounts shall be based on the nameplate storage capacity of the energy storage system, as measured in kilowatt hours of alternating current power output.       b.    Stand-alone energy storage systems or energy storage systems that are paired with a  renewable source of electric power, including, but not limited to, a solar photovoltaic array, shall be eligible for the program.  However, the pilot program shall be available only to an energy storage system that:
     (3)   The incentives provided through the incentive program shall be structured as an administratively-determined, fixed incentive paid on an annual basis for a period of 15 years, or another period as may be established by the board, based on the energy storage capacity of the energy storage system, as measured in kilowatt-hours.  The amount of the incentive shall be expressed in dollars per rated kilowatt-hour of energy storage capacity per year.  The board shall establish different incentive levels that distinguish between different projects sizes, whether the energy storage system is customer-sited or front-of-the-meter, and other criteria as established by the board.  The total present value of an incentive provided through the incentive program over the 15-year incentive term, or other term as may be established by the board, shall not exceed 40 percent of a project’s total cost, based on a seven percent discount rate or other discount rate set by the board.  The board may develop a system of incentive bonuses to differentiate between projects by attributes, including, but not limited to, those serving overburdened communities and those providing resilient power to critical community facilities.
     (1)   becomes operable on or after the date of the pilot program’s establishment;
     b.    Stand-alone energy storage systems or energy storage systems that are paired with a renewable source of electric power, including, but not limited to, a solar photovoltaic array, shall be eligible for the incentive program.  However, the incentive program shall only be available to an energy storage system that becomes operable on or after the date on which the incentive program is established pursuant to subsection a.
and      (2)   is either:
of this section and is either:  a customer-sited energy storage system that is owned, hosted, leased, or operated by a residential or non-residential customer of an electric public utility;
     (a)   a customer-sited energy storage system that is owned, leased, or operated by a residential or non-residential customer of an electric public utility;
or a front-of-the-meter energy storage system located in the service area of an electric public utility and connected to the distribution system.
or      (b)   a  front-of-the-meter energy storage system located in the service area of an electric public utility.
     c.     The board shall reserve at least one quarter of the incentives provided to customer-sited energy storage systems for customer classes or deployment scenarios that face greater economic hurdles, including, but not limited to, low-to-moderate income customers and customers located in overburdened communities.
     c.     The board shall reserve at least one third of the upfront incentives provided to customer-sited energy storage systems for customer classes or deployment scenarios that face greater economic hurdles, including, but not limited to, low-to-moderate income customers and customers sited in overburdened communities.
     d.    The incentive program shall not prevent or discourage customer-sited energy storage systems or front-of-the-meter energy storage systems from providing services to, or participating in, the wholesale markets, particularly the PJM capacity market, unless such restrictions are temporarily needed to ensure the peak load reduction value of energy storage systems supported by the incentive program is reflected in PJM load forecasts prior to the first delivery year in which the energy storage systems can act as capacity suppliers.  Any evaluation of costs and benefits of customer-sited energy storage systems or front-of-the-meter energy storage systems shall include benefits that accrue directly or indirectly to ratepayers due to the participation of the customer-sited energy storage system or front-of-the-meter energy storage system in wholesale markets.
     d.    In the course of developing the pilot program, the board shall consider revising the eligibility requirement for net-metering for solar energy systems that requires that the capacity of the solar energy system be no greater than the annualized electricity usage of the facility to which the solar energy system supplies electricity, in order to accommodate the inclusion of energy storage system capacity, as well as the potential for future electric vehicle capacity.  The board shall include its recommendation in the report required by section 7 of this act.
     e.     An applicant seeking an incentive award through the incentive program for a customer-sited energy storage system shall complete the project by no later than 30 months after the date on which the applicant’s application is approved.  An applicant seeking an incentive award through the incentive program for a front-of-the-meter energy storage system shall complete the project by no later than 42 months after the date on which the applicant’s application is approved.  However, the project timeline requirements established by this subsection may be waived or extended for an applicant that demonstrates extenuating circumstances that caused a delay in the completion of the project, including, but not limited to, delays caused by an electric public utility, PJM, a permit authority, or supply chain disruption.
     e.     The pilot program shall be designed to achieve or exceed, together with other programs established by the board, the energy storage goals established by subsection d.
     f.     The board, with input from stakeholders, shall establish minimum performance standards for customer-sited energy storage systems and a method for measuring and ensuring compliance with those standards for energy storage systems receiving an incentive through the incentive program, which performance standards may include, but shall not be limited to, capability to increase distributed renewable energy hosting capacity, congestion relief, capacity value or peak load reduction, voltage control services such as Volt/Var control systems and Volt/Watt control systems, ramp rate control, and transmission and distribution infrastructure investment deferral or avoidance.  The performance standards may be autonomous or respond to signals from the local distribution utility.
of section 1  of P.L.2018, c.17 (C.48:3-87.8).
     The board may include within the minimum filing requirements established in subsection a.
     f.     The program shall not prevent energy storage systems from providing services to, or participating in, the wholesale market.  Any evaluation of costs and benefits of energy storage systems shall include benefits that accrue directly or indirectly to ratepayers due to the participation of the energy storage systems in wholesale markets.
of this section, an adjustment to the incentive payments according to a project’s degree of compliance for program years after the initial program year.  The board may apply a preliminary version of these performance standards to the first year of performance for the initial program year incentive recipients.
Show all 82 changed rows (42 more)
Previous
Latest
     g.    The pilot program shall be closed immediately upon the adoption of the rules and regulations required pursuant to section 8 of this act.
     g.    After the board issues minimum filing requirements pursuant to subsection a.
       4.    a.  The pilot program shall include an upfront incentive for the owner of a customer-sited energy storage system or front-of-the-meter energy storage system, which shall be based on the installed capacity of the energy storage system and provided in dollars per kilowatt-hour  and shall not exceed 40 percent of the project’s all-in cost.  When determining the amount of the upfront incentive offered to an energy storage system, the board shall perform a gap analysis to ensure that the incentive to the owner incorporates consideration of the difference between available revenue streams, including any performance incentive offered under the pilot program, and the all-in system costs of the energy storage system.  The board may develop a system of incentive bonuses to differentiate between projects by attributes, including, but not limited to, those serving low- and middle-income communities.  After the expiration of the pilot program, the board may reduce or eliminate the upfront incentive commensurate with a Statewide reduction in all-in system costs for energy storage systems or an increase in revenue streams available to owners of energy storage systems.
of this section, each electric public utility shall file with the board a petition, or all electric public utilities shall file with the board a joint petition if the board so directs, proposing how to implement the incentive program.  Any individual petitions shall maximize common public utility elements and minimize public utility-specific elements.
     b.    The board shall establish qualifications and requirements an applicant shall be required to meet in order to be eligible for an upfront incentive pursuant to this section, which may be more stringent than the requirements of subsection b.
     h.    The board shall review each petition or the joint petition and may direct changes to the implementation plan presented in the submitted petitions or joint petition prior to board action.  The board shall approve, approve in part, or deny each submitted petition and shall determine the appropriate level of spending for each electric public utility’s implementation plan and allow each electric public utility to recover its costs through a separate component of the utility’s rate.  Each electric public utility’s cost recovery shall be limited to the actual cost of implementing the incentive program and administering the incentive payments, inclusive of any carrying costs needed to account for any difference between the timing of incentive program expenditures and cost recovery.  Notwithstanding the foregoing, the board may allow an electric public utility to earn a rate of return, which may be less than the rate of return established in the electric public utility’s most recent base rate case, if the electric public utility successfully meets incentive program implementation benchmarks established by the board.
of section 3 of this act.
     i.     Beginning in 2027 and ending in the first calendar year after cost recovery ends under the incentive program established by this section, the board shall report annually to the Governor, and to the Legislature pursuant to section 2 of P.L.1991, c.164 (C.52:14-19.1), information pertaining to the incentive program.
     c.     For energy storage systems with 25 kilowatts of nameplate storage capacity or greater, the board shall require the applicant for an upfront incentive to pay to the board a refundable deposit, which shall be refunded once the energy storage system is determined by the board to be operable and in use.  The board shall develop a formula for calculating the deposit amount, in which the amount of the deposit is proportional to the nameplate capacity of the energy storage system.
     3.    Each electric public utility in the State shall file a tariff with the board no later than 12 months after the effective date of P.L.    , c.    (C.        ) (pending before the Legislature as this bill), which tariff shall apply only to front-of-the-meter energy storage systems.  The tariff shall be formulated to maximize common elements among each electric public utility and compensate front-of-the-meter energy storage systems for their value to the grid, as described in P.L.    , c.    (C.        ) (pending before the Legislature as this bill).  The tariff shall establish a new rate design for front-of-the-meter energy storage systems that reflects cost causation.
     d.    (1)        The board shall require an applicant for an upfront incentive to complete the energy storage project:
 The tariff may distinguish between different sizes and types of front-of-the-meter energy storage systems.  The tariff shall exempt front-of-the-meter energy storage systems from charges intended for customers who consume electricity, including, but not limited to, the societal benefits charge imposed pursuant to section 12 of P.L.1999, c.23 (C.48:3-60).
     (a)   for customer-sited energy storage systems, no later than 18 months after the date the board approves the applicant’s application;
       4.    The board shall, in accordance with the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), adopt rules and regulations as necessary to implement this act.
and      (b)   for front-of-the-meter energy storage systems, no later than 40 months after the date the board approves the applicant’s application.
       5.    This act shall take effect immediately.
     (2)   An applicant that does not comply with the project timeline requirements of this subsection shall not be refunded the deposit paid to the board pursuant to subsection c.
of this section.  The deposit shall be transferred by the board to the General Fund.  The board may waive or extend the project timeline requirements established by this subsection for an applicant that demonstrates extenuating circumstances that caused a delay in the completion of the energy storage project, including any delays caused by an electric public utility or PJM.
     e.     The board shall limit upfront incentives to one award per electric meter, for customer-sited energy storage systems.
     f.     The board shall allocate at least $60 million per year, for the duration of the pilot program, from moneys collected from the societal benefits charge imposed pursuant to section 12 of P.L.1999, c.23 (C.48:3-60) to fund upfront incentives pursuant to this section.  After the expiration of the pilot program, the board may determine the appropriate amount of funds to allocate to upfront incentives.
       5.    a.  The pilot program shall include a performance incentive to compensate the owner of  a customer-sited energy storage system  or front-of-the-meter energy storage system.  The purpose of the performance payment shall be to:
     (1)   provide fair compensation for the full value of services provided by the energy storage system, including improving the efficiency of the transmission and distribution system and reducing the peak demand placed on electricity generators;
     (2)   increase the number of cost-effective energy storage systems that are connected to the transmission and distribution system;
     (3)   facilitate the integration of distributed sources of electricity generation;
and      (4)   increase the resilience of the transmission and distribution systems through the deployment of back-up power.
     b.    The board shall require each electric public utility in the State to offer an appropriate performance incentive, for a period to be determined by the board, to an owner of an energy storage system that participates in the program, which compensates for the operational attributes of the system, including, but not limited to, capacity, demand response, load shifting, generation shifting, locational value, and voltage support.  The costs of the performance incentives shall be apportioned to ratepayers using a methodology approved by the board.
     c.     The board shall establish qualifications and requirements an applicant shall be required to meet in order to be eligible for a performance incentive pursuant to this section, which may be more stringent than the requirements of subsection b.
of section 3 of this act.
       6.    In addition to the upfront incentive established pursuant to section 4 of this act, and the performance incentive established pursuant to section 5 of this act, each electric public utility in the State shall file a tariff with the board, no later than 12 months after the effective date of this act, that  shall apply only to front-of-the-meter energy storage systems  that are not subject to a tariff from PJM.  The tariff shall be formulated to provide front-of-the-meter energy storage systems with compensation for their value to the grid, as described in section 5 of this act.  The tariff shall establish a new rate design for front-of-the-meter energy storage systems that accurately reflects cost causation, based on a cost of service study.  The tariff may distinguish between different sizes and types of energy storage systems.  The tariff shall exempt front-of-the-meter energy storage systems from charges intended for customers who consume electricity, including, but not limited to, the societal benefits charge imposed pursuant to section 12 of P.L.1999, c.23 (C.48:3-60).
       7.    No later than one year after the date of the pilot program's establishment, the board shall conduct a review of the program and submit a report, pursuant to section 2 of P.L.1991, c.164 (C.52:14-19.1), to the Legislature that includes, but need not be limited to, details about the recipients of incentive payments, the total costs of upfront incentives provided through the program, an evaluation of the extent of energy storage capacity that has been deployed in the State as a result of the program, an evaluation of the distribution of different energy storage technologies deployed, and an analysis of the maturity of the energy storage market in the State.
       8.    No later than three years after the effective date of this act, the board, pursuant to the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), shall adopt rules and regulations establishing a permanent energy storage incentive program.  The permanent program shall be consistent with the provisions of this act.
       9.    This act shall take effect immediately.
STATEMENT        This bill requires the Board of Public Utilities (BPU) to develop a program to provide monetary incentives to persons who install new energy storage systems in the State.
     Specifically, the bill directs the BPU, no later than 180 days after the bill’s effective date, to publish incentive levels and an application process for an energy storage incentive pilot program.
The pilot program will continue until the BPU adopts rules and regulations to establish a permanent program pursuant to the bill.
The program is to meet or exceed the State’s goal of hosting two gigawatts of energy storage capacity by 2030.
     The bill establishes certain requirements for the program, including parameters for the types of energy storage projects eligible for the program, as described in the bill.
The program is available to customer-sited energy storage systems, which are smaller energy storage systems owned by a customer of electric utilities and sited in a customer’s residence or business, and to front-of-the-meter energy storage systems, which are larger energy storage systems that are connected directly to the grid.
     The bill directs the BPU to reserve a portion of the incentives for energy storage systems owned by low-to-moderate income customers and customers sited in overburdened communities.
The incentives are an upfront incentive and a performance incentive.
     The upfront incentive consists of a one-time payment made by the BPU’s Clean Energy Program, which is funded by the societal benefits charge imposed under current law pursuant to N.J.S.A.48:3-60.
The amount of the upfront incentive is calculated using a “gap analysis,” as defined in the bill, to determine the difference between the all-in system cost and the expected lifetime revenue that the customer can expect to gain from the system.
“All-in system cost” is defined as the total cost of purchasing and installing a new energy storage system, including the costs of hardware, siting, installation, permitting, and interconnection.
The bill requires certain applicants for an upfront incentive to pay a deposit and requires applicants to meet certain timeline requirements, as described in the bill.
The bill specifies that the BPU is to allocate at least $60 million per year of funds collected from the societal benefits charge for upfront incentives for the duration of the pilot program.
     The performance incentive is a recurring payment, made by an electric public utility, to compensate the owner of the energy storage system for services to the grid made by the system, including reduction of peak demand and supply of power during outages.
     The bill directs each electric public utility to file a tariff, a pricing structure that includes rates and other charges, with the BPU for front-of-the-meter energy storage systems that are not subject to a tariff by PJM Interconnection, L.L.C.
The tariff is required to take into account the costs of service and benefits to the grid from front-of-the-meter energy storage systems.
The tariff is required to exempt front-of-themeter energy storage systems from charges intended for customers who consume electricity, including, but not limited to, the societal benefits charge.
     Finally, the bill directs the BPU to submit a report to the Legislature on the pilot program no later than one year after the program is established.
View plain text versions (2)
  • Committee Substitute Comm Sub Current html June 09, 2026
  • Introduced View text html December 18, 2025

Action History

  1. REF SBA

  2. REP/SCS 2RS

  3. INT 1RS REF SEN

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

2 sponsors · 1 co-sponsors · 117 not signed on

Sponsors (2)

Co-sponsors (1)

Not signed on (117)

117 members have not signed on to this bill.

Show all 117 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 631 do?
Energy storage systems, new-req. BPU develop program to incentivize installation
Who sponsors S 631?
S 631 is sponsored by Diegnan Jr., Patrick J. (Democrat), Greenstein, Linda R. (Democrat), and Smith, Bob (Democrat).
What is the current status of S 631?
This bill has been introduced in the Senate. Introduced January 13, 2026. It must pass committee before a floor vote.
Where can I track S 631?
Track S 631 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 631

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 631

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →