A 5397 — Requires data centers to submit construction phase water usage plan to DEP.
Last action — INT 1RA REF ATU
-
1Introduced
-
2In Committee
-
3Passed General Assembly
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill has been introduced in the General Assembly. Introduced September 10, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Odds of enactment
Low chanceBased on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
In plain language
The bill requires data centers to submit a water usage plan during construction to the DEP.
This bill mandates that data centers provide a water usage plan to the Department of Environmental Protection (DEP) while in the construction phase. It aims to manage water resource usage effectively during the building of data centers.
What this means for you
- Environment: This means that water usage by data centers during construction will be monitored, potentially protecting local water resources.
Summary
Water usage plan-require data centers submit construction phase to DEP
Bill Text
- Introduced View text Current html September 11, 2026
Action History
-
INT 1RA REF ATU
Sponsors
- Heather Simmons · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 119 not signed on
Sponsors (1)
- Simmons, Heather Democrat
Co-sponsors (0)
None.
Not signed on (119)
119 members have not signed on to this bill.
Show all 119 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does A 5397 do?
- Water usage plan-require data centers submit construction phase to DEP
- Who sponsors A 5397?
- A 5397 is sponsored by Simmons, Heather (Democrat).
- What is the current status of A 5397?
- This bill has been introduced in the General Assembly. Introduced September 10, 2026. It must pass committee before a floor vote.
- Where can I track A 5397?
- Track A 5397 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on A 5397
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of A 5397
Last checked for changes 27 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →