District of Columbia Council Period 25 Status: Enacted

B25-1027 — Modification 2 to Contract No. NFPHC-ER-23-C between the Not-for-Profit Hospital Corporation and George Washington University Medical Faculty Associates, Inc., Approval and Payment Authorization Emergency Act of 2024

Last action — Act A25-0673 Published in DC Register Vol 72 and Page 000012, Expires on Mar 24, 2025

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Council
  4. ✓
    To Executive
  5. 5
    Enacted

This bill has been enacted into law. Introduced November 06, 2024. Enacted.

Prognosis

Advancing 50% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Modification 2 to Contract No. NFPHC-ER-23-C between the Not-for-Profit Hospital Corporation and George Washington University Medical Faculty Associates, Inc., Approval and Payment Authorization Emergency Act of 2024

Bill Text

What changed in the latest version

41 added · 375 removed

Plain-language change summary

The bill B25-1027 has been amended to approve an emergency modification to an existing contract with the Not-for-Profit Hospital Corporation and George Washington University Medical Faculty Associates. The changes authorize a payment of nearly $3.5 million for emergency department services that have already been provided and will continue to be provided. This is important because it ensures that essential emergency services at the hospital can continue without interruption, responding to immediate healthcare needs in the community.

→
Previous
Latest
aye WMC UNITED November 6,2024 The Honorable Phil Mendelson:
ENROLLED ORIGINAL AN ACT ____________ IN THE COUNCIL OF THE DISTRICT OF COLUMBIA ____________ To approve, on an emergency basis, Modification No.
Chairman, Council oftheDistrictofColumbia Pennsylvania Avenue, N.W.
2 to Contract No.
Suite504 Washington, D C 20004 Dear Chairman Mendelson:
NFPHC-ER-23- C the Not-for-Profit Hospital Corporation, commonly known as United Medical Center, and George Washington University Medical Faculty Associates, Inc., to provide emergency department services, and to authorize payment for the services received and to be received under the contract.
EnloedfrcosieatonadaproalbyteConcloftheititofColumbisi Modification 2.
BE IT ENACTED BY THE COUNCIL OF THE DISTRICT OF COLUMBIA, That this act may be cited as the “Modification 2 to Contract No.
to Contract No.
NFPHC-ER-23-C between the Not-for-Profit Hospital Corporation and George Washington University Medical Faculty Associates, Inc., (“GW MFA”) Approval and Payment Authorization Emergency Act of 2024”.
NFPHC-ER-23-C between the Not-for-Profit Hospital Copoaion nd Georgasinton nvesty edcal cuty socae, Ic, CotrctN.
NFPHC-ER-23-twentheNt-o-roitHsptlCorortonand GeorgeWashingnvesiyMeiclFaulyAsoite,Ic.AprvaladPayment ‘AtoiztonEmergenecaatonesluionf224,orheroiionfemergency dearmetsrvcs(“onrc”.
Conclatiniseesaytoppoveoifcaion,whichs exkrsseptonYar 2intheamounf$347,0826fra6-monthrod(ctber,2024oMarch1, 205.
Thepopsedodfcaionsrtoctvedueoteexededngtatngprod nededtoscuetheinumentvedordrigtheHsptl’spndngwind wn.
sevcs.daprvlisvtltoaodigamajrdirutoninheeciialaietcre Asalways,Iamavaiodiscussanyquestionsyoregardingubitl.
In order to facilitate a response to any questions you may have, please have your staff contactme at(202) 574-6611.
Ilook forward toa favorable considerationon thiscontract.
icrey, q u e d v ePosenR e d ” CiefEectieOfiern o-orPoftHsitlCopraion nloure 1810SOUTHERNAVENUE,SEWC.03-63 + 254600 + WWW.UNITED-MEDICALCENTER.COM ~ ~ hainnanPhil Mendelson on behalfofthe Not-for-Profit Hospital Corporation 6 8 A BILL IN THE COUNCIL OF THE DISTRICT OF COLUMBIA To approve, on an emergency basis, Modification 2 to Contract No.
NFPHC-ER-23-C the Not-for-Profit Hospital Corporation, commonly knowns United Medical Center ("Hospital") and George Washington University Medical Faculty Associates, Inc., ("GW MFA") to provide emergency department services, and to authorize payment for the services received and to be received under the Contract.
BE IT ENACTED BY THE COUNCIL OF THE DISTRICT OF COLUMBIA, That this act may be cited as the "Modification 2 to Contract No.
NFPHC-ER-23-C between the Not-for-Profit Hospital Corporation and George Washington University Medical Faculty Associates, Inc., ("GW MFA") Approval and Payment Authorization Emergency Act of2024".
Pursuant to section 451 ofthe District of Columbia Home Rule Act, approved December 24, 1973 (87 Stat.
Pursuant to section 451 of the Home Rule Act (D.C.
803;
Official Code § 1- 204.51) and notwithstanding the requirements of section 202 of the Procurement Practices Reform Act of 2010, effective April 8, 2011 (D.C.
D.C.
Official Code§ 1-204.51), and notwithstanding the requirements ofsection 202 ofthe Procurement Practices Reform Act of2010, effective April 8, 2011 (D.C.
Official Code§ 2-352.02), the Council approves Modification 2 to Contract No.
Official Code § 2-352.02), the Council approves Modification No.
NFPHC-ER-23-C between the Not for-Profit Hospital Corporation and George Washington University Medical Faculty Associates, Inc., (“GW MFA”) to provide emergency department services, and authorizes payment for the services received and to be received under this Contract and payment in the amount of $3,497,908.26.
2 to Contract No.
NFPHC-ER- 23-C between the Not-for-Profit Hospital Corporation and George Washington University Medical Faculty Associates, Inc.
to provide emergency department services, and authorizes payment in the not-to-exceed amount of $3,497,908.26 for the services received and to be received under the contract.
This act shall take effect following approval by the Mayor (or in the event of veto by the Mayor, action by the Council to override the veto), and shall remain in effect for no longer than 90 days, as provided for emergency acts of the Council of the District of Columbia in section 412(a) of the District of Columbia Home Rule Act, approved December 24, 1973 (87 Stat.
This act shall take effect following approval by the Mayor (or in the event of veto by the Mayor, action by the Council to override the veto), and shall remain in effect for no longer than 90 days, as provided for emergency acts of the Council of the District of ENROLLED ORIGINAL Columbia in section 412(a) of the District of Columbia Home Rule Act, approved December 24, 1973 (87 Stat.
2 GOVERNMENT OF THE DISTRICT OF COLUMBIA Office of Contracting and Procurement Pursuant to section 202(c-1) of the Procurement Practices Reform Act of 2010, as amended, D.C.
___________________________________ Chairman Council of the District of Columbia _________________________________ Mayor District of Columbia 2
Official Code § 2-352.02(c-1), the following contract summary is provided:
COUNCIL CONTRACT SUMMARY (Retro) (A) Contract Number:
Contract No.
NFPHC-ER-23-C Proposed Contractor:
George Washington University Medical Faculty Associates, Inc., (“GW MFA”) Contract Amount:
Modification 2:
$3,497,908.26 Unit and Method of Compensation:
Monthly with proper invoices Term of Contract:
October 1, 2024 to March 31, 2025;
retroactive Type of Contract:
Fixed Fee, with monthly reconciliation Source Selection Method:
Sole Source under 27 DCMR 4618 (B) For a contract containing option periods, the contract amount for the base period and for each option period.
If the contract amount for one or more of the option periods differs from the amount for the base period, provide an explanation of the reason for the difference:
- Base Period:
Show all 222 changed rows (182 more)
Previous
Latest
o Initial letter Contract:
$713,793.66 (October 1, 2022 to October 31, 2022) o Total definitized Contract:
$7,997,458.78 (October 1, 2022 to September 30, 2023);
Council approved (A24-718) - Option Year 1 o Modification 1:
$7,945,816.52 (October 1, 2023 to September 30, 2024) Council approved (A25-298) - Option Year 2 (partial exercise) o Proposed Modification 2:
$3,497,908.26 (October 1, 2024 to March 31, 2025) (C) The goods or services to be provided, the methods of delivering goods or services, and any significant program changes reflected in the proposed contract:
The provision of emergency department services for a period from October 1, 2024 to March 31, 2025.
Through the duration of this contract UMC will pay out of pocket $1,922,908.26 and the balance up to $ 1,575,000.00 from billing collections for 6 months.
(D) The selection process, including the number of offerors, the evaluation criteria, and the evaluation results, including price, technical or quality, and past performance components:
This Contract was sole sourced under 27 DCMR 4618 because UMC couldn't afford to experience disruption with these urgent services, especially given the pending wind down.
George Washington University Medical Faculty Associates is the incumbent vendor and can provide the emergency department services without any lapse.
(E) A description of any bid protest related to the award of the contract, including whether the protest was resolved through litigation, withdrawal of the protest by the protestor, or voluntary corrective action by the District.
Include the identity of the protestor, the grounds alleged in the protest, and any deficiencies identified by the District as a result of the protest:
There were no protests associated with this procurement.
(F) The background and qualifications of the proposed contractor, including its organization, financial stability, personnel, and performance on past or current government or private sector contracts with requirements similar to those of the proposed contract:
Medical Faculty Associates, Inc.
- Background and Qualifications Medical Faculty Associates, Inc.
("MFA") is a leading healthcare provider across the Washington Metropolitan region.MFAservesastheadministrativeandcontractingorganization for The George Washington University's ("GWU") 800 academic and community physicians.
With experts across over 50 clinical specialty and subspecialty areas, MFA serves patients and families from across the Washington Metropolitan region.
MFA faculty provides services to many communities and health care institutions including The George Washington University Hospital, Children's National Health System, Walter Reed National Military Medical Center, INOVA Healthandmore.MFA providesa variety of office and hospital-based services for adult patients including Emergency Medicine, Hospitalist, Radiology, Anesthesiology,Critical Care, Pathology, Obstetrics and Gynecology, Pain Management, Psychiatric, and Surgical services.
Description and Organizational Philosophy MFA is a 501(c)(3), not-for-profit, locally controlled, physician-led tax-exempt organization.
MFA hasover2,150 employees and iscomprised of13clinical Departments that makeup alarge integrated multispecialty group.
Affiliated with The George Washington University, MFA has grown to become oneofthelargest independent physician practices.Affiliated with TheGeorge Washington School of Medicine and Health Sciences ("GWSMHS"), MFA is committed to the goals of providing superior healthcare, advancing knowledge and training future caregivers.
MFA's physicians teach and mentor medical students, residents and researchers at GWSMHS which was the first medical school in the nation's capital and the eleventh oldest in the United States.
(G) The period of performance associated with the proposed change, including date as of which the proposed change is to be made effective:
October 1, 2024 to March 31, 2025.
Should the Council approve the proposed change, it will be deemed effective retroactive to Oct 1, 2024.
(H) The value of any work or services performed pursuant to a proposed change for which the Council has not provided approval, disaggregated by each proposed change if more than one proposed change has been aggregated for Council review:
The value of work performed pursuant to Modification 2 is $0 (I) The aggregate dollar value of the proposed changes as compared with the amount of the contract as awarded:
The aggregate value of the of the proposed Modification 2:
$3,497,908.26 (J) The date on which the contracting officer was notified of the proposed change:
July 3, 2024 (K) The reason why the proposed change was sent to Council for approval after it is intended to take effect:
Additional time to negotiate was required to avoid a lapse in critical emergency department services.
(L) The reason for the proposed change:
To exercise the next option year.
(M) The legal, regulatory, or contractual authority for the proposed change:
NFPHC Contracting Authority;
NFPHC Establishment Act;
Home Rule Act.
(N) A summary of the subcontracting plan required under section 2346 of the Small, Local, and Disadvantaged Business Enterprise Development and Assistance Act of 2005, as amended, D.C.
Official Code § 2-218.01 et seq.
(“Act”), including a certification that the subcontracting plan meets the minimum requirements of the Act and the dollar volume of the portion of the contract to be subcontracted, expressed both in total dollars and as a percentage of the total contract amount:
UMC has worked diligently with DC Department of Small and Local Business Development (DSLBD) to find CBEs to provide these services, but past efforts were unsuccessful.
There is no subcontracting plan because of the critical need and highly specialized nature of the services to be provided.
UMC will continue to do its best, yet acknowledges that as the closure nears, procurement opportunities will become even more limited and avoiding disruption to major services even more paramount.
(O) Performance standards and the expected outcome of the proposed contract:
The Contractor's performance will be monitored by the Not-for-Profit Hospital Corporation Interim CEO and Chief Nursing Officer.
The performance standards are as outlined in the proposed Contract and as required by applicable local, federal, industry, and licensing entities.
(P) The amount and date of any expenditure of funds by the District pursuant to the contract prior to its submission to the Council for approval:
The amount of funds used prior to submission is $0.
(Q) A certification that the proposed contract is within the appropriated budget authority for the agency for the fiscal year and is consistent with the financial plan and budget adopted in accordance with D.C.
Official Code §§ 47-392.01 and 47-392.02:
See enclosed fiscal certification from the OCFO.
(R) A certification that the contract is legally sufficient, including whether the proposed contractor has any pending legal claims against the District:
See enclosed legal certification from UMC Counsel.
(S) A certification that Citywide Clean Hands database indicates that the proposed contractor is current with its District taxes.
If the Citywide Clean Hands Database indicates that the proposed contractor is not current with its District taxes, either:
(1) a certification that the contractor has worked out and is current with a payment schedule approved by the District;
or (2) a certification that the contractor will be current with its District taxes after the District recovers any outstanding debt as provided under D.C.
Official Code § 2-353.01(b):
See enclosed Clean Hands Certification.
(T) A certification from the proposed contractor that it is current with its federal taxes, or has worked out and is current with a payment schedule approved by the federal government:
The proposed contractor has certified its compliance.
(U) The status of the proposed contractor as a certified local, small, or disadvantaged business enterprise as defined in the Small, Local, and Disadvantaged Business Enterprise Development and Assistance Act of 2005, as amended, D.C.
Official Code § 2-218.01 et seq.:
The Contractor is not certified as a local, small, or disadvantaged business enterprise.
(V) Other aspects of the proposed contract that the Chief Procurement Officer considers significant:
All relevant aspects of the proposed Contract are enclosed.
(W) A statement indicating whether the proposed contractor is currently debarred from providing services or goods to the District or federal government, the dates of the debarment, and the reasons for debarment:
Asof September 11, 2024, the Contractor does not appear on the District or Federal Excluded Parties List.
(X) Any determination and findings issues relating to the contract’s formation, including any determination and findings made under D.C.
Official Code § 2-352.05 (privatization contracts):
None.
(Y) Where the contract, and any amendments or modifications, if executed, will be made available online:
Due to the hospital’s pending closure, the website will not undergo further upgrades;
however, the contract remains available onsite.
(Z) Where the original solicitation, and any amendments or modifications, will be made available online:
Due to the hospital’s pending closure, the website will not undergo further upgrades;
however, the contract remains available onsite.
M* E* * —lcetheif aclfierumbia 114"et,SW M E —lcofTadRevenue ‘ahnt,DC20024 DatNotice:
Oc2,er4 NoticeNumber:
0012801558 2150PENNSYLVANIAAVE NWESINC WASHINGTON DC 20037-3201 AsrpotdinheCeanHandyse,theboereernedidvdulettyhsnoottadig laiiywthteDsrctfColumbificefTaxndRevenurteDearmetofEmployment Srics.Asftheaeabv,te niida/nityasomlidwihDCCode§47282, hrfre tisetfcaeoCleanHandssue.
TITLE 47.
TAXCHAPTER 28 GENERAL LICENSE ASSESSMENTS, A N D FEES SUBCHAPTER II.CLEAN H A NDS BEFORE RECEIVING A LICENSE O R PERMIT D.C, CODE § 47-2862 (2006) §47-2862PROHIBITION AGAINST ISSUANCE OF LICENSE OR PERMIT Authorized By Melinda Jenkins Branch Chief, Collection and Enforcement Administration Tovldaetisetfct,pesevitMyTax.DC.gov.eMyTaxDChoepge,lckte “Validate a Certificate of Clean Hands” hyperlink under the Clean Hands section.
11thret,SieW27ahgo,DC02Poe:0)724-S048/CvTax.
Government of the District of Columbia Office of the Chief Financial Officer MEMORANDUM To:
Jacqueline Payne-Borden, Chief Executive Officer CC:
Kendrick Dandridge, Contracting Officer From:
Lilian Chukwuma, CFO – Not-for-Profit Hospital Corporation Date:
November 06, 2024 Re:
Modification 2 to Contract No.
NFPHC-ER-23-C between Not-for-Profit Hospital Corporation and George Washington University Medical Faculty Associates, Inc., (“GW MFA”) Approval and Payment Authorization Emergency Act of 2024 The Not-for-Profit Hospital Corporation (NFPHC) intends to contract with George Washington University Medical Faculty Associates, Inc., (“GW MFA”) for the provision of emergency department services.
The Proposed Modification 2 of Contract No.
NFPHC-ER-23-C has a contract value of $3,497,908.26 for a 6-month period, October 1, 2024 – March 31, 2025.
The Office of the Chief Financial Officer hereby certifies that the funds are included in the NFPHC FY 2025 budget.
eW A U M C UNEEE )-RFTHOSPITALCORPORATI MEMORANDUM o:
JaqelnePyn-Brdn ChiexeutveOfier From:
BreGolt x ;
GeerlConsl g B l d efrece:
Moifctin2toCnratNo.NFPHC-ER-23eteeno-frPrft Asoiae,Ic,(‘GWMFA”)pprvalndPaymenuhoiztonuty Emergencctof024 Date:
November 6,2024 ubec:
LealSffceny Iaverviwedheaov-efrecdMoifcaion2oCotrctN.NFPHC-ER-23-C etwenteNo-orPoftHsptaloroato,commonlyknownsniedMeicl Cner(“opta”,andGeorgeahinton ivrityMdialFautyAsoiae, n.,orhepoisonofemergenpatmntsrie.
Terbycriytattpparsobeeglysfiin.Plaseeaviedhatmyinig ispremised on theContractsbeing submitted to and approvedby the Councilofthe DistrictofColumbia.
30SOUTHERNAVENUE,SEW..202423 +25460 + WWW.UNITED-MEDICALCENTER.COM Docusign Envelope ID:CA2B59D521--143--D948-9743C-3635137FC0A0538B NOT-FOR-PROFIT HOSPITAL CORPORATION, commonly known as CONTRACT MODIFICATION/ CHANGE Page United Medical Center, ORDER an instrumentality of the District of Columbia government, hereinafter known 1 of 2 as the “Hospital”.
NFPHC - NFPHC-ER-23-C-0001A 2.
Address (Send invoices here) 3a.
Effective Date:
4.
Requisition/Purchase Order/Task Order/Modification Number:
Not-For-Profit Hospital Corporation 10/01/2024 United Medical Center – AccountsPayable 3b.
Date of Council Approval:
Modification #2 Southern Avenue, S.E.
TBD Washington, D.C.
20032 5.
Department(s) Using Goods or Services:
6.
Contractor:
name;
address;
phone number and email address 7.
Subject:
Medical Faculty Associates, Inc.
Modification for partial exercise of Option Year Two (OY2) for the Pennsylvania Avenue NW provision of Adult Emergency Department at the Hospital twenty-four (24) Washington, DC 20037 hours per day, from October 1, to March 31, 2025, reporting to the assigned Hospital Administrative Staff.
8.
Exercise of Change Order Supplemental Letter Contract/ Other:
Option X Agreement Contract Extension 9.
Modification/Change Order Amount:
$3,497,908.26 (Out-of-Pocket from UMC 10.
Total Contract Amount:
$3,497,908.26 $ 1,922,908.26 +Balance Up to $1,575,000.00 from Billing Collections for 6 months) 11.
The parties hereby agree to exercise this Mod 2 to this certain Contract for FY 25 as follows:
a.
OPTION YEAR 2 - 6 month partial exercise Contract Line Annual Not-to- Item Number Description Monthly Amount (CLIN) Exceed Amount Primary Provider Costs Physicians;
Flex 5,490 - 7,847.5 Hours (30hrs/day – $320,484.71 $1,922,908.26 42hrs/day) Mid-levels;
4,430 Hours 2.0 additional staff.
TOTAL AMOUNT:
$1,922,908.26 *Total value of the contract is $3,497,908.26 Medical Faculty Associates, Inc.
receives and keep up to $1,575,000.00 of collections for this agreement (NFPHC-ER- 23-C-0001) and excess collection over the agreement will revert to UMC.
*Medical Faculty Associates, Inc.
(“MFA”) shall have the flex capability of staffing between 30.0 and 42.0 hours per day based upon patient volume at United Medical Center.
However, if MFA staffs fewer than 42.0 hours, they must ensure the staffing is adequate to provide appropriate coverage reflective of the patient volume.
b.
Performance Metrics:
1.
ROOM TO DOCTOR......................................................................................................................90% COMPLIANCE o MEDIAN - 20 MINUTES 2.
ROOM TO ADMISSION DECISION ............................................................................................90% COMPLIANCE o MEDIAN – 180 MINUTES 3.
ROOM TO DISCHARGE DECISION............................................................................................90% COMPLIANCE o MEDIAN – 150 MINUTES 4.
PRESS GANEY SCORES...............................................................................................................100% COMPLIANCE o MONTHLY COMPOSITE SCORES ABOVE 55% 5.
COMPLETION OF DOCUMENTATION PER MEDICAL STAFF BYLAW..............................90% COMPLIANCE 6.
COMPLIANCE WITH MEDICAL NECESSITY (Shared Performance)......................................90% COMPLIANCE COORDINATION OF CARE o APPROPIRATENESS OF ADMISSION o APPROPRIATE LEVEL OF CARE Docusign Envelope ID:
C23B9D5211--143--D948-9774C-36357137C0DA0538B There will be a three (3) month grace period from the commencement of the contract before any penalties are to be levied.
During this time, the Hospital will review and make any necessary adjustments in any particular areas prior to moving forward.
This will include assessing nursing and ancillary staffing, consultation availability and other support services.
For any measure that falls below the indicated level of compliance for any given quarter, there will be a $1,000.00 penalty assessed against the next month’s payment.
For the shared performance metric, if performance falls below the compliance level for any given quarter, both services will incur a $1,000.00 penalty to be assessed against the following months payments.
If there are any disputes or mitigating factors that significantly impact the ability to comply with the performance metrics as stated, those concerns are to be forwarded to the Chief Medical Officer for review and final determination.
There will be no bonus payments for any performance above the stated levels of compliance as this is the level of care that is expected under the terms of the contractual agreement.
However, penalties may be waived by improved performance above the compliance level for the corresponding metric for the quarter immediately following.
*All other Contract terms shall remain in full force and effect.
12.
Name of Contractor:
Date:
13.
Signature of Contracting Officer:
Kendrick Dandridge, Date:
09/30/24 Contracting Officer Signature:
_ Signature:
_ 14.
GENERAL COUNSEL – LEGAL SUFFICIENCY This contract appears legally sufficient.
Please be advised that my finding is premised on the Contract receiving any and all requisite approvals.
In additions, the Hospital continues to work with other District agencies to determine the most effective manner for all involved to achieve their respective legislative mandates while the Hospital strives to meet:
(i) its Establishment Act purposes (D.C Official Code §44-95 I.02(b)):
(ii) the Hospital Board of Directors approved Strategic Plan (all thirteen Councilmembers introduced the Sense of the Council Not-for-Profit Hospital Corporation Transformation and Sustainability Resolution of 2014 (PRO-731)), which expressed the desire that the Hospital moveswiftlyto implement thestrategicplan);and (iii) itsclarifiedDistrict government charged legislativemandatein the Fiscal Year2015 Budget Support Emergency Act of 2014 (B20-849), which required the Hospital move forward expeditiously with improving UMC operations and soliciting proposals for private sector takeover of the ownership and management of the United MedicalCenter.
9/30/2024 Legal Sufficiency:
Date:
Eric Goulet,NFPHC General Counsel 15.
CERTIFICATION OF FUNDS 10/22/2024 I hereby certify funds are sufficiently included in the District’s FY 2025 budget Signature:
Date:
_ and financial plan to support this Contract.
Lilian Chukwuma, NFPHC CFO FOR INTERNAL PURPOSES ONLY 10/4/2024 OCFO REVIEW APPROVAL:
NFPHC Budget Officer CEO REVIEW APPROVAL:
NFPHC Chief Executive Officer
View plain text versions (2)

Action History

  1. Act A25-0673 Published in DC Register Vol 72 and Page 000012, Expires on Mar 24, 2025

  2. Returned from Mayor

  3. Signed by the Mayor and Enacted with Act Number A25-0673, Expires on Mar 24, 2025

  4. Transmitted to Mayor, Response Due on Jan 02, 2025

  5. Legislative Meeting

  6. Retained by the Council with comments from the Committee on Health

  7. B25-1027 Introduced by Chairman Mendelson at Office of the Secretary

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 13 not signed on

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does B25-1027 do?
Modification 2 to Contract No. NFPHC-ER-23-C between the Not-for-Profit Hospital Corporation and George Washington University Medical Faculty Associates, Inc., Approval and Payment Authorization Emergency Act of 2024
Who sponsors B25-1027?
B25-1027 is sponsored by Phil Mendelson.
What is the current status of B25-1027?
This bill has been enacted into law. Introduced November 06, 2024. Enacted.
Where can I track B25-1027?
Track B25-1027 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on B25-1027

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.