Relating to a cost overage exemption for interconnection of advanced nuclear reactors to the ERCOT transmis...
Do you support it?
Want to know if it passes?
We'll email you when HB 5590 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on HB 5590.
You're tracking HB 5590
We'll email you the moment it moves.
HB 5590 — Relating to a cost overage exemption for interconnection of advanced nuclear reactors to the ERCOT transmission system.
Last action — Referred to State Affairs: Apr 7 2025 5:28PM
No card. One bill, free forever — alerts when it moves.
-
1Introduced
-
2In Committee
-
3Passed House
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill died with 89th Legislature, Regular Session. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Relating to a cost overage exemption for interconnection of advanced nuclear reactors to the ERCOT transmission system.
Bill Text
We don't have the full text on file for this bill yet.
Read HB 5590 on the official Texas source →AI-generated reading aid from the bill's amendatory text — verify against the official bill.
This bill amends 1 section(s) of the Texas statutes: Section 35.004(d-2), Utilities Code.
-
Section 35.004(d-2), Utilities Code
This subsection does not apply to excess costs incurred to interconnect a generation resource that is an advanced nuclear reactor. For purposes of this subsection, an advanced nuclear reactor is a fission-based reactor belonging to one of the following categories: (1) a large reactor, with a generation capacity between 400 and 1400 megawatts of electricity; (2) a small modular reactor, with a generation capacity between 50 and 400 megawatts of electricity; or (3) a microreactor, with a generation capacity of less than 50 megawatts of electricity.
amended
Action History
-
Referred to State Affairs
-
Read first time
-
Filed
Sponsors
- Cody Harris · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 183 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (183)
183 members have not signed on to this bill.
Show all 183 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does HB 5590 do?
- Relating to a cost overage exemption for interconnection of advanced nuclear reactors to the ERCOT transmission system.
- Who sponsors HB 5590?
- HB 5590 is sponsored by Cody Harris.
- What is the current status of HB 5590?
- This bill died with 89th Legislature, Regular Session. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track HB 5590?
- Track HB 5590 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB 5590
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB 5590
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →