Virginia 2026 Session Status: Introduced

HB1141 — Electric utilities; suspension of certain requirements.

Last action — Left in Labor and Commerce

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House of Delegates
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the House of Delegates. Introduced January 14, 2026. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Prognosis

Not enough signal yet

Where this bill stands today.

Odds of enactment

Low

How often bills like it became law.

Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Electric utilities; suspension of certain requirements.

Bill Text

We don't have the full text on file for this bill yet.

Read HB1141 on the official Virginia source →

How this bill changes current law

13 changes Share ↗

Compared against the Code of Virginia as published AI-generated reading aid — verify against the official bill.

This bill amends 1 section(s) of the Code of Virginia: 56-585.5.

  • 56-585.5

    M. Notwithstanding any other provision of this section, the renewable energy portfolio standard requirements and any associated construction, procurement, or retirement mandates set forth

    Inserts “M. Notwithstanding any other provision of this section, the renewable energy portfolio standard requirements and any associated construction, procurement, or retirement mandates set forth”.

  • 56-585.5

    in this section

    Inserts “in this section”.

  • 56-585.5

    shall be suspended for the applicable compliance year if the Commission determines that compliance has resulted in, or will result in, any of the following:

    Inserts “shall be suspended for the applicable compliance year if the Commission determines that compliance has resulted in, or will result in, any of the following:”.

  • 56-585.5

    1. An increase in the average residential customer's total monthly electric bill of more than five percent in any calendar year that is attributable, in whole or in part, to compliance with the renewable energy portfolio standard or associated zero-carbon generation or energy storage requirements;

    Inserts “1. An increase in the average residential customer's total monthly electric bill of more than five percent in any calendar year that is attributable, in whole or in part, to compliance with the renewable energy portfolio standard or associated zero-carbon generation or energy storage requirements;”.

  • 56-585.5

    2. An increase in any rate adjustment clause, rider, or non-bypassable charge associated with compliance with this section that exceeds $50 per month for the average residential customer;

    Inserts “2. An increase in any rate adjustment clause, rider, or non-bypassable charge associated with compliance with this section that exceeds $50 per month for the average residential customer;”.

  • 56-585.5

    3. A determination by PJM Interconnection, LLC, the North American Electric Reliability Corporation, or the State Corporation Commission that compliance with this section poses a material risk to electric system reliability or resource adequacy in the Commonwealth; or

    Inserts “3. A determination by PJM Interconnection, LLC, the North American Electric Reliability Corporation, or the State Corporation Commission that compliance with this section poses a material risk to electric system reliability or resource adequacy in the Commonwealth; or”.

  • 56-585.5

    4. A determination that the cost of renewable energy certificates necessary for compliance exceeds the applicable alternative compliance payment or deficiency payment for two consecutive compliance years.

    Inserts “4. A determination that the cost of renewable energy certificates necessary for compliance exceeds the applicable alternative compliance payment or deficiency payment for two consecutive compliance years.”.

  • 56-585.5

    Upon

    Inserts “Upon”.

  • 56-585.5

    such

    Inserts “such”.

  • 56-585.5

    a finding by the Commissi

    Inserts “a finding by the Commissi”.

  • 56-585.5

    on

    Inserts “on”.

  • 56-585.5

    , all renewable energy portfolio standard percentage requirements, procurement mandates, and associated retirement schedules shall be suspended beginning in the next compliance year, and no deficiency payments shall accrue during such suspension period.

    Inserts “, all renewable energy portfolio standard percentage requirements, procurement mandates, and associated retirement schedules shall be suspended beginning in the next compliance year, and no deficiency payments shall accrue during such suspension period.”.

  • 56-585.5

    The requirements suspended pursuant to this subsection shall not resume unless and until the General Assembly enacts legislation expressly authorizing the resumption of such requirements.

    Inserts “The requirements suspended pursuant to this subsection shall not resume unless and until the General Assembly enacts legislation expressly authorizing the resumption of such requirements.”.

Action History

  1. H Left in Labor and Commerce

  2. H Fiscal Impact Statement from State Corporation Commission (HB1141)

  3. H Referred to Committee on Labor and Commerce

  4. H Prefiled and ordered printed; Offered 01-14-2026 26103649D

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 147 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (147)

147 members have not signed on to this bill.

Show all 147 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB1141 do?
Electric utilities; suspension of certain requirements.
Who sponsors HB1141?
HB1141 is sponsored by Timothy P. Griffin.
What is the current status of HB1141?
This bill has been introduced in the House of Delegates. Introduced January 14, 2026. It must pass committee before a floor vote.
Where can I track HB1141?
Track HB1141 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB1141

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB1141

Last checked for changes 4 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →