United States 114th Congress Status: Died 1 D cosponsors

S 848 — Resolving Environmental and Grid Reliability Conflicts Act of 2015

Last action — Read twice and referred to the Committee on Environment and Public Works.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Resolving Environmental and Grid Reliability Conflicts Act of 2015 This bill amends the Federal Power Act with respect to orders by the Federal Energy Regulatory Commission (FERC) to generate, transmit, or sell electricity to prevent an emergency in energy reliability, where the order may result in a conflict with environmental law. FERC must ensure that the order: (1) requires generation, delivery, interchange, or transmission of electricity only during hours necessary to meet the emergency and serve the public interest; and (2) be consistent with applicable environmental law and minimize any adverse environmental impacts to the maximum extent practicable. Compliance with such an order shall not be considered a violation of conflicting federal, state, or local environmental laws. Orders that may result in a conflict with environmental law must expire within 90 days and may be renewed or reissued for subsequent periods as necessary to meet the emergency and serve the public interest. During an emergency, a municipality engaged in the transmission or sale of electricity and not otherwise subject to FERC's jurisdiction may make temporary connections with public utilities subject to FERC's jurisdiction and construct temporary facilities for the transmission of electricity in interstate commerce as may be necessary or appropriate to meet the emergency.

Bill Text

We don't have the full text on file for this bill yet.

Read S 848 on the official United States source →

Action History

  1. Read twice and referred to the Committee on Environment and Public Works.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 546 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (546)

546 members have not signed on to this bill.

Show all 546 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 848 do?
Resolving Environmental and Grid Reliability Conflicts Act of 2015 This bill amends the Federal Power Act with respect to orders by the Federal Energy Regulatory Commission (FERC) to generate, transmit, or sell electricity to prevent an emergency in energy reliability, where the order may result in a conflict with environmental law. FERC must ensure that the order: (1) requires generation, delivery, interchange, or transmission of electricity only during hours necessary to meet the emergency and serve the public interest; and (2) be consistent with applicable environmental law and minimize any adverse environmental impacts to the maximum extent practicable. Compliance with such an order shall not be considered a violation of conflicting federal, state, or local environmental laws. Orders that may result in a conflict with environmental law must expire within 90 days and may be renewed or reissued for subsequent periods as necessary to meet the emergency and serve the public interest. During an emergency, a municipality engaged in the transmission or sale of electricity and not otherwise subject to FERC's jurisdiction may make temporary connections with public utilities subject to FERC's jurisdiction and construct temporary facilities for the transmission of electricity in interstate commerce as may be necessary or appropriate to meet the emergency.
Who sponsors S 848?
S 848 is sponsored by Claire McCaskill (D).
What is the current status of S 848?
This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 848?
Track S 848 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 848

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 848

Last checked for changes about 7 hours ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →