Positive Train Control Enforcement and Implementation Act of 2015
Do you support it?
Want to know if it passes?
We'll email you when HR 3651 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on HR 3651.
You're tracking HR 3651
We'll email you the moment it moves.
HR 3651 — Positive Train Control Enforcement and Implementation Act of 2015
Last action — Referred to the Subcommittee on Railroads, Pipelines, and Hazardous Materials.
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
Died in session
This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Positive Train Control Enforcement and Implementation Act of 2015 This bill extends deadlines and modifies requirements for railroad carriers and providers of intercity or commuter rail passenger transportation to implement positive train control (PTC) systems. (A PTC system is a communications and signaling system designed to prevent train-to-train collisions, over-speed derailments, incursions into established work zone limits, and the movement of a train through a switch left in the wrong position. Railroads which carry passengers or have high-volume freight traffic with certain hazardous materials are required to implement a PTC system.) Within 60 days of enactment of this bill, each Class I railroad carrier (the largest operators by revenue) and provider of intercity or commuter rail passenger transportation must submit to the Department of Transportation (DOT) a plan for implementing PTC by December 31, 2018, instead of the December 31, 2015, deadline required under current law. DOT may extend the deadline if specified requirements are met. The revised plan must include a detailed schedule and sequence for fully implementing PTC in a manner that complies with specified regulations, and railroads must implement PTC in accordance with the plan. DOT may authorize a railroad carrier or other entity to begin the provisional operation of a PTC system without the required certification if it is necessary to enable the safe implementation of PTC in phases.
Bill Text
We don't have the full text on file for this bill yet.
Read HR 3651 on the official United States source →Action History
-
Referred to the Subcommittee on Railroads, Pipelines, and Hazardous Materials.
-
Referred to the House Committee on Transportation and Infrastructure.
-
Introduced in House
Sponsors
- Bill Shuster · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 546 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (546)
546 members have not signed on to this bill.
Show all 546 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does HR 3651 do?
- Positive Train Control Enforcement and Implementation Act of 2015 This bill extends deadlines and modifies requirements for railroad carriers and providers of intercity or commuter rail passenger transportation to implement positive train control (PTC) systems. (A PTC system is a communications and signaling system designed to prevent train-to-train collisions, over-speed derailments, incursions into established work zone limits, and the movement of a train through a switch left in the wrong position. Railroads which carry passengers or have high-volume freight traffic with certain hazardous materials are required to implement a PTC system.) Within 60 days of enactment of this bill, each Class I railroad carrier (the largest operators by revenue) and provider of intercity or commuter rail passenger transportation must submit to the Department of Transportation (DOT) a plan for implementing PTC by December 31, 2018, instead of the December 31, 2015, deadline required under current law. DOT may extend the deadline if specified requirements are met. The revised plan must include a detailed schedule and sequence for fully implementing PTC in a manner that complies with specified regulations, and railroads must implement PTC in accordance with the plan. DOT may authorize a railroad carrier or other entity to begin the provisional operation of a PTC system without the required certification if it is necessary to enable the safe implementation of PTC in phases.
- Who sponsors HR 3651?
- HR 3651 is sponsored by Bill Shuster (R).
- What is the current status of HR 3651?
- This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track HR 3651?
- Track HR 3651 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HR 3651
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HR 3651
Last checked for changes about 16 hours ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →