Grid Reliability Act of 2014
Do you support it?
Want to know if it passes?
We'll email you when S 2620 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on S 2620.
You're tracking S 2620
We'll email you the moment it moves.
S 2620 — Grid Reliability Act of 2014
Last action — Read twice and referred to the Committee on Environment and Public Works.
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
Died in session
This bill died with 113th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Grid Reliability Act of 2014 - Amends the Federal Power Act, with respect to temporary connection and exchange of facilities during an emergency, to direct the Federal Energy Regulatory Commission (FERC), if an order conflicts with any federal, state, or local environmental law or regulation, to ensure that the order: (1) requires generation, delivery, interchange, or transmission of electric energy only during hours necessary to meet the emergency and serve the public interest; (2) is consistent, to the maximum extent practicable, with federal, state, or local environmental law and regulations; and (3) minimizes any adverse environmental impacts. Shields from either civil or criminal liability, including a citizen suit under environmental law or regulation, those actions or omissions taken by a party to comply with an order issued pursuant to this Act, even if the order is subsequently stayed, modified, or set aside by a court. Declares that an order issued under this Act which may conflict with federal, state, or local environmental law or regulation expires within 90 days after its issuance date. Authorizes FERC to renew or reissue an order for subsequent 90-day periods if necessary to meet the emergency and serve the public interest.
Bill Text
We don't have the full text on file for this bill yet.
Read S 2620 on the official United States source →Action History
-
Read twice and referred to the Committee on Environment and Public Works.
Sponsors
- Claire McCaskill · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 546 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (546)
546 members have not signed on to this bill.
Show all 546 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does S 2620 do?
- Grid Reliability Act of 2014 - Amends the Federal Power Act, with respect to temporary connection and exchange of facilities during an emergency, to direct the Federal Energy Regulatory Commission (FERC), if an order conflicts with any federal, state, or local environmental law or regulation, to ensure that the order: (1) requires generation, delivery, interchange, or transmission of electric energy only during hours necessary to meet the emergency and serve the public interest; (2) is consistent, to the maximum extent practicable, with federal, state, or local environmental law and regulations; and (3) minimizes any adverse environmental impacts. Shields from either civil or criminal liability, including a citizen suit under environmental law or regulation, those actions or omissions taken by a party to comply with an order issued pursuant to this Act, even if the order is subsequently stayed, modified, or set aside by a court. Declares that an order issued under this Act which may conflict with federal, state, or local environmental law or regulation expires within 90 days after its issuance date. Authorizes FERC to renew or reissue an order for subsequent 90-day periods if necessary to meet the emergency and serve the public interest.
- Who sponsors S 2620?
- S 2620 is sponsored by Claire McCaskill (D).
- What is the current status of S 2620?
- This bill died with 113th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track S 2620?
- Track S 2620 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 2620
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S 2620
Last checked for changes about 11 hours ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →