Dry-Redwater Regional Water Authority System Act of 2014
Do you support it?
Want to know if it passes?
We'll email you when S 1997 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on S 1997.
You're tracking S 1997
We'll email you the moment it moves.
S 1997 — Dry-Redwater Regional Water Authority System Act of 2014
Last action — Read twice and referred to the Committee on Energy and Natural Resources.
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
Died in session
This bill died with 113th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Dry-Redwater Regional Water Authority System Act of 2014 - Authorizes the Secretary of the Interior to carry out the project entitled the "Dry-Redwater Regional Water Authority System" in accordance with the plans described in the "Dry-Redwater Regional Water System Feasibility Study" if the Secretary determines that the project is feasible. Directs the Secretary to enter into a cooperative agreement to provide federal assistance for the planning, design, and construction of the System for specified counties in Montana and North Dakota. Limits the federal share of planning, design, and construction of the System to 75% of the total cost, or such other lesser amount as may be determined by the Commissioner of Reclamation in a feasibility report. Delineates the components of System facilities for which federal funds may be expended. Prohibits federal funds from being used for the System's operation, maintenance, or replacement. Directs the Administrator of the Western Area Power Administration to make available to the System a quantity of power required, up to one and a half megawatt capacity, to meet the System's pumping and incidental operation requirements between May 1 and October 31 of each year from the water intake facilities and through all pumping stations, water treatment facilities, reservoirs, storage tanks, and pipelines up to the point of delivery of water by the water supply system to all storage reservoirs and tanks and each entity that distributes water at retail to individual users. Makes the System eligible to receive such power only if it operates on a nonprofit basis and is constructed pursuant to the cooperative agreement. Sets forth provisions regarding the purchase of additional power, the Authority's responsibility for power charges and non-federal delivery costs, and the System's responsibility for non-federal transmission and distribution system delivery and service arrangements and for funding any transmission upgrades required to the integrated system necessary to deliver power to the System.
Bill Text
We don't have the full text on file for this bill yet.
Read S 1997 on the official United States source →Action History
-
Read twice and referred to the Committee on Energy and Natural Resources.
Sponsors
- Max Baucus · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 546 not signed on
Sponsors (1)
- Max Baucus Democrat
Co-sponsors (0)
None.
Not signed on (546)
546 members have not signed on to this bill.
Show all 546 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does S 1997 do?
- Dry-Redwater Regional Water Authority System Act of 2014 - Authorizes the Secretary of the Interior to carry out the project entitled the "Dry-Redwater Regional Water Authority System" in accordance with the plans described in the "Dry-Redwater Regional Water System Feasibility Study" if the Secretary determines that the project is feasible. Directs the Secretary to enter into a cooperative agreement to provide federal assistance for the planning, design, and construction of the System for specified counties in Montana and North Dakota. Limits the federal share of planning, design, and construction of the System to 75% of the total cost, or such other lesser amount as may be determined by the Commissioner of Reclamation in a feasibility report. Delineates the components of System facilities for which federal funds may be expended. Prohibits federal funds from being used for the System's operation, maintenance, or replacement. Directs the Administrator of the Western Area Power Administration to make available to the System a quantity of power required, up to one and a half megawatt capacity, to meet the System's pumping and incidental operation requirements between May 1 and October 31 of each year from the water intake facilities and through all pumping stations, water treatment facilities, reservoirs, storage tanks, and pipelines up to the point of delivery of water by the water supply system to all storage reservoirs and tanks and each entity that distributes water at retail to individual users. Makes the System eligible to receive such power only if it operates on a nonprofit basis and is constructed pursuant to the cooperative agreement. Sets forth provisions regarding the purchase of additional power, the Authority's responsibility for power charges and non-federal delivery costs, and the System's responsibility for non-federal transmission and distribution system delivery and service arrangements and for funding any transmission upgrades required to the integrated system necessary to deliver power to the System.
- Who sponsors S 1997?
- S 1997 is sponsored by Max Baucus (Democrat).
- What is the current status of S 1997?
- This bill died with 113th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track S 1997?
- Track S 1997 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 1997
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S 1997
Last checked for changes about 8 hours ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →