Exploring for Geothermal Energy on Federal Lands Act
Do you support it?
Want to know if it passes?
We'll email you when S 1470 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on S 1470.
You're tracking S 1470
We'll email you the moment it moves.
S 1470 — Exploring for Geothermal Energy on Federal Lands Act
Last action — Read twice and referred to the Committee on Energy and Natural Resources.
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
Died in session
This bill died with 112th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Exploring for Geothermal Energy on Federal Lands Act - Exempts projects determined by the Secretary of the Interior to be geothermal exploration test projects from environmental impact statement requirements under the National Environmental Policy Act of 1969 (NEPA). Defines a "geothermal exploration test project" as the drilling of a well to test or explore for geothermal resources on lands leased by the Department of the Interior for the development and production of geothermal resources, that is completed in less than 45 days, that causes less than one acre of soil or vegetation disruption at the location of each well and no more than five acres of soil or vegetation disruption during access or egress to the test site, and that is developed: (1) no deeper than 2,500 feet, (2) less than eight inches in diameter, (3) in a manner that does not require off-road motorized access other than to and from the well site along an identified off-road route, (4) without construction of new roads other than upgrading of existing drainage crossings for safety purposes, and (5) with the use of rubber-tired digging or drilling equipment vehicles. Requires: (1) a leaseholder intending to carry out a geothermal exploration test project to provide notice to the Secretary within 30 days prior to the start of drilling, (2) the Secretary to review a project within 10 days of receipt of such notice and to notify such leaseholder either that such NEPA requirements do not apply or that project deficiencies preclude the NEPA exemption, and (3) the Secretary to allow such leaseholder an opportunity to remedy any such deficiencies prior to the date such leaseholder intended to start drilling.
Bill Text
We don't have the full text on file for this bill yet.
Read S 1470 on the official United States source →Action History
-
Read twice and referred to the Committee on Energy and Natural Resources.
Sponsors
- Mike Crapo · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 546 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (546)
546 members have not signed on to this bill.
Show all 546 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does S 1470 do?
- Exploring for Geothermal Energy on Federal Lands Act - Exempts projects determined by the Secretary of the Interior to be geothermal exploration test projects from environmental impact statement requirements under the National Environmental Policy Act of 1969 (NEPA). Defines a "geothermal exploration test project" as the drilling of a well to test or explore for geothermal resources on lands leased by the Department of the Interior for the development and production of geothermal resources, that is completed in less than 45 days, that causes less than one acre of soil or vegetation disruption at the location of each well and no more than five acres of soil or vegetation disruption during access or egress to the test site, and that is developed: (1) no deeper than 2,500 feet, (2) less than eight inches in diameter, (3) in a manner that does not require off-road motorized access other than to and from the well site along an identified off-road route, (4) without construction of new roads other than upgrading of existing drainage crossings for safety purposes, and (5) with the use of rubber-tired digging or drilling equipment vehicles. Requires: (1) a leaseholder intending to carry out a geothermal exploration test project to provide notice to the Secretary within 30 days prior to the start of drilling, (2) the Secretary to review a project within 10 days of receipt of such notice and to notify such leaseholder either that such NEPA requirements do not apply or that project deficiencies preclude the NEPA exemption, and (3) the Secretary to allow such leaseholder an opportunity to remedy any such deficiencies prior to the date such leaseholder intended to start drilling.
- Who sponsors S 1470?
- S 1470 is sponsored by Mike Crapo (R).
- What is the current status of S 1470?
- This bill died with 112th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track S 1470?
- Track S 1470 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 1470
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S 1470
Last checked for changes about 13 hours ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →