United States 112th Congress Status: Died 1 R cosponsors

HR 4273 — Resolving Environmental and Grid Reliability Conflicts Act of 2012

Last action — Received in the Senate and Read twice and referred to the Committee on Environment and Public Works.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 112th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Resolving Environmental and Grid Reliability Conflicts Act of 2012 - Amends the Federal Power Act to require the Federal Energy Regulatory Commission (FERC) to ensure that any emergency order issued under such Act for the interconnection of facilities for the generation, transmission, and sale of electric energy, that may result in a conflict with a requirement of any environmental law, shall: (1) require generation, delivery, interchange, or transmission of electric energy only during hours necessary to meet the emergency and serve the public interest; and (2) to the maximum extent practical, be consistent with any other applicable environmental law and minimize any adverse environmental impacts. Provides that any omission or action taken by a party to comply with such an order that results in noncompliance with any environmental law shall not: (1) be considered a violation of such law; or (2) subject such party to any requirement of, or any civil or criminal liability under, such law. Requires such an order that may result in a conflict with environmental law to expire within 90 days after it is issued. Authorizes FERC to renew or reissue such order for subsequent periods, not to exceed 90 days each, as necessary to meet the emergency and serve the public interest. Requires FERC, in renewing or reissuing such order, to: (1) consult with the primary federal agency with expertise in the environmental interest protected by such law and include in any such order conditions determined to be necessary to minimize any adverse environmental impacts, and (2) make such conditions available to the public. Authorizes FERC to exclude such a condition from the order if such condition would prevent the order from adequately addressing the emergency. Authorizes, during an emergency, a municipality engaged in the transmission or sale of electric energy and not otherwise subject to FERC's jurisdiction to make temporary connections with public utilities subject to FERC's jurisdiction and construct temporary facilities for the transmission of electric energy in interstate commerce as may be necessary or appropriate to meet such emergency.

Bill Text

We don't have the full text on file for this bill yet.

Read HR 4273 on the official United States source →

Action History

  1. Received in the Senate and Read twice and referred to the Committee on Environment and Public Works.

  2. Motion to reconsider laid on the table Agreed to without objection.

  3. On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote. (text: CR H5602-5603)

  4. DEBATE - The House proceeded with forty minutes of debate on H.R. 4273.

  5. Considered under suspension of the rules. (consideration: CR H5602-5604)

  6. Mr. Olson moved to suspend the rules and pass the bill, as amended.

  7. Placed on the Union Calendar, Calendar No. 425.

  8. Reported (Amended) by the Committee on Energy and Commerce. H. Rept. 112-586.

  9. Ordered to be Reported (Amended).

  10. Committee Consideration and Mark-up Session Held.

  11. Subcommittee Hearings Held.

  12. Referred to the Subcommittee on Energy and Power.

  13. Referred to the House Committee on Energy and Commerce.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 546 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (546)

546 members have not signed on to this bill.

Show all 546 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HR 4273 do?
Resolving Environmental and Grid Reliability Conflicts Act of 2012 - Amends the Federal Power Act to require the Federal Energy Regulatory Commission (FERC) to ensure that any emergency order issued under such Act for the interconnection of facilities for the generation, transmission, and sale of electric energy, that may result in a conflict with a requirement of any environmental law, shall: (1) require generation, delivery, interchange, or transmission of electric energy only during hours necessary to meet the emergency and serve the public interest; and (2) to the maximum extent practical, be consistent with any other applicable environmental law and minimize any adverse environmental impacts. Provides that any omission or action taken by a party to comply with such an order that results in noncompliance with any environmental law shall not: (1) be considered a violation of such law; or (2) subject such party to any requirement of, or any civil or criminal liability under, such law. Requires such an order that may result in a conflict with environmental law to expire within 90 days after it is issued. Authorizes FERC to renew or reissue such order for subsequent periods, not to exceed 90 days each, as necessary to meet the emergency and serve the public interest. Requires FERC, in renewing or reissuing such order, to: (1) consult with the primary federal agency with expertise in the environmental interest protected by such law and include in any such order conditions determined to be necessary to minimize any adverse environmental impacts, and (2) make such conditions available to the public. Authorizes FERC to exclude such a condition from the order if such condition would prevent the order from adequately addressing the emergency. Authorizes, during an emergency, a municipality engaged in the transmission or sale of electric energy and not otherwise subject to FERC's jurisdiction to make temporary connections with public utilities subject to FERC's jurisdiction and construct temporary facilities for the transmission of electric energy in interstate commerce as may be necessary or appropriate to meet such emergency.
Who sponsors HR 4273?
HR 4273 is sponsored by Pete Olson (R).
What is the current status of HR 4273?
This bill died with 112th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track HR 4273?
Track HR 4273 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HR 4273

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HR 4273

Last checked for changes about 10 hours ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →